ESTAGOLD (M) SDN BHD. ( W) Incorporated In Malaysia) COMPANY PROFILE

Similar documents
List of Government Clinics

Non Investment Properties Appendix B

List Of Properties As 31 December 2007

Vortex Simplified Brochure Close Size: 20cm(w) X 27cm(h)

LIST OF HOSPITALS & HOSTEL CLINICAL PLACEMENT

APPLYING FOR: SITE AGENT / CLERK OF WORK /SENIOR SITE SUPERVISOR. Jalai Wak, 96510, Pakan, Julau, Sarawak.

NO REGION OUTLETS ADDRESS OPERATION HOURS Lot No. S40, Second Floor, AEON Jusco Bukit Tinggi 1

PANEL WORKSHOPS FOR COMMERCIAL VEHICLE REPAIR

FEEL-LITE LED LIGHTING MALAYSIA

Positioning Your SME Business for Expansion with a Corporate Factory

BRANCH LOCATIONS. OCBC Bank Head Office Menara OCBC No. 18 Jalan Tun Perak Kuala Lumpur

Positioning Your SME Business for Expansion with a Corporate Factory

Jabatan Tenaga Kerja (JTK) Malaysia

L i s t o f P r o j e c t s

Issues for Urban Design and Master Planning in Seberang Perai

F e a t u r e d P r o j e c t s

Document Control. Author Control. Reviewer Control. Version Date Author Purpose V1.0 23/4/2015 Jeeva Rubine To format the Location List

Page 1 of 8. No PROPERTY TYPE PROPERTY ADDRESS SIZE (SQFT) FH /LH REMARKS AUCTIONEER AUCTION DATE RESERVE PRICE

SAFE DEPOSIT BOX PROMOTION: 50% OFF FIRST YEAR RENTAL FEE

A. State: Kelantan. No Town Location/Address of Branch Location/Address of Branch (Incapacitated and not in operation)

8. Selayang 81-85, Jalan 2/3A, Pusat Bandar Utara, KM 12, Jalan Ipoh, Batu Caves, Kuala Lumpur. Tel : Fax :

Registered Training Centre (RTC) in Malaysia

stage 2 stage map Sungai Petani - Georgetown 158.1km Thursday 25 February 2016 SUNGAI PETANI GEORGETOWN Sg. Karangan 28.1km Teluk Bahang 128.

Magnolia King s Confectionery Promotion 2013

Aggregates & Concrete - Soft Launch. Week 2 19-May 20-May 21-May 22-May 23-May 24-May 25-May WL 8am. Aggregates - H&S Day. 8am

NO OUTLET ADDRESS TEL SELANGOR 1 Klang No:84, Jalan Nanas (20/10/1988) Klang, Selangor Darul Ehsan

Avengers Infinity War Movie Voucher List of Participating Stations No STATION NAME STATE TGV MBO 1 PETRON TONGKANG PECAH (FI) JOHOR X 2 PETRON SKUDAI

PRACTICUM INFORMATION FOR SEPTEMBER 2018 PLACEMENT (A172) & FEBRUARY 2019 PLACEMENT (A181)

GARIS PANDUAN PERMOHONAN PENGELASAN SPA DAN PUSAT REFLEKSOLOGI

APPENDIX D DIRECTORY OF PARTICIPATING CENTRES. Blood and Marrow Transplant Services MOH

LIST OF AUTHORISED DEPOSITORY AGENT ( ADA ) ACCOMPANYING THE ELECTRONIC PROSPECTUS OF GDB HOLDINGS BERHAD ( GDB OR THE COMPANY ) DATED 5 MARCH 2018

Penang Food, Penang Travel and Penang Lifestyle

LOOKING FOR BUYERS PLEASE CONTACT US IF INTERESTED TO PURCHASE THE UNDERMENTIONED PROPERTIES.

Untuk kerja-kerja pelancaran 'U Beam' dan kerja-kerja yang berkaitan dengan MRT

Bandar Baru Air Itam No. 37, Jalan Angsana Bandar Baru Air Itam Pulau Pinang Tel : Fax :

APPENDIX D DIRECTORY OF PARTICIPATING CENTRES. Blood and Marrow Transplant Services MOH

1 of 31. TK Kanvas Sdn. Bhd. Padang Mat Sirat. National Instrument Penang. Project Name : Tensile Membrane Padang Mat Sirat

Saturday - Sunday & Public Holidays: 11.00am pm No 1 Avenue 1 Bangsar South No 8 Jalan Kerinchi, Pantai Dalam Kuala Lumpur

MY HOMETOWN SUSTAINABILITY. JULIANIZA ARIFFIN Land of origin : Pulau Pinang

List of Government Clinics

DELFI WAREHOUSE PROPERTY INFORMATION SPACE PROPOSAL. PLO 563, Jalan Keluli 8, Pasir Gudang Industrial Estate, Pasir Gudang, Johor

KEDAH (CONT D) Kuala Perlis (Mini) Pejabat TH Mini Kodiang Bangunan Tabung Haji PT 2475 (Mini) No 5A Tingkat Bawah

2017 July. The impact of Penang Transport Master Plan on its real estate

Assessment on Students Socio-Scientific Understanding: A Research Report

Submitted to the Penang State Government by Socio-Economic & Environmental Research Institute 10 Brown Road, Penang Tel: (04) Fax: 226

CURRICULUM VITAE MOHD ANWAR BIN AZMI 5-1B, JALAN PANDAN 3/10, PANDAN JAYA KUALA LUMPUR, MALAYSIA

CODE ADDRESS TELEPHONE BUSINESS HOURS. Closed : Monday. Tuesday - Saturday : 9.00am pm Rawang, Selangor.

When Dreams Take Flight. Cover Rationale

Terms & Conditions The following sets out the terms and conditions applicable to the Campaign ( T&Cs ):-

Direktori Maklumat SME Contact

Telefon Pejabat(Kuala Lumpur): Pengurus: Setar) Faksimili Pejabat(Kuala Lumpur):

Page 1 of 9 HIGH COURT / LAND OFFICE NO PROPERTY TYPE PROPERTY ADDRESS SIZE (SQFT) FH /LH AUCTION DATE RESERVE PRICE

NO BRANCH NAME FULL ADDRESS STATE DISTRICT 1 BUTTERWORTH No. 49, Jalan Selat Pulau Pinang Seberang Perai Bandar Taman Selat Utara Butterworth 12000

NATIONAL HYDROGRAPHIC CENTRE SEA LEVEL ACTIVITIES IN MALAYSIA

NUTTELEX MALAYSIA STOCKISTS 8TH AUGUST 2018

SENHENG BRANCH LISTING

Terms and Conditions CIMB FIESTA 2016 Count Octo Contest

Saturday - Sunday & Public Holidays: 11.00am pm No 1 Avenue 1 Bangsar South No 8 Jalan Kerinchi, Pantai Dalam Kuala Lumpur

Kajang Tel: Fax: Perak Darul Ridzuan Ipoh Tel: Fax:

List of schools which offers Form 6 classes in Perak

Page 1 of 8 HIGH COURT / LAND OFFICE NO PROPERTY TYPE PROPERTY ADDRESS SIZE (SQFT) FH /LH AUCTION DATE RESERVE PRICE

Continuous. Improvement. Improvement. Continuous. Professionalism. Professionalism. Courtesy Courtesy. Integrity Integrity. Our Commitment.

Provider Name Address Line 1 Address Line 2 City Province Phone Fax Provider Type Kedah Medical Centre

Kampung Baru Gunung Rapat, 31350, Ipoh, Perak.

NO. 48, JALAN SS 19/1F, SUBANG JAYA, SELANGOR DARUL EHSAN NO. 10, JALAN SP 6/4, TAMAN SEGAR PERDANA, CHERAS, SELANGOR DARUL EHSAN.

Level 1-2, Wisma BU 8, No.11, Lebuh Bandar Utama, Bandar Utama, Petaling Jaya, Selangor

FEM/SEN3/SALI BPG NO.EDISI : 03 NO. SEMAKAN : 07 TARIKH KUATKUASA : drp. 30

Messrs YM Chin & Partners A-13-3, Menara UOA Bangsar 5 Jalan Bangsar Utama Bangsar Kuala Lumpur

RAKAN NIAGA PELAN 0% EASYPAY BSN

e-mas: LIST OF PANEL HOSPITALS FOR CROWD CARE

ABC COMPANY. P.C.S. RAKYAT SDN. BHD. Web: Hotline :

Mrazzi Printable Property Listing Date: 09-Jul-2014

Page 1 of 9 HIGH COURT / LAND OFFICE NO PROPERTY TYPE PROPERTY ADDRESS SIZE (SQFT) FH /LH AUCTION DATE RESERVE PRICE

Bahagian II. Daftar Projek Pembinaan Mengikut Nama Kontraktor. Oktober 2010

Investor Presentation 2013

AEROTECH VI CONFERENCE 2016 Innovation in Aerospace Engineering & Technology

Page 1 of 12 HIGH COURT / LAND OFFICE NO PROPERTY TYPE PROPERTY ADDRESS SIZE (SQFT) FH /LH AUCTION DATE RESERVE PRICE

MICARE PANEL GP LIST FOR JERNEH (MAY 2018) NO. STATE TOWN CLINIC NAME ADDRESS TEL OPERATING HOURS

This document is downloaded from DR-NTU, Nanyang Technological University Library, Singapore.

No State Address Contact. ALAM DAMAI 31-G, Jalan Damai Niaga,Alam Damai Cheras,56000 Kuala Lumpur,Wilayah Persekutuan,Malaysia

No. Store Name Address 1. GIANT HYPERMARKET BANTING LOT 555 PERSIARAN KOTA SERI LANGAT KOTA SERI LANGAT, BANTING, KUALA LANGAT SELANGOR

Arahan Amalan Mahkamah Rayuan Bil 3 Tahun 2014 Pengkelasan Kod bagi Kes Semakan Sivil di Mahkamah Rayuan

Court & Land Office auction listing. Page 1 of 8

PHR NO. STORE NAME ADDRESS

FACILITATION FUND UNIT KERJASAMA AWAM SWASTA JABATAN PERDANA MENTERI

BSN 0% EASYPAY PLAN PARTICIPATING MERCHANTS

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KUALA SELANGOR DAN LEBUHRAYA BARU PANTAI

FLL Teams: FLL Children: What FLL Offers: Getting Started: Who can form a team? How FLL Works: HOW IT WORKS

No Student name ID Course Company Name Address 1 Address 2 Address 3 Postcode City State Academic Supervisor JALAN BANDAR RAWANG 8,

EDUCATION CHRONOLOGY:

MINISTRY OF TRANSPORT MALAYSIA

UTAR NEW VILLAGE COMMUNITY PROJECT REPORT NAME OF NEW VILLAGE: GEMAS BARU 金马士峇鲁 JOHOR

MICARE PANEL GP LIST FOR AIA (01 DECEMBER 2016) NO. STATE TOWN CLINIC NAME ADDRESS TEL OPERATING HOURS

Venue 地点 Tempat. Klang Executive Club, Bukit Raja. Founder Circle Hall, Herbalife Distribution Centre. Klana Resort, Seremban

NOTICE OF PROPOSED RECOMMENDATIONS FOR FEDERAL AND STATE CONSTITUENCIES IN THE STATE OF SELANGOR AS REVIEWED BY THE ELECTION COMMISSION IN 2018

Page 1 of 9 HIGH COURT / LAND OFFICE NO PROPERTY TYPE PROPERTY ADDRESS SIZE (SQFT) FH /LH AUCTION DATE RESERVE PRICE

54-59 johor dialysis.indd 54 3/16/12 3:51 PM

ALIM HARMONY, SG. PETANI HASANI EDAR, SG. PETANI PUSTAKA JITRA, JITRA PUSTAKA UNION, ALOR SETAR PUSAT BUKU GEMILANG, KULIM

SYOR-SYOR YANG DICADANGKAN BAGI BAHAGIAN-BAHAGIAN PILIHAN RAYA PERSEKUTUAN DAN NEGERI BAGI NEGERI PULAU PINANG SEBAGAIMANA YANG TELAH DIKAJI SEMULA

SUITE 7.02, 7TH FLOOR WISMA MARAN, NO. 28, MEDAN PASAR, KUALA LUMPUR

Transcription:

ESTAGOLD (M) SDN BHD (202584-W) Incorporated In Malaysia) COMPANY PROFILE

CONTENT... Description Page Company Registration Certificate 4-5 Registered Address & Office Address 6 CIDB Malaysia 7-8 ISO 9001:2000 Certification 9-10 Board Of Directors & Company Secretary 11 Company Shares Allocation 12 List Of Principal Bankers 13 Subsidiary & Associated Companies 14 Company Structure 15 Company Organization Chart 16 Office Administrative Personnel 17 Technical & Site Personnel 18-20 List Of Machinery & Site Equipment 21 List Of Completed Projects 22 Completed Projects / In Progress 23-47 Testimonial 48-50

CONTENT... Description Page Completed Project Photograph 51-77 Estagold Safety Company 78-82

COMPANY REGISTRATION CERTIFICATE

REGISTED ADDRESS 2, Jalan Dewa Pada, 10400 Penang, Malaysia. Tel no. : 04-2296763 Fax no. : 04-2296766 OFFICE ADDRESS 106-A, Jalan Tan Sri Teh Ewe Lim, 11600 Penang, Malaysia. Tel no. : 04-2827844 / 2817845 / 2822210 Fax no. : 04-2827848 Email : estagold@tm.net.my

CIDB (Construction Industrial Development Board Malaysia) Grade - G7

ISO 9001:2008 CERTIFICATION

BOARD OF DIRECTORS Name : LIM HOCK CHUAN Position : Managing Director Experience : More than 27 years in construction industries. Name : P NG CHEANG KHENG Position : Project / Executive Director Experience : More than 26 years in construction industries. COMPANY SECRETARY Company : NK Consultancy Services Name : NEOH CHEE KEAN Position : Company Secretary

COMPANY SHARES ALLOCATION Capital : - Authorised Capital : RM1,000,000.00 Paid Up Capital : RM1,000,000.00 Number Of Shares Holding : - Lim Hock Chuan : 500,000 units P ng Cheang Kheng : 500,000 units

LIST OF PRINCIPAL BANKERS MAYBANK BERHAD 552 & 556, Jalan Jelutong, 11600 Pulau Pinang. Tel no. : 04-6573477 / 6594806 Fax no. : 04-6588572 SOUTHERN BANK BERHAD 403, Jalan Pulau Tikus, 10350 Pulau Pinang. Tel no. : 04-2282131 / 2280501 Fax no. : 04-2280084 UNITED OVERSEAS BANK (M) BERHAD 64E-H, Lebuh Bishop, 10200 Pulau Pinang. Tel no. : 04-2622386 / 2622787 Fax no. : 04-2610868

SUBSIDIARY & ASSOCIATED COMPANIES ESTAGOLD ENGINEERING SDN. BHD. (346326-T) Activities : Steel structure and auto industrial folding door SANJUNG RIA SDN. BHD. (257590-V) Activities : Investment / Property development ORION FAR-EAST SDN. BHD. (490855-D) Activities : Property development TERRA VILLA RESOURCES SDN. BHD. (706070-K) Activities : Property development

COMPANY STRUCTURE ESTAGOLD (M) SDN. BHD. (202584-W) INCORPORATED IN MALAYSIA Estagold Engineering S/B (346326-T) - Steel structure & auto industrial folding door Sanjung Ria S/B (257590-V) - Investment / Property development Orion Far-East S/B (490855-D) - Property development Terra Villa Resources S/B (706070-K) - Property development

COMPANY ORGANIZATION CHART ESTAGOLD (M) SDN. BHD. (Company No.202584-W) Board Of Director MANAGING DIRECTOR SECRETARY PROJECT DEPARTMENT Project Director ACCOUNTS & ADMIN DEPARTMENT Department Manager QA/QC SECTION QA/QC Manager PROJECT SECTION Project Manager CONTRACT SECTION Quantity Surveyor PURCHASING SECTION Purchasing Officer ACCOUNTS SECTION Accounts Officer OFFICE ADMIN SECTION Admin Officer Site Safety Civil & Structural Works Finishes Work Ext. Sanitary & Plumbing Works Pre- Contract Asst. Q. Surveyor Port- Contract Asst. Q. Surveyor Site Officer Sub- Contractor Sub- Contractor Sub- Contractor

OFFICE ADMINISTRATIVE PERSONNEL ANG GUAT MOOI - Senior Finance Executive ACCA-Certified Accounting Technician SEAH JEN DER - Finance Executive / Admin Degree In Accountancy & Finance LIM SIEW WAH - Admin Support / Secretary Spm

TECHNICAL AND SITE PERSONNEL TEH YEW MENG - Project & Safety Manager Diploma In Civil Engineering LAW HOCK GEE - Site Manager SPM LEE CHIA WAI - Project Engineer B.In Civil & Structural Engineering (Hon) TAN TEIK HAI - Project Engineer Degree In Civil Engineering LEW PHOOI LAI - Quantity Surveyor Cert. In Quantity Surveyor LAM RUEY JING - Assistant Quantity Surveyor Diploma In Building Technology THOMAS A/L SOOSAY - Site & Safety Supervisor SPM

TECHNICAL AND SITE PERSONNEL GATHARUBAN A/L RAMASAMY - Site & Safety Supervisor SPM MANGALA VANAN A/L KRISHNASAMY - Safety Officer Certificate In Safety Health & Occupational Officer Cource (NIOSH) ABDUL KARIM BIN ISMAIL - Supervisor SPM CHAN KOON SIANG - Project Co-ordinator Technical College WONG BOON CHUANG - Project Co-ordinator Nil MOHAMMAD AZLAN CHUAH BIN ABDULLAH - Site Clerk SPM P NG CHEOW HIANG - Chief Site Foreman MCE

TECHNICAL AND SITE PERSONNEL CHAN SU HA - Site Foreman / Truck Driver Nil P NG CHEE WEE - Site Supervisor PMR SUHAIRY BIN SHAHID - Civil Engineer Degree In Civil Engineering

LIST OF MACHINERY AND SITE EQUIPMENT Item Type Unit Qty Capacity 1. Concrete Mixer Unit 15 7 & 14t 2. Vibrator Porker Unit 45 20-50mm 3. Vibrator Engine Unit 20 5hp 4. Vibrator Pump Unit 12 75mm 5. Electric Pump Unit 6 75mm 6. Piston Pump Unit 5 12mm 7. Electric Breaker Unit 5 1000w 8. Handrill Unit 10 1000w 9. Chain Saw Unit 4 3hp 10. Compactor Unit 6 5hp 11. Survey Instrument Unit 7-12. Scaffolding Unit 5000-13. Welding Set Unit 3 5000w 14. Generator Set Unit 2 175kva 15. Tower Crane Unit 1 1.5-4ton 16. Mobile Crane Unit 2 20ton 17. Pilling Frame Unit 3 1-2ton 18. Container Office Unit 10 8 x 20 19. Tipper Truck Unit 3 1-2ton

COMPLETED PROJECTS 1) Industrial a) Electronic & Semi-Conductor Factory b) Plastic Molding & Injection c) Precision Machining & Tooling d) Cable, Steel & Pipes Manufacturing e) Paper Industries f) Automotive g) Pharmaceutical h) Others 2) Commercial / Hotel 3) Residential 4) Educational 5) Others

LIST OF COMPLETED PROJECTS 1) Industrial a) Electronic & Semi-Conductor Industrials No. Project Client Architect / Consultant Contrract Sum (RM) Duration Status of Construction 1. Rectification Works On Plot 151, Bayan Lepas FTZ, Phase I, Bayan Lepas, 11900 CANAL ELECTRONIC (M)S/B Plot 151, BayanLepas FTZ, Phase I, Bayan Lepas, 11900 pg. C.T.Wong Consultant Engineers 55-A, Jalan Zainal Abidin, 10400 Pg. 50,000.00 2 months 1993 2. Proposed Extension To Existing Factory At Plot 149, Bayan Lepas FTZ, 11900 INTERQUARTZ (M) S/B Plot 149, BayanLepas FTZ, Phase I, 11900 C.T.Wong Consultant Engineers 55-A, Jalan Zainal Abidin, 10400 Pg. 1,323,000.00 4 months Dec-1994 3. Cadangan Mendirikan Sebuah Kilang & Bangunan Dua Tingkat Pejabat & Kantin Di Atas Plot 1-5 Kawasan Perindustrian Kuala Perlis, Perlis. IRIICHI (M) SDN BHD Plot 1 To 5 Kawasan Perindustrian Kuala Perlis Perlis & ANDO (M) S/B KK Consulting Engineers (PG) S/ B 32 Lebuhraya Jelutong 11600 3,390,000.00 4 months Feb-1996 4. Proposed Single Storey Store Building To Existing Factory On Plot 45, Phase IV, Bayan Lepas FTZ, Pg For M/s Robert Bosch (M) S/B. NAKANO (M) S/B 345-J, 2nd Floor Bangunan Kelab Gelugor 11700 Jalan Sultan Azlan Shah, Derrick David & Associates Chartered Architects Penthouse Wisma Penang Garden 42 Jalan Sultan Ahmad Shah, 10050 1,273,000.00 4 months Aug-1997 5. Cadangan Membina Sebuah Kilang Dua Tingkat Dengan Pejabat Di Atas Plot P 132B, Lorong Perindustrian Bukit Minyak, Sebarang Prai Tengah, Pulau Pinang Untuk Tetuan Taiyo Technology (M) S/B. NAKANO (M) S/B 345-J, 2nd Floor Bangunan Kelab Gelugor 11700 Jalan Sultan Azlan Shah,Pg. AJS ARCHITECT 28-A, Jalan Ss 22/21, Damandar Jaya 47400, Petaling Jaya. 1,195,923.28 5 months Mar-1998

LIST OF COMPLETED PROJECTS a) Electronic & Semi-Conductor Factory No. Project Client Architect / Consultant Contrract Sum (RM) Duration Status of Construction 6. Construction And Completion Of General Building Works For Semi-Conductor Factory At Bayan Lepas FTZ, Semi-Conductor Factory At Bayan Lepas Free Trade Zone 11900 Kampung Jawa, Pg. DERRICK DAVID & ASSOCIATES Chartered Architects Penthouse Wisma Penang Garden 42 Jalan Sultan Ahmad Shah, 10050 16,069,324.83 10 months Mar-1998 7. Proposed External Works For Construction and Completion of General Building for Semi-Conductor Factory At Bayan Lepas FTZ, Semi-Conductor Factory At Bayan Lepas Free Trade Zone 11900 Kampung Jawa, Pg. DERRICK DAVID & ASSOCIATES Chartered Architects Penthouse Wisma Penang Garden 42 Jalan Sultan Ahmad Shah, 10050 Pg. 350,602.20 35 Days Jun-1998 8. Design & Construction Of Roof Coverage Above 3 Storey Building @ AM1. AMD EXPORT S/B Bayan Lepas Free Industrial Zone Phase II, Bayan Lepas 11900 TURNKEY 450,000.00 2 months Mar-1999 9. Proposed Supply And Install Builder's Work For Male And Female Toilet At AM1. AMD EXPORT S/B Bayan Lepas Free Industrial Zone Phase II, Bayan Lepas 11900 DESIGN & BUILT 155,000.00 10 weeks Jul-2000 10. Cadangan Membina Sebuah Bangunan Dua Setengah (2-1/2) Tingkat Kilang, Sebuah Setor Bahan Buangan Kimia, Laluan Serbumbung Dan Kerja- Kerja Bersangkutan Di Atas Plot No.40 Dan 3, Di Jalan Hilir Sg. Keluang 4 Dan Jalan Sg. Keluang 3, Zon Perdagangan Bebas Bayan Lepas, Fasa 4, Mk 12, D.B.D., Pg. VARITRONIX (M) S/B Plot 40, Phase 4 Bayan Lepas Free Industrial Zone, 11900 Bayan Lepas, LEE ACHITECTURAL CONSULTANCY Wisma Prudential 41-5-2 Jalan Cantonment, 10250 6,400,000.00 6 months Mar-2001

LIST OF COMPLETED PROJECTS a) Electronic & Semi-Conductor Factory No. Project Client Architect / Consultant Contrract Sum (RM) Duration Status of Construction 11. Proposed Piling And Floor Strengthening For New Auto Mold, Backgrinder Machine & Back Etcher (FA28870). ADVANCED MICRO DEVICES EXPORT S/B Phase II, Bayan Lepas Free Industrial Zone, 11900 Bayan Lepas, JURUTERA PAKATAN S/B S-12-E & F, Menara Northern, 55 Jalan Sultan Ahmad Shah, 10050 Pg. 122,000.00 1 month Dec-2001 12. Cadangan Tambahan dan Pindaan Kilang Satu Tingkat, Pejabat dan Bilik Mekanikal Dua Tingkat kepada Bangunan Kilang Sediada AM4 Diatas Lot (HS(D) 4656, HS(D) 4658 Dan HS (D) 3328) No.7A Jalan Kampung Jawa, Bayan Lepas FTZ, Fasa 3, MK12, D.B.D Penang Piling Works (Package 300) ADVANCED MICRO DEVICES EXPORT S/B Phase III, Bayan Lepas Free Industrial Zone, 11900 Bayan Lepas, Pg. M.E.I. Consultants S/B 51-12-A, Menara BHL, 51, Jalan Sultan Ahmad Shah, 10050 Pg. 2,000,000.00 2 months Oct-2005 13 Cadangan Tambahan Dan Pindaan Kilang Satu Tingkat, Pejabat Dan Bilik Mekanikal Dua Tingkat Kepada Bangunan Sediada AM4 Di Atas Lot (HS(D) 4656, HS(D) 4658 Dan HS (D) 3328) No.7A, Jalan Kampung Jawa, Bayan Lepas FTZ, Fasa 3, MK 1, D.B.D. Penang - Main Building (Package 500) ADVANCED MICRO DEVICES EXPORT S/B Phase III, Bayan Lepas Free Industrial Zone, 11900 Bayan Lepas, M.E.I. Consultants S/B 51-12-A, Menara BHL, 51, Jalan Sultan Ahmad Shah, 10050 Pg. 39,131,219.71 12 Month August - 2006

LIST OF COMPLETED PROJECTS a) Electronic & Semi-Conductor Factory No. Project Client Architect / Consultant Contrract Sum (RM) Duration Status of Construction 14. Cadangan Tambahan Dan Pindaan Kilang Satu Tingkat, Pejabat Dan Bilik Mekanikal Dua Tingkat Kepada Bangunan Kilang Sediada AM4 Di Atas Lot (HS(D) 4656, HS(D) 4658 Dan HS(D) 3328), No.7A, Jalan Kampung Jawa, Bayan Lepas Free Industrial Zone, Fasa 3, MK12, D.B.D. Penang - Canteen Retrofit Works. ADVANCED MICRO DEVICES EXPORT S/B Phase III, Bayan Lepas Free Industrial Zone, 11900 Bayan Lepas, M.E.I. CONSULTANTS SDN BHD 51-12-A, Menara BHL, 51, Jalan Sultan Ahmad Shah, 10050 457,042.38 2 months Dec-2006 15. Cadangan Melengkapkan Kerja- Kerja Cleanroom Untuk Paras 2 (Fasa 1A) Diatas Lot (HS(D) 4656, HS(D) 4658, Dan HS(D) 3328, 7A, Jalan Kampung Jawa, Bayan Lepas, ADVANCED MICRO DEVICES EXPORT S/B Phase III, Bayan Lepas Free Industrial Zone, 11900 (Polycool HTE Engineering Sdn Bhd) M.E.I. CONSULTANTS SDN BHD 51-12-A, Menara BHL, 51, Jalan Sultan Ahmad Shah, 10050 385,479.07 2 1/2 months Feb-2007 16. Cadangan Mendirikan 1 Unit Pencawang Elektrik Utama (33/11kv) Satu Tingkat Kepada Kilang Sediada AM4 Di Atas Lot (HS(D) 4656, HS(D) 4658 Dan HS (D) 3328) No.7A, Jalan Kampung Jawa, Bayan Lepas FTZ, Fasa 3, MK 1, D.B.D. ADVANCED MICRO DEVICES EXPORT S/B Phase III, Bayan Lepas Free Industrial Zone, 11900 (Sinterang Lektrik Sdn Bhd) M.E.I. CONSULTANTS SDN BHD 51-12-A, Menara BHL, 51, Jalan Sultan Ahmad Shah, 10050 901,276.00 3 months Feb-2007

LIST OF COMPLETED PROJECTS a) Electronic & Semi-Conductor Factory No. Project Client Architect / Consultant Contrract Sum (RM) Duration Status of Construction 17 Proposed New Hardware Centre And A.H.U. Room For Existing 2 Storey Factory Area On Lot 216, Bayan Lepas Free Trade Zone, Lebuh Sungai Tiram 1, SPANSION (PENANG) S/B Phase II, Bayan Lepas Free Industrial Zone, 11900 JURUTERA PAKATAN S/B S-12-E & F, Menara Northern 55, Jalan Sultan Ahmad Shah, 10050 359,000.00 4 months July-2007 18 Cadangan Tambahan Dan Pindaan Kilang Satu Tingkat, Pejabat Dan Bilik Mekanikal Dua Tingkat Kepada Bangunan Kilang Sediada AM4 Di Atas Lot (HS(D) 4656, HS(D) 4658 Dan HS(D) 3328), No.7A, Jalan Kampung Jawa, Bayan Lepas Free Industrial Zone, Fasa 3, MK12, D.B.D. Penang - Installation of 3000kg Cargo Lift. ADVANCED MICRO DEVICES EXPORT S/B Phase III, Bayan Lepas Free Industrial Zone, 11900 M.E.I. CONSULTANTS S/B 51-12-A, Menara BHL, 51, Jalan Sultan Ahmad Shah, 10050 255,000.00 6 months June-2007 19 Cadangan Tambahan Dan Pindaan Kilang Dan Pejabat Dua Tingkat, Bilik Mekanikal Dua Tingkat Dengan Mezzanine Kepada Bangunan Kilang Sediada AM4 Di Atas Lot HS(D) 4656, HS(D) 4658 Dan HS(D) 3328, No.7A, Jalan Kampung Jawa, Bayan Lepas Free Industrial Zone, Fasa 3, MK.12, D.B.D. -Main Building (Package 5000) ADVANCED MICRO DEVICES EXPORT S/B Phase III, Bayan Lepas Free Industrial Zone, 11900 M.E.I. CONSULTANTS SDN BHD 51-12-A, Menara BHL, 51, Jalan Sultan Ahmad Shah, 10050 8,525,342.03 6 months Jan - 2008

LIST OF COMPLETED PROJECTS a) Electronic & Semi-Conductor Factory No. Project Client Architect / Consultant Contrract Sum (RM) Duration Status of Construction 20 Cadangan Membina Sebuah Bangunan Baru Yang Terdiri Daripada :- a) 2 Tingkat Pejabat Dan 1 Tingkat Kilang, b) 1 Tingkat BangunanUtiliti, c) 2 Buah Pondok Pengawal Di Atas Sebahagian Lot 13641, Medan Bayan Lepas, Bayan Lepas Technoplex, Phase IV, Mukim 12, Bayan Lepas Industrial Zone, Daerah Barat Daya, Pulau Pinang. MINI-CIRCUITS TECHNOLOGIES (M) S/B Plot 10, Bayan Lepas Technoplex, Phase IV, Bayan Lepas Industrial Zone, 11900 B.L.TAY ARCHITECT 502-C, Jalan Tanjung Bungah, 11200 43,819,685.60 9 months Sept - 08 21 Semi-Conductor Factory - Structural Steel Remediation Works. Semi-Conductor Factory At Bayan Lepas Free Trade Zone, Phase 3, Halaman Kampung Jawa, Bayan Lepas, 11900 M.E.I. CONSULTANT S/B 51-12-A, Menara BHL, 51, Jalan Sultan Ahmad Shah, 10050 2,872,333.84 6 months Jan - 09 22 Cadangan Pindaan Dan Tambahan Kepada Kilang Sedia Ada AM4 Di Atas Lot PT.373 H.S. (D) 4656, PT375 H.S. (D) 4658 Dan PTBP/A/5 /80 H.S. (D) 3328, Sebahagian Lot 7482 Di No 7A, Jalan Kampung Jawa, Kawasan Perindustrian Bebas Bayan Lepas, Fasa 3 MK12, D.B.D., Pulau Pinang. (Package 5200) ADVANCED MICRO DEVICES EXPORT S/B Phase III, Bayan Lepas Free Industrial Zone, 11900 M.E.I. CONSULTANT SDN BHD 51-12-A, Menara BHL, 51, Jalan Sultan Ahmad Shah, 10050 1,400,000.00 2 months Feb -

LIST OF COMPLETED PROJECTS 1) Industrial b) Plastic Molding & Injection No. Project Client Architect / Consultant Contrract Sum (RM) Duration Status of Construction 1. Proposed 1Storey Factory And 2 Storey Office Block On Plot 101 (C.P. 5022) (O) 4635, MK 1 Kawasan Komplek Bagan Serai Bandar, Seberang Jaya, SPT. C&G PLASTIC INDUSTRIES S/B Plot 5022, Jalan Jelawat, Seberang Jaya Industrial Estate, Bandar Seberang Jaya, 13700 Perai. PERUNDING JURUCITA S/B 9 Lintang Selat 12000 Taman Selat Butterworth. 2,700,000.00 4 months 1992 2. Cadangan Tambahan Kilang & Gudang Di Atas Sebahagian Plot 264&265, Tingkat Perusahaan Lima, Kawasan Perindustrian Prai, Pulau Pinang. ARMSTRONG INDUSTRIES (M) S/B Plot 264 & 265, Tingkat Perusahaan Lima Kawasan Perindustrian Prai Prai & ANDO (M) S/B WNG JURUTERA PERUNDING S/B 7 Kelawei Road, 10250 Penang 4,399,714.00 4 months Jan-1996

LIST OF COMPLETED PROJECTS 1) Industrial c) Precision Machining & Tooling No. Project Client Architect / Consultant Contrract Sum (RM) Duration Status of Construction 1. Proposed Factory On Plot 94 Mukim 12, Daerah Barat Daya, Kawasan Perindustrial Bayan Lepas, Pulau Pinang. G-SHANK ENTERPRISE (M)S/B Plot 94 Bayan Lepas Industrial Estate 11900 Bayan Lepas, AKITEK YDS Suite 304, Chinese Town Hall, Jalan Mesjid Kapitan Keling, 10200 Penang 1,100.000.00 4 months 1991 2. Extension To Existing Factory On Lot 94 MK 12, Daerah Barat Daya, Kawasan Perindustrian Bayan Lepas, Pulau Pinang (Phase II). G-SHANK ENTERPRISE (M)S/B Plot 94 Bayan Lepas Industrial Estate 11900 Bayan Lepas, KK Consulting Engineers (PG) S/ B 32 Lebuhraya Jelutong 11600 985,000.00 4 months Apr-1994 3. Cadangan Tambahan Kilang Yang Sediada Di Atas Plot 94 Lebuhraya Kampung Jawa, Kawasan Perindustrian Bayan Lepas, MK 12, D.B.D., Penang (Phase III). G-SHANK ENTERPRISE (M) SDN. BHD. Plot 94 Bayan Lepas Industrial Estate 11900 Bayan Lepas, KK Consulting Engineers (PG) S/ B 32 Lebuhraya Jelutong 11600 575,000.00 3.5months Feb-1996 4. Cadangan Tambahan 1 Blok Kilang 2 Tkt. Kepada Kilang Yang Sedia Ada Di Atas Plot 94, Lebuhraya Kampung Jawa, Kws. Perusahaan Bayan Lepas, MK 12, D.B.D., G-SHANK ENTERPRISE (M)S/B Plot 94 Bayan Lepas Industrial Estate 11900 Bayan Lepas, KH ARCHITECT 24 Jalan Imigresen, 10400 970,000.00 6 months Apr-1999

LIST OF COMPLETED PROJECTS c) Precision Machining & Tooling No. Project Client Architect / Consultant Contrract Sum (RM) Duration Status of Construction 5. Cadangan Membina Sebuah Bangunan Dua Tingkat Kafetaria / Tambahan Ke Atas Kilang Sediada Dan Kerja-Kerja Bersangkutan Di Atas Pelot 407 & 408, Di Lorong Perusahaan 8 Dan 8B, Kws. Perusahaan 4, Daerah Tengah, MK. 1, Seberang PeraiTengah. PRECICO ELECTRONICS S/B Plot 407, Lorong Perusahaan 8B, Prai Industrial Estate, 13600 Prai, Penang LEE ARCHITECTURAL Unit 2, 5th Floor Wisma Berjaya Prudential, 41 Jalan Cantonment, 10250 3,000.000.00 8 months Sep-2000 6. Cadangan Tambahan Kepada Kilang Sediada Di Atas Plot 92, Hala Kampung Jawa 1, Kawasaan Perindustrian Bayan Lepas (Fasa 3) Mk12, D.B.D., Bayan Lepas, Pulau Pinang. G-SHANK PRECISION (M)S/B Plot 94 Bayan Lepas Industrial Estate 11900 Bayan Lepas, C. SLAUN CONSULTANTS 175B, Jalan Argyll 10050 2,000.000.00 6 months May-2001

LIST OF COMPLETED PROJECTS 1) Industrial d) Cable, Steel & Pipes Manufacturing No. Project Client Architect / Consultant Contrract Sum (RM) Duration Status of Construction 1. Proposed Alteration And Additional To Existing Factory On Lot 1310, MK 14, P.W.C. ADVANCE CABLE (M) SDN. BHD. Lot 1310, MK 12, P.W.C. Permatang Tinggi, 14100 Simpang Empat, SP. JURUTERA T & T CONSULTING ENGINEERS 15, Love Lane, 10200 2,100,000.00 4 months 1991 2. Proposed 3 Storey Machinery Platform Inside On Lot 1385, Kawasan Perusahaan Batu Sg. Petani, Kuala Muda, Kedah. LEADER CABLE INDUSTRIE BHD Lot 1385, Tikam Batu Industrial Estate SP, 05600 Kedah. PERUNDING JURUCITA S/B 9 Lintang Selat, 12000 Taman Selat,Butterworth. 120,000.00 45 Days 1991 3. Proposed Factory On Lot 35, Perai Industrial Estate IV, Seberang Perai. KAMEN STEEL INDUSTRIE S/B Lot 35, Kws. Perusahaan Perai Fasa IV, 13600 Perai. JURUTERA PERUNDING O.S. 73-B Medan Angsana Bandar Baru Ayer Itam,Pg. 950,000.00 4 months 1992 4. Proposed ExtensionTo Existing Factory On Plot 11, Kawasan Perindustrian, Tikam Batu, Sungai Petani, Kedah. LEADER CABLE INDUSTRIE BHD Lot 1385, Tikam Batu Industrial Estate Sungai Petani, 05600 Kedah. CHRISON CONSULTANTS/B 6B Clove HallRoad 10050 500,000.00 2 months 1992

LIST OF COMPLETED PROJECTS d) Cable, Steel & Pipes Manufacturing No. Project Client Architect / Consultant Contrract Sum (RM) Duration Status of Construction 5. Cadangan Membina Dua Buah Kilang Setingkat Kepada Sediada Di Atas Plot 120 (PT 13945) Kawasan Perusahaan LPK, Fasa II, Sungai Petani, Kedah. PETRO-PIPE SOCOTHERM COSTING S/B Kawasan Lembaga Pelabuhan Kuantan P.O.Box 24025720 Kuantan Pahang. KK CONSULTING ENGINEERS (PG) SDN. BHD. 32 Lebuhraya Jelutong 11600 1,675,000.00 4 months Dec-1995 6. Cadangan Tambahan Kepada Kilang Yang Sediada Di Atas Lot-Lot 259B, 260 & 261 Lorong Perusahaan 10, Kws Perindustrian Perai, MK 1, Seberang Perai Tengah. PETRO-PIPE INDUSTRIIES (M) S/B 2431 Lorong Perusahaan 10 Perai Industrial Estate 13600 KK CONSULTING ENGINEERS (PG) SDN. BHD. 32 Lebuhraya Jelutong 11600 300,000.00 17 weeks Nov-1996

LIST OF COMPLETED PROJECTS 1) Industrial e) Paper Industrials No. Project Client Architect / Consultant Contrract Sum (RM) Duration Status of Construction 1. Proposed Extension To Existing Factory On Lot 230 and 321, MK 1, Kawasan Perusahaan Perai, S.P.T. KHENG HWA TIN SDN.BHD. Lot 320 & 321, MK1 Kawasan Perusahaan Perai Tengah 13600, P.W. PERUNDING JURUCITA S/B 9 Lintang Selat, 12000 Taman Selat, Butterworth. 780,000.00 3 months 1991 2. Proposed Machinery Foundation On Lot 320 & 321, MK 1, Kawasan Perusahaan Perai, S.P.T. KHENG HWA TIN SDN. BHD. Lot 320 & 321, MK1 Kawasan Perusahaan Perai Tengah,13600 P.W. TURNKEY 288,000.00 2 months 1991 3. Proposed Additional Works To Existing Factory On Lot 320 And 321, MK 1, Kawasan Perusahaan Perai, S.P.T. KHENG HWA TIN SDN. BHD. Lot 320 & 321, MK1 Kawasan Perusahaan Perai Tengah, 13600 P.W. Nil 180,000.00 21 Days 1991 4. Proposed Water Tank Foundation And Additional Works On Lot 320 And 321, MK 1, Kawasan Perusahaan Perai, S.P.T. KHENG HWA TIN SDN. BHD. Lot 320 & 321, MK1 Kawasan Perusahaan Perai Tengah, 13600 P.W. PERUNDING JURUCITA S/B 9 Lintang Selat, 12000 Taman Selat, Butterworth. 150,000.00 1 month 1993

LIST OF COMPLETED PROJECTS 1) Industrial f) Automotive No. Project Client Architect / Consultant Contrract Sum (RM) Duration Status of Construction 1. Cadangan Mendirikan Sebuah Bangunan Pemeriksaan Kenderaan Dagangan Di Atas Sebuah Lot 18477, Mukim Sungai Petani, Daerah Kuala Muda, Jalan Kuala Ketil, Bandar Sungai Petani, Kedah. (PUSPAKOM). DIVERSIFIED RESOURCES BHD IMATEX BERHAD No 553 Second Floor Batu 3-1/2 Jalan Ipoh 51200 Kuala Lumpur. AKITEK ATMA 737-4-12A, Tingkat 3 Kompleks Sri Sungai Nibong 11900 Jalan Sultan Azlan Shah, 2,500,000.00 4 months Jun-1995 2. Cadangan Mendirikan Sebuah Bangunan Pemeriksaan Kenderaan Dagangan Di Atas Sebahagian Lot 1717, Mukim Jejawi, Perlis. (PUSPAKOM). DIVERSIFIED RESOURCES BHD IMATEX BERHAD No 553 Second Floor Batu 3-1/2 Jalan Ipoh 51200 Kuala Lumpur. AKITEK ATMA 737-4-12A, Tingkat 3 Kompleks Sri Sungai Nibong 11900 Jalan Sultan Azlan Shah, 2,000,000.00 4 months Sep-1995 3. Cadangan Mendirikan Sebuah Bangunan Pemeriksaan Dagangan Di Atas Sebahagian Lot 1007, Mukim Asam Kumbang, Daerah Larut & Matang, Jalan Kg. Dew. Simpang, Taiping, Perak. (PUSPAKOM) DIVERSIFIED RESOURCES BHD IMATEX BERHAD No 553 Second Floor Batu 3-1/2 Jalan Ipoh 51200 Kuala Lumpur. AKITEK ATMA 737-4-12A, Tingkat 3 Kompleks Sri Sungai Nibong 11900 Jalan Sultan Azlan Shah 2,948,000.00 2.5 months Feb-1996 4. Proposed Waste Water Treatment Plant For National Motorcycle Kawasaki Plant At Mukim Of Gurun, Kedah Darulaman. (MODENAS). DIVERSIFIED RESOURCES BHD IMATEX BERHAD No 553 Second Floor Batu 3-1/2 Jalan Ipoh 51200 Kuala Lumpur. PERUNDING INSAN No 2-C Jalan Free School 11600 596,320.00 2 1/4 months Sep-1996

LIST OF COMPLETED PROJECTS f) Automotive No. Project Client Architect / Consultant Contrract Sum (RM) Duration Status of Construction 5. Proposed Waste Storage & Cutting Chip Station Building For Motorcycle Kawasaki Plant On Part Of Lot 7416 (PT 1273) MK Of Gurun, District Of Kuala Muda, Kedah Darulaman. (MODENAS). DIVERSIFIED RESOURCES BHD IMATEX BERHAD No 553 Second Floor Batu 3-1/2 Jalan Ipoh 51200 Kuala Lumpur. PERUNDING INSAN No 2-C, Jalan Free School 11600 199,791.45 7 weeks Sep-1996 6. Proposed Superstructure Works For Warehouse For Motorcycle Kawasaki Plant On Part Of Lot 7416 (PT 1273) Mukim Of Gurun, District Of Kuala Muda, Kedah Darulaman. (MODENAS). DIVERSIFIED RESOURCES BHD IMATEX BERHAD No 553 Second Floor Batu 3-1/2 Jalan Ipoh 51200 Kuala Lumpur. PERUNDING INSAN No 2-C, Jalan Free School 11600 523,626.66 7 weeks Sep-1996 7. Proposed Block A, B & C For National Motorcycle Kawasaki Plant Part Of Lot 7416 (PT 1273) Mukim Of Gurun, District Of Kuala Muda, Kedah Darulaman. (MODENAS). DIVERSIFIED RESOURCES BHD IMATEX BERHAD No 553 Second Floor Batu 3-1/2 Jalan Ipoh 51200 Kuala Lumpur. PERUNDING INSAN No 2-C, Jalan Free School 11600 800,000.00 4 months Oct-1996 8. Cadangan Mendirikan Sebuah Bangunan Pemeriksaan Kenderaan Dagangan Di Atas Sebahagian Lot-Lot 14253, Mukim Durian Sebatang, Teluk Intan, Perak. (PUSPAKOM). DIVERSIFIED RESOURCES BHD IMATEX BERHAD No 553 Second Floor Batu 3-1/2 Jalan Ipoh 51200 Kuala Lumpur. AKITEK ATMA 737-4-12A, Tingkat 3 Kompleks Sri Sungai Nibong 11900 Jalan Sultan Azlan Shah, 2,900,000.00 13 weeks Oct-1996

LIST OF COMPLETED PROJECTS 1) Industrial g) Pharmaceutical No. Project Client Architect / Consultant Contrract Sum (RM) Duration Status of Construction 1. Proposed Warehouse And Canteen Extension To Existing Factory On Lot 23, Bakar Arang Industrial Estate, Sungai Petani, 08000 Kedah. RANBAXY (MALAYSIA) S/B Lot 23, Bakar Arang Industrial Estate, Sungai Petani, 08000 Kedah. MWA JURUTERA PERUNDING 368-4-6, Bellisa Row, Jalan Burma, Pulau Tikus, 10350 475,000,.00 3 months Jul-2003 2. Proposed Pharmaceutical Formulation Facility Expansion Project at Bakar Arang Industrial Estate, Sungai Petani Kedah Darulaman - Main Building Works. RANBAXY (MALAYSIA) S/B Lot 23, Bakar Arang Industrial Estate, Sungai Petani, 08000 Kedah.. M.E.I Project Engineers Sdn.Bhd. 51-12-A Menara BHL, 51, Jalan Sultan Ahmad Shah 10050 1,325,000.00 5 months Mar-2005

LIST OF COMPLETED PROJECTS 1) Industrial h) Others No. Project Client Architect / Consultant Contrract Sum (RM) Duration Status of Construction 1. Proposed Extension To Existing Factory Cadangan Tambahan Kepada Loji Sedia Ada (Dry Fractionation Plant) Di Atas Lot 333 Hingga 346, Prai Industrial Complex, Perai. PALMEX BERHAD Lot 333 Hingga 346 Perai Industrial Complex Perai. ACERS OF DIMOND SDN. BHD. AKITEK KETIKA 7M-2, Jalan Gottlieb, 10350 250,000.00 1 1/2 months 1993 2. Cadangan Membina Fasa 3 Yang Mengandungi 30 Unit Bengkel Teres 1-1/2 Tingkat Di Atas Sebahagian Lot 002868 Dan 002687 Seksyen 3, Bandar Butterworth, Seberang Prai Utara, Jalan Mak Mandin, Seberang Perai. DIVERSIFIED RESOURCES BHD IMATEX BERHAD No 553 Second Floor Batu 3-1/2 Jalan Ipoh 51200 Kuala Lumpur. AKITEK ATMA 737-4-12A, Tingkat 3 Kompleks Sri Sungai Nibong 11900 JalanSulta Azlan Shah, 3,000,000.00 6 months May-1997 3. Proposed Road Widening To Existing Warehouse At Adjacent Plot 74, Kawasan Perusahaan Bukit Tengah, Mukim 11, Seberang Perai Tengah, Pulau Pinang. APEX PROPERTIES SDN.BHD. No.1B, Medan Angsana Bandar Baru Air Itam, 11500 HST CONSULTING ENGINEER No.1B, Medan Angsana Bandar Baru Air Itam, 11500 180,000.00 6 weeks Nov-2005

LIST OF COMPLETED PROJECTS 1) Industrial h) Others No. Project Client Architect / Consultant Contrract Sum (RM) Duration Status of Construction 4. Cadangan Mendirikan 2 Tingkat Pejabat Dan 1 Tingkat Gudang Di Plot 35(b) Taman Perindustrian Bukit Minyak, Mukim 13, Seberang Perai Tengah - Main Building. APEX PROPERTIES SDN BHD Plot 35(b), Taman Perindustrian Bukit Minyak, Mukim 13, Seberang Perai Tengah. (Origin Management & Planning Sdn Bhd) PERUNDING ERA ZAMAN SDN BHD 765C, Jalan Sultan Azlan Shah, Sungai Nibong, 11900 Bayan Lepas, 11,821,605.53 8 months Nov - 2007 5. Cadangan Pindaan Dan Tambahan Kepada Kilang Sedia Ada Di Atas Lot No. H.S. (D) 7973, P.T. 1887, Taman Perindustrian Bayan Lepas, Fasa IV, MK.12, D.B.D., Hilir Sungai Keluang, Pulau Pinang. BRADY TECHNOLOGY SDN BHD Plot 6, Hilir Sungai Keluang 4, Bayan Lepas Free Industrial Zone, Phase IV, Bayan Lepas, 11900 M.E.I. CONSULTANT SDN BHD 51-12-A, Menara BHL, 51, Jalan Sultan Ahmad Shah, 10050 7,085,452.32 6 Months Mar -

LIST OF COMPLETED PROJECTS 2) Commercial / Hotel No. Project Client Architect / Consultant Contrract Sum (RM) Duration Status of Construction 1. Proposed 3 Storey Commercial Complex At Package "B" On Lot 73774, Sec. 3, Town of Jelutong, N.E.D., "The Gallery. IJM CORPORATION BHD 9th Floor Wisma Penang Garden, 42 Jalan Sultan Ahmad Shah 10500 OOI TEIK BOON CONSULTING ENGINEERS 23A, Lorong Kuching, 10350 4,500,000.00 12 months 1992 2. Cadangan Membina 3 Unit Kedai 3 Tkt. Di Atas Lot 876, Sek. 2, Jalan Kg. Paya, Butterworth (Baki Lot Kedai Sediada). LEN YU PLUMBING ENGINEERING S/B 6700, Jalan Kampung Paya 12200 Butterworth. ARKITEK MELATI 47, 2nd Floor, Jalan Selat Taman Selat, 12000 Butterworth. 510,000.00 10 months Feb-2000 3. Cadangan 1 Blok 6-Tingkat Komplek Komersial Di Lebuh Leith, Di Atas Lot 607 Dan 610, Sek 19, Bandar Georgetown, D.T.L., Pulau Pinang. HAPPY ESSENTIAL SDN. BHD. Oriental Hotel Building, 105-B, Penang Road, 10000 KH ARCHITECT 24, Jalan Imigresen 10400 1,900,000.00 10 months Feb-2000

LIST OF COMPLETED PROJECTS 2) Commercial / Hotel No. Project Client Architect / Consultant Contrract Sum (RM) Duration Status of Construction 4. Cadangan Membina Sebuah Blok Kondotel 6 Tingkat Di Atas Sebahagian Lot 6594, Mk. Kamunting, Daerah Larut Dan Matang Perak Darul Ridzuan - Site Clearance, Earthwork, Piling & Pile Caps Works. DOMINANT STAR SDN BHD Jalan Bukit Jana, P.O.Box 4, 34600, Kamunting, Perak Darul Ridzuan. SENIBINA ARKITEK Bangunan Tan Lai Kim 160, Jalan Kelang Lama, 58000 Kuala Lumpur. 800,000.00 3 months Aug-2003 5. Cadangan Membina Sebuah Blok Kondotel 6 Tingkat Di Atas Sebahagian Lot 6594, Mk. Kamunting, Daerah Larut Dan Matang Perak Darul Ridzuan - Main Building And Infrastructure Works. DOMINANT STAR SDN BHD Jalan Bukit Jana, P.O.Box 4, 34600, Kamunting, Perak Darul Ridzuan. SENIBINA ARKITEK Bangunan Tan Lai Kim 160, Jalan Kelang Lama, 58000 Kuala Lumpur. 9,080,438.00 15 months Apr-2005 6.. Cadangan Membina Sebuah Kolam Renang Dan Kemudahan Rumah Pump Dan Tandas Awam Di Atas Sebahagian Lot 6594, Mukim Kamunting, Daerah Larut Dan Matang, Perak. DOMINANT STAR SDN BHD Jalan Bukit Jana, P.O.Box 4, 34600, Kamunting, Perak Darul Ridzuan. SENIBINA ARKITEK Bangunan Tan Lai Kim 160, Jalan Kelang Lama, 58000 Kuala Lumpur. 772,243.87 4 months Sep-2005

LIST OF COMPLETED PROJECTS 3) Residential No. Project Client Architect / Consultant Contrract Sum (RM) Duration Status of Construction 1. Proposed 1 Block 4 Storey Apartment On Lot 626, Sec. 2, Town Of Air Itam, FU HUAT REALTY SDN BHD 10th Floor, Komplek Mutiara No 125-J, Jalan Anson 10400 PERUNDING ALAM BINA 30, Jalan Irawadi 10050 1,200,00.00 12 months 1991 2. Proposed Piling Works For 9 Storey Apartment At Bayan Lepas, FU HUAT REALTY SDN BHD 10th Floor, Komplek Mutiara No 125-J, Jalan Anson 10400 C.T. WONG CONSULTANT ENGINEERS 55A, Jalan Zainal Abidin 10400 500,000.00 1 month Completed On 1991 3. Proposed 9 Storey Low Cost Flats On Lot 60 And Part Of Lots 59&56 MK12, D.B.D., FU HUAT REALTY SDN BHD 10th Floor, Komplek Mutiara No 125-J, Jalan Anson 10400 C.T. WONG CONSULTANT ENGINEERS 55-A, Jalan Zainal Abidin 10400 2,500,00.00 15 months Completed On 1993 4. Proposed 9 Storey Low Cost Flats At Lot 1841, MK 13, N.E.D., CANIVEST CORPORATION S/B 207-G Jalan Dato Keramat, 10150 Pg. AKITEK PERDANA 14A, Jalan Pahang 10400 5,767,263.92 18 months Mar-1995

LIST OF COMPLETED PROJECTS 3) Residential No. Project Client Architect / Consultant Contrract Sum (RM) Duration Status of Construction 5. Proposed 3 Storey Bungalow At Lot 313 And Part Of Lot 314, Section 44, Mukim Keladi, Daerah Kulim, Kedah. DR NG BOON TONG & DR TEE CHIN CHIN 30-A Jalan Paya 09000 Kulim Kedah Darulaman. FARID H. KAMAL ARCHITECT 44 Lorong Kinta, 10400 796,531.00 10 months Jun-2000 6. Cadangan Pindaan & Tambahan Ke Atas Rumah Kedai 2 Tingkat Sediada No : 458, Taman Cendana II, Di Atas Lot 1679, Seksyen 36, Mukim Kulim, Daerah Kulim, Kedah Darulaman. MR. NG BOON KUAN & MS.WONG LEE YEN Plot 1679, Kulim Keladi, Daerah Kulim, Kedah Darulaman. CSW CONSULTANT 54, Lintang Sungai Ara 1, Taman Sungai Ara, 11900 Bayan Lepas, 260,000.00 6 months Aug-2002 7. Cadangan Meroboh Rumah-Rumah Sediada (3 unit) Dan Membina Rumah Berkembar 2 Tingkat (10 unit) Diatas Lot 63, Mukim 12, Daerah Barat Daya, Jalan Bayan Lepas, Pulau Pinang. ESTAGOLD ENGINEERING S/B & ORION FAR EAST 106A, Jalan Tan Sri Teh Ewe Lim 11600 Pulau Pinang. AKITEK K.E.Koay 15-A2, Menara Ban Hin Lee 51, Jalan Sultan Ahmad Shah 10050 Pulau Pinang. 1,872,000.00 12 months Feb-2006

LIST OF COMPLETED PROJECTS 4) Educational No. Project Client Architect / Consultant Contrract Sum (RM) Duration Status of Construction 1. Proposed Sub-Structure & Piling Works For School On Plot 1886 Lot 753, M.K. 11, Seberang PeraiTengah. SEKOLAH MENENGAH JIT SIN Bukit Mertajam Seberang Perai. PERUNDING JURUCITA S/B 9, Lintang Selat, Taman Selat 12000 Butterworth. 300,000.00 4 months 1990 2. Proposed 1 Block 3 Storey School At Sek. Menengah Georgetown, GEORGETOWN SECONDARY SCHOOL Batu Lanchang 11600 J.K.R. 650,000.00 12 months 1991 3. Proposed 1 Block 2 Storey School At Sek. Menengah (P) Sri Mutiara, SRI MUTIARA SECONDARY SCHOOL Jalan Air Itam J.K.R. 650,000.00 12 months 1991 4. Pembinaan Satu (1) Blok Empat (4) Tingkat Bangunan Tambahan Sekolah Kebangsaan Mohd. Shah, Seberang Perai Utara, Pulau Pinang. ZAMRIDA SENDIRIAN BERHAD No. 27, Tingkat 1, Jalan Pauh Indah, Taman Pauh Indah, 13500 Permatang Pauh Bukit Mertajam. JABATAN KERJA RAYA Seberang Perai Utara (JKR SPU), Bertam, 13200 Kepala Batas. 211,067.20 (Provisional) 1 month Feb-2002 5. Pembinaan 3 Blok 4 Tingkat Bangunan Sekolah Tambahan, Bangunan Makmal Dan Bangunan Kemahiran Hidup Di Sekolah Menengah Bakti, Tasek Gelugor, Seberang Perai Utara, Pulau Pinang. PEMBANGUNAN MESRA SDN. BHD. 20, Lorong Maju 2, Taman Haji Abdullah Fahim, 13200 Kepala Batas, S.P.U. JABATAN KERJA RAYA Seberang Perai Utara (JKR SPU), Bertam, 13200 Kepala Batas. 2,010,000.00 6 months Nov-2002

LIST OF COMPLETED PROJECTS 5) Others No. Project Client Architect / Consultant Contrract Sum (RM) Duration Status of Construction 1. Renovation Works At Butterworth Railway Station Restaurant, Butterworth. MKAMAL FOOD HOLDING S/B Walttie Airport Terrace, Terminal Baru Lapangan Terbang Sultan Azlan Shah 13135 Ipoh, Perak. Nil 220,000.00 30 Days 1992 2. Proposed 1 No. Waste Treatment Plant At Bayan Lepas, Pulau Pinang Gotong Royong Berhad. MECHMAR ENVIROTECH S/B 116 Jalan Semangat, P.O. Box4, 46700 Selangor Darul Ehsan. JIMMY KHOO CONSULTANT ENGINEERS 7M-2, Asas Centre 10350 Gottlied Road 250,000.00 2 months 1993 3. Cadangan Mendirikan Semula Sebuah Gereja Dan 1 Blok 3 Tingkat Dewan Serbaguna Di Jalan Burma Di Atas Lot 1026, 1027 And 1841, M.K. 13, N.E.D., GENERAL CONFERENCE & CORPORATION OF SEVENTH-DAY ADVENTISTS CHURCH 160 Jalan Burma 10350 AKITEK MEGA 19 Lorong Berjaya 10350 Pulau Tikus 833,298.00 6 months Aug-1995 4. Proposed 4 Storey New Church Building And 2 Storey Classroom On Plot 3, Part Of Lot 1216, MK 12, Bandar Bayan Baru D.B.D., THE CHARISMATIC CHURCH OF PG 136, Jalan Sultan Azlan Shah 11900 Bayan Lepas DENNIS LIEW & ASSOCIATES Chartered Architects 6 Jalan Berjaya 10350 Pulau Tikus, Pg. 1,700,000.00 10 months Mar-1997 5. Cadangan Mendirikan Dewan Serbaguna 1 Tingkat Dan 3 Bilik Darjah Di Atas Lot 611, Sek. 5, Georgetown, D.T.L., Pulau Pinang. THE CHURCH OF THE HOLY SPIRIT No 1, Tingkat Besi Satu Off Green Lane 11600 DENNIS LIEW & ASSOCIATES Chartered Architects 6, Jalan Berjaya 10350 Pulau Tikus, Pg. 2,045,000.00 9 months Aug-1997

LIST OF COMPLETED PROJECTS 5) Others No. Project Client Architect / Consultant Contrract Sum (RM) Duration Status of Construction 6. Proposed 3-Storey New Building, Alteration & Additions On Lot 14, Sek. 13, Bandar Georgetown, D.T.L., Pulau Pinang At No. 224, Jalan Macalister, THE TRUSTEES OF THE PENANG BAPTIST CHURCH No 224, Jalan Macalister 10400 DENNIS LIEW & ASSOCIATES Chartered Architects 6, Jalan Berjaya 10350 Pulau Tikus, Pg. 488,180. 00 6 Months Aug-1998 7. Proposed 4-Storey Hostel On Lot 297, Sek. 1, Bandar Tanjung Tokong, D.T.L., Pulau Pinang. THE TITULAR ROMAN CATHOLIC BISHOP OF PENANG 3, Lebuh Farquhar 12000 DENNIS LIEW & ASSOCIATES Chartered Architects 6, Jalan Berjaya 10350 Pulau Tikus, Pg. 2,028,000.00 12 Months Jun-1998 8. Renovation Works To Gymnasium And Field Games Changeroom For Penang Sports Club, Jalan Utama, PENANG SPORTS CLUB Jalan Utama DENNIS LIEW & ASSOCIATES Chartered Architects 6, Jalan Berjaya 10350 Pulau Tikus, Pg. 28,445.00 2 Months Nov-1998 9. Proposed Alterations & Additions On Lot 3266, Mukim 13, DTL, Jalan Sungai Dua, Pulau Pinang. SILVER JUBILEE HOME FOR THE AGED Jalan Sungai Dua 11700 Pulau Pinang. LOH & LOH ARCHITECT 123P, 1st Floor, Wisma Lister Garden 10400 Macalister Road 90,000.00 4 Months Aug-2000

LIST OF PROJECT IN PROGRESS a) Electronic & Semi-Conductor Factory No. Project Client Architect / Consultant Contrract Sum (RM) Duration Status of Construction 1. Proposed Project For Semi-Conductor Factory Linkway Progressive Build Upgrade For Existing Factory Lot 8, Jalan Hi-Tech 2/3, Kulim Hi-Tech Park, 09000 Kulim Kedah Darul Aman. Semi-Conductor Factory At Bayan Lepas Free Trade Zone, Phase 3, Halaman Kampung Jawa, Bayan Lepas, 11900 BYG ARCHITECTURE SDN BHD 12-A, Arratoon Road, 10050 5,817,825.81 8 months Work In Progress

TESTIMONIAL

COMPLETED PROJECT PHOTOGRAPHS

Brady Technology Sdn Bhd Plot 6, Hilir Sungai Keluang 4, Bayan Lepas, Brady Technology Sdn Bhd Plot 6, Hilir Sungai Keluang 4, Bayan Lepas,

Mini-Circuits Technologies (M) Sdn Bhd Plot 10, Bayan Lepas Technoplex, Phase IV, Bayan Lepas Free Industrial Zone. Mini-Circuits Technologies (M) Sdn Bhd Plot 10, Bayan Lepas Technoplex, Phase IV, Bayan Lepas Free Industrial Zone.

Mini-Circuits Technologies (M) Sdn Bhd Plot 10, Bayan Lepas Technoplex, Phase IV, Bayan Lepas Free Industrial Zone. Mini-Circuits Technologies (M) Sdn Bhd Plot 10, Bayan Lepas Technoplex, Phase IV, Bayan Lepas Free Industrial Zone.

Advanced Micro Devices Export Sdn.Bhd. (Package 5200 - Double Storey) Phase III, Kg. Jawa, Bayan Lepas, Advanced Micro Devices Export Sdn.Bhd. (Package 5200 - Double Storey) Phase III, Kg. Jawa, Bayan Lepas,

Advanced Micro Devices Export Sdn.Bhd. Phase III, Kg. Jawa, Bayan Lepas, Penang (Package 5000 - Level 3) Advanced Micro Devices Export Sdn.Bhd. Phase III, Kg. Jawa, Bayan Lepas, Penang (Package 5000 - Level 3)

Advanced Micro Devices Export Sdn.Bhd. Phase III, Kg. Jawa, Bayan Lepas, Penang (Package 5000 - Level 3) Advanced Micro Devices Export Sdn.Bhd. Phase III, Kg. Jawa, Bayan Lepas, Penang (Package 5000 - Level 3)

Apex Properties Sdn Bhd - Taman Perindustrian Bukit Minyak Apex Properties Sdn Bhd - Taman Perindustrian Bukit Minyak

Advanced Micro Devices Export Sdn.Bhd. Phase III, Kg. Jawa, Bayan Lepas, Penang (Package 500) Advanced Micro Devices Export Sdn.Bhd. Phase III, Kg. Jawa, Bayan Lepas, Penang (Package 500)

Advanced Micro Devices Export Sdn.Bhd. Phase III, Kg. Jawa, Bayan Lepas, Penang (Package 500) Advanced Micro Devices Export Sdn.Bhd. Phase III, Kg. Jawa, Bayan Lepas, Penang (Package 500)

Advanced Micro Devices Export Sdn.Bhd. Phase III, Kg. Jawa, Bayan Lepas, Penang (Package 500) Advanced Micro Devices Export Sdn.Bhd. Phase III, Kg. Jawa, Bayan Lepas, Penang (Package 500)

Condotel, Bukit Jana, Taiping, Perak. Condotel, Bukit Jana, Taiping, Perak.

Condotel, Bukit Jana, Taiping, Perak. Condotel, Bukit Jana, Taiping, Perak.

Ranbaxy (M) Sdn Bhd Sungai Petani, Kedah Ranbaxy (M) Sdn Bhd Sungai Petani, Kedah

Varitronix (M) Sdn.Bhd. Bayan Lepas Free Industrial Zone, Varitronix (M) Sdn.Bhd. Bayan Lepas Free Industrial Zone,

Varitronix (M) Sdn.Bhd. Bayan Lepas Free Industrial Zone, Varitronix (M) Sdn.Bhd. Bayan Lepas Free Industrial Zone,

G-Shank Precision (M) Sdn.Bhd. Bayan Lepas Free Industrial Zone, G-Shank Precision (M) Sdn.Bhd. Bayan Lepas Free Industrial Zone,

G-Shank Precision (M) Sdn.Bhd. Bayan Lepas Free Industrial Zone, Proposed One Block Six Storey Commercial Complex For Happy Essential Sdn.Bhd. Leith Street,

The Church Of The Holy Sprit, Green Lane, The Trustees Of The Penang Baptist Church, Macalister Road,

The Charismatic Church Of Penang Bayan Lepas, Penang Proposed General Conference & Corporation Of Seventh-Day Adventist Church, Burmah Road,

Vehicle Inspection Centre For PUSPAKOM Sungai Petani, Kedah. Vehicle Inspection Centre For PUSPAKOM Jejawi, Perlis.

Reservoir Villa For Fu Huat Reality Sdn.Bhd. Air Itam, Proposed 3 Storey Bunglow, Ms. Dr. Ng Boon Tong & Dr. Tee Chin Chin, Kulim Kedah Darulaman.

Taman Bunga Merah For Canivest Corporation Sdn.Bhd. Sungai Dua, Taman Halaman Murni For Fu Huat Reality Sdn.Bhd. Bayan Lepas,

COMPANY SAFETY CELEBRATION

Safety Celebration 100,000 Man-hours and Safety Drill. Safety Celebration 100,000 Man-hours and Safety Drill.

Safety Celebration 100,000 Man-hours and Safety Drill. Safety Celebration 100,000 Man-hours and Safety Drill.

Safety Celebration 100,000 Man-hours and Safety Drill. Safety Celebration 100,000 Man-hours and Safety Drill.

Safety Celebration 100,000 Man-hours and Safety Drill Safety Celebration 100,000 Man-hours and Safety Drill