DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2017 REQUEST FOR ADDITIONAL APPROPRIATIONS

Similar documents
DEPARTMENT OF THE NAVY

AIR FORCE RESERVE COMMAND

AIR NATIONAL GUARD REQUEST FOR ADDITIONAL FY 2017 APPROPRIATIONS MILITARY CONSTRUCTION APPROPRIATION 3830 PROGRAM YEAR 2017

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2002 AMENDED BUDGET SUBMISSION

DEPARTMENT OF THE NAVY

Washington Headquarters Services Military Construction, Defense-Wide FY 2010 Budget Estimates ($ in thousands)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Department of Defense Corrosion Policy and Oversight FY 2013 OCO

Fiscal Year (FY) 2011 Budget Estimates AIR FORCE RESERVE FY 2011 MILITARY CONSTRUCTION PROGRAM

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2019 BUDGET ESTIMATES

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Report to Congress on Distribution of Department of Defense Depot Maintenance Workloads for Fiscal Years 2015 through 2017

DOD Leases of Foreign-Built Ships: Background for Congress

Fiscal Year (FY) 2015 Budget Estimates AIR FORCE RESERVE FY 2015 MILITARY CONSTRUCTION PROGRAM

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2007 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4

Hampton Roads Region Joint Land Use Study Norfolk / Virginia Beach

NAVFAC Hawaii Construction Outlook

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: RDT&E Ship & Aircraft Support

Military Construction Program

DoD Education Activity Military Construction, Defense-Wide FY 2007 Budget Estimates ($ in thousands)

UNCLASSIFIED R-1 ITEM NOMENCLATURE

FY19 President s Budget Request

DEPARTMENT OF THE NAVY FISCAL YEAR 2010 BUDGET ESTIMATES (BRAC 2005)

AIR NATIONAL GUARD. Fiscal Year (FY) 2011 BUDGET ESTIMATES MILITARY CONSTRUCTION APPROPRIATION 3830 PROGRAM YEAR 2011

AIR NATIONAL GUARD Fiscal Year (FY) 2014 BUDGET ESTIMATES

Navy ManTech Program. ManTech Update. Tom Hite CTC 15 October 2014

Report Documentation Page

Tricare Management Activity Military Construction, Defense-Wide FY 2006 Budget Estimates ($ in Thousands)

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

MEMORANDUM. July 7, 2016

CLIENT ALERT. FY 2013 National Defense Authorization Act (P.L ): Impacts on Small Business Government Contracting.

Fiscal Year 2009 National Defense Authorization Act, Section 322. Study of Future DoD Depot Capabilities

DEPARTMENT OF THE ARMY OFFICE OF THE ASSISTANT SECRETARY CIVIL WORKS 108 ARMY PENTAGON WASHINGTON DC

STATEMENT OF REAR ADMIRAL MARK A. HUGEL, U.S. NAVY DEPUTY DIRECTOR, FLEET READINESS DIVISION BEFORE THE

SENATE APPROPRIATIONS COMMITTEE FY16 HOMELAND SECURITY APPROPRIATIONS U.S. COAST GUARD As of June 22, 2015

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: SOF Underwater Systems

Fiscal Year (FY) 2014 Budget Estimates AIR FORCE RESERVE FY 2014 MILITARY CONSTRUCTION PROGRAM

San Francisco County Transportation Authority Proposition K Sales Tax Program Allocation Request Form

Department of the Air Force. Military Family Housing. Fiscal Year (FY) 2013 Budget Estimate

Great Decisions Paying for U.S. global engagement and the military. Aaron Karp, 13 January 2018

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2018 BUDGET ESTIMATES

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Consolidated Afloat Network Ent Services(CANES) FY 2012 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Department of the Navy

GAO DEFENSE INFRASTRUCTURE. DOD Needs to Determine and Use the Most Economical Building Materials and Methods When Acquiring New Permanent Facilities

NEW YORK CITY ECONOMIC DEVELOPMENT CORPORATION

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2018 BUDGET ESTIMATES

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #58

United States Government Accountability Office GAO. Report to Congressional Committees

AIR NATIONAL GUARD Fiscal Year (FY) 2017 BUDGET ESTIMATES MILITARY CONSTRUCTION APPROPRIATION 3830 PROGRAM YEAR 2017

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Air Control

GAO DEFENSE INFRASTRUCTURE

Fiscal Year (FY) 2017 Budget Estimates AIR FORCE RESERVE FY 2017 MILITARY CONSTRUCTION PROGRAM

AIR FORCE RESERVE COMMAND

Fiscal Year (FY) 2006/FY 2007 Budget Estimates AIR FORCE RESERVE FY 2006 MILITARY CONSTRUCTION PROGRAM. February 2005

DEPARTMENT OF THE NAVY COMMANDER, NAVY INSTALLATIONS COMMAND 716 SICARD STREET, SE, SUITE 1000 WASHINGTON NAVY YARD, DC

AIR FORCE RESERVE COMMAND

States Pacific Command (USPACOM). Its secondary mission is to transfer the ammunition at sea using the Modular Cargo Delivery System (MCDS).

UNCLASSIFIED. UNCLASSIFIED Navy Page 5 of 10 P-1 Line #11

AIR FORCE CONTRACT CONSTRUCTION

Acquisition. Air Force Procurement of 60K Tunner Cargo Loader Contractor Logistics Support (D ) March 3, 2006

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 12 P-1 Line #51

H. R. ll [Report No. 115 ll]

OPNAVINST DNS-3/NAVAIR 24 Apr Subj: MISSIONS, FUNCTIONS, AND TASKS OF THE COMMANDER, NAVAL AIR SYSTEMS COMMAND

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED UNCLASSIFIED

STATEMENT OF ADMIRAL WILLIAM F. MORAN U.S. NAVY VICE CHIEF OF NAVAL OPERATIONS BEFORE THE HOUSE ARMED SERVICES COMMITTEE STATE OF THE MILITARY

Naval Sea Systems Command Did Not Properly Apply Guidance Regarding Contracting Officer s Representatives

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 P-1 Line #18

NAVSEA STANDARD ITEMS FY-19 CH-2 (26 MAR 2018)

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY/BA-7

FOR IMMEDIATE RELEASE No June 27, 2001 THE ARMY BUDGET FISCAL YEAR 2002

FAMILY HOUSING, DEFENSE-WIDE FY 2007 BUDGET ESTIMATE. Table of Contents PROGRAM SUMMARY...FH-2 APPROPRIATION LANGUAGE...FH-3 NEW CONSTRUCTION..

Fiscal Year 2018 Military Construction Appropriations Act

NAVAIR Commander s Awards recognize teams for excellence

Military Construction Program

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2017 BUDGET ESTIMATES JUSTIFICATION OF ESTIMATES FEBRUARY 2016 RESERVE PERSONNEL, MARINE CORPS

Department of the Air Force. Military Family Housing. Fiscal Year (FY) 2017 Budget Estimate

DEPARTMENT OF THE NAVY

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 P-1 Line #1

Report No. D-2011-RAM-004 November 29, American Recovery and Reinvestment Act Projects--Georgia Army National Guard

GAO MILITARY PERSONNEL

AIR NATIONAL GUARD Fiscal Year (FY) 2013 BUDGET ESTIMATES MILITARY CONSTRUCTION APPROPRIATION 3830 PROGRAM YEAR 2013

Smithsonian Institution

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Recommended Physical Plant Improvements to Existing Nursing Homes for Disaster Preparedness. Report to the Governor and to the Legislature

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 8 R-1 Line #77

The reserve components of the armed forces are:

Advance Questions for Buddie J. Penn Nominee for Assistant Secretary of the Navy for Installations and Environment

Office of the Inspector General Department of Defense

DRAFT. January 7, The Honorable Donald H. Rumsfeld Secretary of Defense

Employing the USS HORNET MUSEUM. as an Emergency Response Center. during a major Bay Area disaster

Corps, Navy each plan to spend $1B on projects here in By BENJAMIN MINNICK Journal Construction Editor

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2000

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Unmanned Combat Air Veh(UCAV) Adv Cp/Proto Dev. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Depot Maintenance (NON-IF) FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Transcription:

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2017 REQUEST FOR ADDITIONAL APPROPRIATIONS JUSTIFICATION OF ESTIMATES MARCH 2017 Military Construction

The estimated cost for this report for the Department of the Navy (DON) is $36,719. The estimated total cost for supporting the DON budget justification material is approximately $1,834,000. This includes $75,200 in supplies and $1,758,800 in labor.

Department of Defense Military Construction and Family Housing Base Budget Appropriation FY 2017 PB Request FY 2017 Enacted FY 2017 March Additional Request FY 2017 Revised Total Base Military Construction, Navy Major Construction 909,743 1,220,059 16,708 1,236,767 Prior Year Projects Cost to Complete: FY 2016 Unaccompanied Housing, Patuxent River, MD (2,043) FY 2016 Electrical Repairs to Piers 2,6,7 and 11, Norfolk, VA (12,166) FY 2016 Waterfront Utilities, Portsmouth, VA (2,499) Minor Construction 29,790 29,790 29,790 Planning and Design 88,230 88,230 138,230 Total Military Construction, Navy 1,027,763 1,338,079 66,708 1,404,787

Blank page

FY 2017 Proposal Military Construction, Veterans Affairs and Related Agencies Appropriations Act, 2017 (Division A, Public Law 114-223) DEPARTMENT OF DEFENSE-MILITARY PROGRAMS MILITARY CONSTRUCTION Military Construction, Navy and Marine Corps For an additional amount for Military Construction, Navy and Marine Corps, $66,708,000, to remain available until September 30, 2021: Provided, That such funds may be obligated and expended to carry out planning and design and military construction projects authorized by law. This request will fund the planning, design, and construction of facilities and infrastructure at Department of Navy installations. Funds will be used for enacted projects requiring additional funds to complete construction and will provide critical planning and design for future and emergent projects. The three previously enacted projects requiring additional funds will provide improved operations at Naval shipyards and safe housing for Navy personnel. Inability to complete these projects will further contribute to declines in readiness and warfighter support. Lack of additional planning and design funds will delay the delivery of future construction projects that support readiness. 59

Blank page

Installation: Patuxent River, Maryland Project: Unaccompanied Housing Project Number: P975 Military Construction, Navy FY 2017 Supplemental Request Authorization: P.L. 114-92, the National Defense Authorization Act (NDAA) for Fiscal Year (FY) 2016 Estimated Cost ($000): Previously Appropriated 40,935 Supplemental Request 2,043 Total Estimated Cost 42,978 Project description: Constructs a multi-story unaccompanied housing (UH) facility to provide two-bedroom market-style units for E1-E4 permanent party personnel. The project also constructs an alert force facility adjacent to Building #2199 to support administrative and training spaces for aircraft squadron personnel currently located in Building #468, which will be demolished as part of this project. A total of seven buildings will be demolished. The existing UH facilities are old, not configured to meet current UH criteria, lack storage spaces, lack adequate fire protection systems, and have poorly functioning heating, air conditioning and ventilation systems. They are also located in an aircraft accident potential zone in violation of airfield safety criteria. Justification: Market conditions in the Baltimore/Washington area have become less favorable for Navy construction projects. The growth in the number of commercial-sector construction projects in this recovering market has put a premium on labor, sub-contractors and materials. Proposals for Navy projects have been higher than expected. Budget cost estimates were based on market conditions that were more favorable to the government.

Blank page

Military Construction, Navy FY 2017 Supplemental Request Installation: Norfolk, Virginia Project: Electrical Repairs to Piers 2, 6, 7 and 11 Project Number: P610 Authorization: P.L. 114-92, the National Defense Authorization Act (NDAA) for Fiscal Year (FY) 2016 Estimated Cost ($000): Previously Appropriated 44,254 Supplemental Request 12,166 Total Estimated Cost 56,420 Project description: Constructs new 480-volt power systems on Piers 2, 6, 7 and 11 to include connectors, receptacle stations, conduits, and cables to protected ductbanks located between the upper and lower pier decks. Electrical conduit and cable systems on the double-deck piers have failed at many locations and continue to have outages caused by storms. Each major storm creates significant damage to the current cable systems due to high water flooding the lower deck and floating objects ramming the utilities components. Deterioration is creating problems with reliability and safety issues with the electrical systems. Reliable shore power to ships in port is required. Justification: The cost for the power receptacle stations is much higher than budgeted. The original design was determined to be unsuitable due to safety and storm damage vulnerability concerns and would not be able to adequately service the mix of ships required.

Blank page

Installation: Portsmouth, Virginia Project: Waterfront Utilities Project Number: P614 Military Construction, Navy FY 2017 Supplemental Request Authorization: P.L. 114-92, the National Defense Authorization Act (NDAA) for Fiscal Year (FY) 2016 Estimated Cost ($000): Previously Appropriated 45,513 Supplemental Request 2,499 Total Estimated Cost 48,012 Project description: Installs five new permanent substations providing industrial and shore power to Dry Docks 2 and 3; replaces existing potable water distribution lines and riser around Dry Docks 2, 3 and 4; and replaces the existing salt water pipelines around Dry Dock 4. The existing pump at Berth 18 will be replaced. The utilities around the dry docks and at Berth 18 are undersized, severely deteriorated, inefficient and outdated and lack adequate capacity to serve the ships in dry dock or at berth. Justification: The water and saltwater distribution systems were significantly more costly than budgeted due to unexpected site conditions identified during final design. The existing water lines were more deteriorated than anticipated, thus requiring replacement. Additionally, conflicts with existing utilities were encountered resulting in the need for special measures and increased length of utility runs. Finally, higher capacity piping and appurtances were needed to meet flow pressure and quantity requirements.

Blank page

1. Component NAVY 9. COST ESTIMATES Item UM Quantity Unit Cost Cost($000) PLANNING & DESIGN LS DESIGN COSTS SUBTOTAL CONTINGENCY (0%) TOTAL CONTRACT COST SIOH (0%) SUBTOTAL TOTAL REQUEST ROUNDED TOTAL REQUEST 10. Description of Proposed Construction: MILITARY CONSTRUCTION PROGRAM 5. Program Element 6. Category Code 7. Project Number 0901211N FY 2017 3. Installation(SA)& Location/UIC: N64482 PLANNING /DESIGN UNSPECIFIED, WORLDWIDE LOCATIONS LS P227A 4. Project Title Planning & Design 2. Date 01 MAR 2017 8. Project Cost ($000) () 0 0 Funds to be utilized under Title 10 USC 2807 for architectural and engineering services and construction design in connection with military construction projects including regular program projects, exceptional authority construction (including unspecified minor construction) projects, land appraisals, and other projects as directed. Engineering investigations, such as field surveys and foundation exploration, will be undertaken as necessary. 11. Requirement: PROJECT: Planning and design funds. (Current Mission) REQUIREMENT: All projects in a military construction program presented for approval must be based on sound engineering and the best cost data available. For this reason, design is initiated to establish project estimates in advance of program submittal to the Congress. Based on this preliminary design, final plans and specifications are then prepared. These costs for architectural and engineering services and construction design are not provided for in the construction project cost estimates except in those where Design/Build contracting method is used. CURRENT SITUATION: IMPACT IF NOT PROVIDED: ADDITIONAL: Economic Alternatives Considered: DD Form 1 Dec 76 1391 Page No. 1

1. Component NAVY FY 2017 3. Installation(SA)& Location/UIC: N64482 PLANNING /DESIGN UNSPECIFIED, WORLDWIDE LOCATIONS MILITARY CONSTRUCTION PROGRAM 4. Project Title Planning & Design 2. Date 01 MAR 2017 5. Program Element 6. Category Code 7. Project Number 0901211N P227A A. Status Quo: B. Renovation/Modernization: C. Lease: D. New Construction: E. Other Alternatives: F. Analysis Results: 8. Project Cost ($000) 12. Supplemental Data: A. Estimated Design Data: 1. Status: (A) Date design or Parametric Cost Estimate started (B) Date 35% Design or Parametric Cost Estimate complete (C) Date design completed (D) Percent completed as of September 2015 January 2016 (E) Percent completed as of (F) Type of design contract (G) Parametric Estimate used to develop cost (H) Energy Study/Life Cycle Analysis performed 2. Basis: (A) Standard or Definitive Design (B) Where design was previously used 3. Total Cost (C) = (A) + (B) = (D) + (E): (A) Production of plans and specifications (B) All other design costs (C) Total (D) Contract (E) In-house 4. Contract award: 5. Construction start: 6. Construction complete: B. Equipment associated with this project which will be provided from other appropriations: NONE JOINT USE CERTIFICATION: $0 Activity POC: Phone No: DD Form 1 Dec 76 1391C Page No. 2