Procedure: 3.4.1p2. (II.D.2a.) Business Continuity Planning

Similar documents
Procedure: 3.4.1p1. (II.D.1a) Emergency Operations Planning

Table 1: Types of Emergencies Potentially Affecting Urgent Care Centers o Chemical Emergency

Duties & Responsibilities of the EMC

SECTION EARTHQUAKE

SAFE SCHOOL ZONE EMERGENCY RESPONSE AND CRISIS MANAGEMENT FOR SCHOOLS AND COMMUNITIES

EMERGENCY RESPONSE FOR SCHOOLS Checklists

Administrative Procedure AP FIRE, EARTHQUAKE AND DISASTER PREPAREDNESS (DISASTER PREPAREDNESS)

Emergency Operations Plan

CYBER ATTACK SCENARIO

Northern Arizona University Emergency Operations Plan 2011

Emergency Procedures at the Workplace

Office of the City Auditor. Committed to increasing government efficiency, effectiveness, accountability and transparency

BLINN COLLEGE ADMINISTRATIVE REGULATIONS MANUAL

ANNEX J INSTITUTIONAL CONTINUITY PLAN

NAVY CONTINUITY OF OPERATIONS PROGRAM AND POLICY

Procedure: 3.4.1p4. (II. D. 4.) Hazard Communication Program Planning and Hazardous Material Inventory

The software that powers HOME HEALTH. THERAPY. PRIVATE DUTY. HOSPICE

COUNTY OF EL DORADO, CALIFORNIA BOARD OF SUPERVISORS POLICY

School Emergency Management: An Overview

Department of Defense INSTRUCTION

The 2018 edition is under review and will be available in the near future. G.M. Janowski Associate Provost 21-Mar-18

SECTION EARTHQUAKE

School Vulnerability Assessment

New Hanover County Schools. Emergency Operations Plan. Summary (January, 2013)

SCHOOL CRISIS, EMERGENCY MANAGEMENT, AND MEDICAL EMERGENCY RESPONSE PLANS

Part 1.3 PHASES OF EMERGENCY MANAGEMENT

Nursing Home Incident Command System

SECTION EARTHQUAKE

Department of Elder Affairs Programs and Services Handbook Chapter 8: Emergency Management and Disaster Preparedness CHAPTER 8

Procedure: 4.2.2p2. Telework and Alternate Work Locations

Administrative Policies and Procedures

EMERGENCY OPERATIONS PLAN UNIVERSITY OF CINCINNATI December 2012 Rev. 4.2

VOCATIONAL SAFETY PROGRAM SELF INSPECTION CHECKLIST

Communication Plan (Incident Command Structure) Revision Date(s): October 2007; February 14, 2012; November 21, 2012, April 16, 2015 June 20, 2016

ANNEX R SEARCH & RESCUE

Emergency Planning: The Galveston National Laboratory. Joan E. Nichols PhD University of Texas Medical Branch Associate Director GNL Galveston, Texas

DISASTER PREPAREDNESS FOR MEDICAL PRACTICES

NUMBER: UNIV University Administration. Emergency Management Team. DATE: October 31, REVISION February 16, I.

Incident Planning Guide Tornado Page 1

Revising the National Strategy for Homeland Security

BLINN COLLEGE ADMINISTRATIVE REGULATIONS MANUAL

Emergency and Critical Incident Policy

Chapter 3: Business Continuity Management

Manager on Duty Tip of the Spear in Crisis Management

RENAL NETWORK 11 MOCK DRILL INSTRUCTIONS

Emergency Preparedness Glossary

Development of an Emergency Preparedness Plan for a Bibb County, Georgia Faith Based. Organization

ALABAMA DEPARTMENT OF HOMELAND SECURITY ADMINISTRATIVE CODE CHAPTER 375-X-2 DUTIES AND RESPONSIBILITIES OF ASSISTANT DIRECTORS TABLE OF CONTENTS

Emergency Preparedness Challenges Facing Long Term Care

University of San Francisco EMERGENCY OPERATIONS PLAN

UNIVERSITY OF HOUSTON

PATIENT SAFETY & RIS K SOLUTIONS GUIDELINE. Emergency Preparedness for Healthcare Practices

BUSINESS CONTINUITY PLANNING

BASIC PLAN. Alvin Community College Jurisdiction 01/16

Comprehensive Emergency Management Plan

DOH Policy on Healthcare Emergency & Disaster Management for the Emirate of Abu Dhabi

Mission. Directions. Objectives

Chapter 1 - History and Current Status of Emergency Management

MAHONING COUNTY PUBLIC HEALTH EMERGENCY RESPONSE PLAN DISTRICT BOARD OF HEALTH MAHONING COUNTY YOUNGSTOWN CITY HEALTH DISTRICT

Barrow County Emergency Management Agency Emergency Operations Plan

Cobb County Emergency Management Agency

Hurricane Response Overview for UWF Senior Administrators. Peter Robinson, Director, OEM

Keep on Keepin On Arkansas Continuity of Operations Program

RS 29:729 Parish homeland security and emergency preparedness agency authorities and responsibilities

Business Continuity Plan

Dialysis Facility Disaster Plan Template

Emergency/Crisis Response at Lakehead University Campuses

3 ESF 3 Public Works and. Engineering

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

DELAWARE COUNTY COMPREHENSIVE EMERGENCY MANAGEMENT PLAN RISK REDUCTION

Emergency Management Policy

REGULATORY DOCUMENTS. The main classes of regulatory documents developed by the CNSC are:

FOR CONSULTING SERVICES FOR DISASTER RESPONSE, ENGINEERING, AND GRANT MANAGEMENT SUPPORT

EMERGENCY SUPPORT FUNCTION (ESF) 3 PUBLIC WORKS AND ENGINEERING

EMERGENCY PREPAREDNESS POLICY

Telework. A Successful Business Strategy. Ensure Business Continuity

Health, Safety, and Emergency Policy & Procedures Manual. Version: 2 Updated date: 18 June 2013 Approved By: Document Revision Form

Emergency Preparedness UB Business Day

Emergency Management Guideline, 2018

BCM in the Bundesbank Crisis management at the Bundesbank Christoph Stute October 2015

School Earthquake Preparedness Guidebook

OFFICE OF EMERGENCY MANAGEMENT ANNUAL REPORT

NEW DISASTER PLANNING REGULATIONS AND REQUIREMENTS: ARE YOU PREPARED?

STATE EMERGENCY FUNCTION (SEF) 10 HAZARDOUS MATERIALS. I. Lead Agency: Colorado Department of Public Safety (CDPS), Colorado State Patrol (CSP).

Why Prepare? Personal preparedness. Make your own emergency plans. Why? The government may not be able to meet your needs. Example?

Continuity of Operations Plan (COOP)

Emergency Preparedness Planning and Implementation (EPPI) Study Guide

Business Continuity Plan Example

School District 68 (Nanaimo-Ladysmith)

WHAT IS AN EMERGENCY? WHY IT IS IMPORTANT TO PREPARE COMMUNICATIONS

What U.S. Habitat affiliates and state support organizations need to know

DRCOG Business Continuity Plan

Community-based Disaster Risk Reduction Clinician Outreach and Communication Activity (COCA) Conference Call August 21, 2012

The Board is asked to note the survey outcome as Substantial (green rag rating). Progress with action planning and delivery has commenced

Business Continuity Plan

What is MITIGATION? An action that reduces or eliminates long-term risk to people and property from natural hazards and their effects.

Miami-Dade County, Florida Emergency Operations Center (EOC) Continuity of Operations Plan (COOP) Template

EMERGENCY OPERATIONS PLAN WHITNEY INDEPENDENT SCHOOL DISTRICT Whitney Independent School District 1

Emergency/Crisis Response at Lakehead University Campuses;;

LAMAR INSTITUTE OF TECHNOLOGY BUSINESS CONTINUITY PLAN

Transcription:

Procedure: 3.4.1p2. (II.D.2a.) Business Continuity Planning Revised: January 17, 2017; November 7, 2013 Last Reviewed: January 17, 2017; October 14, 2016 Adopted: November 7, 2013 I. PURPOSE: The Business Continuity Plan (BCP) ensures the maintenance of critical operations when confronted with adverse events such as natural disasters, technology failures, human errors, or terrorism. The BCP must minimize loss to the organization, continue to serve customers, and maintain administrative operations. Each work unit or technical college has an obligation to protect and provide for employees, students, volunteers, visitors, vendors and contractors in the event of a major interruption to the mission or operation. The President is directly responsible for the implementation of this procedure. The President shall provide sufficient resources, personnel and administrative support to accomplish this end. II. RELATED AUTHORITY: n/a III. APPLICABILITY: All work units and technical colleges associated with the Technical College System of Georgia. IV. DEFINITIONS: Business Continuity: Business continuity is an ongoing process to ensure that the necessary steps are taken to identify the impact of potential losses and maintain viable recovery strategies, recovery plans, and continuity of services. Business Continuity Planning: Business continuity planning is the process whereby organizations ensure the maintenance of critical mission functions when confronted with adverse events such as natural disasters, technology failures, human errors, or terrorism. The objectives of a business continuity plan (BCP) are to minimize loss to the organization, continue to serve customers, and maintain administrative operations. Business Continuity Impact Analysis: Business continuity impact analysis identifies critical business processes, assigns estimates of maximum allowable downtime, and designates priorities for restoration. Critical Mission Functions: Critical mission functions include those activities, devices, services or systems whose failure or disruption will cause a collapse in business operations.

Hazard Vulnerability Assessment: Hazard vulnerability assessment identifies specific threats, assesses vulnerability to those threats, and assigns degree of risk associated with each threat. Mitigation: The capabilities necessary to eliminate or reduce the loss of life and property damage by lessening the impact of an event or emergency. V. ATTACHMENTS: A. Attachment 3.4.1p2.a1. TCSG Business Continuity Plan Template VI. PROCEDURE: A. The President is directly responsible for the implementation of this procedure and shall provide sufficient resources, personnel and administrative support to accomplish this end. B. The BCP must be developed and implemented with regard to the protocol as follows: 1. Recognize the Intent of the BCP: The intent of the BCP is to guide response and recovery from a major emergency and where appropriate, to be linked or combined with emergency operations procedures. 2. Form a Collaborative Team: This team should be representative of the operational units of the work unit or technical college and work cooperatively with a System Office contact. The work unit or technical college will assign a single individual to serve as the Continuity Coordinator. 3. Identify Scope of BCP: A BCP represents the needs of the work unit or technical college as a whole, as well as for the individual operating units within, which are responsible for critical mission functions. 4. Perform Business Impact Analysis: A Business Impact Analysis identifies critical business processes, assigns estimates of maximum allowable downtime, and designates priorities for restoration. 5. Complete Hazard Vulnerability Assessment: A Risk Assessment identifies specific hazards, assesses vulnerability to those hazards, and assigns degree of risk associated with each hazard. 6. Develop the BCP: These are the strategies which mitigate the risk of the identified hazards. Provide information to complete the designated templates and work with the TCSG System Office to submit the information to the requisite State of Georgia Living Disaster Recovery Planning System (LDRPS). Other optional BCP systems or processes may be considered. 7. Maintain the BCP: The BCP shall be reviewed as part of a continuous improvement process and revised as necessary each year. In addition, review of the BCP should be considered when any of the following have occurred: actual emergencies; changes have been made in policy, procedure, personnel, organizational structures, processes, facilities, or equipment; formal updates of planning guidance or standards have been finalized; formal exercises have taken place; changes in the surrounding

community have occurred; threats or hazards change or new ones emerge; or ongoing assessments generate new information. 8. Implement the BCP: Promulgate the BCP to all stakeholders. Train, drill and exercise all participants to their level of involvement. Document BCP implementation. C. The President shall submit the reviewed BCP to the TCSG System Office not later than May 1st of each calendar year. D. The System Office shall review, coordinate the revisions of and approve the BCP. The System Office will provide technical assistance for the development and review processes as well as training, drills and exercises. VII. RECORD RETENTION: The currently implemented BCP and all of its revisions shall be retained for a three year period.

Attachment 3.4.1p2.a1. TCSG Business Continuity Plan Template Business Continuity Plan {Technical College} 2016-2017 REVIEWED: DATE: BUSINESS CONTINUITY COORDINATOR {TECHNICAL COLLEGE} APPROVED: DATE: PRESIDENT {TECHNICAL COLLEGE} REVIEWED: DATE: EMERGENCY MANAGER TECHNICAL COLLEGE SYSTEM OF GEORGIA APPROVED: DATE: GENERAL COUNSEL TECHNICAL COLLEGE SYSTEM OF GEORGIA

Business Continuity Plan Overview: {Technical College} 2016-2017 The Business Continuity Plan (BCP) supports the State Board of the Technical College System of Georgia Policy II. D. Emergency Preparedness, Health, Safety and Security assertion which states, The Technical College System of Georgia (TCSG) and each of its associated technical colleges and work units are committed to healthy, safe and secure workplaces and/or educational settings for all employees, students, volunteers, visitors, vendors and contractors. Each technical college or work unit shall develop, review and submit, at least annually to the System Office, those plans and procedures which are essential to respond to matters of natural and man-made hazards; public health; occupational and environmental safety as well as security. These plans and procedures shall be established with the goals of mitigating risk to individuals and physical resources as well as of maintaining compliance with national, state and local regulations. The intent of the Business Continuity Plan is to guide response and recovery from a major emergency and where appropriate, to be linked or combined with emergency operations procedures. This BCP has been prepared through a collaborative process, with a thorough examination of critical mission functions, a systematic hazard vulnerability assessment, and comprehensive development of strategies for each critical mission function recognized to be potentially at risk during emergency. This BCP is exercised and reviewed annually as a part of the evaluative and planning processes. The following business continuity incidents occurred during the 2016-2017 year. (Append information to BCP.) {Technical College} engages in the following contractual agreements regarding business continuity:. (List contractual agreements here.) {Technical College} engages in the following training, drills and exercises {Describe training, drills, exercises performed.} The protocol for the retention of training records is. {Describe protocol for the retention of records here.} The protocol for the annual review of the BCP is. {Describe protocol for annual review here.} The protocol for the retention of the BCP is. {Describe protocol for retention of BCPs here.}

Critical Mission Functions Chart OPERATING UNIT CRITICAL MISSION FUNCTION Emergency Communication External Communication Non-Academic Activities Public Information ALLOWABLE DOWNTIME PRIORITY LEVEL Classroom Instruction Distance Instruction Computer Classroom Instruction Laboratory Instruction Library Services Utilities Deliver Core IT Systems Payroll Procurement Facilities Repair Internal Communication Mail Services General Accounting Services Admissions Classroom Instruction Distance Instruction Admissions Classroom Instruction Distance Instruction Admissions Registration Transcript Issuance Non-Academic Activities

Hazard Vulnerability Assessment Instrument HAZARD PROBABILITY BUSINESS CONTINUITY IMPACT FINANCIAL IMPACT Natural Tornado/Winds/ Thunderstorm Winter Weather Floods/Dam Failure Wildfires Lightning Drought Hurricane Earthquake Technological Structural Collapse Utility Failure Power Failure Network Failure/Cyber Attacks Telecommunications Failure Major Structure Fire Vehicle/Air/Train Accident Biological Disease Outbreak Contaminated Food Outbreak Adversarial, Incidental & Human-Caused Civil Disorder Terroristic Threat Hazardous Materials Armed Intruder Hostage Situation High Med Low High Med Low High Med Low

Business Continuity Plan Worksheet Exemplar (Duplicate as needed for each identified Critical Mission Function) Business Continuity Plan Worksheet Technical College/Work Unit: Date: Critical Mission Function: Function Description: Production Location: Process Manager: Department: Backup Personnel: Recovery Details: Recovery Strategy Overview: Maximum Allowable Downtime (MAD): MAD Rationale/Justification: Can process be suspended? Can process be degraded? Work-around procedures in place? Work-around procedures tested?

Recovery Point Objective (relocation): Hours to Point Objective: Recovery Time Objective (hours): Hardware Needs: Software Needs: Necessary Vendors/Contractors: Special Notes:

Emergency/Utility Contacts Exemplar (Produce one for each different physical site) Law Enforcement: Fire: Power: Water: Natural Gas: Telecommunications: Other: