license AUTHORITY FILE CC Apv il., 1982

Similar documents
Outage dates (duration): September 5, 1996 to May 27, 1999 (2.7 years) Reactor age when outage began: 8.8 years

CProgress Energy. Qk4~ May 21, F U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC

NRC INSPECTION MANUAL STSB

NEI [Revision 0] Guidelines for a Certified Fuel Handler Training and Retraining Program

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN

APPENDIX A ENFORCEMENT GUIDANCE MEMORANDA

Nuclear Operating Company

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C

HUMBOLDT BAY INDEPENDENT SPENT FUEL STORAGE INSTALLATION LICENSE APPLICATION ENVIRONMENTAL REPORT SAFETY ANALYSIS REPORT

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF REACTOR REGULATION WASHINGTON, DC September 26, 2005

REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH REGULATORY GUIDE 1.8 (Drafts were issued as DG-1084 and DG-1012)

TO ALL LICENSEES OF OPERATING PLANTS, APPLICANTS FOR AN OPERATING LICENSE, AND HOLDERS OF CONSTRUCTION PERMITS

Life Extension of Nuclear Power Plants

Research and Test Reactor Licensing Actions and Lessons Learned

NATIONAL NUCLEAR REGULATOR

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is discontinuing a rulemaking

DRAFT REGULATORY GUIDE

NUCLEAR REGULATORY COMMISSION. [Docket Nos ; NRC ] Northern States Power Company - Minnesota; Prairie Island Nuclear Generating Plant

NUREG-0800 U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN ADMINISTRATIVE PROCEDURES - GENERAL REVIEW RESPONSIBILITIES

Exelkn. PSLTR: # U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

NRC UPDATE EP REGULATORY ACTIVITIES. Glenn M. Tracy / Kathy Halvey Gibson Office of Nuclear Reactor Regulation

Request for Relief No. 20, Revision 0, for Units I and 2 3rd Ten Year Inservice Inspection Interval

May 23, Docket No License No. DPR-12

X STANDARD REVIEW PLAN

Regulatory Activities Related to Power Reactors Transitioning to Decommissioning

Record of Proceedings, Including Reasons for Decision

Regulatory Approach for License Renewal for Commercial Nuclear Power Reactors in the USA

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA

February 8, 2017 SUBJECT: GRAND GULF NUCLEAR STATION - NRC INTEGRATED INSPECTION REPORT /

VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C April 10, 2018

February 13, 2013 EA

Regulations on the Safety of Nuclear Power Plants Operation (PAK/913)

EXTRAORDINARY PUBLISHED BY AUTHORITY. ISLAMABAD, THURSDAY, March 1, 2012

i6 Ct AR (p. 16): HEMORANDUMI FOR: Chairman Zech Commissioner Roberts Commissioner Carr Commissioner Rogers Commissioner Curtiss FROM:

Control Number: Item Number: 209. Addendum StartPage: 0

ES-301 Administrative Topics Outline Form ES-301-1

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C July 7, 2011

Standard NUC Nuclear Plant Interface Coordination

Duquesne Light Our Energy...Your Power

A. General provisions and other electrical systems are specified in other Sections of Division 26.

Emergency Preparedness Final Rule Implementation

As amended upto 31 1st December 2015

Certification of Persons Working at Nuclear Power Plants

NUCLEAR REGULATORY COMMISSION [NRC ] Preparation of Environmental Reports for Nuclear Power Stations

July 29, 2009 WATTS BAR NUCLEAR PLANT NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT /

2. Classification of Nuclear Items Ability to identify nuclear components, parts, and appurtenances.

QRO Operator Certification Renewal Application

GUIDE FOR COMPLETING NATIONAL BOARD FORM NR-1, REPORT

ASME Nuclear Conformity Assessment. Bernard E. Hrubala Sr. Vice President Code and Standards October 7, 2008

NRC INSPECTION MANUAL IRIB

FENOC AOLVS. February 3, 2000 PY-CEI/NRR-2463L. United States Nuclear Regulatory Commission Document Control Desk Washington, D. C.

Summary Report for Individual Task E-1069 Maintain the KVG-72(*) Status: Approved

In the Matter of )Docket No Tennessee Valley Authority ) BROWNS FERRY NUCLEAR PLANT (BFN) - STATUS OF UNIT 1 RESTART ISSUES, REVISION 3

DRAFT REGULATORY GUIDE

Radiation Protection Program Updates

Department of Defense INSTRUCTION. Occupational Ionizing Radiation Protection Program

GUIDE FOR ASME REVIEW TEAMS FOR REVIEW OF APPLICANTS FOR ASME CERTIFICATES OF AUTHORIZATION (V, HV, UD, UV, UV3, UD3, TD, TV)

February 27, Mr. Benjamin Beresford Mountain Manager Hesperus Ski Area P.O. Box 187 Hesperus, CO RE: Annual Unannounced Inspection

HOSPITALS STATUTE RULE CRITERIA. Page 1 of 13

Fingerprinting and Criminal History Records Check Requirements for Unescorted Access to Certain Radioactive Material

Qualifications for Authorized Inspection

NUCLEAR REGULATION AND LICENSING OF PNPP-1. Dr. Alumanda M. Dela Rosa Director Philippine Nuclear Research Institute

U.S. Nuclear Regulatory Commission

*Note: An update of the English text of this Act is being prepared following the amendments in SG No. 59/ , SG No. 66/26.07.

AN ORDINANCE TO AMEND CERTAIN PROVISIONS IN THE RAPID CITY ELECTRICAL CODE BY AMENDING SECTION OF THE RAPID CITY MUNICIPAL CODE

EMERGENCY MANAGEMENT PLANNING CRITERIA FOR HOSPITALS

Summary Report for Individual Task E-1102 Repair Communications System Control C-6533(*)/ARC Status: Approved

April 4, 2001 SUBJECT: LICENSE AMENDMENT 10, ADMINISTRATIVE CHANGES, CROW BUTTE RESOURCES IN SITU LEACH FACILITY, LICENSE NO.

NRC INSPECTION MANUAL

BASINGSTOKE AND NORTH HAMPSHIRE HOSPITALS NHS FOUNDATION TRUST

Technical Basis for the Emergency Preparedness Rulemaking

Inspections, Compliance, Enforcement, and Criminal Investigations

ATOMIC SAFETY AND LICENSING BOARD

Commandant United States Coast Guard

Department of Defense DIRECTIVE. SUBJECT: Marine Sanitation Devices for Vessels Owned or Operated by the Department of Defense

107 FERC 61,053 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

B. All of the documents in this RFP form the Basis-of-Design for this project.

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA JANUARY 25, 2017

AnJEDISON 10 CFR CFR March 31, ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C.

REVISION: This revised Management Directive (MD) updates TSA MD , dated January 29, 2004.

CEMP Criteria for Ambulatory Surgery Centers Emergency Management

Licensing of Nuclear Installations

Operational Experience Log Book

4.2.2 Transmission Owners Transmission Planners Transmission Service Providers Balancing Authorities.

Decommissioning Licensing Process of Nuclear Installations in Spain Cristina CORREA SÁINZ.

Coast Guard NVIC Oct 1992

GUIDANCE AND EXAMPLES FOR IDENTIFYING 10 CFR 50.2 DESIGN BASES

Approaches and Methods to Conduct Regulatory Safety Review and Assessment

Summary Report for Individual Task E-1402 Repair Receiver-Transmitter RT-(*)/ARC-164(V)(*) Status: Approved

IAEA MISSION TO REVIEW NISA S APPROACH TO THE COMPREHENSIVE ASSESSMENTS FOR THE SAFETY OF EXISTING POWER REACTOR FACILITIES CONDUCTED IN JAPAN

Functions important to nuclear power plant safety, and training and qualification of personnel

Summary Report for Individual Task R Repair the Aviator's Night Vision Imaging System AN/AVS-6 Status: Approved

Title 32: PROFESSIONS AND OCCUPATIONS

ASSISTED LIVING FACILITIES STATUE RULE CRITERIA

COUNTY OF VENTURA ADMINISTRATIVE SUPPLEMENT TO THE STATE CEQA GUIDELINES

Approved for public release. Distribution is unlimited.

Department of Defense INSTRUCTION

TRAINING ON BACKGROUND AND IMPLEMENTATION OF ASME OM CODE, APPENDIX III

Transcription:

license AUTHORITY FILE CC -7 0 ~UNITED STA TES DO NOT I t EU lý;ii 0 NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Apv il., 1982 Dockets Nos. 50-269,60-270 Mr. William 0. Parker, Jr. Vice President - Steam Production Duke Power Company P. 0. Box 33189 422 South Church Street Charlotte, North Carolina 28242 11+-C1 Dear Mr. Parker: The Commission has issued the enclosed Amendments Nos. 110, 110, and 107 to Licenses Nos. DPR-38, DPR-47 and DPR-55 for the Oconee Nuclear Station, Units Nos. 1, 2 and 3. These amendments consist of changes to the Station's common Technical Specifications (TSs) in response to your request dated December 7, 1981. These amendments revise the TSs to include the Emergency Feedwater System (EFWS) automatic initiation circuitry testing requirements, clarify the testing requirement for the Anticipatory Reactor Trip from Loss of Main Feedwater, and require an EFWS flow test. We have also included our evaluation of the EFWS in accordance with NUREG-0737, Item II.E.l.l, in the enclosed Safety Evaluation. A copy of the Notice of Issuance is also enclosed. Sincerely, Enclosures: 1. Amendment No. 110 to DPR-38 2. Amendment No. 110 to DPR-47 3. Amendment No. 107 to DPR-55 4. Safety Evaluation 5. Notice Philip C. Wagner, Projectanager Operating Reactors Branch #4 Division of Licensing cc w/enclosures: See next page

Duke Power Company cc w/enclosure(s): Mr. William L. Porter cc w/enclosure(s) & incoming dtd.: Duke Power Company P. 0. Box 33189 December 7, 1981 422 South Church Street Office of Intergovernmental Relations Charlotte, North Carolina 28242 116 West Jones Street Raleigh,.North Carolina 27603 Oconee County Library 501 West Southbroad Str-eet Walhalla, South Carolina 29691 Honorable James M. Phinney County Supervisor of Oconee County Walhalla, South Carolina 29621 Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission, Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Reqional Radiation Representative EPA Region IV 345 Courtland Street, 14.E. Atlanta, Georgia 3030.B William T. Orders Senior Resident Inspector U.S. Nuclear Regulator), Commission Route 2, Box 610 Seneca, South Carolina 29678 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division Suite 220, 7910 Woodmont Avenue Bethesda, Maryland 2OB14 Manager, LIS NUS Corporation 2536 Countryside Boulevard Clearwater, Florida :33515 J. Michael McGarry, III, Esq. DeBevoise & Liberman 1200 17th Street, N.W. Washington, D. C. 20036 FL

IUNITED STATES, i 0 NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 "DUKE POWER COMPANY DOCKET NO. 50-269 OCONEE NUCLEAR STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 110 License No. DPR-38 1. The Nuclear Regulatory Commission (the Commission) has found that: A. The application for amendment by Duke Power Company (the licensee) dated December 7, 1981, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the pro visions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satis fied. 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 3.B of Facility Operating License No. DPR-38 is hereby amended to read as follows: 3.B Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.110 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

-2-3. This license amendment is effective as of the date of its.issuance. FOR THE NUCLEAR REGULATORY COMMISSION Attachment: Changes to the Technical1 Speci fi cations Date of Issuance: April 8, 1982 Jo F e.nstolz, Chief erating Reactors Branch #4 Division of Licensing L I

i 0 "UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D. C. 20555 ~lop DUKE POWER COMPANY DOCKET NO. 50-270 OCONEE NUCLEAR STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 110 License No. DPR- 4 7 1. The Nuclear Regulatory Commission (the Commission) has found that: A. The application for amendment by Duke Power Company (the licensee) dated December 7, 1981, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the pro visions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance Commission's fied. of this amendment is in accordance with 10 CFR Part 51 of the reoulations and all applicable requirements have been satis- 2. Accordingly, the license is amended by as indicated in the attachment to. this Facility Operating License No. DPR-47 changes to the Technical Specifications license amendment and paragraph 3.B of is hereby amended to read as follows: 3.B Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.llO are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

-2 3. This license amendment is effective as of the date of its.issuance. FOR THE NUCLEAR REGULATORY COMMISSION Jo n F. Stolz, Chiefý O erating Reactors Branch #4 i vision of Licensing Attachment: Changes to the Technical Specifications Date of Issuance: April 8, 1982

-0" ' ~ i 0. UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D. C; 20555 DUKE POWER COMPANY DOCKET NO. 50-287 OCONEE NUCLEAR STATION, UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 107 License No. DPR-55 1. The Nuclear Regulatory Commission (the Commission) has found that: A. The application for amendment by Duke Power Company (the licensee) dated December 7, 1981, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the pro visions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this "amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations, D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance Commission's fied. of this amendment is in accordance with 10 CFR Part 51 of the regulations and all applicable requirements have been satis- 2. Accordingly, the license is amended by as indicated in the attachment to this Facility Operating License No. DPR-55 changes to the Technical Specifications license amendment and paragraph 3.B of is hereby amended to read as follows: 3.B Technical Specifications The Technical. Specifications contained in Appendices A and B, as revised through Amendment No.107 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

-2-3. This license amendmiant is effective as of the date of its.issuance. FOR THE NUCLEAR REGULATORY COMMISSION '-F. Stolz, Chief -J ating Reactors Branch #4 sion of Licensing Attachment: Changes to the Technical Specifications Date of Issuance: Aprill 8, 1982

ATTACHMENT TO LICENSE AMENDMENTS AMENDMENT NO. IIo TO DPR-38 AMENDMENT NO. 110 TO DPR-47 AMENDMENT NO. 1:07 TO DPR-55 DOCKETS NOS. 50-269, 50-270 AND 50-287 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages. The revised pages are identified by amendment numbers and contain yertical lines indicating the area of change. REM1OVE PAGES INSERT PAGES 4.1-8 4.1-3 4.9-1 4.9-1

Table 4.1-1. inued) SChannel Description Check Test Calibrate Remarks c-t 49, Emergency Feedwater MO NA RV "C> Flow Indicators 50. PORV and Safety Valve MO NA RF Position Indicators 51. RPS Anticipatory NA MO RF Reactor Trip System Loss *D of Turbine Emergency Trip System Pressure Switches 52. RPS Anticipatory Reactor Trip System "Loss of Main Feedwater H a) Control Oil Pressure NA MO RF Switches *b) Discharge Pressure NA MO RF Switches Emergency Feedwater Initiation Circuits a) Control Oil Pressure NA MO RF Switches *b) Discharge Pressure NA MO RF Switches ES - Each Shift QU - Quarterly DA - Daily AN - Annually WE - Weekly PS - Prior to startup, if not performed previous week MO - Monthly NA - Not Applicable RF - Refueling Outage * This Technical Specification will become effective as follows: Unit I - at the first convenient outage prior to or at the end of Oconee I Cycle B Refueling Outage Unit 2 - end of Oconee 2 Cycle 6 Refueling Outage Unit 3 - end of Oconee 3 Cycle 7 Refueling Outage During the interim period, these discharge pressure switches will be tested during cold shutdown not to exceed once per month.

4.9 EMERGENCY FEEDWATER PUMP AND VALVE PERIODIC TESTING Applicability Applies to the periodic testing of the turbine-driven and motor-driven emergency feedwater pumps and associated valves. Objective To verify that the emergency feedwater pumps and associated valves are operable. Specification 4.9.1 Pump Test Monthly, the turbine-driven and motor-driven feedwater pumps shall be operated on recirculation to the upper surge tank for a minimum of one hour. 4.9.2 Valve Test Quarterly, automatic valves in the emergency feedwater flow path will be determined to be operable in accordance with the applicable edition of the ASME Boiler and Pressure Vessel Code, Section XI. 4.9.3 System Flow Test Prior to Unit operation above 25% Full Power following any modifications or repairs to the emergency feedwater system which could degrade the flow path and at least once per refueling cycle, the emergency feedwater system shall be given either a manual or an automatic initiation signal. 4.9.4 Acceptance Criteria These tests shall be considered satisfactory if control board indication and visual observation of the equipment demonstrates that all components have operated properly. In addition, during operation of the System Flow Test (Item 4.9.3 above), flow to the steam generators shall be verified by control room indication, I Bases The monthly testing frequency is sufficient to verify that the emergency feed water pumps are operable. Verification of correct operation is made both from the control room instrumentation and direct visual observation of the pumps. The parameters which are observed are detailed in the applicable edition of the ASME Boiler and Pressure Vessel Code; Section XI. The System Flow Test verifies correct total system operation following modifications or repairs. REFERENCES (1) FSAR, Section 10.2.2 (2) FSAR, Section 14.1.2.8.3 Amendments Nos. 110, 110, & 107 4.9-1

UNITED STATES SO 0 NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION SUPPORTING AMENDIIENT NO. 110 TO FACILITY OPERATING LICENSE NO. DPR-38 AMENDMENT NO. 110 TO FACILITY OPERATING LICENSE NO. AMENDMENT NO. 107 TO FACILITY OPERATING LICENSE NO. DPR-47 DPR-55 DUKE POWER COMPANY OCONEE NUCLEAR STATION, UNITS NOS. 1, 2 AND 3 DOCKETS NOS. 50-269, 50-270 AND 50-287 1,0 Introduction By letter dated June 3, 1981, the NRC approved the design of the Emergency Feed water System (EFWS) Automatic Initiation and Flow Indication systems for the Oconee Nuclear Station (ONS) with the provision that acceptable Technical Speci.fications (TSs) be submitted which would require periodic testing of the initia tion circuitry. By letter dated December 7, 1981, Duke Power Company (Duke or the licensee) applied for these requested additions to the ONS TSs. y letter dated October 30, 1981, Duke responded to our August 25, 1981, Safety -- ýevaluation (SE) concerning NURE6-0737, Item II.E.l.l, "Auxiliary Feedwater System Evaluation". We have reviewed this information and have included our findings in this SE. 2.0 EFWS Automatic Initiation By letter dated May 22, 1981, Duke informed the NRC of the proposed testing to be performed on the EFIS automatic initiation circuitry after its installation. We found the proposed testing to be acceptable provided the tests were performed during each hot shutdown instead of cold shutdown for the Main Feedwater (MIFW) discharge pressure switches. In the Decenmer-7, 1981 application, Duke provided for monthly testing of both EFWS initiation circuits and the MFW discharge pressure anticipatory reactor trip circuitry. However, in order to perform these tests during reactor operation, modification needed to be made to the dis charge pressure test circuitry. These modifications will be implemented as follows: Oconee Unit 1: Duke will implement this modification during the first available outage of sufficient length prior to or during the Oconee 1, Cycle 8 refueling outage. Oconee Unit 2: This modification will be implemented during the Oconee 2, Cycle 6 refueling outage. "onee Unit 3: This modification will be implemented during the 1982 Oconee 3, Cycle 7 refueling outage.

Duke Power Company -2- The proposed TS indicates that the testing requirements will become effective on a schedule consistent with the modification installation described above, and require, in the interim, that the MFW discharge pressure switches be tested during each cold shutdown period if not tested within the previous month. We have reviewed this proposal and find that it is in accordance with our request and presents an acceptable means of providing assurance of con tinued system operability. Therefore, we conclude that these changes to the TSs are acceptable and that NUREG-0737, Item II.E.l.2, has been satisfactorily resolved. 3.0 EFWS Evaluation By letter dated August 25, 1981, the NRC provided an SE for the Emergency Feedwater System in acccrdance with NUREG-0737, Item II.E.l.l. This SE con cluded that all but the following issues, involved in the resolution of Item II.E.l.l, had been acceptably addressed. The remaining issues are: 1. Flow tests from the EFIJ pumps to the steam generators, 2. Endurance testing of EFW pumps, 3. Tornado protection, 4. TSs requiring periodic initiation circuitry testing, and 5. Completion of NRC review of the EFWS flow requirement. Duke responded to the request contained in our August 25, 1981, letter asking for additional information related to Items 1, 2 and 3 above by letter dated October 30, 1981; the approval of Duke's December 7, 1981 appli cation, discussed in the preceding section of this SE, resolves Item 4 above; and our evaluation of Item 5 follows. Duke provided information related to the EFWS flowrate design bases and criteria, requested by [tem II.E.l.l, by letters dated March 3, April 3 and April 17, 1981. Duke's response evaluated various transient and accident conditions involving the use of the EFMJS. The results of these evaluations showed that any one EFIW pump (two electric motor driven and one steam turbine driven pumps are provided in each unit) could provide sufficient EFW flow to remove decay heat from the Reactor Coolant System. We have reviewed this information and have concluded that the flowrate design bases are acceptable at the ONS. Duke's October 30, 1981, letter responded to the remaining open issues for Item II.E.l.l. Duke objected to the TS requiring a flow test to the steam generators (SGs) following a cold shutdown because: 1) the injection of cold water into the SGs may cause unnecessary stressing, and 2) similar testing is not required for other systems presently required to be operable by the TSs. We have reviewed this response and agree that this testing is not needed following each cold shutdown at the ONS since the ASME Section XI pump and valve testing in addition to the double verification of correct valve positioning following a cold shutdown provide reasonable?ssurance of system operability. However, we maintain that it is advisable periodi cally, and following any maintenance or repairs which could degrade the

Duke Power Company -3- flow path, to perform a system flow test. This position was discussed with Duke representatives and they agreed that such testing would be accomplished, Therefore, with the agreement of Duke, an additional requirement (Specifica tion 4.9.3) was incorporated into the ONS TSs which requires a system flow test. We find this change to be acceptable and that this issue has been acceptably resolved. Duke also objected to the necessity of performing a 48-hour endurance test on each EFW pump. Duke provided the test data from endurance tests per formed on one motor driven and one turbine driven EFW pump, This data indicates that the tests were accomplished without significant problems. We have reviewed this information and find that this issue has been adequately resolved because: 1) the EFW pumps which were acceptably tested are identical to the other comparable EFW pumps, and 21 all EFW pumps will continue to be tested in accordance with procedures which are at least as restrictive as ASME Section XI requirements, The last item involved providing assurance, in the event of a tornado with complete loss of both the MR4S and the normal EFWS, that cooling water could still be provided to the SGs. Duke stated that the Auxiliary Service Water System (ASWS) could be used to provide the cooling water under these circumstances. In addition, although an analysis has not as yet been per-' formed, Duke states that the Standby Shutdown Facility CSSF), which is presently being installed, will also be available to provide the necessary cooling water flow. We have reviewed the information provided by Duke and question the adequacy of the ASWS in removing decay heat since this system is a low pressure system which would require considerable steam generator blowdown to lower the pressure to the point where the ASWS could provide cooling water flow, Additional concerns involve overpressurization of the ASWS and possible cold shocking effects of injecting cold water into a relatively dry SG, Since verification that the SSF system is tornado protected has not been accomplished, we, likewise, question its acceptability for this service. We have discussed these concerns with Duke and an agreement has been reached that this subject will be handled as a separate issue, Duke has agreed to provide supporting information within 120 days of this evaluation on the availability of a source of SG cooling water and/or an evaluation which demonstrates that the probability of a tornado damaging both the normal EFWS and the SSF system is acceptably low, We find this to be an acceptable approach to this concern. On the basis of the above, we find that all concerns of NUREG-0737, Item II.E.l.l, have been acceptably resolved. Therefore, we conclude that this Item is satisfactory for continued plant operation.

Duke Power Company -4-4.0 Environmental Consideration We have determined that the amendments do not authorize a change in effluent types or total amounts nor an increase in power level and will not result in any significant environmental impact. Having made this determination, we have further concluded that the amendments involve an action which is insignificant from the standpoint of environmental impact and, pursuant to 10 CFR 51.5(d)(4), that an environmental impact statement,.or negative declaration and environ mental impact appraisal nee(f not be prepared in connection with the issuance of these amendments. 5.0 "Conclusion We have concluded, based on the considerations discussed above, that: (1) because the amendments do not involve a significant increase in the probability or consequences of accidents previously considered and do not involve a signi ficant decrease in a safety margin, the amendments do not involve a significant hazards consideration, (2) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, and (3) such activities will be conducted in compliance with the Conmmission's regulations and the issuance of these amendments will not be inimical to the common defense and security or to the health and safety of the public. Dated: April 8, 1982 The following NRC staff persorne! have contributed to this Safety Evaluation: P. C. Wagner, T. Chan.

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKETS NOS. 50-269, 50-270 AND 50-287 DUKE POWER COMPANY NOTICE OF ISSUANCE DF AMENDMENTS OPERATING LICENSES TO FACILITY The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendments Nos. 110,l10 and 107to Facility Operating Licenses Nos. DPR-38, DPR-47 and DPR-55, respectively, issued to Duke Power Company, which revised the Tech nical Specifications (TSs) for operation of the Oconee Nuclear Station, Units Nos. 1, 2 and 3, located in Oconee County, South Carolina. The amend ments are effective as of the date of issuance. These amendments revise the TSs to include the Emergency Feedwater System (EFWS) automatic intiation circuitry testing requirements, clarify the testing requirements for the Anticipatory Reactor Trip from Loss of Main Feedwater, and require an EFWS flow test. The application for the amendments complies with the standards and require ments of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required" by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendments. Prior public notice of these amendments was not required since the amendments do not involve a significant hazards consid eration. The Commission has determined that the issuance of these amendments will not result in any significant environmental impact and that pursuant to 10 CFR Section 51.5(d)(4) an environmental impact statement or negative declaration and environ mental impact appraisal need not be prepared in connection with the issuance of these amendments.

-2-7590-01 For further details with respect to this action, see (1) the application for amendments dated December 7, 1981, (2) Amendments Nos. 110, 11 ), and 107 to Licenses Nos. DPR-38, DPR.-47 and DPR-55, respectively, and (3) the Commission's related Safety Evaluation. All of these items are available for public inspection at the Commission's Public Document Room, 1717 H Street, N. W., Washington, D. C. and at -the Oconee County Library, 501 West Southbroad Street, Walhalla, South Carolina 29691. A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D. C. 20555, Attention: Director, Division of Licensing. Dated at Bethesda, Maryland, this 8th day of April 1982. FOR THE NUCLEAR REGULATORY COMMISSION /John:'F. Stolz, Chief (Operating Reactors Branch"#4 Di9v;ision of Licensing