United States Department of the Interior BUREAU OF INDIAN AFFAIRS Northwest Regional Office 911 NE 11th Avenue Portland, Oregon

Similar documents
FOREST SERVICE MANUAL NATIONAL HEADQUARTERS (WO) WASHINGTON, DC

Federal Register / Vol. 73, No. 179 / Monday, September 15, 2008 / Notices

SAFETEA-LU. Overview. Background

SUMMARY: The Captain of the Port of New Orleans (COTP New. Orleans), under the authority of the Magnuson Act,, established

Water Trust Board 2019 Application Overview and Frequently Asked Questions

This appendix provides the following Federal and State Regulations related to the Hazard Mitigation Planning process.

National Indian Gaming Commission

SUMMARY: By this direct final rule, the Coast Guard is removing. the regulation for the safety zone at Snake Island, also known as

Office of Surface Mining Reclamation and Enforcement

Northern Arizona Council of Governments Annual Work Program Amendment 1

MEMORANDUM OF AGREEMENT BETWEEN THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION AND THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY

Safety Zones, Facilities on the Outer Continental Shelf in the. SUMMARY: The Coast Guard proposes to establish safety zones

S One Hundred Seventh Congress of the United States of America AT THE FIRST SESSION

Rules and Regulations

Safety Zone, Barrel Recovery, Lake Superior; Duluth, MN. SUMMARY: The Coast Guard is establishing a temporary safety zone

APPENDIX A Notice of Intent to Prepare an EIS and Notice of Availability of the Draft EIS

NEBRASKA ENVIRONMENTAL TRUST BOARD RULES AND REGULATIONS GOVERNING ACTIVITIES OF THE NEBRASKA ENVIRONMENTAL TRUST

Sovereignty in Indian Education (SIE) Enhancement Initiative

Security Zones; Naval Base Point Loma; Naval Mine Anti Submarine. SUMMARY: The Coast Guard is increasing a portion of an existing

Land and Water Conservation Fund: Appropriations for Other Purposes

DOD INVENTORY OF CONTRACTED SERVICES. Actions Needed to Help Ensure Inventory Data Are Complete and Accurate

PPEA Guidelines and Supporting Documents

124 STAT PUBLIC LAW JAN. 7, 2011

Safety Zone; MODU KULLUK; Kiliuda Bay, Kodiak Island, AK to. SUMMARY: The Coast Guard is establishing a temporary safety

Department of Defense INSTRUCTION

S To establish the Caddo Lake National Heritage Area, and for other purposes. IN THE SENATE OF THE UNITED STATES

a GAO GAO ENDANGERED SPECIES PROGRAM Information on How Funds Are Allocated and What Activities Are Emphasized

The President. Part V. Tuesday, January 27, 2009

DOD INSTRUCTION STATE PARTNERSHIP PROGRAM (SPP)

Agency Information Collection Activities; Proposed ecollection ecomments Requested;

[Docket ID ED-2014-OPE-0035; CFDA Number: B.] Proposed Priority - Foreign Language and Area Studies

Commodity Credit Corporation and Foreign Agricultural Service. Notice of Funding Availability: Inviting Applications for the Emerging Markets

SUMMARY: The Coast Guard proposes to establish a temporary safety zone for the

Safety and Security Zones; New York Marine Inspection and Captain of the Port

RECOMMENDATIONS TO THE SECRETARY

Department of Defense INSTRUCTION

City of Fernley GRANTS MANAGEMENT POLICIES AND PROCEDURES

DEPARTMENT OF VETERANS AFFAIRS SUMMARY: The Department of Veterans Affairs (VA) is amending its regulations that

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS 1002 WEST 23 RD STREET, SUITE 350 PANAMA CITY, FLORIDA

Schaghticoke Tribal Nation v. Kent School Corporation Inc.

Department of Defense

vessel prepares for and actively off-loads two new Post-Panamax gantry cranes to the

COMPARISON OF FEDERAL REGULATIONS, VIRGINIA CODE AND VIRGINIA PART C POLICIES AND PROCEDURES RELATED TO INFRASTRUCTURE DRAFT

EPA s Integrated Risk Information System Assessment Development Procedures

Public Law th Congress An Act

Acres for America Grantee Webinar June 4, 2014

2017 Grant Assurances - Comments Concerning LSC s Proposed Revisions to the 2017 Grant Assurances. (81 FR ) April 5, 2016

NAVAJO - GALLUP WATER SUPPLY PROJECT QUARTERLY REPORT: APRIL JUNE, 2014

55644 Federal Register / Vol. 66, No. 213 / Friday, November 2, 2001 / Notices

Rob McKenna ATTORNEY GENERAL OF WASHINGTON Consumer Protection Division 800 Fifth Avenue Suite 2000 MS TB 14 Seattle WA (206)

OFFICE OF THE SECRETARY OF DEFENSE 1950 Defense Pentagon Washington, DC

An Invitation: Establishing a community forest with the U.S. Forest Service

PUBLIC NOTICE Application for Permit

The CESU Network Strategic Plan FY

DEPARTMENT OF VETERANS AFFAIRS SUMMARY: This document implements a portion of the Veterans Benefits,

Delayed Federal Grant Closeout: Issues and Impact

Open Burn Pit Registry Airborne Hazard Self-Assessment Questionnaire Web-Accessible: VA Form OMB 2900-XXXX

MEMORANDUM OF UNDERSTANDING COOPERATIVE ECOSYSTEM STUDIES UNITS NETWORK

Agency Information Collection Activities; 30 CFR 550, Subpart B, Plans and. ACTION: Notice of Information Collection; request for comment.

PART 512 RESEARCH. Subpart B Research. 28 CFR Ch. V ( Edition)

Division of Workforce Development (477)

Department of Defense INSTRUCTION

BC Capacity Initiative

2100 Second St., SW Washington, DC Staff Symbol: G-MEP Phone: (202) United States U.S. Coast Guard NOV /11

DEP has three main regulatory chapters that relate to pipeline construction.

Florida Department of Environmental Protection

SUMMARY: The Coast Guard is establishing a temporary safety zone on the Upper Mississippi

FY 2013 Competitive Resource Allocation National Guidance (revised 5/11/12)

OUTDOOR RECREATION ACQUISITION, DEVELOPMENT AND PLANNING U.S. DEPARTMENT OF INTERIOR

STATE ENVIRONMENTAL REVIEW PROCESS FOR PENNSYLVANIA WASTEWATER PROJECTS. Clean Water State Revolving Fund Program

Seminole Tribe of Florida Native Learning Center Request for Proposals (RFP) Call for Instructors Procedures

CHIEF NATIONAL GUARD BUREAU INSTRUCTION

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET, NW WASHINGTON, DC

The FAST Act: New Department of Transportation Tribal Self-Governance Program and Tribal Transportation Provisions

Santa Fe County, Santa Fe Association of REALTORS January 12, 2017

Fiscal Year 2018 Competitive Funding Opportunity; Grants for Buses and Bus Facilities Infrastructure Investment Program

PART ENVIRONMENTAL IMPACT STATEMENT

SUMMARY: The Coast Guard is establishing a safety zone during the 2015 Fautasi Ocean

TRANSPORTATION ALTERNATIVES (TA) SET ASIDE PROGRAM July 2016

NAVAJO - GALLUP WATER SUPPLY PROJECT QUARTERLY REPORT: JULY -SEPTEMBER, 2014

Tribal Historic Preservation Office

Federal Register / Vol. 74, No. 80 / Tuesday, April 28, 2009 / Rules and Regulations 19135

County Transportation Infrastructure Fund Grant Program Implementation Procedures

Tribal Engagement and the Region 10 Regional Response Team and Northwest Area Committee

Safety Zone; Navy Underwater Detonation (UNDET) Exercise, Apra Outer Harbor, GU

2012 Annual Tribal Self-Governance Department of the Interior and Department of Health and Human Services Conference

Subpart A General. PART 576 EMERGENCY SHELTER GRANTS PROGRAM: STEWART B. McKINNEY HOMELESS ASSIST- ANCE ACT. 24 CFR Ch. V ( Edition)

Department of Agriculture

DEPARTMENT OF VETERANS AFFAIRS SUMMARY: The Department of Veterans Affairs (VA) proposes to amend its medical

THE SECTION 106 REVIEW PROCESS

Mt. Stuart Elementary School Property_Background Information on Federal Grant Requirements Provided by Farley Walker, Business Manager.pdf (p.

Homeless Veterans Comprehensive Assistance Act of 2001 Prime Sponsor: Mr. Christopher H. Smith (NJ-04)

Clean Water Act Section 319 Base Funding. Eligibility and TAS

Technical Revisions to Update Reference to the Required Assessment Tool for. State Nursing Homes Receiving Per Diem Payments From VA

ACTION: Temporary final rule; request for comments. SUMMARY: The Coast Guard is establishing a temporary safety zone on navigable

Department of Defense

Appendix F: Native Americans

Special Local Regulation; Fautasi Ocean Challenge Canoe Race, Pago Pago Harbor,

National Historic. Preservation Act. A Guidebook on Section 106 August United States marine corps

Appendix C: Public Participation

Transcription:

IN REPLY REFER TO: Natural Resources United States Department of the Interior BUREAU OF INDIAN AFFAIRS Northwest Regional Office 911 NE 11th Avenue Portland, Oregon 97232-4169 Dear Tribal Leader:.t"' 0 2 2016 We are pleased to announce the Bureau of Indian Affairs (Bureau) is accepting requests for funding under the Water Management, Planning and Pre-Development (N34) (Water Management) and the Water Rights Negotiation/Litigation (R31) (Water Rights) Programs. These programs are funded with non-recurring appropriations and the funding is awarded on a competitive, discretionary basis for use on water-related projects or for water rights activities. The Bureau is accepting requests for funding in anticipation that funds for these programs will be appropriated in fiscal year 2017. We are enclosing a memorandum that provides general direction on preparing and submitting a funding request. Attached to the memorandum is a checklist showing the format to be used in preparing a request and a copy of the 2005 Federal Register Notice that provides detailed instructions for preparing and prioritizing requests. Both documents provide information or instructions on preparing a funding request, so please review them carefully. Each request should be categorized as either a water management project or a water rights project; requests for a specific project should not request funding from both programs. You may submit your funding request(s) for fiscal year 2017 to this office. Your request(s) must be post-marked on or before September 2, 2016 to allow our staff sufficient time to process and forward them to the Office of Trust Services by the September 15, 2016 deadline. If you have questions or concerns, please contact David Red horse, Natural Resource Officer, at (503) 231-6883. Sincerely, Enclosures cc: Superintendent

CHECK LIST BUREAU OF INDIAN AFFAIRS FY 2017 FUNDING REQUEST WATER RIGHTS LITIGATION/NEGOTIATION (R31) WATER MANAGEMENT PLANNING & PRE-DEVELOPMENT (N34). REGIONAL OFFICE 1. Date of Request: 2. Tribe and Reservation Name: 3. Project Name and Purpose: 4. Funding Amount Requested: 5. Type of Request: Water Resource Management Planning & Pre-Development, or Water Rights Litigation/ Negotiation, (refer to Federal Register Notice/ Vol.70, No. 201/Wednesday, October 19, 2005). 6. Project Manager Name and Contact Information: 7. Name and Contact Information of Person Preparing the Request: 8. Project Description: a. Scope of Work b. Proposed Methodology c. Project Deliverables d. Description of Past Accomplishments e. Current Status of Litigation/Negotiation Case 9. Budget Justification: a. Project Cost by Categories

b. Phase of Project Completion c. Others Costs Considered Necessary for Project Success 10. History of Past Funding: Including $ Dollar amount for the last 3 years a. FY 2016--$ b. FY 2015--$ c. FY 2014--$ d. Past Years Accomplishments e. Past 3 Years UDO s, (Undelivered Orders) 11. Water Rights funding Request Information: a. Project Solicitor s Name and Contact Information b. Project DOJ Attorney s, Name and Contact Information c. Consultation Information with the Solicitor and DOJ attorney s d. Litigation/ Negotiation Case Summary

60846 Federal Register / Vol. 70, No. 201 / Wednesday, October 19, 2005 / Notices ANILCA, the Service would be required to provide Doyon with adequate and feasible access to its holdings, which could include a road and/or pipeline across Refuge lands, if warranted by production. (3) Modified land exchange with conservation easements. The land exchange would proceed as described in Phase 1 under Alternative 1 above. In addition, at the time of the initial exchange, Doyon would donate to the U.S. conservation easements that preclude development on those Doyon lands identified in Phase II of the Agreement in Principle (whether or not oil/gas is produced from the exchange lands). If Doyon were to produce oil/gas, the U.S. would receive reduced production payments. (4) Modified land exchange excluding White-Crazy Mountains. The Yukon Flats Comprehensive Conservation Plan and Environmental Impact Statement recommended Wilderness designation for a 658,000 acre area in the White- Crazy Mountains. Under Alternatives 1 and 3, Doyon would receive title to about 26,270 acres of this land; under Atlternative 4, these 26,270 acres would be excluded from the exchange. In Phase I of the exchange, Doyon would receive approximately 84,000 acres of Refuge lands, surface and subsurface. From Doyon, the U.S. would receive an equal-value amount of land. Doyon would receive some oil and gas rights at the northern edge of the recommended Wilderness area, but only off-site drilling would be allowed; there would be no surface occupancy by Doyon. There would be no access corridor through the Service-recommended Wilderness area. The land consolidation exchange and 12(b) reallocation provisions of Phase I would proceed as detailed in the Agreement in Principle. Phase II of the exchange, would proceed as detailed in the Agreement, however Doyon s commitment to sell the U.S. additional lands would be reduced from about 120,000 acres to about 80,000 acres. The Fish and Wildlife Service released an Evaluation and Review of a Proposed Land Exchange and Acquisition of Native Lands on February 3, 2005, and accepted public comments until July 30, 2005. The Evaluation and Review, along with the comments received to date will be used in the scoping of a more detailed analysis through the EIS process. The Summary of Public Comments on a Proposed Land Exchange, Yukon Flats National Wildlife Refuge, 2005 is posted at http://alaska.fws.gov/nwr/yukonflats/ current.htm. Issues of concern repeatedly identified during the public comment period that will be addressed in the EIS may include, but are not limited to: (1) Refuge Purposes. The potential conflict between the proposed land exchange and the purposes of the Refuge; (2) Environmental Impacts. The potential for environmental degradation and contamination of air, water, and fish and wildlife resources; (3) Subsistence Impacts. The potential for negative effects on subsistence resources and increased user conflicts; (4) Impacts to Special Designation Areas. The potential for the exchange to jeopardize the wilderness character of the Service-recommended White-Crazy Mountains Wilderness Area and to degrade the wild quality of the Beaver Creek Wild River; (5) Insufficient Information. The potential that available biological, environmental, and socio-economic data may be insufficient to analyze the impacts of the exchange; (6) Impacts to Rural Communities. The potential for both positive and negative impacts on rural communities within the Yukon Flats region; (7) Loss of Native-owned Lands. There is opposition to the divestiture of Native lands within the Yukon Flats region; (8) Socio-economic Benefits. The potential for oil development to provide high-paying jobs to local residents and strengthen the regional economy; and (9) Refuge Benefits. The proposed exchange would increase the amount of land protected in the Refuge and would facilitate management by consolidating both Refuge and private ownerships. Dated: September 8, 2005. Rowan Gould, Regional Director, U.S. Fish and Wildlife Service, Anchorage, Alaska. [FR Doc. 05 20883 Filed 10 18 05; 8:45 am] BILLING CODE 4310 JA P DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Notice of Revised Instructions for Preparing and Prioritizing Water Program Funding Requests AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice. SUMMARY: The Bureau of Indian Affairs (BIA) will implement revised procedures for preparing and prioritizing funding requests in order to improve the management of two water programs with non-recurring annual appropriations. The two programs are the Water Rights Negotiation/Litigation Program (Water Rights Program) and the Water Resources Management, Planning and Pre-development Program (Water Resources Program). These water programs support the long-term goals of assisting Indian tribes in confirming and defining water rights, resolving claims through negotiation or litigation, and promoting the prudent conservation, management and use of natural resources. All of the BIA s water program managers and many water rights and water resources program managers employed by Indian tribes request these appropriations to support numerous Indian water rights litigation and negotiation efforts, to conduct water resources management, and to develop associated plans for tribal water resources. Typically, the BIA s Office of Trust Services receives more than 400 funding requests annually for water rights and water resources managementrelated activities. Funding requests are submitted by all 12 of the BIA s Regional Offices and approximately 150 to 175 Indian tribes each year. The current system for preparing and prioritizing water program funding requests needs improvement in order to provide BIA decision makers with more clear demarcations of priority. These revised procedures will allow for more effective prioritization and thus enable BIA decision makers to distribute more efficiently the available water program funds. DATES: The revised procedures for preparing and prioritizing water program funding requests will be used to distribute funding in Fiscal Year 2006. ADDRESSES: Jeffery Loman, Chief, Natural Resources, Office of Trust Services, Bureau of Indian Affairs, Mail Stop 4655 MIB, Code 210, 1849 C Street, NW., Washington, DC 20240, Telephone (202) 208 7373. FOR FURTHER INFORMATION CONTACT: Jeffery Loman, (202) 208 7373. SUPPLEMENTARY INFORMATION: Water Rights Program The BIA manages the Water Rights Program for the purpose of confirming and defining Indian water rights through litigation and court decree or through negotiated settlement. The first priority for program funds is to provide all documentation and other materials deemed necessary to further the United States water rights claims on behalf of Indian tribes or individuals. These materials may include preparing hydrographic survey reports; determining surface and ground water VerDate Aug<31>2005 14:50 Oct 18, 2005 Jkt 208001 PO 00000 Frm 00063 Fmt 4703 Sfmt 4703 E:\FR\FM\19OCN1.SGM 19OCN1

Federal Register / Vol. 70, No. 201 / Wednesday, October 19, 2005 / Notices 60847 supplies; identifying arable lands; completing a practicably irrigable acreage (PIA) assessment; determining point(s) and means of diversion, purpose(s) and place(s) of use, and amount of water diverted or depleted; and conducting studies to determine the water needs of fish, wildlife, or other resources for which Indian tribes have reserved rights. These funds may also be used to provide similar materials as necessary to facilitate active Indian water rights negotiations undertaken by the Secretary of the Interior. Water Resources Program The BIA manages the Water Resources Program for the purpose of managing, conserving and utilizing reservation water resources. The first priority for these program funds is to provide necessary technical research, studies, and other information for Indian tribes to serve as informed and prudent managers of their water resources. These efforts may occur through partnerships or through coordination and cooperation with other governmental entities to obtain information describing surface and ground water assessments, inventories, monitoring, modeling and gauging. Additionally, these funds are used for the preparation of comprehensive reservation water management and development plans, use surveys, interagency drought management planning, and necessary assessments to define and characterize tribal water resources. Activities Not Eligible for Funding Examples of activities typically not eligible for funding from either water program include: Projects that duplicate work that the BIA has identified as necessary for its efforts, has undertaken, or has completed through its employees or contractors or through arrangements with other Federal agencies, including the U.S. Department of Justice; Projects to design, construct, repair or improve water facilities, including domestic water supply, waste water, and irrigation or dam infrastructure, except to the extent that PIA analyses under the Water Rights Program require such design projects; Development of recommendations or conditions in hydropower licensing procedures and water quality studies to initiate actions needed to address pollution problems; Attorney fees and related expenses for legal services; and Administrative overhead costs. Preparing Funding Requests Funding requests should not be lengthy (2 to 3 pages maximum) and should not include endorsements or other extraneous information such as contractor proposals or contracts. The following information must be provided in funding requests: (1) Name and contact information (mailing address, e-mail, telephone and fax number) of person preparing the request. (2) Date of request. (3) Type of request (Congressional/ Court Mandate, Water Rights Litigation Support, Active Water Rights Adjudication/Negotiation Support, Water Management, Water Planning/ Pre-Development). Note: Congressional/Court Mandate-based requests must include a copy of the mandate, and Water Rights Litigation requests must include case citation. Also, the requests must state clearly the ultimate goal of the project in one sentence. (4) Copy of current tribal resolution or cover letter signed by tribal leader supporting request. (For all non-bia generated requests.) (5) Project manager name and contact information (mailing address, e-mail, telephone and fax number). (6) DOI and DOJ Attorney name(s) and contact information for all water rights requests, including tribal requests. All water rights litigation/adjudication requests must be prepared in consultation with the Federal attorney(s), and consensus must be reached on the amount of funds requested for litigation support. Where consensus cannot be reached, an explanation should be included describing the position of the BIA Project Manager and the federal attorney(s). (7) Name and contact information of Federal Indian Water Rights Negotiation Team Chair for all water rights negotiation requests. (8) Project purpose and description, including: Summary of past accomplishments, if applicable; list of all outstanding activities yet to be completed or finalized; status of litigation, if applicable; and, status of negotiations, if applicable, including a list of primary participating parties. (9) Scope of Work, including project deliverables, method, and timeline to accomplish work. (10) Amount requested and budget justification, including a breakdown of labor/equipment costs per project task, a clear articulation of individual task priorities (as funding may not be available to support all requested activities), and total amount requested. Note: The request should be limited to the amount necessary to accomplish the proposed work in accordance with industry standards and to meet critical project objectives during the fiscal year for which funds are being requested. (11) History of funding received during the past 3 years from the Water Rights or Water Resources Programs, including a description of past accomplishments and an explanation of any amount(s) unexpended. Funding requests do not need to identify the specific water program from which funds are being requested. The BIA will determine the appropriate program(s) based on the information provided in the requests. Prioritizing Water Program Funding Requests The Deputy Director, Office of Trust Services, will make final decisions for the distribution of funding from the Water Rights and Water Resources Programs. In order to receive funding from these programs, all funding requests must be in strict accordance with the directions provided above. All funding requests, including those from Indian tribes, must be submitted by the Regional Water Programs Coordinator to the Office of Trust Services, Division of Natural Resources, Water Programs Branch, on or before September 15 of each year. Therefore, the Regional Water Programs Coordinators must set the deadline by which the Indian tribes in their respective regions must submit their requests to the Regional Office, and the Coordinators must communicate this information to the Indian tribes they service annually. Any additional requests or requests for changes or additions to previously submitted requests forwarded after September 15 of each year must be accompanied by a memorandum from the respective Regional Director providing justification for any postdeadline submissions. The BIA will complete the funding allocation decision process for these programs by October 31 of each year, unless Congress has not yet completed the appropriations process for the Interior Department and related agencies. The BIA also cannot distribute funds until Congress completes the appropriations process for the BIA. Water Programs Coordinator Each Regional Director will identify a Water Programs Coordinator(s). The Coordinator(s) will be responsible for forwarding the instructions set forth in this notice to all Indian tribes and appropriate Bureau field offices serviced by each respective Regional Office. The VerDate Aug<31>2005 14:50 Oct 18, 2005 Jkt 208001 PO 00000 Frm 00064 Fmt 4703 Sfmt 4703 E:\FR\FM\19OCN1.SGM 19OCN1

60848 Federal Register / Vol. 70, No. 201 / Wednesday, October 19, 2005 / Notices Coordinator(s) will also be responsible for collecting the requests, reviewing each request to determine that funding is being requested for eligible activities, and determining whether the amount of funds being requested is in accordance with industry standards or is otherwise reasonable. After reviewing each request, the Coordinator(s) and other BIA staff may make suggestions for improvement or corrections as necessary. Once the reviews are completed, the Water Programs Coordinators will prepare a summary of all funding requests for their respective regions, listing the projects in order of priority, and send a copy of the requests and summary to the Office of Trust Services, Water Programs Branch, Mail Stop 4600 MIB, 1849 C Street, NW., Washington, DC 20240, on or before September 15 of each year. Water Funding Prioritization Team The Office of Trust Services Water Programs Branch staff will assemble all BIA funding requests, including Central Office requests, and prepare a master summary with the original Regional Office delineation of priorities intact. A Water Funding Prioritization Team shall be established, with BIA members being appointed by the Deputy Director, Office of Trust Services, and shall consist of one representative from the Office of Trust Services, three representatives from any of the BIA s Regional Offices, one representative from the Secretary of the Interior s Indian Water Rights Office, and one representative from the Office of the Solicitor, Division of Indian Affairs. The Regional Office Team members will be selected at random and rotated each year so that every Regional Office participates on an equal basis. The Team will be provided a copy of each request and the master summary. The Team will prioritize each request in accordance with the following criteria: Water Rights Program (34420) (1) Congressional and Court Mandates: Assign 100 points to each request for activities essential for supporting compliance with a Congressional or Court mandate that the BIA must fulfill. No further ranking is necessary. (2) Indian Water Rights Litigation/ Adjudication with Time Sensitivity: Assign 60 to 70 points to each request active Indian water rights litigation/ adjudication with court-mandated deadline(s) for which work must commence or continue to meet those deadline(s). (3) Indian Water Rights Litigation/ Adjudication without Time Sensitivity: Assign 50 to 60 points to each request an active Indian water rights litigation/ adjudication for which no specific court-mandated deadline is evident. (4) Indian Water Rights Negotiations with Time Sensitivity: Assign 50 to 60 points to each request active Indian water rights negotiations or settlement implementation for which the activities are required to meet a specific schedule recognized by the Secretary of the Interior s Indian Water Rights Office. (5) Indian Water Rights Negotiations without Time Sensitivity: Assign 30 to 40 points to each request active Indian water rights negotiations or settlement implementation for which no specific time requirement has been indicated. As with the previous category, these situations typically involve a Secretarial priority and/or have a Federal negotiation team assigned. (6) Indian Water Rights Litigation/ Adjudication/Negotiation Feasibility: Assign 20 to 30 points to each request the development of Indian water rights claims for the purpose of establishing the feasibility of future negotiations, adjudication or litigation but for which no current negotiation or litigation is taking place. Water Resources Program (34020) (1) Water Management Indian Water and Associated Reserved Resources: Assign 50 to 60 points to each request water management activities necessary for the use of tribal water resources or to protect against the encroachment on or management of tribal water and associated reserved resources. (2) Water Management Coordination/Cooperation/ Consultation/Conservation: Assign 30 to 40 points to each request water management activities necessary for intergovernmental cooperation, consultation, and coordination designed to conserve water and associated reserved resources. (3) Water Management Other: Assign 20 to 30 points to each request other water management activities not previously listed. (4) Water Planning and Pre- Development Indian Water: Assign 30 to 40 points to each request for activities essential for the planning or pre-development of tribal water rights. (5) Water Planning and Pre- Development Other: Assign 20 to 30 points to each request for activities essential for the planning or development of multi-jurisdictional waters. (6) All Water Program Funding Cost Effectiveness: Assign an additional 1 to 10 points to each request based on the degree of overall cost effectiveness, where the estimated cost of each activity is appropriate for the objectives to be accomplished and the amount requested comports with industry standards and is otherwise reasonable. Examples of cost effectiveness include requests that demonstrate benefits to be gained through leveraging funding from multiple agencies and those that will complete projects more efficiently within the current funding cycle. (7) All Water Program/Project Funding Compliance with Requesting Guidelines: Assign an additional 1 to 10 points to each request based on the degree of adherence to the instructions set forth in this notice. (8) All Water Program/Project Funding Efficiency and Accomplishment: Assign an additional 1 to 10 points to each request based on the degree of accomplishment in utilizing funds previously provided or anticipated efficiency in utilizing funds in the future. Instructions for Water Funding Prioritization Team In assigning points to each funding request, Water Funding Prioritization Team members will consider the degree to which requested funds will support the establishment of title to Indian water. Team members will also take into account any urgency with respect to the need to complete activities or how the activities will promote and support coordination, cooperation, consultation and conservation in water management and planning. A request involving multiple categories of activities should be carefully evaluated. Team members must also take into account the need to support the trust responsibility of the United States. The Team will compile the scores of each member on a master list and obtain an average score by dividing the total of each member s score for each request by the number of team members. The Team will enter the average score for each request on the master summary and provide the master summary to the Deputy Director, Office of Trust VerDate Aug<31>2005 14:50 Oct 18, 2005 Jkt 208001 PO 00000 Frm 00065 Fmt 4703 Sfmt 4703 E:\FR\FM\19OCN1.SGM 19OCN1

Federal Register / Vol. 70, No. 201 / Wednesday, October 19, 2005 / Notices 60849 Services, on or before October 15 of each year. Although a single ranking is conducted, the BIA will utilize the scores to make funding decisions for projects supporting both the Water Rights Program and the Water Resources Program. Funding for all requests will be provided from the appropriate program consistent with the intent of Congress. Distribution Decision Making and Reserved Funds When the total amount of appropriations for each program is insufficient to fund all requests, the Deputy Director, Office of Trust Services, will determine the appropriate cut-off for funding the requests received and will reserve 3 percent to 5 percent of the total amount from each program to fulfill unforeseen high priority contingencies (e.g., court-ordered activities or other emergencies). This determination may include a decision not to fund lower-ranking requests and/ or to conduct across the board funding reductions, beginning first, and in magnitude, with water planning and pre-development activities, followed by water management, water rights negotiation, water rights adjudication and finally, and only when absolutely necessary and while maintaining efficiency and effective prosecution of each legal requirement, active water rights litigation support. Authority: This notice is published in accordance with the authority delegated by the Secretary of the Interior to the Principal Deputy Assistant Secretary Indian Affairs by part 209 of the Departmental Manual. Dated: October 3, 2005. Michael D. Olsen, Acting Principal Deputy Assistant Secretary Indian Affairs. [FR Doc. 05 20919 Filed 10 18 05; 8:45 am] BILLING CODE 4310 W7 P DEPARTMENT OF THE INTERIOR National Park Service 60-Day Notice of Intention To Request Clearance of Collection of Information: Opportunity for Public Comment AGENCY: Department of the Interior, National Park Service. ACTION: Notice and request for comments. SUMMARY: The National Park Service (NPS) Office of International Affairs (OIA) proposes to collect information from property owners who volunteer for their properties to be included in a list of sites (Tentative List) that will be considered for nomination by the United States to the World Heritage List. In order to manage the U.S. World Heritage Program (37 CFR 73) effectively and in a timely manner NPS must prepare and submit through the Secretary of the Interior and the Secretary of State to the World Heritage Centre by February 1, 2007, a Tentative List of properties that appear to meet the criteria for nomination to the World Heritage List and which the United States intends to nominate during the ensuing decade (2007 2017). Only sites that have been found to be of national significance and that have such legal protections as are necessary to ensure the preservation of the properties and their environment may be considered for nomination by the United States. By law, all property owners must also concur in any World Heritage nomination. In order to gather the required information for the preparation of the Tentative List, it is proposed that an expanded and annotated version of the World Heritage Nomination Format (or form, hereinafter referred to as the Application ) be made available to owners who wish to apply for inclusion in the U.S. Tentative List. It would be made available on the Internet at http:// www.nps.gov/oia and http:// www.georgewright.org. Under the provisions of the Paperwork Reduction Act of 1995 and 5 CFR part 1320, Reporting and Recordkeeping Requirements, the NPS invites comments on the need for and proposed manner of gathering the information in the study. Comments are invited on: (1) The practical utility of the information being gathered; (2) the accuracy of the burden hour estimate; (3) ways to enhance the quality, utility, and clarity of the information to be collected; and (4) ways to minimize the burden of information collection to respondents, including the use of automated information collection techniques or other forms of information technology. DATES: Public comments will be accepted on or before sixty days from the date of publication in the Federal Register. Send Comments to: Send comments and requests for copies of a draft of the proposed Application and the accompanying Guidebook to the U.S. World Heritage Program to James H. Charleton, Office of International Affairs, National Park Service, 1201 I Street NW. (0050). E-mail: james_ charleton@contractor.nps.gov. Phone: (202) 354 1802. Fax (202) 371 1446. FOR FURTHER INFORMATION CONTACT: James H. Charleton, (202) 354 1802 or April Brooks, (202) 354 1808. SUPPLEMENTARY INFORMATION: Title: Instructions for Preparing U.S. World Heritage Nominations. Form: Format for the Nomination of Properties for Inscription on the World Heritage List. OMB Number: To be requested. Expiration Date: To be requested. Type of Request: Request for new clearance. Description of Need: The primary purpose of the proposed Collection of Information is to gather the information necessary to evaluate the potential of properties for nomination by the United States to the World Heritage List and to use the information for preparing a Tentative List of candidate sites. The World Heritage List is an international list of cultural and natural properties nominated by the signatories of the World Heritage Convention (1972). The following year, the United States was the first nation to ratify the treaty. U.S. participation and the roles of the Department of the Interior and the National Park Service are authorized by Title IV of the Historic Preservation Act Amendments of 1980 and conducted in accord with 36 CFR 73 World Heritage Convention. A Tentative List is a national list of natural and cultural properties appearing to meet the eligibility criteria for nomination to the World Heritage List. It is an annotated list of candidate sites which a country intends to nominate within a given time period. The World Heritage Committee has issued Operational Guidelines asking participating nations to provide Tentative Lists, which aid in evaluating properties for the World Heritage List on a comparative international basis and help the Committee to schedule its work over the long term. The Guidelines recommend that a nation review its Tentative List at least once every decade. The current U.S. Tentative List (formerly Indicative Inventory) dates to 1982. The U.S. Tentative List will serve as a guide for at least the next decade (2007 2017) of U.S. nominations to the World Heritage List. The Tentative List will be structured so as to meet the World Heritage Committee s December 2004 request that the Tentative List allow for the nomination of no more than two sites per year by any one nation, at least one of which must be a natural site (excluding potential emergency nominations not at present foreseen). The National Park Service Office of International Affairs (NPS OIA) and the VerDate Aug<31>2005 14:50 Oct 18, 2005 Jkt 208001 PO 00000 Frm 00066 Fmt 4703 Sfmt 4703 E:\FR\FM\19OCN1.SGM 19OCN1