C O N N E C T I N G L I V E S, A C C E L E R A T I N G G R O W T H

Similar documents
A. State: Kelantan. No Town Location/Address of Branch Location/Address of Branch (Incapacitated and not in operation)

L i s t o f P r o j e c t s

Non Investment Properties Appendix B

MINISTRY OF TRANSPORT MALAYSIA

APPLYING FOR: SITE AGENT / CLERK OF WORK /SENIOR SITE SUPERVISOR. Jalai Wak, 96510, Pakan, Julau, Sarawak.

NO OUTLET ADDRESS TEL SELANGOR 1 Klang No:84, Jalan Nanas (20/10/1988) Klang, Selangor Darul Ehsan

LIST OF HOSPITALS & HOSTEL CLINICAL PLACEMENT

-2SD +2SD -3SD -2SD -3SD -2SD

FEEL-LITE LED LIGHTING MALAYSIA

KEDAH (CONT D) Kuala Perlis (Mini) Pejabat TH Mini Kodiang Bangunan Tabung Haji PT 2475 (Mini) No 5A Tingkat Bawah

Status of MALARIA CONTROL in Malaysia

No.of Bed : 29 No.of Bed : 68 No.of Bed : 242

Click to edit Master text Kubor styles Second level Third level Fourth level Fifth level

List Of Properties As 31 December 2007

List of Government Clinics

SAFE DEPOSIT BOX PROMOTION: 50% OFF FIRST YEAR RENTAL FEE

Knowledge Park. AN INTEGRATED KNOWLEDGE HUB

Jabatan Tenaga Kerja (JTK) Malaysia

A11 BUDGET ALLOCATIONS

NO REGION OUTLETS ADDRESS OPERATION HOURS Lot No. S40, Second Floor, AEON Jusco Bukit Tinggi 1

SENHENG BRANCH LISTING

NO BRANCH NAME FULL ADDRESS STATE DISTRICT 1 BUTTERWORTH No. 49, Jalan Selat Pulau Pinang Seberang Perai Bandar Taman Selat Utara Butterworth 12000

F e a t u r e d P r o j e c t s

APPENDIX D DIRECTORY OF PARTICIPATING CENTRES. Blood and Marrow Transplant Services MOH

PRACTICUM INFORMATION FOR SEPTEMBER 2018 PLACEMENT (A172) & FEBRUARY 2019 PLACEMENT (A181)

List of Government Clinics

Assessment on Students Socio-Scientific Understanding: A Research Report

APPENDIX D DIRECTORY OF PARTICIPATING CENTRES. Blood and Marrow Transplant Services MOH

1991 POULATION AND HOUSING CENSUS OF MALAYSIA

8. Selayang 81-85, Jalan 2/3A, Pusat Bandar Utara, KM 12, Jalan Ipoh, Batu Caves, Kuala Lumpur. Tel : Fax :

WARTA KERAJAAN PERSEKUTUAN FEDERAL GOVERNMENT GAZETTE

BRANCH LOCATIONS. OCBC Bank Head Office Menara OCBC No. 18 Jalan Tun Perak Kuala Lumpur

Avengers Infinity War Movie Voucher List of Participating Stations No STATION NAME STATE TGV MBO 1 PETRON TONGKANG PECAH (FI) JOHOR X 2 PETRON SKUDAI

WATER SUPPLY AND DEMAND STATUS IN MALAYSIA SURUHANJAYA PERKHIDMATAN AIR NEGARA SPAN

NATIONAL HYDROGRAPHIC CENTRE SEA LEVEL ACTIVITIES IN MALAYSIA

NUTTELEX MALAYSIA STOCKISTS 8TH AUGUST 2018

INDUSTRIAL TRAINING BRIEFING

POST EVENT DOSSIER. Programme partners: Programme Targets. About DiGi CyberSAFE Programme

TERMS AND CONDITIONS CIMB F.I.R.S.T Grab Promotion Code Campaign

Document Control. Author Control. Reviewer Control. Version Date Author Purpose V1.0 23/4/2015 Jeeva Rubine To format the Location List

Page 1 of 9 HIGH COURT / LAND OFFICE NO PROPERTY TYPE PROPERTY ADDRESS SIZE (SQFT) FH /LH AUCTION DATE RESERVE PRICE

PANEL WORKSHOPS FOR COMMERCIAL VEHICLE REPAIR

PHR NO. STORE NAME ADDRESS

Capacity Building for Geospatial Information Management in Malaysia (Case Studies in JUPEM)

PROFIL SYARIKAT. Profil Syarikat. ILHAM Management Consultants Sdn Bhd ( U) Perkhidmatan:

CHAPTER 1 : PROVISION OF CORONARY CARE SERVICE IN MALAYSIA. Omar Ismail 1 Chin Sze Piaw 2 Sim Kui Hian 3 Wan Azman Wan Ahmad 4

CONTENT

CORPORATE INFORMATION

Station List with F1 Merchandise

Northern Corridor Economic Region (NCER) Regional Impacts, Opportunities & Prospects

National Orthopaedic Registry of Malaysia (NORM)

List of Government Clinics. 1 Alor Gajah MLK001 Klinik Kesihatan Padang Sebang Kg. Padang Sebang Alor Gajah

Page 1 of 10 HIGH COURT / LAND OFFICE NO PROPERTY TYPE PROPERTY ADDRESS SIZE (SQFT) FH /LH AUCTION DATE RESERVE PRICE

THE SCENARIO OF TRAINING OFFERED BY PUBLIC TRAINING INSTITUTIONS IN 2016

Court & Land Office auction listing. Page 1 of 8

Vortex Simplified Brochure Close Size: 20cm(w) X 27cm(h)

First and foremost, I hope this message finds you well in the best of health and business endeavors.

Issues for Urban Design and Master Planning in Seberang Perai

GARIS PANDUAN PERMOHONAN PENGELASAN SPA DAN PUSAT REFLEKSOLOGI

No State Address Contact. ALAM DAMAI 31-G, Jalan Damai Niaga,Alam Damai Cheras,56000 Kuala Lumpur,Wilayah Persekutuan,Malaysia

KESATUAN OLAHRAGA MALAYSIA. Malaysia Athletics Federation TAKWIM KOM 2018 JANUARY DATE LOCAL COMPETITION OVERSEAS COMPETITION COURSE / SEMINAR

Page 1 of 9 HIGH COURT / LAND OFFICE NO PROPERTY TYPE PROPERTY ADDRESS SIZE (SQFT) FH /LH AUCTION DATE RESERVE PRICE

ALIM HARMONY, SG. PETANI HASANI EDAR, SG. PETANI PUSTAKA JITRA, JITRA PUSTAKA UNION, ALOR SETAR PUSAT BUKU GEMILANG, KULIM

LOOKING FOR BUYERS PLEASE CONTACT US IF INTERESTED TO PURCHASE THE UNDERMENTIONED PROPERTIES.

WIRA UKUR CONSULTANT is a fully bumiputra owns and professional licensed land surveyor which was incorporated on 22 nd October 1990.

EDUCATION CHRONOLOGY:

Magnolia King s Confectionery Promotion 2013

e-mas: LIST OF PANEL HOSPITALS FOR CROWD CARE

Aggregates & Concrete - Soft Launch. Week 2 19-May 20-May 21-May 22-May 23-May 24-May 25-May WL 8am. Aggregates - H&S Day. 8am

Telefon Pejabat(Kuala Lumpur): Pengurus: Setar) Faksimili Pejabat(Kuala Lumpur):

11 D Mart Air Tawar 05 (Felda 57)(Onepay) - Kota Tinggi, Johor Johor. 9 D Mart Air Tawar 03 (Felda 134)(Onepay) - Kota Tinggi, Johor Johor

Submitted to the Penang State Government by Socio-Economic & Environmental Research Institute 10 Brown Road, Penang Tel: (04) Fax: 226

Investor Presentation 2013

Ref: (27) MTCC 7/1/6/3 Date: 8 October 2015

ABC COMPANY. P.C.S. RAKYAT SDN. BHD. Web: Hotline :

LIST OF AUTHORISED DEPOSITORY AGENT ( ADA ) ACCOMPANYING THE ELECTRONIC PROSPECTUS OF GDB HOLDINGS BERHAD ( GDB OR THE COMPANY ) DATED 5 MARCH 2018

Tan Sri S Subramaniam Tamil Debate

Page 1 of 9 HIGH COURT / LAND OFFICE NO PROPERTY TYPE PROPERTY ADDRESS SIZE (SQFT) FH /LH AUCTION DATE RESERVE PRICE

Page 1 of 8 HIGH COURT / LAND OFFICE NO PROPERTY TYPE PROPERTY ADDRESS SIZE (SQFT) FH /LH AUCTION DATE RESERVE PRICE

AEROTECH VI CONFERENCE 2016 Innovation in Aerospace Engineering & Technology

Mesra - List of Participating Stations N0 Station

LATAR BELAKANG BACKGROUND. Kelab Maya Sahabat Ar Rahnu

Perak Investment Profile. Silver Opportunities GOLDEN PROFITS

stage 2 stage map Sungai Petani - Georgetown 158.1km Thursday 25 February 2016 SUNGAI PETANI GEORGETOWN Sg. Karangan 28.1km Teluk Bahang 128.

Constituency Delimitation Review Report

Voting Behaviour in FELDA Parliamentary Constituencies since 2004

BRANCHES OPEN ON SATURDAY, 11 MARCH 2017 FOR DEBIT CARD REPLACEMENT

FEM/SEN3/SALI BPG NO.EDISI : 03 NO. SEMAKAN : 07 TARIKH KUATKUASA : drp. 30

Editorial PROVISIONAL PDF. Abstract. Introduction. Chronology of the Flood

Page 1 of 12 HIGH COURT / LAND OFFICE NO PROPERTY TYPE PROPERTY ADDRESS SIZE (SQFT) FH /LH AUCTION DATE RESERVE PRICE

Malaysia MALAYSIA HOTELS MOTELS INNS. The International Hotel and Travel Directory I.H.T.

National Orthopaedic Registry of Malaysia (NORM)

Page 1 of 9 HIGH COURT / LAND OFFICE NO PROPERTY TYPE PROPERTY ADDRESS SIZE (SQFT) FH /LH AUCTION DATE RESERVE PRICE

Page 1 of 8. No PROPERTY TYPE PROPERTY ADDRESS SIZE (SQFT) FH /LH REMARKS AUCTIONEER AUCTION DATE RESERVE PRICE

CURRICULUM VITAE. : Shareena Bibi binti Mohd Arif : : Chief Matron Grade U44, Hospital Tengku Ampuan Rahimah, Klang.

Terms and Conditions CIMB FIESTA 2016 Count Octo Contest

ROSLIZAWATI CHE AZIZ /

Bandar Baru Air Itam No. 37, Jalan Angsana Bandar Baru Air Itam Pulau Pinang Tel : Fax :

Kajang Tel: Fax: Perak Darul Ridzuan Ipoh Tel: Fax:

Arahan Amalan Mahkamah Rayuan Bil 3 Tahun 2014 Pengkelasan Kod bagi Kes Semakan Sivil di Mahkamah Rayuan

Transcription:

C O N N E C T I N G L I V E S, A C C E L E R A T I N G G R O W T H

PROJECT PROPONENT ECRL STEERING COMMITTEE Chaired by Tan Sri Ketua Setiausaha Perbendaharaan Regulatory Agency SURUHANJAYA PENGANGKUTAN AWAM DARAT THE EAST COAST RAIL LINK PROJECT IS 100% OWNED AND WILL BE OPERATED BY THE GOVERNMENT OF MALAYSIA Project Proponent MALAYSIA RAIL LINK SDN BHD 100% owned by Ministry of Finance Contractor CHINA COMMUNICATIONS CONSTRUCTION CO

EAST COAST RAIL LINK C O N N EC T I N G L I V E S, AC C E L E R AT I N G GROWTH THE NEED FOR THE ECRL

EAST COAST RAIL LINK A NATIONAL TRANSPORTATION INFRASTRUCTURE to balance the development and reduce economic gap between the West and East Coast of Peninsular Malaysia to enhance economic development and competitiveness of the East Coast states Rancangan Fizikal Negara 1 (2005)

EAST COAST RAIL LINK A NATIONAL TRANSPORTATION INFRASTRUCTURE Greater Klang Valley East Coast Economic Region Kelantan, Terengganu & Pahang 4X Gross Domestic Product in 2010 RM 216 billion vs RM 50 billion 32X Gross Domestic Product per unit land area in 2010

EAST COAST RAIL LINK A NATIONAL TRANSPORTATION INFRASTRUCTURE A critical infrastructure under the ECER MASTERPLAN to reduce economic gap between West and East Coast ECER MASTERPLAN

EAST COAST RAIL LINK A NATIONAL TRANSPORTATION INFRASTRUCTURE Improve transportation linkages in the East Coast & reduce traffic congestion Holiday season KL Kota Bahru KL- Tumpat ECRL 12 15 hours by road 15 hours by KTM 4 hours

EAST COAST RAIL LINK A NATIONAL TRANSPORTATION INFRASTRUCTURE Kota Bahru Kuala Tganu Kuantan Gambang Enhance urban growth and competitiveness Dungun Maran Chukai Mentakab Bentong CONSISTENT WITH THE NATIONAL URBANISATION POLICY

EAST COAST RAIL LINK A NATIONAL TRANSPORTATION INFRASTRUCTURE Increase competitiveness of manufacturing sector Gebeng Kertih Temerloh/ Mentakab Pahang Technology Park, Gambang

EAST COAST RAIL LINK A NATIONAL TRANSPORTATION INFRASTRUCTURE Increase competitiveness of Malaysian ports Kemaman Port Kuantan Port

EAST COAST RAIL LINK A NATIONAL TRANSPORTATION INFRASTRUCTURE Boost tourism in the East Coast states Setiu Bukit Tinggi/ Genting Highlands Redang Kota Bahru

EAST COAST RAIL LINK C O N N EC T I N G L I V E S, AC C E L E R AT I N G GROWTH PLANNING OF THE ECRL

EAST COAST RAIL LINK to balance the development and reduce economic gap between the West and East Coast of Peninsular Malaysia CONNECTING LIVES, ACCELERATING GROWTH RFN 1 (2005) RFN 2 (2010) RFN 3 (2016)

3 EAST COAST RAIL LINK Rancangan Struktur Negeri Kelantan Rancangan Struktur Negeri Terengganu Rancangan Struktur Negeri Pahang Rancangan Struktur Negeri Selangor DRAF RANCANGAN STRUKTUR NEGERI KELANTAN 2003-2020 Dasar Pembangunan Negeri Kelantan PELAN LOKASI Perlis Kedah Pulau Pinang Kelantan Terengganu Perak Pahang Selangor Negeri Sembilan Melaka Johor Ke Narathiwat THAILAND Ke Narathiwat D22 Bukit Bunga Rantau Panjang PASIR MAS D27 Pengkalan Kubor D28 Tumpat TUMPAT 134 CHINA LAUT 8 CHINA SELATAN 3 57 131 SELATAN SELATAN SELATAN SELATAN SELATAN SELATAN SELATAN SELATAN Kota Bharu Wakaf Baru Kubang Kerian Bachok Pasir Mas D5 KOTA BHARU Pauh Lima BACHOK D11 Ketereh D13 Tok Bali Pulai Chondong D7 D12 PASIR PUTEH Pasir Puteh 4 Ke Kuala Besut 4 Jeli TANAH MERAH Macang MACHANG Ke Jertih / Kuala Terengganu Ke Gerik Ke Pulau Pinang JELI Kuala Krai TERENGGANU PERAK 66 KUALA KRAI Dabong Manek Urai Laloh GUA MUSANG 8 D29 Chiku Ke Kuala Berang Kg. Kuala Betis D30 Gua Musang Lojing Ke Kuala Lipis Ke Cameron Highland PAHANG Sum ber : Jabat an Per ancangan Bandar dan Desa, Sem enanjung Malaysia PETUNJUK: Sem padan Ant arabangsa Sem padan Negeri Sem padan Jajahan Lebuh Raya Jalan Per sekut uan Jalan Neger i Jalan Lain Landasan Ker et api 5 66 D29 Lapangan Terbang Nombor Jalan Persekut uan Nombor Jalan Negeri Bandar / Pekan Pelabuhan Pelabuhan Darat RAJAH 4.1 SISTEM RANGKAIAN PERHUBUNGAN DAN PENGANGKUTAN NEGERI KELANTAN Skala 1 : 10,000 4-3

PLANNING HISTORY STRATEGIC OBJECTIVES Physically Well-Connected Policy Enhance Rural and Inter-City Connectivity Affordable and Accessible to All Convenience with High Service Levels and Quality Safe and Secure Better Quality of Life NATIONAL LAND PUBLIC TRANSPORT MASTERPLAN

PLANNING HISTORY The Tumpat - Bentong Gombak (standard gauge) alignment agreed in principle by National Economic Council on 18 Feb 2013 CRITERIA FOR ALIGNMENT SELECTION Economy Link to major cities, ports, industrial hubs, committed projects, opportunities for growth, construction costs Technical Geometry, constructability, topography, physical constraints Social/Environment Minimise land acquisition, avoid environmentally sensitive areas Feasibility Study 2010-2014 Stakeholder Feedback/ Preference Alignment preference of state governments, etc

RAILWAY SCHEME/ EIA/ PRELIM. DESIGN 2016-2017 ALIGNMENT OPTIONS DESIGN OPTIONS Option 8b Option 9a Option 10a Option 11 Option 12a Option 12b At grade Embankment Tunnel Railway Bridge Viaduct

RAILWAY SCHEME/ EIA/ PREL. DESIGN 2016-2017 DEC 2016 1 MAC 2017 19

RAILWAY SCHEME/ EIA/ PREL. DESIGN 2016-2017 CONSULTATION WITH GOVT AGENCIES Terengganu MB & EXCO Jabatan Perhutanan Terengganu Jabatan Perhilitan Terengganu Jabatan Perhilitan Pahang Kelantan MB & EXCO Jabatan Perhutanan Ibu Pejabat + Pengarah2 Negeri Jabatan Perhilitan Ibu Pebajat Jab Pengairan & Saliran Kelantan Pahang MB & EXCO Jab Pengairan & Saliran Terengganu Jab Pengairan & Saliran Pahang Forest Research Institute Malaysia Jabatan Perhutanan Pahang UPEN Pahang UPEN Terengganu Pejabat Daerah dan Tanah Bentong Jabatan Alam Sekitar Ibu Pejabat UPEN Kelantan 18 Jan 19 Jan 19 Jan 20 Jan 23 Jan 26 Jan 27 Jan 31 Jan 1 &16 Feb 1 Feb 2 Feb 3 Feb 6 Feb 7 Feb 9 Feb 9 Feb 16 Feb 16 Feb

RAILWAY SCHEME/ EIA/ PREL DESIGN 2016-2017 CONSULTATION WITH GOVT AGENCIES Jabatan Alam Sekitar Pahang + agensi-agensi negeri Jabatan Alam Sekitar Terengganu Jab Pengairan & Saliran Ibu Pejabat + wakil negeri Jab Mineral & Geosains Ibu Pejabat + Pengarah2 Negeri Jabatan Perhilitan Selangor JPBD Ibu Pejabat + Pengarah2 Negeri Jabatan Kemajuan Orang Asli (JAKOA) Selangor Jabatan Perhutanan Ibu Pejabat + Pengarah2 Negeri Kementerian Pertanian dan Industri Asas Tani Jabatan Alam Sekitar Selangor Jabatan Perhilitan Ibu Pejabat + Pengarah2 Negeri Majlis Daerah Setiu Kementerian Sumber Asli & Alam Sekitar + agensi2 Jabatan Alam Sekitar Pahang + agensi-agensi negeri Jabatan Kemajuan Orang Asli (JAKOA) Bentong UPEN Selangor Majlis Perbandaran Kuantan 21 Feb 28 Feb 1 Mac 6 Mac 2 Mac 13 Mac 13 Mac 16 Mac 15 Mac 21 Mac 22 Mac 28 Mac 4 Apr 12 Apr 17 Apr 20 Apr 26 Apr

RAILWAY SCHEME/ EIA/ PREL DESIGN 2016-2017 CONSULTATION WITH GOVT AGENCIES Majlis Perbandaran Kuantan 26 Apr 2017 Jawatankuasa Kerja Tindakan Daerah Kuantan 28 Apr 2017 Jabatan Warisan Negara 2 May 2017 JabatanPengairan & Saliran Pahang 4 May 2017 UPEN Kelantan 7 May 2017 Mesyuarat Jawatankuasa CFS Terengganu 9 May 2017 Jabatan Pengairan & Saliran Kuala Lumpur 12 May 2017 UPEN Terengganu 15 May 2017 Pejabat Tanah & Galian Terengganu 15 May 2017 UPEN Pahang 15 May 2017 Exco Negeri Kelantan 17 May 2017

RAILWAY SCHEME/ EIA/ PREL. DESIGN 2016-2017 PERCEPTION SURVEY 2600 respondents

FEEDBACK FROM THE PUBLIC - FGDs Selangor Pahang Terengganu Kelantan RAILWAY SCHEME/ EIA/ PREL. DESIGN 2016-2017 1 Ketua Kg/JKK Kg Batu Dua Belas 15/2/17 2 Pengarah Hospital Orang Asli 17/2/17 3 Desa Makmur, Kg Sungai Salak, Taman Permai Jaya 17/2/17 4 Taman Sri Gombak 18/2/17 5 Taman Pertanian Ahmad Shah 2/3/17 6 Kg Kabut, Kg Awah, Kg Dalam 1/3/17 7 Kolej Matrikulasi 2/3/17 8 Kg Buntut Pulau, Kg Tg Batu, Kg Tengah 8/3/17 9 Serenity Water Villa/The Waterway Villa Bukit Tinggi, Bentong 21/2/17 10 Selesa Golf and Country Club 21/2/17 11 ADUN Lepar 7/3/17 12 Kg Paya, Kg Nangka and Kg Gong Surau 27/2/17 13 Kg Pinang, Kg Gong Kepas, Kg Batu Tumbuh 27/2/17 14 Kg Che Mohid, Kg Banggul 28/2/17 15 Kg Che Lijah 28/2/17 16 Kg Tasek, Kg Binjai Bongkok 28/2/17 17 SMK Padang Kemunting 1/3/17 18 Syarikat Keluarga Jaya 28/2/17 19 Sekolah Rendah Agama Al-Amin 1/3/17 20 Pengerusi JKKK Kg Padang Hangus 28/2/17 21 ADUN Kuala Besut and MB Terengganu (Communication Unit) 27/2/17 22 Sek Gong Darman, wakil Masjid Gong Darmin, Penghulu Gong Darmin/Penduduk 5/3/17 23 Kg Jelawat, Kg Beris Lalang 5/3/17 24 Penghulu Gaung Pendik, Penghulu Tunjung, Penghulu Repet, Imam 6/3/17 25 Guru, Penghulu. Ketua Kg, Pengerusi PIBG, wakil PendudukWakaf baru 6/3/17 26 Penghulu Mukim Tok Bali, Penghulu Kulim, AJK Pemuda, Penghulu Rhu,wakil penduduk 7/3/17 27 E-Mutiara Konsortium Kg Panji 7/3/17

RAILWAY SCHEME/ EIA/ PREL. DESIGN 2016-2017 WWF MALAYSIA TREES RIMBA 27 MARCH 2017

PUBLIC INSPECTION/ DISPLAY RAILWAY SCHEME Conditional approval on 2 Mar 2017 Public display (3 months) @ 20 locations. EIA Public display from 4 April 4 May @ 24 locations. TOTAL: 14,039 Walk in: 12,668 (90%) Online: 1,371 (10%)

EAST COAST RAIL LINK C O N N EC T I N G L I V E S, AC C E L E R AT I N G GROWTH THE PROJECT

OVERVIEW Start point : End point : Main line 6 spur lines WAKAF BHARU ITT GOMBAK 532.3 km 65.9 km Bukit Besi Kerteh (Provisional) Kemaman Kuantan Port City Kuantan Sentral (Provisional) Mentakab Kuala Terengganu

OVERVIEW Stations 23 Passenger 12 Freight 2 Passenger & freight 9 Interchange Stations Traction Wakaf Bahru Passenger & Freight Transfer with KTM Mentakab Passenger & Freight Transfer with KTM ITT Gombak Passenger Transfer with KLJ LRT Electrified Speed 160 km/h passenger 80 km/h freight

STATIONS Gemas (KTMB) Tumpat (KTMB) Cherating Kuantan Port City Spurline Wakaf Bharu Kuantan Port City Kota Bahru Kuantan Sentral Spurline Kuala Terengganu Jelawat Kota SAS Kuantan Sentral Tok Bali Gambang Kg. Raja Maran Penarik Tumpat (KTMB) ``` ``` Mentakab Spurline Gemas (KTMB) Kuala Terengganu Kuala Telemong Mentakab Bentong Gombak North Bukit Besi Spurline Pengkalan Berangan ITT Gombak Kuantan Sentral LRT Kelana Jaya Dungun Kerteh Spurline Kelantan Kemasik Kerteh Terengganu Pahang Kemaman Spurline Selangor Chukai Provisional Station

THE ALIGNMENT

PAHANG

TRACK Single Track on Double Track Formation Standard Gauge (1435 mm) more stable at higher speed Continuous Welded Track ROW typically 25 m at-grade

GEOMETRY less than 1% Maximum track gradient Minimum radius 1600m

CONSTRUCTION METHODS At-grade/ embankment 77% 395.8 km 200 Vehicular Box Culverts Elevated 15% 88.0 km 80 Bridges > 300 m long: Sg. Kelantan Sg. Terengganu Sg. Dungun Sg. Kemaman Sg. Pahang 33 Viaducts Tunnel 8% 48.5 km 19 Tunnels

TIMELINE 2017 2018 2019 2020 2021 2022 2023 2024 7 years