INDONESIA ARRANGEMENTS FOR TRAINING & EXERCISES IN EPR Dedik Eko Sumargo BAPETEN INDONESIA Eighth Meeting of Representatives of the Competent Authorities identified under the Early Notification Convention and the Assistance Convention Vienna, Austria 06-10 June 2016
HAZARD ASSESSMENT As of 20 Mei 2016: Medical (4534 ): EPC-III Radiology diagnostic, Radiotherapy, Nuclear Medicine; Industrial (5898) EPC-III Nuclear gauges, Industrial radiography, Well logging, Analysis, Irradiator, Gamma scanners; Research (11): EPC-III RR (2 EPC-II) Tracers, Standardization, Etc.
HAZARD ASSESSMENT RI-C RI-E Experimental FE Installation, Serpong RR Fuel Fabrication Plant, Serpong RI-D RI-A Install. of Radiometallurgy, Serpong RI-F RI-G Spent Fuel Interim Storage, Serpong RI-B
REFERENCES Indonesia arrangements for training and exercises in EPR based on : 1. GR No. 54/2012 on Safety and Security of Nuclear Installation. 2. BCR No.01/2010 on Nuclear Emergency Preparedness and Response 3. GSR Part 7:Preparedness and Response for a Nuclear or Radiological Emergency 4. IAEA EPR-Exercise (2005); Preparation, Conduct, And Evaluation Of Exercises To Test Preparedness For A Nuclear Or Radiological Emergency.
REGULATION GR No. 54/2012 on Safety and Security of Nuclear Installation: Article 66: Nuclear emergency preparedness is conducted based on nuclear emergency preparedness programme are implemented by: establishing nuclear emergency preparedness programme at facility level establishing nuclear emergency preparedness programme at province level, called Contingency Plan for nuclear emergency and has been established: 2013 : Tangerang Selatan 2014 : Bandung 2015 : Yogyakarta Article 69, 71, 73: exercises or drills on nuclear emergency: on facility level, at least once every year on local government level, at least once every 2 years - in coordination with the operator on national level, at least once every 4 years - in coordination with BAPETEN and relating national agencies, involving the local government, and the operator.
Nuclear Emergency Response Organisation: CHAIRMAN* (BNPB) DEPUTY (BATAN) BAPETEN Planning Section INFORMATION CENTRE TECH. SUP. FOR OPERATION SECTION INVESTIGATION OPERATION SECTION 1. DEP. OF AGRICULTURE 2. DRUGS & FOOD REG. AGENCY 3. DEP. OCEANGRPHY & FISHERY 4. DEP. OF TRANSPORTATION 5. ENVIRONMENTAL MINISTRY 1. BOM SQUAD 2. FORLAB 3. CRIM RES 4. INTELLIGENCE 1. FIRST RESPONDERS -POLICE (FORLAB,BOM SQUAD) -FIRE BRIGADE (PMK) -AMBULANCE/HEALTH DEP. 2. RMA -NNEA (BATAN) -NBC (NUBIKA) -MGA (BMKG) * : The Chairman is Head of NDMA(BNPB) and operated through national disaster countermeasure mechanism of NDMA(BNPB)
The objectives are: to validate plans & procedures and to test performance (performance evaluation) to provide opportunity for training in a realistic situation (training) to explore and test new concepts and ideas for emergency arrangements (trials) Types of Exc : 1. Drills 2. TTE 3. Partial and Full-scale Exc 4. FE PURPOSE & TYPES OF EXERCISE
GUIDANCE 1. Standard Operating Procedure for National Nuclear Emergency Response Organization (OTDNN) 2. Contingency Plan for nuclear emergency Serpong, 3. Contingency Plan for nuclear emergency Bandung and 4. Contingency Plan for nuclear emergency Jogjakarta 5. Guidance for : UPA for Nuclear Emergency respond (based on IAEA-TECDOC 955) Radiological Emergency respond (based on IAEA-TECDOC 1162) Response to events involving the inadvertent movement or illicit trafficking of radioactive materials (based on IAEA-TECDOC 1313) Medical response during a nuclear or radiological emergency (based on IAEA-Generic Procedure for Medical Response during a Nuclear or Radiological Emergency) Transportation accident response Illicit trafficking response
EXERCISES HAVE BEEN CONDUCTED (1) 1. Annual drill/exercise for the site of all nuclear installations or licensee, conducted by all operators and reported to BAPETEN 2. Exercises for EPC II: NTTE, Scenario: Severe accident at BATAN Multi Purpose Reactor MPR-30. Jakarta, 31 October 2007. NTTE, Scenario: Severe accident at BATAN Reactor Bandung 2 MWth, October 2009 NFE, Scenario: Nuclear Emergency in PRSG Reactor, October 2010 NTTE, Scenario: Severe accident BATAN Multi Purpose Reactor MPR-30, Dec 2015 NFE, Scenario: Severe accident BATAN Multi Purpose Reactor MPR-30, 2016
EXERCISES HAVE BEEN CONDUCTED (2) 2. Exercises for EPC III / IV : NFE, Scenario: Radiological Emergency Response to a Dirty Bomb (RDD). Jakarta, 22 September 2005. Field Exercise. Scenario: Radiological Emergency Response to a Transportation Accident. Yogyakarta, Center of Java. October, 2008 Field Exercise. Scenario: Radiological Emergency Response to Sea Transportation Accident, Surabaya. November, 2011. Field Exercise. Scenario: Radiological Emergency Response to a Transportation Accident. Bandung, West Java. September 2013 FE (+Indonesia Coast Guard), Radiological Emergency Response to a sea Transportation Accident. Ambon, December 2015 FE (+Indonesia Coast Guard), Radiological Emergency Response to a sea Transportation Accident.Batam, March 2016 3. Training for: National Coast Guard (BAKAMLA)-2015 Indonesia ARMY/Presidential Security Forces-2016 4. BAPETEN-ERTbased o n BCR No. 14 Year 2007 (Revised into BCR No.1 / 2015): 3x / YEAR
EXERCISES NTTE October 2009 RDD, September 2005 NFE October 2010 Transportation October 2008 Transportation September 2013 11
FE + NCG: 2015, 2016
CONCLUSION NO GSR Part 7, Req.25 GR.54/2012 and BCR. 01/2010 1 Para 6.28 Performance Indicator: 2 Para 6.29 4: The requirement is almost fully met. (for EPC II) 3 Para 6.30 3: The requirement is partially met but 4 Para 6.31 the gap is not so significant. There is an action plan to address the gaps.(for 5 Para 6.32 EPC III and IV) 6 Para 6.33 The Indonesia government ensure that personnel relevant for emergency response shall take part in regular training, drills and exercises to ensure that they are able to perform their assigned response functions effectively in a nuclear or radiological emergency. 13
THANK YOU Dedik Eko Sumargo +62 88213955612 d.sumargo@bapeten.go.id