February 12, Request for Proposal Overview Pre-bid Conference

Similar documents
I-66 Vienna/Fairfax-GMU Metrorail Station Accessibility Improvement RFQ Information Meeting

VDOT. Virginia Department of Transportation REQUEST FOR QUALIFICATIONS A DESIGN-BUILD PROJECT

VDOT. Virginia Department of Transportation REQUEST FOR QUALIFICATIONS A DESIGN-BUILD PROJECT

Traditional v. Negotiated Procurement. Malcolm T. Kerley, P.E. Capital Beltway HOT Lanes PPTA Advisory Panel December 4, 2003

Smart Portal State of Good Repair Pavement and Bridge. November 8, 2017

REQUEST FOR PROPOSALS

Massachusetts Bay Transportation Authority. POLICIES & PROCEDURES Design Build Procurement Procedures April 2016

Exhibit A DEFINITIONS AND ACRONYMS

A DEFINITIONS AND ACRONYMS

REQUEST FOR PROPOSALS

AMENDMENT TO ADVERTISED CONTRACT

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE MARCH LANE/EAST BAY MUD BICYCLE AND PEDESTRIAN PATH CONNECTIVITY IMPROVEMENTS.

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR RAISED MEDIAN AT EL DORADO STREET. Issued by:

REQUEST FOR QUALIFICATIONS Construction Engineering Services for On-Call Consulting Services. and

FAIRFIELD AVENUE, EWING STREET, SUPERIOR STREET, AND WELLS STREET PRELIMINARY FEASIBILITY STUDY

A DEFINITIONS AND ACRONYMS

REQUEST FOR PROPOSAL Milling Services

2015 Five-Year County Highway and Bridge Improvement Plan Guide

Overview of the Procurement and Project Milestones

2. PROJECT SCHEDULE PROJECT COST ESTIMATE PROJECT FINANCING... 9 Summary of Estimates and Expenditures... 9 Project Allocations...

Georgia DOT Local Maintenance Improvement Grant Program. Todd Long, P.E., Deputy Commissioner

October 6, The proposal due date and time scheduled for Friday, November 3, at 04:30 P.M. remains unchanged.

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE BRIDGE REHABILITATION PROJECT. Issued by:

REQUEST FOR PROPOSALS PROFESSIONAL DESIGN SERVICES

BRF-009-9(73) IA 9 Black Hawk Bridge

City of Mount Rainier

STANDARD DRAWINGS INDEX

2018 Community Crossings Matching Grant Program

Guidance for Locally Administered Projects. Funded Through the NJDOT/MPO Program Funds Exchange. August 27, Revised September 15, 2014

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS (RFP)

DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, VIRGINIA

PUBLIC WORKS DEPARTMENT 22 E. Weber Avenue, Room 301 Stockton, CA (209) REQUEST FOR PROPOSALS PROFESSIONAL DESIGN SERVICES FOR THE

Addendum No.3 to ITB Wakulla County Fire and EMS Station Issued: November 1, 2017

OCTOBER 1, 2015 ADDENDUM NO. 1 FOR REQUEST FOR QUALIFICATIONS ( RFQ ) FOR DESIGN CONSULTING SERVICES (TARGET MARKET) SPECIFICATION NO.

Water Street Corridor Streetscape Improvement Project. Resident Engineer Services Information Session June 1st, 2018, 1:00 PM

REQUEST FOR PROPOSALS (RFP) For Electrical Engineering Design Services City Hall Switchgear Replacement October 28, 2016

CITY OF JOPLIN, MISSOURI

PRE-BID CONFERENCE FOR BID NO SOUTH MAIN STREET MILLING AND RESURFACING IMPROVEMENTS TOWN OF WINDERMERE, FLORIDA

ORIGINAL. Public Private Transportation Proposal USR 460. Richmond PROPOSER. September 14, 2006 TEAM MEMBERS

VALUE ENGINEERING PROGRAM

Request for Proposal Design- and Construction- Engineering Services

Value Engineering Program Administration Manual (05/16/2018)

Request for Qualifications For

PENNSYLVANIA TURNPIKE COMMISSION RETENTION OF AN ENGINEERING OR CONSTRUCTION INSPECTION FIRM. Open-End Construction Inspection Services for

CITY OF PLACERVILLE Development Services Department ENGINEERING DIVISION

PRE-PROPOSAL CONFERENCE

Route 58 PPTA Project Finance Plan Annual Update Hillsville to Stuart Corridor. Submitted By:

I-80/I- 380 Systems Interchange Reconstruction Construction Manager/General Engineering Consultant Services

REQUEST FOR QUALIFICATIONS (RFQ) AIRPORT ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT MINOT INTERNATIONAL AIRPORT

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR INSTALLATION & UPGRADE OF BICYCLE FACILITIES (CLASS II & CLASS III) Issued by:

Exhibit "A" SCOPE OF SERVICES. Escambia County, Florida Design Services for State Road 95 (US 29) Improvement Project

City of Mount Rainier

Asphalt Quality Task Force. October 2, 2012 David Shiells, P.E. District Materials Engineer, NOVA District

Scope of Services The City is seeking consulting services for the following tasks:

Subject: Request for Proposal Route 99 Interchanges at Hammett Road and Kiernan Avenue

PRE-BID CONFERENCE. Invitation for Bids (IFB) 8-18-C001. Design/Build Dulles Airport Metrorail Station Windscreens Package G.

CHESAPEAKE BAY BRIDGE AND TUNNEL DISTRICT PARALLEL THIMBLE SHOAL TUNNEL REQUEST FOR QUALIFICATIONS #PTST-15-1

(This page intentionally left blank)

SCOTT COUNTY COMMUNITY SERVICES DIVISION

2017 Statewide On-Call Design Request for Proposal

PARTNERSHIPS ACCELERATE ECONOMIC DEVELOPMENT & JOB CREATION. J. Douglas Koelemay, Director

REQUEST FOR PROPOSAL FOR POLICE OPERATIONS STUDY. Police Department CITY OF LA PALMA

DALLAS HORSESHOE PROJECT RFQ Q & A MATRIX #6. (February 14, 2012)

Culpeper, VA. Virginia Department of Transportation

Brazoria Drainage District No. 4 Request for Qualifications (RFQ) For Engineering Design Services for the Mykawa Drainage Improvement Project

HIGHWAY CONSTRUCTION PROGRAM. N. C. Department of Transportation (Research and Development) (Construction and Maintenance)

Request for Proposals Construction Services Workplace Excellence Project

Five-Year County Highway and Bridge Improvement Plan Guide

I SAVANNAH GA 11 JUN 89

Northfield Historical Society Request for Proposal (RFP)

REQUEST FOR PROPOSALS (RFP) Northern Washington County - Corridor-Based, Small Area Transportation Plan

REQUEST FOR PROPOSALS

PENNSYLVANIA TURNPIKE COMMISSION

Request for Proposal

PENNSYLVANIA TURNPIKE COMMISSION

Golden Valley Historical Society Request for Proposal (RFP) Museum Interpretive Exhibit Curatorial Work, Design, Fabrication, & Installation

Enhancement Program Project Delivery Breakout Session #4C Track: Funding Programs

FLORIDA DEPARTMENT OF TRANSPORTATION

SACRAMENTO REGIONAL SOLID WASTE AUTHORITY REQUEST FOR PROPOSALS FOR CONSULTING SERVICES FOR A REGIONAL GREEN WASTE PROCESSING FACILITY

Guidance. Historical Studies Review Procedures

REQUEST FOR PROPOSALS FOR AS-NEEDED TRAFFIC ENGINEERING AND PROFESSIONAL SERVICES FISCAL YEARS 2017 THRU 2019

Request for Qualifications Architectural Analysis Programming and Planning for the Clear Creek County Courts Wing Remodel Project Georgetown, Colorado

Conceptual Proposal for U.S. Route 460 Corridor Improvements Project Through the Public-Private Transportation Act

Staff Approve Resolution R to amend the FY TIP.

2016 I-74 General Engineering Consultant Services

3 Multi-contract, 38-mile roadway project adapts to face challenges PMC manages 38-mile US 290 Program in Houston US 290 Program Office

REQUEST FOR PROPOSALS (RFP)

MINER AVENUE COMPLETE STREET IMPROVEMENTS

CONSTRUCTION DIVISION (CD)

HILLSBOROUGH COUNTY AVIATION AUTHORITY THREE YEAR OVERALL DISADVANTAGED BUSINESS ENTERPRISE GOAL Federal Fiscal Years 2017, 2018 and 2019

Expected Roadway Project Crash Reductions for SMART SCALE Safety Factor Evaluation. September 2016

April 13, 2007 SUBJECT: GEOMETRIC IMPROVEMENTS OF CITY CONNECTING LINKS OF THE STATE HIGHWAY SYSTEM - FISCAL YEAR 2011

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION

REQUEST FOR QUALIFICATIONS CAMP HALL RAILROAD BUILD-IN DESIGN-BUILD PROJECT. Camp Hall Commerce Park (Camp Hall) Ridgeville, South Carolina

PENNSYLVANIA TURNPIKE COMMISSION RETENTION OF AN ENGINEERING OR CONSTRUCTION MANAGEMENT FIRM

Transportation Management Plan Overview

The Maryland Transportation Authority has. Staff Approve Resolution R to amend the FY TIP.

REQUEST FOR QUALIFICATIONS (RFQ) FOR DESIGN ENGINEERING SERVICES FOR TOWN CENTER STORMWATER IMPROVEMENTS

Transcription:

February 12, 2014 I-495 Northern Section Shoulder Use Project Request for Proposal Overview Pre-bid Conference

I-495 Northern Section Shoulder Use Project Scope of Work Major Items Mill and overlay - Light gray pavement for shoulder use lane Pavement joint repairs Pier protection ti TL-5 Median Barrier modifications Advance DMS sign(s), static ti signs, overhead lane control signs and CCTV Relocating 3 Bridge mounted OHS Joint reconstruction on Scotts Run bridge Traffic control / MOT 2

Key Design Elements Match the lane configuration, including the 12 lane locations, as shown in the RFP Conceptual Plans Left shoulder no less than 2.5 Vertical clearance Design Waivers Georgetown Pike and Old Dominion Drive over pass (included in the RFP Information Package) Design Exceptions Reduced NB Lane and Shoulder Widths/ SB Inside Shoulder Width at Sign Structures/ Horizontal Sight Distance (obtained by VDOT) 3

Key Elements Hydraulics Design Shoulder-use lane - Maximum design spread width shall be the shoulder width plus three (3) feet throughout Preliminary spread computations are included in the Drainage Report For the purpose of developing the Price Proposal, the Offeror shall assume that the drainage pipes and culverts within the Project limits which h are a functional element of the proposed final drainage design, are in a serviceable condition. 4

Key ITS Elements Lane Control System, Advance DMS, Incident Detection System, CCTVs and Loop Detectors Existing Fiber between Northern terminus of Express Lanes and American Legion Bridge (Plans included in the RFP Information Package) Testing and Coordination with VDOT Northern Region Operations (NRO) and/or VDOT s representatives 5

MOT/ Traffic Control Roadway Lane and Shoulder Closure Restrictions Permitted Hours Roadway Single-Lane Closures Double-Lane Closures Complete Road Closure* I-495 including interchanges and associated ramps M, Tu, W, Th 9:30 a.m. to 3:00 p.m. 9:30 p.m. to 5:00 a.m. Friday 9:30 a.m. to Noon 10:00 p.m. to 9:00 a.m. Saturday 9:30 p.m. to 9:00 a.m. Sunday 9:30 p.m. to 5:00 a.m. M, Tu, W, Th 11:00 p.m. to 5:00 a.m. Friday 10:30 p.m. to 7:00 a.m. Saturday 10:00 p.m. to 9:00 a.m. Sunday 10:00 p.m. to 5:00 a.m. M, Tu, W, Th 11:00 p.m. to 5:00 a.m. Friday 11:00 p.m. to 7:00 a.m. Saturday 11:00 p.m. to 9:00 a.m. Sunday 10:00 p.m. to 5:00 a.m. Other Roadways M, Tu, W, Th 9:00 a.m. to 3:00 p.m. 9:00 p.m. to 5:00 a.m. Friday 9:00 a.m. to Noon 9:30 p.m. to 9:00 a.m. Saturday 9:30 p.m. to 9:00 a.m. Sunday 9:30 p.m. to 5:00 a.m. M, Tu, W, Th 11:00 p.m. to 5:00 a.m. Friday 11:00 p.m. to 7:00 a.m. Saturday 11:00pm p.m. to9:00am a.m. Sunday 10:00 p.m. to 5:00 a.m. High Traffic Volume Corridor Important to follow Lane Closure restrictions Lane Rental Fees Work in close coordination with 495 Express Lanes 6

Contract Documents Five Parts: Part 1 Instructions for Offerors Part 2 Technical Requirements RFP Information Package Part 3 Lump Sum Agreement Exhibit 1 to Part 3 Part 4 General Terms & Conditions Part 5 Division I Amendments Since this project is Single Phase, please monitor the APD RFP website for any addendums or additional information: http://www.virginiadot.org/business/request-forproposals.asp 7

Part 1 Instructions to Offerors Introduction (Section 1.0) Project Priorities Cost - Best price for scope of work identified in RFP Estimated Contract Value - $15,101,000 Procurement Overview (Section 1.1) Single-Phase Low-Bid Responsive Bidder with lowest Proposal Price within VDOT s budget will be awarded the contract Bidders must meet minimal qualifications 8

Procurement Schedule & Project Milestones (Part 1, Section 2.4) Pre-proposal Meeting 02/12/14 RFP Questions Due to VDOT 02/19/14 VDOT Response to Questions 02/26/14 LOS/Price Proposal Due Date 03/12/14 Open LOS/Price Proposals 03/14/14 Notice of Intent to Award 03/21/14 CTB Approval/ Notice to Award 04/16/14 Contract Execution 05/07/14 Notice to Proceed 05/19/14 Interim Milestone 12/31/14 Final Completion 03/31/15 9

Procurement Schedule & Project Milestones (Part 1, Section 2.4) Interim Milestone all paving, striping, i dynamic message signs, overhead lane control system, ITS devices and systems, ATM field device and software integration and preliminary Acceptance Testing, signs associated with the shoulder operation, drainage, concrete barrier and pier protection, and other required items completed, accepted, and fully operational; and the shoulder use lane opened to traffic. 10

Contents of Proposals (Part 1, Section 4.0) Letter of Submittal (Section 4.1) Attachments to the Letter of Submittal (Section 4.2) Price Proposal (Section 4.3) Post Notice of Intent to Award Submittals (Section 4.4) 11

Letter of Submittal (Part 1, Section 4.1) C-78-RFP -Acknowledgment of RFP Declare the Offeror s intent to enter into a contract with VDOT and that the offer will remain in effect for 120 days Identify the Point of Contact for the Offeror Identify the Principal Officer for the Offeror Identify the Lead Contractor and Lead Designer Commit to achieving a 11% DBE Goal Provide Interim Milestone and Final Completion dates 12

Attachments to the Letter of Submittal (Part 1, Section 4.2) Affiliated and Subsidiary Companies Debarment Forms VDOT Prequalification Certificate Letter of Surety SCC and DPOR Registration Information for Businesses Work History Forms for Lead Contractor and Lead Designer 13

Attachments to the Letter of Submittal (Part 1, Section 4.2) Conceptual Roadway Plans Lane widths Shoulder widths Minimum i pavement sections Locations of full depth pavement and milling and overlay Locations of joint repair Cross slopes Plan location of all signs Conceptual layout for ITS devices Offeror s Conceptual Plan must meet RFP requirements to be responsivee 14

Price Proposal (Part 1, Section 4.3) Proposal Price specified as a Lump Sum Amount Asphalt, Fuel and Steel Adjustments Proposal Guaranty (Form C-24) Sworn Statement Forms Applicable DBE Forms Make sure DBE forms are complete and accurate!! Providing inaccurate DBE information or incomplete forms may render a Proposal non-responsive. 15

Post Notice of Intent to Award Submittals (Part 1, Section 4.4) 4) Organizational Chart and Narrative Identify Offeror s Key Personnel Design-Build Project Manager Quality Assurance Manager (PE) Design Manager (PE) Construction Manager (RLD and ESCCC) Electrical / ITS Supervising Technician SCC and DPOR Registration Information for Individuals DBE Subcontracting Narrative Proposal Schedule and Narrative Schedule of Items Monthly Payment Schedule Escrow Proposal Documents 16

Parts 3, 4 and 5 Standard Template Documents and Exhibit 1 to Part 3 Liquidated Damages (Part 3, Article 5.6) Interim Milestone- $20,000/day Final Completion - $3,100/day Scope Validation (Part 4, Article 2.2) 2) Begins on Date of Commencement and lasts for 60 days Verify and Validate RFP Documents provided by VDOT Identify Errors, Inconsistencies or Defects in the RFP Notify VDOT in Writing and with Supporting Documentation within Time Period 17

Parts 3, 4 and 5 Standard Template Documents and Exhibit 1 to Part 3 Builder s Risk Insurance (Part 5, Section 103.06) 18

Bryan Stevenson, P.E. VDOT Point of Contact Alternate Project Delivery Office Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219 Phone: (804) 786-6929 Fax: (804) 786-7221 E-mail: bryan.stevenson@vdot.virginia.gov t i i 19