WATERFRONT MAINTENANCE NOTE Number 13. MK 137 MODS 1,2, and 4 SRBOC Decoy Launching System Refurbishment

Similar documents
Subj: CHANGE OR EXCHANGE OF COMMAND OF NUCLEAR POWERED SHIPS. Encl: (1) Engineering Department Change of Command Inspection List

A. General provisions and other electrical systems are specified in other Sections of Division 26.

CNRMCINST Code Jun 13. Subj: CONDITION FOUND REPORT (CFR) AND LETTER OF TRANSMITTAL (LOT)

ELECTRICAL INSPECTION ACT CANADIAN ELECTRICAL CODE REGULATIONS

Automotive unit test specification breakdown

DEPARTMENT OF THE NAVY COMMANDER NAVY REGIONAL MAINTENANCE CENTER 9170 SECOND STREET, SUITE 245 NORFOLK, VA

RFP for 2015 E-Rate Funded Wireless Upgrade Project at Four Locations In Thomasville City Schools RFP Reference# 2015Wireless Cabling Contact Mike

6. If you have questions that were not answered at the above web site, contact the

AIRCRAFT WEAPONS SYSTEMS TEST EQUIPMENT

Buck & Boost Transformer Installation Instructions

VSE Corporation. Integrity - Agility - Value. VSE Corporation Proprietary Information

Impact of Corrosion on Ground Vehicles: Program Review, Issues and Solutions

Houston Controls, Inc Safety Management System

CUBICLE/STUDIO SPACE POLICIES AND GUIDELINES FALL & SPRING BID STUDIO CONTRACT

CALIFORNIA STATE UNIVERSITY, OFFICE OF THE CHANCELLOR Telecommuting Policy and Guidelines For CSUEU Employees

STRATEGIC ARMS REDUCTION TREATY (START) COMPLIANCE AND IMPLEMENTATION

OPNAVINST G N09P 17 Jul Subj: MISSION, FUNCTIONS, AND TASKS OF THE BOARD OF INSPECTION AND SURVEY

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT COMPLIANCE DEPARTMENT COM 2035

SUBJECT: MAIN ROTOR HUB ASSEMBLY SPINDLE ASSEMBLY, P/N , MANDATORY REVISION OF INSPECTION AND OVERHAUL REQUIREMENTS.

User-Service Manual Joerns Assist Handle Model F025

University of Chattanooga Respiratory Protection Program. Areas Affected: Employees whose duties require the use of a respirator

Pipeline Operational Qualification (OQ) Crosswalks

A preventive maintenance program has been established to: A. Increase the life of a building and its mechanical system;

Business Safety Leadership. Part 2: Incident and Root Cause Analysis

MUNITIONS RESPONSE SITE SELF-ASSESSMENT CHECKLIST

NAVSEA STANDARD ITEM. 1.1 Title: Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish

NAVSEA STANDARD ITEMS FY-19 CH-2 (26 MAR 2018)

AN ORDINANCE TO AMEND CERTAIN PROVISIONS IN THE RAPID CITY ELECTRICAL CODE BY AMENDING SECTION OF THE RAPID CITY MUNICIPAL CODE

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Respiratory Protection Program

Student Affairs: Student Housing & Residence Life. Student Housing Residence Facilities Obz Square

Schedule B New York Main Street (NYMS) Administrative Plan Awardee/LPA NAME Project Name

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

INFORMATION BULLETIN OPERATING PERMITS

Subj: FULL POWER AND ECONOMY TRIAL REQUIREMENTS FOR NON-NUCLEAR SURFACE SHIP CLASSES

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT II EXHIBIT D DISTRICT TWO BRIDGE TENDER QUALIFICATIONS MANUAL

CONTRACTORS SAFETY PROCEDURES Health and Safety Procedures Overview. Safety is a high priority of the Chinook s Edge School Division No. 73.

U.S. CONCRETE, INC. SAFETY POLICY and PROCEDURE MANUAL

SECNAVINST F DNS Dec 2005

DEPARTMENT OF THE NAVY COMMANDER, NAVAL SURFACE FORCE UNITED STATES PACIFIC FLEET 2841 RENDOVA ROAD SAN DIEGO, CALIFORNIA

DEPARTMENT OF THE NAVY COMMANDER NAVY REGIONAL MAINTENANCE CENTER 9170 SECOND STREET, SUITE 245 NORFOLK, VA

COMDTPUB P16721 NVIC August 25, 2014

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

TESTING APPLICATION STANDARD (TAS) IMPACT TEST PROCEDURES

DEPARTMENT OF THE NAVY OFFICE OF THE SECRETARY 1000 NAVY PENTAGON WASHINGTON, DC

HELICOPTER MECHANIC, HELICOPTER MECHANIC SUPERVISOR, 3749

Title: Brake Replacement

1. Perform maintenance tasks associated with L120 and SMB actuators: 3. Evaluate L120 and SMB actuators for correct operation.

TECHNICAL MANUAL OPERATORS AND ORGANIZATIONAL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST) DEMOLITION MATERIALS

Oak Grove School District Respiratory Protection Program

Department of Defense DIRECTIVE

Request for Proposals for Exterior Concrete Structural Analysis Services for The Mount Umunhum Radar Tower Project

FRCSE receives first Super Hornet to prototype maintenance

FFG UPGRADE Brochure Delivering tag integrated line warfare solutions.

Summary Report for Individual Task E-1102 Repair Communications System Control C-6533(*)/ARC Status: Approved

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Controlling Office: Director of Clinical Services Effective Date: May 1, Applies to CAMTS: n/a Last Review: January 1, 2018

No. 22 in In accordance to articles 152 & 108 / second of Labor Law no. (71) of 1987 we decided to issue the following instructions:

Subj: REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OPERATIONAL ENVIRONMENT STATEMENTS FOR FLEET AIR RECONNAISSANCE SQUADRON SEVEN (VQ-7)

Ammunition and Explosives related Federal Supply Classes (FSC)

DRAFT. Telework Policy. 1. Applicability. This policy applies to civilian employees of the Fort Belvoir Garrison.

TECHNICAL MANUAL OPERATOR, UNIT, AND DIRECT SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

APPRENTICESHIP PROGRAM FOR MOS OF CENTRAL OFFICE REPAIRER

Subj: NUCLEAR SURVIVABILITY POLICY FOR NAVY AND MARINE CORPS SYSTEMS

SCULPTURE ON CLYDE 2018 Information & Application for Exhibitors

AIR CONDITIONER HORIZONTAL, COMPACT, 9,000 BTU/HR, 115 VOLT SINGLE PHASE 50/60 HERTZ PART NO. S8450-9KC-1H (NSN ) (EIC: N/A)

STANDARD ITEM. 1.1 Title: Prevention of Radiographic-Inspection Ionizing-Radiation Hazard; accomplish

DEFENSE SECURITY COOPERATION AGENCY WASHINGTON, DC

Subj: SCOPE, LIMITATIONS, CERTIFICATION, UTILIZATION, AND PHYSICIAN OVERSIGHT OF CERTIFIED ATHLETIC TRAINERS

INTRODUCTION TO EXERCISE AND TRAINING (ET) MINES

USAF TECHNICAL TRAINING NAS Pensacola Florida Develop America's Airmen Today --- for Tomorrow

CNRMC PSSRA Brief. Mr. Kevin Taylor May 19, 2016

Rapid Development and Integration of Remote Weapon Systems to Meet Operational Requirements Abstract May 2011

OPNAVINST N46 24 Apr Subj: MISSION, FUNCTIONS, AND TASKS OF NAVAL FACILITIES ENGINEERING COMMAND

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY. SUMMARY OF REVISIONS This document is substantially revised and must be completely reviewed.

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Advanced Manufacturing

DEPARTMENTOFTHENAVY COMMANDER, REGIONAL MAINTENANCE CENTERS 9170 SECOND STREET, SUITE 245 NORFOLK, VA

Request for Proposals School Year Project Lafayette County School District 100 Commodore Drive Oxford, MS 38655

TEMPLE UNIVERSITY ENVIRONMENTAL HEALTH AND RADIATION SAFETY

PERFORMANCE WORK STATEMENT (PWS) Logistics Support for the Theater Aviation Maintenance Program (TAMP) Equipment Package (TEP)

FFG(X) Update National Symposium - Surface Navy Association

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

RG 102 Accreditation for the Inspection of Non-public High Voltage Electrical Systems

TECHNICAL MANUAL UNIT AND DIRECT SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST) FOR LONG RANGE SNIPER RIFLE (LRSR), M107

Chapter 12 Environmental, Safety and Health (ES&H) Regulatory Compliance and Contractor Oversight Program

Academy Health and Safety Policy 2017/2018

SHIP'S ORGANIZATION. General

(ALL Applications received AFTER NOVEMBER 1, 2017 will require a $25.00 late fee)

OPERATOR S MANUAL FOR MULTIPLE INTEGRATED LASER ENGAGEMENT SYSTEM (MILES) SIMULATOR SYSTEM, FIRING LASER: M83 (NSN ) FOR

Safety Process For Navy Gun and Ammunition Systems

NOTICE OF DISCLOSURE

CERTIFICATES OF ELECTRICAL SAFETY RESPONSIBILITY OF RECs AND ELECTRICIANS

Evolution of a Team-Run BSL-3 Facility Maintenance Program

Subj: CORROSION PREVENTION AND CONTROL (CPAC) PROGRAM

NOTE ON PERFORMANCE TESTING

Feel at home. No matter where you stay. TECHNICAL MANUAL

Commander, Navy Regional Maintenance Command

INSTITUTIONS REGULATION, 1981

OPNAVINST B N8 7 Nov Subj: NAVY TEST, MEASUREMENT, AND DIAGNOSTIC EQUIPMENT, AUTOMATIC TEST SYSTEMS, AND METROLOGY AND CALIBRATION

Transcription:

19 Nov 2015 SERMC CODE: 900 WATERFRONT MAINTENANCE NOTE Number 13 MK 137 MODS 1,2, and 4 SRBOC Decoy Launching System Refurbishment The following references are provided to assist ships force in preparation for overhaul of MK 137 MODS 1,2 and 4 SRBOC Launcher. Ref: (a) NSWC CRANE NSL-Q32-WXM-2012-048 DTD 15MAY2012 (b) SW393-A1-MMM-010 REVISION 4, Launching System, Mk 36, Mods 1,2,5,6,11, 12,17 Through 19. (c) SW393-CO-MMM-A10 REVISION 8 Decoy Launching System MK 53 Mods 3 Through 8 (d) S9086-VD-STM-010 Chap. 631, Preservation of Ships in Service (e) NAVSEA STD Item 009-32 Cleaning and Painting Encl: (1) Memorandum of Understanding (MOU) Requirements. 1. Purpose: To define the specific shipboard/rmc responsibilities that are required to support MK 137 SRBOC Decoy Launcher ships force self-help overhaul. Adherence to this procedure will enable all MK 137 SRBOC equipped ships system homeported in Mayport to receive technical assistance from SERMC CODE 954 SRBOC shop personnel in the performance of the ships force self-help project. 2. Background: IAW Ref (a), the MK 137 SRBOC Launcher is required to receive overhaul on average once every 48-72 months. SBROC Launcher overhaul will be performed by ships force and SERMC Code 954 IAW Ref (a). A Memorandum Of Understanding (Enclosure 1) will be signed by all parties prior to commencing any work.

3. Procedures: Ship s Force (S/F) shall: a. S/F submit one 4790/2K per launcher for refurbishment. b. SERMC Code 954 personnel will contact S/F to confirm a date for the visual inspection and operability test. 1. Visual inspection will include checking all painted surfaces, fasteners, clamp, and junction boxes (inside and out). 2. Operability test will be performed from bridge panels and will test all internal components such as empty/loaded switches, safe/on switch, lamp, and fire voltage checks. 3. All findings and results will be documented on the Pre-Refurbishment report and Post-Refurbishment report. c. Upon completion of inspection and testing, S/F will tag-out MK 137 Decoy Launching System in accordance with ship s tag-out procedures. d. In preparation for Decoy Launching System (DLS) removal, S/F personnel will remove all base bolts and electrically disconnect launcher from ship s mounts. e. Once launchers are removed, S/F will perform corrosion control and prime the launcher foundation IAW Ref (c). f. Once primer has dried, cover with plastic to ensure a clean surface is maintained. g. Ensure all wiring is properly labeled IAW Ref (a), bagged, and sealed to ensure no water intrusion can occur. 4. SERMC Code 954 shall: a. SERMC Code 954 personnel will arrange crane services for a specified date coordinated with S/F. b. Code 954 personnel will transport launchers to SERMC for overhaul IAW Ref (a) and (b). c. S/F technician is required to be Temporarily Assigned Duties (TAD) to SERMC to help with breakdown of launchers. d. During breakdown all parts deemed obsolete or damaged beyond repair IAW Ref (a) and (b) will be discarded accordingly.

e. Once assembled, the decoy launchers will be bench tested with both SERMC and S/F personnel present. f. SERMC Code 954 personnel will arrange crane services for a specified date coordinated with S/F. g. S/F and SERMC Code 954 personnel will ensure system is still tagged out. h. Once launchers are placed onboard, S/F personnel will complete the initial installation by electrically and mechanically reconnecting launcher to the ship s system with SERMC Code 954 oversight. i. Once the initial installation is complete, S/F and SERMC Code 954 personnel will clear tag-out and perform an operational test of launchers. j. Once all conditions of the installation are met and all testing has proven satisfactory results, S/F personnel will return system to normal operation. 5. Points of Contact: For further guidance or information, contact SERMC Code 954 at 904-270-5126 x3977, x5856 or x3115.

Southeast Regional Maintenance Center (SERMC) Combat System Production Memorandum of Understanding for Super Rapid Bloom Off Chaff (SRBOC) Launcher Ships Force Self Help Refurbishment The SERMC Combat Systems Production (Code 950) provides assistance to ships force personnel in conducting a Ships Force SRBOC Launcher Refurbishment. Launchers will be accepted only during availabilities of 8 weeks or longer. It is the ships force personnel s responsibility to accomplish the refurbishment on time Ship s Force (S/F) shall: 1) Submit one 4790/2K (2K) per launcher for refurbishment during ship's maintenance availability. Order and provide Overhaul Kits and associated parts for each Launcher as directed. 2) Tag out MK 137 Decoy Launching System in accordance with ships instruction, remove all base bolts, and electrically disconnect launcher from ship. 3) Once launchers are removed, ensure all wiring is properly labeled, bagged, and sealed to ensure no water intrusion occurs. Prior to the reinstallation of the refurbished launchers, S/F must perform preservation on the launcher foundations. 4) Assign two (2) S/F technicians for temporary duty at SERMC for duration of tear down, refurbishment, and rebuild of launchers. This valuable training experience will provide in-depth knowledge on the proper procedures for maintenance of the Decoy Launcher System. Duration of temporary duty is normally four to five weeks. 5) Ship s Work Center Supervisor or LCPO shall observe the bench test at SERMC at the completion of the refurbishment prior to installation. 6) Assist in the transportation of refurbished launchers return to the ship. 7) Electrically and mechanically reconnect launchers. 8) Coat all reinstalled bolts with polysulfide to protect against topside elements. 9) Clear safety tags. 10) Perform an operational test of launchers with SERMC personnel observing. 11) Return system to normal operation. b. SERMC shall: 1) Coordinate all crane services. 2) Repair all MK 191 Mod 0 test cartridges. Test cartridges are covered under ship's blanket 2M/MTR jobs. No 2K is required. 3) Transport launchers from/to ship. 4) Assist S/F with Overhaul/refurbish launchers as required. Enclosure (1)

5) Observe all required pre/post refurbishment maintenance requirements. 6) Provide oversight and guidance to S/F throughout the process. 7) Provide a safe working area for S/F to perform maintenance. The following agreement is in place: 1. SHIP S NAME understands Ships Force (S/F) personnel are required to be available the entire time the job is in progress. If S/F personnel are not made available, there will be no guarantee of completion by avail end date. 2. SHIP S NAME understands that the launchers must be disconnected and ready to be removed no later than START DATE. It is also understood that launchers delivered after this date will not be accepted and the ship will lose the opportunity to have the launchers refurbished during this availability. Work will have to be rescheduled for a later availability. Signature SHIP S NAME (Co or rep) Date Signature,SERMC Code 900 Dept. Head or Rep Date Signature SERMC Code 950 Product Family Supervisor Date Enclosure (1)