The Tactical Information Exchange Domain The Joint Battlespace Networked Environment and Tactical Data Links/Multi TDL Networks (MTN) Mr Graham King DJCIX JFI/JCC SQNLDR Paul Ashby SO1 TIED CIOG Achievements in 2013 and Plans for 2014 2013 Battlespace Information Exchange Working Group JP 2089 Phase 2A Sustained Initial MTN capability JP 2089 Phase 3A Initial guidance on establishing a mature MTN capability Concept for MTN Joint Interface Control Operations Initial framing of Joint Battlespace Networked Environment (JBNE) Operating Concept TIED functional support arrangements TIED (Phase 2A) Capability Support Plan 1
Achievements in 2013 and Plans for 2014 2014 JP 2089 Phase 3A capability development guidance on establishing a mature MTN capability JP 2089 Phase 4 Scoping the project (an ongoing BLOS capability; Land Network integration; enhancing the MTN) Development of the Joint Battlespace Networked Environment operating concept Further realigned functional support arrangements JBNE/TIED Strategy development 2
Draft V0.1 10-Oct--2013 (Adapted from TIED diagram) Joint Battlespace Networked Environment (JBNE) Context Legend Sustaining Bases Long Haul Deployed JTF Component Commanders Air/Maritime Land Enterprise Architecture (BTIA) - Policy (CIOG) - Governance (JWC) - Priorities Organisation - Roles - Responsibilities Whole of Govt Allies Coalition Regional HQJOC HQs COP CTP (National WASP) CTP Op / C2 Bases, Sites & Sensors Product: Environment CTPs RAP&RMP RLP UHF & HF Multi-TDL Network TDS/C2 with L11, 16, 22 & JREAP, Weapons & Gateways Land Network BGC3/BMS, VMF/Gateway, AFATDS, VMF/CNR, FBCB2 - BFT ISR for the Warfighter ISR, Control, CDL (C, L, S, Ka & Ku) & CEC Intelligence Mission Data (IMD) IBS, IBS-I, IBS/CMF, ELINT, GEOINT Scope: FIC elements across the CLC (Needs, Requirements, Development, In-service Use & Disposal) ISR Joint Regional Immature CTP/TP Link does not exist Impermanent Link Partial solution exists Immature link exists Future links Regional Sensors and Inputs Heron, Hermes, FN-6, TMEO Permanent Sites Fixed Backbone Ext n to Theatre Joint Battlespace Networked Environment (JBNE) Strategic J6 CC - HJCC; CM - CA, CN, CAF; PRM - CIOG; Sustainment - CIOG, DMO SATCOM SATCOM SATCOM AIRBORNE SENSORS AIRBORNE WEAPONS AIRBORNE C2 LAND WEAPONS TUAV LAND C2 COMBAT TEAMS LAND SENSORS MARITIME WEAPONS MARITIME C2 MARITIME SENSORS 3
Increasingly Strategic 13/11/2013 Amphibious C2 Function and Systems Fights multiple Forces Strategic engagement & ROE Plans many missions Sets the mission of CATF Theatre wide coordination JTF/ CJTF/ JOC Strategic systems Shape and Influence role Operational Command Support Whole of Govt communications Fights the Joint Force/ Group Plans and executes specific missions CATF and CLF supported and supporting relationship AOA wide coordination Executes Joint Fires AOA wide airspace coordination COR plans and coordinates Ship to Objective Manoeuvre (STOM) JOR SACC COR Mix of tactical & strategic systems Provide planning and coord. Coalition collaboration and planning. Battlespace networks management Tactical systems interactions Increased network planning and mgt. Joint collaboration through common SA Increasingly time sensitive Fight the ship Integrate ship into the Joint Force Integrates aircraft ops into Ship Ship s Ops Room FLYCO Tactical systems Combat system interface with Force TDL. Battlespace Success 4
Sustaining an Initial Capability Electronic Warfare ISR (Battlespace Awareness CBRN Battlespace Integration Counter- IED Task Force Information operations Convergence Missile defence Cyber Joint Battlespace Networked Environment Strategic Environment DSN DRN COALITION COALITION Joint Battlespace Network DDSN Strategic Services DDRN Air Common Services Hub Cross Domain Guard MISSION SECRET NETWORK Developed by LNIC Maritime 5
MilCIS Conference 2013 Squadron Leader Paul Ashby Directorate of ICT Capability Co-ordination Chief Information Officer Group Building the Capability Where are we now? Simplex Operations. Link 16 UHF + JREAP Link 11 UHF/HF VMF CNR Various proprietary data links 6
VMF + LINK 16 LINK 11 Building the Capability Where do we want to be? Complex operations that utilise multiple TDL s to seamlessly move tactical data. Link 16 Link 11 or other BLOS RF Link VMF JREAP Future TDLs 7
Building the Capability How do we get there? Capability Management Framework Policy & Governance Assurance and Compliance Training Equipment Capability Management & Coordination VCDF Joint Capability Authority CIO DIE Coordinating Capability Manager ADF Capability Managers HICTO TIED Capability Sustainment Mngr (Delegated) HJCC Joint Capability Authority & Joint Capability Coordinator (Delegated) Key: Management / Coordination Authority Group Delegations / Authorities Capability Sustainment requirements & provision ADFTA TIED SME DMO System Project Offices (Sustainment) TIEIO Acquire & Sustain TDL Family of Sys Coordination / Liaison 8
Report Compliance 13/11/2013 Policy & Governance Delegated Authorities /Defence Instructions CDF / SECDEF Delegated Authorities/Defence Instructions CIO Accountable: DIE Manager ADF Accountable / Raise, Train & Sustain CJOPS Joint Operations VCDF Accountable: Joint Capabilities CDG Define / Develop Joint Projects CTO Enterprise, Systems and Technical Architectures & Standards HICTO/Strat J6 TIED Capability Sustainment Mngr HJCC Joint Capability Authority HJCC Responsible Joint Training Authority ADFTA TIED CoE DMO Accountable / Capability System Project Acquisition &Sustainment TIESPO Acquire & Sustain TDL Family of Sys Key: Portfolio Delegations / Policy (DIs) Group Delegations / Authorities Joint Capability Instructions may supplement, or suspend out-of-date DIs SME policy and operating advice CIO Integrated Defence Architecture ADF Platform Technical Regulatory Authority CJOPS Commander Joint Operations VCDF Accountable: Joint Capabilities CDG Define / Develop Joint Projects CTO Architecture / Standards & Tech Assurance Authority Set Architecture & Standards Set Architecture & Standards Coordination HICTO Capability Requirements validation Assess & Report Compliance Report Compliance Set Requirements ADFTA TIED Standards Assurance & Compliance JIT / CIT Report Compliance Report Compliance Op Needs & Functional Req ts JDNO / HJCC JICO Op Network Authority Authority DMO Acquire / Deliver to Function & Performance Specification TIEIO Develop & Accept to Spec Joint Capability Key: Group Delegations / Authorities Standards, etc Demonstrate / Report Compliance Demonstrate Compliance Set Requirements, Coordination / Liaison 9
Education & Training CIO DIE Coordinating Manager ADF Single-Service Training Managers Joint Training CJOPS Joint Operations VCDF Joint Collective Training HICTO TIED Capability Sustainment Mngr JDNO / JICO Op Network Authority HJCC Joint Training Authority Key: Group Delegations / Authorities ADFTA TIED SME Training DMO Accountable / Capability System Project Acquisition &Sustainment TIESPO Acquire & Sustain TDL Family of Sys Provision of Training Packages / Support Report Compliance (against training objectives) ADFTA TDL Training Courses ADF Interface Control Office (ADF ICO) Future AT-301 equivalency candidate Joint Multi-TDL Planning Course (JMPC) Future AT-201 equivalency candidate ADF Multi-TDL Advanced Course (AMAC) Accredited as AT-102 equivalent Joint Link-16 Intermediate Course (JLIC) Accredited as AT_101 equivalent Joint Link-16 Basic Course (JLBC) Future AT-220 equivalency candidate Joint Multi-TDL Overview (JMTO) Accredited as a component of AT-102 equivalency Multi-TDL Overview Course Possible equivalent to AT-401 10
Initial MTN Capability JP 2089 Phase 2A Provides Initial Common Support Infrastructure (ICSI) Supports existing in-service data links Link11 Link16 VMF (gateway) JREAP - Systems Management Remote Deployable 11
JP2089 Ph 2A ICSI Milestones Milestone Constitution Date 1 Delivery of deployable MTN Network Monitoring Systems. Mid 2014 2 Achieve ICSI Initial Operating Capability 3 rd QTR 2014 3 Delivery of MTN Primary Monitoring Site (MS); Delivery of MTN Secondary MS; Delivery of first three Temporary Sites; and Delivery of 1 Prototype Relocatable Secure Container. Late 2014 4 Achieve Operating Capability 2 Early 2015 5 Delivery of remaining Sites; and Delivery of final deployable MTN Network Monitoring Systems. Late 2015 6 Achieve ICSI Final Operating Capability Early 2016 Mature MTN Capability JP2089 Phase 3A Enhanced Common Support Infrastructure More of the same delivered under Phase 2A Not necessarily same equipment or software but same capabilities. Still based on current in service data links Link 11 Link 16 JREAP VMF 12
Proposed JP2089 Phase 3A Milestones Stages 1 (Tech) 2 (Facilities) Constitution Upgrade TIEIO development site Upgrade extant deployable MTN Network Monitoring Systems Upgrade MTN Monitoring Site (PMS and SMS); Upgrade current Phase 2A Sites Install tranche 1 Sites (RC + SS) Install tranche 2 Sites (RC + SS); Install tranche 3 Sites (SS); Install Tranche 2 deployable MTN Network Monitoring Systems; and Establish third MTN MS (SMS) Future Capability Beyond Line of Sight Data Link Link 22 (HF and UHF) JREAP Other technologies Land Network Enhancements 13
Questions? 14