The National Musculoskeletal (MSK) NHS Lanarkshire Pilot. Dr Sarah L Mitchell National Programme Manager Rehabilitation Framework

Similar documents
MSK AHP REFERRAL HUB (ADMIN)

NHS HIGHLAND ALLIED HEALTH PROFESSIONS MUSCULOSKELETAL REDESIGN

Ayrshire and Arran NHS Board

Prime Contractor Model King s Fund Nick Boyle Consultant Surgeon 27 March 2014

MUSCULOSKELETAL OUTPATIENT PHYSIOTHERAPY SERVICES DEVELOPING A PROPOSAL FOR A SINGLE MANAGEMENT STRUCTURE

Business Case Advanced Physiotherapy Practitioners in Primary Care

NHS CONTRACT FOR COMMUNITY SERVICES SCHEDULE 2 - THE SERVICES

ACUTE WAITING TIMES REPORT

CREATING EFFICIENT OUTPATIENT SERVICES

ASPIRE. Allied Health Professions Supporting and Promoting Improvement, Rehabilitation and Enabling Others ADVANCED PRACTICE SPECIALIST GENERALIST

DRAFT. Rehabilitation and Enablement Services Redesign

Physiotherapy outpatient services survey 2012

Transforming musculoskeletal and orthopaedic elective care services

Your Care, Your Future

NHS LANARKSHIRE PATIENT ACCESS POLICY

Management of Sickness Absence in NHS Lanarkshire

Trauma & Orthopaedics Service Redesign July 2016

Learning from best Practice. Musculoskeletal conditions as a health priority. The role of clinical networks

NHS GRAMPIAN. Local Delivery Plan - Section 2 Elective Care

Improving General Practice for the People of West Cheshire

Committee is requested to action as follows: Richard Walker. Dylan Williams

NHS Electronic Referrals Service. Paper Switch Off an update Digital Health Webinar 4 May 2018

Child and Adolescent Mental Health Services Waiting Times in NHSScotland

Data Quality and Information Flow

Child and Adolescent Mental Health Services Waiting Times in NHSScotland

Operational Measures for AHP Services across Scotland

Musculoskeletal Triage Service

WAITING TIMES REPORT

62 days from referral with urgent suspected cancer to initiation of treatment

Neath Primary Care Hub Pacesetter

NHS BORDERS PATIENT ACCESS POLICY

REDESIGNING ALLIED HEALTH OUTPATIENTS - Lean Thinking Applications to Allied Health

PATIENT RIGHTS ACT (SCOTLAND) 2011 ACCESS POLICY FOR TREATMENT TIME GUARANTEE

1. NHS Tayside Independent review by Grant Thornton UK on financial governance in NHS Tayside, including endowment funds

You said We did. Care Closer to home Acute and Community Care services. Commissioning Intentions Engagement for 2017/18

Intensive Psychiatric Care Units

Child and Adolescent Mental Health Services Waiting Times in NHSScotland

WAITING TIMES 1. PURPOSE

The Community Musculoskeletal Service

Clinical Decision Support (CDS) in Primary Care: Getting Evidence into Frontline Practice

Outpatient Services Improvement September 2010

GP Social Enterprise led Call Handling & Nurse Triage Project

Issue No. 7 February 2011 ORTHODONTIC PATHWAY AND REFERRAL GUIDANCE. Primary Care Practitioner. Assessment of occlusion. referral not indicated

SCOTTISH DRIVING ASSESSMENT SERVICE: DRAFT FOR DOP COMMENT

Update Report to Clinical Members. Quarter 3; what have we done so far

NHS Board Workforce Projections 2017 NHS LANARKSHIRE. Table of Contents

Report to Governing Body 19 September 2018

Bristol CCG North Somerset CGG South Gloucestershire CCG. Draft Commissioning Intentions for 2017/2018 and 2018/2019

Lanarkshire NHS Board, Kirklands, Fallside Road, Bothwell, Glasgow, G71 8BB Telephone

The PCT Guide to Applying the 10 High Impact Changes

Every Person in NHS Ayrshire and Arran referred with a disorder of the nervous system experiences a quality of care that gives confidence to patient,

2. This year the LDP has three elements, which are underpinned by finance and workforce planning.

General Practice 5 Year Forward View Operational Plan Leicester, Leicestershire and Rutland (LLR) STP

Agenda Item No: 6.2 Enclosure: 4 17/1/02012 Intended Outcome:

Business Case Template

PRIMARY CARE COMMISSIONING COMMITTEE

The PCT Guide to Applying the 10 High Impact Changes. A guide from NatPaCT

Ayrshire and Arran NHS Board

RBCH Actions to meet CQC Essential Standards

Quality and Efficiency Support Team (QuEST) Directorate for Health Workforce and Performance

Report by Margaret Brown, Head of Service Planning & Donna Smith, Divisional General Manager, Patient Services, Raigmore

THE MUSCULOSKELETAL MAP OF SCOTLAND. Evidence of local variation in the quality of NHS musculoskeletal services in Scotland

Intensive Psychiatric Care Units

NHS GRAMPIAN. Local Delivery Plan (LDP) 2016/17 Progress Report on Primary Care Chapter

20 February 2018 Paper No: 18/04 DELIVERING THE NEW 2018 GENERAL MEDICAL SERVICES CONTRACT IN SCOTLAND

Supporting the health and well being of NHS staff and reducing sickness absence

AHP Services Data Definitions Guidance. Guidance for monitoring the Ministerial AHP 13 Week Access Target

Newport East Neighbourhood Care Network Action Plan Progress against the plan

Outpatient Services Review and Improvement (3 Clinician pilot) Full Report - May 2010

Ayrshire and Arran NHS Board

3. ORGANISATIONAL POSITION

Board of Directors Meeting

PHYSIOTHERAPY PRESCRIBING BETTER HEALTH FOR AUSTRALIA

A 360 Degree Approach to Health and Work. Mersey Care NHS Trust

OPERATIONAL PERFORMANCE REPORT: March Swindon Community Health Services Overview

Community Health Partnerships (CHPs) Scheme of Establishment for Glasgow City Community Health and Social Care Partnerships

Access to Psychological Therapies DCAQ in NHS Ayrshire & Arran

An improvement resource for the district nursing service: Appendices

OPTIONS APPRAISAL PAPER FOR DEVELOPING A SUSTAINABLE AND EFFECTIVE ORTHOPAEDIC SERVICE IN NHS WESTERN ISLES

Primary Care Workforce Survey 2013

Route Map to the 2020 Vision: A Strategic Assessment of a Health Board s Capability and Capacity to Deliver the 2020 Vision for Primary Care

Appendix 1: South Lanarkshire H&SCP Improvement Plan 2017/18.

Lessons Learned from Scotland s Electronic Health Record Programme. Greater China e-health Forum 7 th October 2011

Leicester, Leicestershire and Rutland s Sustainability & Transformation Plan (STP)

Learning from adverse events. Learning and improvement summary

Executive Summary / Recommendations

Evaluation of physiotherapist and podiatrist independent prescribing: Summary findings from final report

DRAFT BUSINESS PLAN AND CORPORATE OBJECTIVES 2017/8

Appendix 1: Integrated Urgent Care Service Update. 1. Purpose

NHS GRAMPIAN. Grampian Clinical Strategy - Planned Care

NHS 24 SCTT Strategy

Redesign of Front Door

CCG authorisation Case Study Template. NHS Croydon Clinical Commissioning Group. Patient Navigation (PatNav) 3 of 3

SERVICE SPECIFICATION FOR THE PROVISION OF MUSCULO-SKELETAL SERVICES TO PATIENTS REFERRED FROM PRIMARY CARE WITH MUSCULO-SKELETAL PROBLEMS

Community Services Quality Update Report. Melissa Laskey, AD Commissioning Jackie Bene, Chief Executive, Bolton FT (action plan)

Primary Care in Scotland Looking to the future. Fiona Duff Senior Advisor, Primary Care Division, Scottish Government

Greater Manchester Health and Social Care Strategic Partnership Board

CLINICAL STRATEGY IMPLEMENTATION - HEALTH IN YOUR HANDS

Welsh Government Response to the Report of the National Assembly for Wales Public Accounts Committee Report on Unscheduled Care: Committee Report

Inpatient, Day case and Outpatient Stage of Treatment Waiting Times

Transcription:

The National Musculoskeletal (MSK) NHS Lanarkshire Pilot Dr Sarah L Mitchell National Programme Manager Rehabilitation Framework

Policy Background The National Delivery Plan for the Allied Health Professions in Scotland, 2012 2015

Why are we re-designing our MSK services? 1 in 4 GP consultations MSK related (1 in 3 for over 75 s) More than 10 million GP consultations (MSK) each year costing 141M (UK). 30,000 patients sitting on Orthopaedic waiting list in Scotland, with conversion to surgery as low as 11%. 7.6 million working days lost due to MSK related conditions. 40,000+ MSK referrals into Lanarkshire AHP Services. Patient Variation Experiences Access Management...Outcomes Waiting Times

Current Systems in Scotland Current pathway of GP to Consultant results in approx. 35% conversion to surgery Current MSK self referral services not efficient Large variation in referral rates into services and long waits No system in place to assist workless into employability services No systematic approach to support self management Large variation in practice across NHS Boards No robust data collection to evidence impact

What are we Proposing? A National MSK Triage and Referral Management Service for NHS Scotland utilising the technologies of NHS 24 Local referral management hubs within boards Direct referral into WHSS for those working in SME s Development of Interdisciplinary pathways using evidence based outcome measures Development of algorithms within pathway to ensure correct service provision Early identification of employability issues, anxiety depression scores Greater utilisation of leisure facilities What does that mean for each of us? Increased or Decreased workload for some of us. Better use of clinical skills and resources. Better patient clinical outcomes. Right Patient, right place, right time. Some of us may have to grow our current skill set. We all need to place high value on clinical evidence and patient outcomes. We all need to be prepared to be held to account more as leaders.

Patient visits GP 1.8 times on average before being referred to AHP service Current referral pathway Referral received by local AHP service and put onto waiting list 20 (2) days Patient attends 78 (60) days GP completes written referral or patient self refers 18 days Patient contacted and offered appointment 68 (50) days Patient calls NATS*, triaged and referral sent to local MSK Hub Proposed referral pathway Patient attends Within 40 days Patient contacted and offered appointment 5 days

MSK MATS Referral Proposed Process Proposed Patient Journey - MATS *******Implementation dependant on Pilot Sites Evaluation*******.

MSK Key Performance Indicators Total MSK demand Patient DNA rates Referrals to Orthopaedics Waiting times GP consultations Investigations Prescription charges Referrals to Leisure services Referrals to Employability services Mental Health referrals Patient experience & Satisfaction (inc selfmanagement grp) Functional Improvement Outcomes Assess equity of access for patients to appropriate management options - consistent high quality information, advice and treatment Full cost benefit and economic analysis True health / employability pathway

The Role of NHS 24 What? It will run a national advice and triage telephone based management resource for MSK conditions. Why? Reduce inequity Provide speedy access to advice and information Consistent triage of callers Realise efficiencies and release frontline capacity

Data Source: MATS National Data Base MATS 2012 YTD Data Total 12854 Total 2040 16% Total Self Management Option 1 + Option 2 SM 2040 + 1127 = 3167 28% of Total Calls Database is split by board and rolls up to National Figures Total 10814 84% Board 7367 68% WHS 315 3% EC 2 0% SM 1127 11% GP 57 1% Misc 1946 18% Avg Talk Time per Call 8.21 mins Clinical Supervision 8% SLA % - 93% Web Hits YTD 39,000 TV Hits YTD 2,000

Milestones Achieved NHS Lanarkshire Pilot Local Communication Strategy GP regular updates. Relationship established with LMC SOPs (Standard Operating Procedures) being developed and standardised for all elements of pilot. Direct links made with Pain Services. A&C Review in process. Pre-Pilot Patient Satisfaction Survey completed. Podiatry Pathway from Referral HUB in development. Pathway work initiated in NHS Ayrshire & Arran. On-going in NHS Lothian.

January February March April May June July August September October November December July 12 update NHS Lanarkshire (MSK) Redesign Programme Programme Goal Improve access to the most appropriate MSK management and treatment pathways: better clinical outcomes and experience. Activity to date within NHS Lanarkshire Total month demand in NHS Lanarkshire 4000 3500 3000 2500 39 26 1204 66 1214 30 933 32 904 15 799 35 912 National Programme Activity MATS (NHS 24) Electronic referrals received via Sugar system by NHS Lanarkshire. WHSS referrals still sent to NHS L New style sheet from Sept Referrals from NATS to WHSS to be sent directly from Sept Admin & Clerical AHP MSK Physio HUB continues in Hairmyres primarily staffed by bank staff. Admin review ongoing with transfer of admin resource to be finalised HUB location may alter with outcome of this review. 2000 1500 1000 500 0 1158 836 673 810 686 699 740 611 1649 1520 1356 1225 1325 1393 1071 0 0 0 0 0 0 0 2012 2012 2012 2012 PAL GP GP ORTHO REFERRALS PAPER ELECTRONIC 2012 NHS24 2012 OTHER Pathways Spinal, Shoulder and Knee Pathways finalised. Physiotherapy MSK staff training on use of pathways Information session arranged to inform WHSS physios of pathway process Foot and Ankle Pathway awaiting decision form DMT. Total month activity in NHS Lanarkshire IT Issues 28 tablets available for use Treatment outcomes with IT dept Wifi scoping underway Outcome measures analysis with IT dept Remind + scoped SOPs signed off Treatment outcomes on Trakcare Admin review agreed Outcomes measures IT build Wifi Scope Electronic tablets Sept Sept Sept / Oct Sept / Oct Sept / Oct Sept / Oct Oct If you require any further information please contact: Ruth Currie, Physiotherapy MSK Manager : ruth.currie@lanarkshire.scot.nhs.uk>

Successes to Date High Profile within National Networks and Forums Single Point of Access for all MSK Patients within NHSL MSK Electronic Referrals for GPs and other HC professionals introduced Interface between NATs and NHSL Creation of Self Management Resources Evidence based outcome measures on TRAK Call Handlers Trained in MATs All NHSL physiotherapy clinics now on TRAK All NHSL physiotherapy staff trained on TRAK HUB Admin Staff appointed Key aspect of Ministerial Debate on rehabilitation.

Capacity & Demand Clinical (AHP) Capacity & Demand Calculator Step 1 Enter Staffing details: - Staff Member - Non-clinical duties (tick boxes and hours out) - Contracted hours - Location/Department - Speciality (Physio, Podiatry, etc.) - Current expected N:R ratio - Current template (expected number of patients seen) - Identifies actual capacity versus demand and clinic utilisation (RAG status) - Sets clinic templates in line with time available to meet actual demand (standardisation) - Appointment slot times set as variables to show impact on capacity if times adjusted - Sets workforce planning rules (the expected way to work) - Matches resource to individual clinic demand - Provides Waiting list predictor based on current queue and workforce planning

NHS Lanarkshire 2012 Data YTD Referral Numbers Average of 3167 total referrals per month over the first seven months Waiting Times Add comment if required?

NHS Lanarkshire - Orthopaedic Demand Low back pain 2009-2011 - Over 3000 Ortho Patient Demand Reduction

Pathway Development NHS Lanarkshire Pathways now in place for: WHSS Mental health Employability services Leisure services Pain services Rheumatology services Orthopaedic services Older people / falls services

WHSS INTEGRATION & MSK EMPLOYED PATIENTS VIA NHS24, NHSL, GPS EMPLOYERSS RAPID ACCESS TO THERAPY WHSS SERVICE CENTRE (4000 PATIENTS PER ANNUM) UNEMPLOYED PATIENTS EQUALLY WELL VIA NHSL, NHS24 JOB BROKERING VIA REMPLOY RETURN TO WORK MENTAL HEALTH SUPPORT GAIN EMPLOYMENT

WHSS Demand NHS Lanarkshire - NHS 24 Referral Form adapted to highlight WHSS requirement more visible. - Change of Inclusion Criteria for WHSS to accept all SMEs, irrespective of being off sick - Created spread sheet in Fristport to simplify referral from HUB to WHSS - Work continues with SCi Gateway to directly refer WHSS patients from NHS 24 - NHSL awareness training event to be held in March.

KPI National MSK redesign programme Scope: Lanarkshire, Lower Back Pain, Physiotherapy, Start Date: 1 st May 2012 Evaluation Status CHI Age Sex Postcode Functional Outcomes (Questionnaires) Date & Score Employment Work Absence Source of Referral (Joint) Available Available Available Available Roland Morris on TRAK Able to extract data eta Oct 12 Available Not Available (AOB) Not Available* Demand Specialist Secondary MSK Services Not Available * New DNA Return DNA Average/Range Waiting Times - Urgent & Routine Not Available* Not Available* # Patients on Waiting List Not Available* Discharge Reasons/Outcomes #Contacts per patient journey Waiting Times Available. Urgent/Routine Split current not available Not Available* Discharge Outcomes to be loaded onto TRAK Not Available* # Investigations Investigate Service Data ** Notes: - Paul Mathieson to advise all demographic data available and team to advise if any additional required. * Data is captured in TRAK but not currently by joint. Stuart Wallace EHealth Lead NHSL investigating solution. ** Paul Mathieson to investigate current system investigation are logged on and advise.

Major Deliverables Equitable access for MSK patients to appropriate management options Consistent, high quality information and advice Information developed and adopted across NHS Scotland Enhanced user experience True health/employability pathway Wider Cost Benefits Full economic analysis