Cooperation between the Nordic and the Baltic power systems in Electricity Balancing

Similar documents
Balancing pilot projects update. April 2016

CWE MC Go-Live Forum. Düsseldorf June 8th

CWE Flow-based Market Coupling Project

Current and future challenges of TSOs in the European Market design. Dr. Oliver John 27 September 2016

CWE Flow-based Market Coupling Project. at EMART Energy 2012

Implementation of day-ahead (DA) market coupling in the North-Western Europe (NWE) region summary memo

Nordic TSO Perspective on the future of the Nordic Electricity Market

Methodology for capacity calculation for ID timeframe

Publishing date: 04/02/2014 Document title: We appreciate your feedback. Share this document

Joint European Standing Group Meeting 31

CWE Flow-Based Market Coupling: on the Eve of Implementation. Pieter Schavemaker and Philippe Noury

Publishing date: 29/05/2015. We appreciate your feedback. Share this document

Explanatory document for the Nordic synchronous area proposal for coordination actions aiming to reduce FRCE as defined in Article 152(14) and

BritNed: Enabling Market Integration

Casc Publication Handbook

POSITION PAPER BY ALL CWE NRAs on THE CWE TSOs PROPOSAL for A FB IDCC METHODOLOGY

Context paper CWE Intraday

CWE Enhanced FB. Report presentation. March 22 nd, 2011

Nordic FB Stakeholder Forum

Joint European Stakeholder Group. Monday 12 February 2018 Meeting 29 WebEx

Joint European Standing Group Meeting 32

Joint European Stakeholder Group. Tuesday 21 November 2017 Meeting 25 London

Position Paper of CWE NRAs on Flow- Based Market Coupling

NWE Day-Ahead Market Coupling Project. 2 nd Progress Report

Term of Contract 15-year term, from 1 October 2018 to 31 December 2033

1st Workshop Federal Grid Code

CWE FB MC project. PLEF SG1, March 30 th 2012, Brussels

Regulatory Cooperation in Europe. Natalie McCoy, CEER Secretary General INOGATE Conference - Brussels, 1 February 2013

ACER s functions and responsibilities in the European Union

CWE FB MC project. PENTA SG1, April 8 th 2013, Brussels

ENRD LEADER Cooperation Practitioner-Led Working Group Proposals and summary < April 2017 >

Developing an Incremental Proposal for EU gas transmission. Draft Project Plan

International Credit Mobility Call for Proposals 2018

Brief status on CENELEC standard related to Connection Network Code

Status WG European Market Design. Users Group 20 March 2014

An action plan to boost research and innovation

Leading coordination For enhanced reliability of supply.

Flow-Based Market Coupling First lessons

Modification Proposal BSCP40/03

Resource Pack for Erasmus Preparatory Visits

Digital Public Services. Digital Economy and Society Index Report 2018 Digital Public Services

R&D in Estonia. Haridus- ja Teadusministeerium. Mõningaid andmeid T&A kohta (2004) brief overview 2006

The Helsinki Manifesto We have to move fast, before it is too late.

Mobility project for VET learners and staff

Introduction & background. 1 - About you. Case Id: b2c1b7a1-2df be39-c2d51c11d387. Consultation document

Erasmus+ Programme Jean Monnet Activities. Snejina Nikolova Education, Audiovisual and Culture Executive Agency (EACEA)

COMMISSION IMPLEMENTING DECISION. of

Energy and Environment Partnership with the Mekong Region. EEP Mekong Programme

Darstellung der TEN-E Verordnung und der Connecting Europe Facility

Info Session Webinar Joint Qualifications in Vocational Education and Training Call for proposals EACEA 27/ /10/2017

Nordplus PROGRAMME DOCUMENT

Skillsnet workshop. "Job vacancy Statistics"

Mental health services in Estonia. Peeter Jaanson 14 th April 2011 Tartu

INTERNATIONALISATION PAYS OFF!

COST. European Cooperation in Science and Technology. Introduction to the COST Framework Programme

A European workforce for call centre services. Construction industry recruits abroad

Deliverable 3.3b: Evaluation of the call procedure

Information Erasmus Erasmus+ Grant for Study and/or Internship Abroad

ECONOMIC DEVELOPMENT PROGRAMS

Creative Europe Culture sub-programme & Co-operation Projects

CATALOGUE OF TRAINING COURSES PROPOSED BY EFCA 2017 version CATALOGUE OF TRAINING COURSES PROPOSED BY EFCA (2017)

WORTH PARTNERSHIP PROJECT

TARIFF & CUT-OFF TIMES - IRELAND

CFD IMPLEMENTATION PLAN: ROUND 2. CFD Implementation Plan

Energy Efficiency in EU buildings

CFD IMPLEMENTATION PLAN: ROUND 2

Advisory Workshop on AHRB Centre Anchor Project on Implementing the E-Commerce Directive Ways Forward Edinburgh, December 17 th am 3pm

Innovation and research priorities of the EEA and Norway Grants

CATALOGUE OF TRAINING COURSES PROPOSED BY EFCA 21/01/2016 version CATALOGUE OF TRAINING COURSES PROPOSED BY EFCA (2016)

The implementation of the Clinical Trial Regulation (CTR, n 536/2014) in Belgium. and impact on the ethical review process

Integrating mental health into primary health care across Europe

EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL AND URBAN POLICY

EU Stress Tests and National Action Plans

ENVIRONMENT CANADA S ECONOMIC AND ENVIRONMENTAL POLICY RESEARCH NETWORK CALL FOR PROPOSALS

Capacity Building in the field of youth

Documentation of the CWE FB MC solution as basis for the formal approval-request (Brussels, 9 th May 2014)

Health Statistics in Estonia. Health Statistics Department

ADVISORY TECHNICAL COMMITTEE (ATC) RULES OF OPERATION SOUTH EAST EUROPEAN REGIONAL CIGRE

Next Century Power: Energy Efficiency for LA

YOUR FIRST EURES JOB. Progress Monitoring Report. Targeted Mobility Scheme. EU budget: January June 2016 Overview since 2015

Towards a Common Strategic Framework for EU Research and Innovation Funding

THE MIDDLE EAST GROUP SIMPLIFYING MATTERS

Energy and Environment Partnership with the Mekong Region. EEP Mekong Programme. Call-for-Proposal (CfP) MEETING Vientiane Lao PDR 22 June 2016

1 ST CALL FOR PROPOSALS THE POLAND-RUSSIA CBC PROGRAMME GENERAL INFORMATION

Licensing of a Nuclear Installation. November 11th 2010 Licensing of a Nuclear Installation 1

DSO Non GPA Process. November 2010 Version 8

About London Economics. Authors

July Assessment Report on PES capacity

Horizon 2020 Spreading Excellence and Widening Participation

IAEA MISSION TO REVIEW NISA S APPROACH TO THE COMPREHENSIVE ASSESSMENTS FOR THE SAFETY OF EXISTING POWER REACTOR FACILITIES

Illinois Power Agency Long-Term Renewable Resources Procurement Plan. What s Next?

GENDER-NET Plus Joint Call for Proposals 2018

Guidelines on developing TYNDPs Stakeholders Workshop

Excess volume and moderate quality of inpatient care following DRG implementation in Germany

Estonian Entrepreneurship Growth Strategy 2020

Bernd Wächter, ACA English-Taught Programmes in Europe. Results from an ACA study.

Industrial policy, Smart Specialisation, COSME

Spreading Excellence and Widening Participation in Horizon 2020 TWINNING

WENDWG Issues to NHC58

Answers to questions following the call for tender for a Fund Operator for the EEA and Norway Grants Global Fund for Regional Cooperation

Transcription:

Cooperation between the Nordic and the Baltic power systems in Electricity Balancing Integration of Renewable Energy and Future Electricity Market Design Ingrid Arus Head of Electricity Markets Departement Elering AS

Basis for the study: BEMIP Common balancing market is foreseen by BEMIP: Step 3. Activities Target timescale 2011 2013. Baltic common day ahead market (based on Nord Pool Spot trading platform) Stepwise introduction of Intra-day market Market based congestion management, implicit auction between Baltic countries managed by NPS Estonia, Latvia, Lithuania and Finland have a common position and trading principles towards non EEA third countries Transparency according to the ERGEG's North European Electricity Regional Initiative Common reserves and balancing power market Harmonized imbalance settlement and imbalance pricing Common market monitoring and surveillance rules Development of financial markets (OTC) Status Completed Completed Completed No Completed TSO-TSO Partialy Completed Partialy

Basis for the study: Entso-E Balancing Pilot Project In response to the call for cross border pilot projects on integration of electricity balancing issued by ENTSO-E, the Nordic TSOs nominated a Pilot Project for Balancing Electricity. To examine possibilities of the cooperation between Nordic TSOs and TSOs from neighbouring countries four feasibility studies are planned within the Nordic Pilot Project. The Nordic-German feasibility study The Nordic-Polish feasibility study The Nordic-Baltic feasibility study The Nordic-Netherlands feasibility study

Study Content and Goals Identify opportunities (and obstacles) for the balancing energy exchange in current market set-ups. The necessary actions to implement the Baltic CoBA: Principles for common Baltic imbalance netting and coordinated Baltic balancing. Necessary steps to facilitate balancing energy exchange between the Baltic and Nordic markets (considering goal for Baltic and Nordic balancing markets integration).

Study results: Baltic and Nordic balancing market cooperation development Suggested Baltic Nordic balancing market cooperation and developments process may be split into four steps: Step 1 Step 2 Step 3 Step 4 Development of current TSO-TSO assistance, testing new functions and extending TSO- TSO assistance Creation of common Baltic Balancing Area (incl. harmonisation of the balance management system principles and creation of common balancing market) Establishment of deeper cooperation between Baltic and Nordic balancing markets aiming at CMO Creation of common Baltic Nordic balancing market

Pilot 5: Illustration of timeline Illustration deadlines have not been disucssed and are only for illustrationay use Feasibility, Implementation Testing Operation Decision gate (Nordics) Indicative schedule 2015 2016 2017 2018 NC EB Expected decision and enter into force Comitology Transition period, products + imbalance netting Proposal after 3 years, TSO-TSO after fire years and European integration model implemented after 6 years after NC EB enter into force Baltic CMO Development of Baltic mfrr market (incl. Baltic imbalance netting) Operation Baltics Combined CMO TSO- TSO Nordic Baltic TSO(s) Extended Nordic Baltic cooperation incl. Nord Balt HVDC, Testing Nordic Baltic combined CMO Imbalance netting Imb. net 6 March 2015 Page 6

Step 1. Development and extension of current TSO-TSO assistance The current TSO-TSO assistance between Fingrid and Elering should be further developed and new possibilities for cooperation should be tested. Tested and proven well-functioning principles should be implemented. After commissioning of NordBalt DC connection, the cooperation could be extended to take place between Svenska Kraftnät and Litgrid with harmonized principles, if agreed between relevant parties. This kind of assistance could also be extended to include a Baltic TSO - Nordic mfrr market CMOL cooperation model where it would be possible to activate more mfrr bids than just the bids available in the connecting countries.

Step 2. Creation of common Baltic CoBA Current balancing market set-up differences and lack of harmonisation between the Baltic mfrr-markets and Nordics hinder an efficient co-operation for mfrr exchange. Study WG proposes to proceed with Baltic balancing market development to create common Baltic balancing market for the efficient balancing energy exchange within Baltic power systems and with Nordic power systems. Proposals for improvement of the current situation: The Baltic TSOs should take more clear role in balancing power systems in Baltics; Common Baltic balancing energy (mfrr) market shall be created; Activation procedures, pricing and settlement of exchanged balancing energy shall be harmonised across the Baltics; mfrr product definition shall be harmonised.

Step 2. Baltic power system imbalance netting Until 31.12.2014 Since 01.2015 Elering AST Litgrid Elering Latvenergo Inter RAO Lietuva Inter RAO AST Litgrid Four party agreement with Russian counterparty for total not netted imbalance The previous practice and the new goal of imbalance settlement and pricing in the Baltic is describerd in detail in the Nordic-Baltic feasibility study on electricity balancing.

Baltic TSOs Open Balance Agreement The agreement on the Sale and Purchase of Imbalance Energy in the Baltic Electricity System has been signed by AB INTER RAO Lietuva, Elering AS, AS Augstsprieguma tīkls and LITGRID AB and is effective as of January 1 st, 2015. Under the agreement: - The Baltic electricity systems constitute as a Baltic Coordinated Balance Area ( Baltic CoBa ). - Elering acts as the Settlement Coordinator and shall perform the Baltic CoBa settlement reports and shall be responsible for data exchange and invoicing between the Baltic CoBA and the Open Balance Provider. - Each TSO is responsible for the data of their own Balance Area.

Statistics For Baltic there has been 63% hours with imbalance netting values in January 2015 For EE: the methodology for calculating the imbalance electricity prices for the Estonian power system remains unchanged. But as the reference price is based on new principles, the picture with effect is below:

Target model for Baltic CoBA Day Ahead Market Intraday Market Balancing Market Settlement of balance area's ACE Settlement of balancing deliveries Imbalance settlement Deadline D-1 H-1 Intra-hour D+1 D+1 M+15 Chain The goal The pricing principles* NPS and BRP > TSO Physical trading Marginal pricing NPS and BRP > TSO Extra-trading with purpose to avoid imbalance energy Pre-conditions OK OK TSO-TSO-BSP TSO-TSO TSO-TSO-BSP TSO-BRP System balancing: CoBa shall be based on total Baltic's ACE. The pricing methods shall be based on marginal pricing. Imbalance netting inside the Baltic's CoBA. Not-netted imbalance energy traded with open balance provider. The price of netted imbalance is based on average Elspot prices of Baltic's bidding area. The price of not-netted imbalance is based on Open Supply price. Common ACE agreement; New IT solutions or common platform and bid activation algorithms should be developed. Each TSO shall settle the activated volume of balancing energy with the BSP in its balance area and between other areas Marginal pricing Each TSO shall calculate the Imbalance for each BRP Input shall be based on balancing market prices. Incentives to reduce imbalance. Harmonization of imbalance pricing model should be analysed separately

Baltic standard mfrr product Baltic mfrr standard product: All technical requirements among Baltic TSOs can/should be harmonized with Nordic mfrr standard product Key characteristics of common Baltic mfrr product: Standard Products Full Activation Time Minimum and maximum quantity Deactivation Period Pricing Method Divisibility Minimum and maximum duration of Delivery Period Mode of Activation Gate closure of the offers Firmness of the offers The proposal of mfrr standard products to be exchanged 15 min MIN = 5 MW MAX = no restrictions < 15 min Marginal price Offers are divisible MIN = 1 min; MAX = 60 min (but not more than until the end of operational hour). Manual H-45min All received offers are firm (fixed). Market participant has responsibility to inform TSO if there are unplanned technical restrictions to execute the offer after the Gate closure but not later than exact order.

Step 3. Establishment of deeper cooperation between Baltic and Nordic balancing markets Expansion of Baltic and Nordic balancing market cooperation could go in parallel depending on the following developments of Baltic and Nordic balancing markets: Exchange of the Baltic and Nordic balancing merit order lists between TSOs for information and testing purposes; Harmonization of mfrr product exchanged between FI-EE and LT-SE; Creation of the model for cooperation between common Baltic and Nordic balancing markets aiming at common merit order (CMO); Decision on cooperation of Baltic - Nordic separate CMO and mfrr product activation and settlement procedures; Implementation of the model for cooperation between common Baltic and Nordic balancing markets aiming at CMO and needed IT solutions.

Step 4. Creation of common Baltic Nordic balancing market Proven the successful cooperation between the Baltic CoBA and Nordic CoBA the integration of mfrr markets with similar market setups can be considered as final target Parallel to the creation of common Baltic - Nordic balancing market also other harmonization processes (such as German, Netherlands, UK and Polish markets) might happen, as the ultimate goal is to have common European-wide balancing market.

Thank you!