Legacy Tanker Division

Similar documents
KC-46A Tanker DoD Budget FY2013-FY2017. RDT&E U.S. Air Force

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: KC-10S. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

Headquarters U.S. Air Force. Ensuring An Adequate Infrastructure To Execute Assigned Maintenance Workload

PROVIDING THE WARFIGHTER S

OC-ALC/LK. Contractor Logistics Support (CLS) CLS. DOD Maintenance Symposium. Maintenance in Theatre & CLS. 28 Oct 2003

Navy & Marine Corps Vertical Lift: Past and Future

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 P-1 Line #50

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #90

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

Ogden Air Logistics Center

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

Tactical Wheeled Vehicle Sustainment

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #176

2016 Major Automated Information System Annual Report

Air Armament Symposium. 5 October 2011 Col Tim Morris, USAF Director of Development F-35 Lightning II Program

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #232

Common Range Integrated Instrumentation System (CRIIS)

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

Aircraft Carriers Enduring and Transformational

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Impact of the War on Terrorism on the USAF

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Air Traffic Control/Approach/Landing System (ATCALS) FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Specialized Undergraduate Pilot Training. FY 2011 Total Estimate. FY 2011 OCO Estimate

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2002

CLASSIFICATION: UNCLASSIFIED

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68

USAF Tankers: Critical Assumptions for Comparing Competitive Dual Procurement with Sole Source Award

NATIONAL AIRSPACE SYSTEM (NAS)

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Exhibit R-2, RDT&E Budget Item Justification February 2008

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

AMRDEC. Core Technical Competencies (CTC)

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 R-1 Line #98

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Air Traffic Control/Approach/Landing System (ATCALS) FY 2012 OCO

Fixed Wing Targeting Lockheed Martin Missiles and Fire Control 2015 Supplier Summit

448th Supply Chain Management Wing. FSC 1560 (Structures) Reverse Engineering Industry Day 20 August 2015

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

F-35 Lightning II. 5 th Generation True Stealth for Korea From 2016 and Beyond

Product Manager Air Warrior Update AAAA ASE Symposium

PROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD)

Mission-Based Test & Evaluation Strategy: Creating Linkages between Technology Development and Mission Capability

Fighter/ Attack Inventory

Exhibit R-2, RDT&E Budget Item Justification

Ogden Air Logistics Center

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Air Control

Sustaining Systems Engineering: The A-10 Example

OPNAVINST DNS-3/NAVAIR 24 Apr Subj: MISSIONS, FUNCTIONS, AND TASKS OF THE COMMANDER, NAVAL AIR SYSTEMS COMMAND

Mr. James Hondo Geurts Deputy Director for Acquisition United States Special Operations Command

PROVIDING THE WARFIGHTER S EDGE

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification

2016 Major Automated Information System Annual Report

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. JSF17-702, F-35 Sustainment

Subj: REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OPERATIONAL ENVIRONMENT STATEMENTS FOR FLEET AIR RECONNAISSANCE SQUADRON SEVEN (VQ-7)

1. Definitions. See AFI , Air Force Nuclear Weapons Surety Program (formerly AFR 122-1).

Environmental Excellence in Weapon System Acquisition Large Program KC-46A Program Environment, Safety, and Occupational Health Team

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2007 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4

2016 Major Automated Information System Annual Report

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Advanced Medium Range Air-to-Air Missile (AMRAAM) Prior Years FY 2013 FY 2014 FY 2015

Strategic Cost Reduction

MILITARY STRATEGIC AND TACTICAL RELAY (MILSTAR) SATELLITE SYSTEM

Ogden Air Logistics Center

Common Range Integrated Instrumentation System (CRIIS)

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Lean Enterprise Transformation: Ogden ALC Case Study

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 13 P-1 Line #25

B-1B CONVENTIONAL MISSION UPGRADE PROGRAM (CMUP)

2.0 Air Mobility Operational Requirements

F-35 JOINT STRIKE FIGHTER. Development Is Nearly Complete, but Deficiencies Found in Testing Need to Be Resolved

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

2016 Major Automated Information System Annual Report

Exhibit R-2, RDT&E Budget Item Justification

Future Combat Systems Industry Day Briefing

Boeing artist s concept. Operators help define the next tanker. The KC-46. Enlisted Team. By Marc V. Schanz, Senior Editor

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

DEPARTMENT OF THE AIR FORCE

Lieutenant General Maryanne Miller Chief of Air Force Reserve Commander, Air Force Reserve Command

MILITARY STRATEGIC AND TACTICAL RELAY (MILSTAR) SATELLITE SYSTEM

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

515th Air Mobility Operations Wing

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #91

Transcription:

Legacy Tanker Division Col R. Mark Mocio Chief, Legacy Tanker Division KC-135 PM & KC-10 Deputy PM Charles W. Darnell Deputy Chief, Legacy Tanker Division KC-10 PM & KC-135 Deputy PM Mr. Jerold Smith Chief Engineer, Legacy Tanker Division

Tanker Directorate (AFLCMC/WK) PEG Chief Capt Tabata Executive Officer Capt Konakowitz PEO Brig Gen Shipton Deputy PEO Mr. Sorial Military Deputy Director Col Muha Directorate Staff Director of Engineering Mr. Keen Chief of Contracts* Mr. Ehret Chief of Finance* Mr. Walker Superintendent SMSgt Koonce Chief of Logistics* Col Decker Division/Branch Leaders FAA MCO Liaison/ Test Advisor Dr. Marx KC-46 SPM Col Newberry KC-46 Deputy SPM Mr. Turner Chief Engineer Mr. Keen * Dual-hatted PEO and KC-46 staff KC-135 SPM Col Mocio KC-135 Deputy SPM Mr. Darnell Chief Engineer Mr. Smith KC-10 SPM Mr. Darnell KC-10 Deputy SPM Col Mocio Chief Engineer Mr. Smith 3

I n t e g r i t y - S e r v i c e - E x c e l l e n c e KC-135 Stratotanker

399 C/KC-135 inventory average age 55 years Missions Air Refueling (primary) Cargo/passenger transport (secondary) Command & Control interoperability (emerging) Aeromedical Evacuation Operational Statistics (FY17 Q3) # Sorties: 26,592 # AC refueled: 65, 594 Cargo moved: 306.18 short tons Fuel offloaded: 66, 496, 761 gals C/KC-135 Program of Record Program Office at Tinker AFB manages System Operational Safety, Suitability, and Effectiveness parameters Programmed Depot Maintenance (PDM) requirements, funding, engineering dispositions Logistics support ops AA improvement initiatives, a/c disposal/migration, supply chain support Aircraft modifications/upgrades: Block 45, LAIRCM, RTIC, Low Cost Mods 5 Foreign Military Sales customers AF Sustainment Center at Tinker AFB Executes PDM requirements to ensure airworthiness (once every 5 yrs for all a/c); all organic in FY14 Aircraft Workload: ~75 A/C per year; ~30,000 man hours per A/C; ~140 flowday average Engine Workload: ~120 engines per year, ~65 flowday average Executes supply operations 5

KC-135 CNS/ATM Block 45 Program Overview Included Systems: Radio Altimeter (RA) Replaces high maintenance RA Digital Flight Director (FD) system Replaces current FD-109 Replaces analog Auto Pilot (AP) system Electronic Engine Instrument Display Replaces 21 analog engine indicators Capability: Maintains CNS/ATM airspace access beyond 2015 Reduces logistics footprint -- mitigates reliability, maintainability, and supportability shortcomings Creates digital backbone for growth and ease of future software integration Improves signal fidelity -- converts systems from analog to digital Status: Development and Testing complete IOC declared Feb 16 64 aircraft delivered to warfighter Full Rate Production and Install (FY17) Grp A Production break-out to Small Business Grp B procured from Rockwell Collins 6

LAIRCM G3 Pod Program Overview Requirements: Upgrade 140 AFRC & ANG A/C with Group A kits Procure 35 Group B kits (pods) LAIRCM system components must be contained within a single removable pod Pod must be rotable among the 140 Group A-equipped A/C Capability: Pod system provides A/C protection from infrared (IR) missile threats System autonomously: Detects threat missile launch Tracks the threat missile Optically jams the threat missile using an IR laser Enables warfighter to forward deploy closer to the air refueling tracks Status: Integration & test activities conclude Spring 2018 Milestone C decision Feb 2018 Testing complete Spring 2018 Anticipate contract award May 2018 IOC required by end of FY19 7

MECSIP AVIP ASIP PSIP Lifecycle Management WSIP Logistics Infrastructure Affordable, Survivable, Maintainable, Supportable Operationally Safe, Suitable & Effective Systems integrity lifecycle objectives Planned service yr: 2040+ Average flight hrs: 22,692 Flt hrs Current service life: 39,000 Flt hrs Average fleet age: KC-135: 396 tankers 54-yr Solve tomorrows problems today--tactically agile/strategically focused Integrity Process Life Cycle Task I Task II Task III Task IV Task V Design Info & Preliminary Planning Design Analyses & Development Tests System/ Subsystem/ Component Test & Analysis Ground & Flight Test Obtain a clear understanding of platform health Mechanical, avionic, structural, propulsion systems/subsystems Production & Sustainment Focused on evaluating damage induced by age & environment Workspec generated to preserve a/c health during depot maintenance life cycle--technical refreshes affect degradation as a function of time Improving inspection tech to find varied defects w/the potential to shorten service life

I n t e g r i t y - S e r v i c e - E x c e l l e n c e KC-10 Extender

KC-10 Program of Record 59 KC-10 inventory average age 31 years Missions Air Refueling (primary) Cargo/passenger transport (secondary) Aeromedical Evacuation Operational Statistics (thru FY17 Q3) # Sorties: 6,178 # AC refueled: 25,149 Cargo moved: 3,813.57 short tons Fuel offloaded: 43,954,463 gals Program Office at Tinker AFB manages System Operational Safety, Suitability, and Effectiveness parameters Contractor Logistics Support (CLS) contract Contractor responsible for depot maintenance (~29/yr), supply chain, ground support via contractor field teams, engine overhauls/spares Aircraft modifications/upgrades: CNS/ATM, Service Bulletins, Airworthiness Directives 1 Foreign Military Sales customer AF Sustainment Center at Tinker AFB Executes aircraft paint 10

KC-46 Pegasus 11

KC-46 Program of Record KC-46 begins replacement of aging tanker fleet Acquires 179 aircraft Acquires Aircrew and Maintenance Training Systems Aircraft production spans 13 lots through 2027 Missions Air refueling Cargo/passenger transport Aeromedical evacuation Development Statistics (thru 31 May 17) Flights: 534 and 1,540 hours # A/C Contacts: 1327 Fuel Offloaded: 237 Klbs; Onloaded: 4 Klbs Implements Better Buying Power concepts Fixed-Price-Incentive-Firm contract awarded 24 Feb 11 Success depends on stable funding and requirements Production options for Lot 1 and 2 awarded 18 Aug 16 Production option for Lot 3 awarded 27 Jan 17 KC-46 program team KC-46 built in the Boeing Everett WA factory Boeing Program Office located at Everett, WA Air Force System Program Offices at WPAFB OH & Tinker AFB OK Future C-Checks at AF Sustainment Center at Tinker AFB OK 12

Tinker AFB KC-46 Stand-up Status Activities to date Infrastructure contract awarded Infrastructure and land preparations initiated Summer 16 KC-46 campus ground breaking dedication on 26 Jul 16 448 SCMW stood up team to implement supply chain strategy Flight Standards Management Office (FSMO) stood up at OC-ALC Construction on first KC-46 hangar underway Future activities Begin construction on 2 bay multi-purpose new KC-46 hangar docks (FY17) OC-ALC hiring ~1500 KC-46 maintenance personnel (FY18 FY28) 9

Legacy Tanker Foreign Military Sales France 11 KC-135FR: Purchased Direct Commercial Sales Mar 62 3 KC-135R: Purchased FMS Jun 97 Turkey 7 KC-135R: Purchased FMS Dec 97 Singapore 4 KC-135R: Purchased FMS Sep 99 Chile 3 KC-135E: Purchased FMS Feb 10 Israel 11 KC-135 Slow Speed Booms: PurchasedFMS Jan 12 Netherlands Provide engineering services and aerial refueling system support Two KDC-10s Commercial derivative of the Boeing DC-10 modified in 1995 14

NKAWTG N! 15