Update on Turkey s PMR Project

Similar documents
Final MRP Endorsement Date. Implementing Country/Technical Partner. Comments/Remarks

PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR)

PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR)

PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR) MEXICO

MEXICO PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR) ISR 02 COVERING PERIOD 10/ /2018

United Nations Development Programme. Country: Armenia PROJECT DOCUMENT

The Ethiopian Climate Resilient Green Economy Facility (CRGE Facility) June, 2013 Lombok, Indonesia

The Accreditation and Verification Regulation - Quick guide on the role of the verifier and the CA

with the Corporación Andina de Fomento (CAF) for Republic of Chile 16 March 2017 Entity Support & Strategic Frameworks

Transposition of Aviation Directive. Aviation in EU ETS Workshop 30 June 2009

Climate change is an important issue in Indonesia. The country consists of thousands of islands with lowlying coastal areas liable to floods as well

The What, Who and How of the Partnership for Market Readiness (PMR)

How GIZ supports partner countries in the preparation of their INDCs

PRICING CARBON TO ACHIEVE CLIMATE MITIGATION. Annual Report April

Indonesia - FCPF Readiness Preparation Grant FCPFR - FOREST CARBON PARTNERSHIP FACILITY

with the Corporación Andina de Fomento (CAF) for Republic of Chile 16 March 2017 Entity Support

World Bank - Grant Reporting and Monitoring (GRM) Report. Report to Donor. Ref. TF0A2303 Reporting Period: 07/01/2016 to 06/30/2017

NAMAs and the PACIFIC NAMA GUIDELINES

FMO External Monitoring Manual

THE GREEN CLIMATE FUND AND NATIONAL CLIMATE PLEDGES LEADING TO PARIS Ned Helme, President

International Climate Initiative and NAMA Facility

Capacity Building Project for Measurement, Reporting and Verification (MRV) of Greenhouse Gas (GHG) Emission Reduction in Africa

Indonesia - FCPF Readiness Preparation Grant FCPFR - Forest Carbon Partnership Facility

ENHANCED INTEGRATED FRAMEWORK EXECUTIVE SECRETARIAT FOR THE EIF (ES) AND EIF TRUST FUND MANAGER (TFM) PROCEDURES FOR FEASIBILITY STUDIES.

World Bank - Grant Reporting and Monitoring (GRM) Report

PROCUREMENT NOTICE. Project name: Small Decentralized Renewable Energy Power Generation (DREG)

GEF-UNIDO Energy Management Systems (EnMS) Capacity Building and Implementation (CBI) Programme. Call for Consultant Applications

With the Global Green Growth Institute (GGGI) for Mongolia. 05 June 2017 Strategic Frameworks

European Territorial Cooperation Programme Management structures related to the SEE Transnational Programme in Greece

TERMS OF REFERENCE Individual Contractor. National Consultant Post Disaster Needs Assessment in Cambodia

Best practices and challenges in supporting MRV in developing countries

Global Partnership on Output-based Aid Grant Agreement

Argentine Republic's Readiness Preparation - Readiness Fund for Forest Carbon Partnership Facility (FCPF) FCPFR - Forest Carbon Partnership Facility

International NAMA Facility - Template for NAMA Support Project Outlines

Costa Rica's Readiness Preparation Proposal Readiness Fund of the FCPF FCPFR - FOREST CARBON PARTNERSHIP FACILITY

UNDP Ethiopia TOR. National Consultant On Climate Change and Renewable Energy ( house hold energy and/or improved cook stove expert )

MRV of Finance Received: Potential Practice and Issues in Indonesia

Republic of Congo: FCPF Readiness Grant FCPFR - FOREST CARBON PARTNERSHIP FACILITY

LOW-CARBON INNOVATION FUND (LCIF) Program Guidelines

Public consultation on the Establishment of the Innovation Fund

ELENA TECHNICAL ASSISTANCE

LOW-CARBON INNOVATION FUND (LCIF) Program Guidelines

Terms of Reference (TOR) for Independent End of Project Evaluation

NORMATIVE FRAMEWORK IMPLEMENTATION OF SUSTAINABLE RAINWATER MANAGEMENT INFRASTRUCTURES AT THE SOURCE

The World Bank Sustainable Rural Sanitation Services Program for Results (P154112)

with the Agency for Agricultural Development of Morocco (ADA) for the Kingdom of Morocco 12 July 2017 Entity Support

II. Background Information

Brief Description of Initiation Plan

with Environment and Sustainable Development Agency for Republic of Mali 17 March 2015 Strategic Frameworks and Country Programming

REQUIRED DOCUMENT FROM HIRING UNIT

The Mineral Products Association

with Ministry of Economic Growth and Job Creation for Jamaica 14 July 2017 Entity Support and Private Sector Mobilization

Worldbank Flickr. Roadmap for Scaling Up Resource Efficiency in Israel

The World Bank Serbia Research, Innovation and Technology Transfer Project (P145231)

Accessing financing from the Green Climate Fund

JCM Indonesia Application Procedures. Rini Setiawati Indonesia JCM Secretariat

CONTRACTS DEPARTMENT INVITATION FOR EXPRESSION OF INVITATION EOI. For

NAMA Fair Side-event at COP-21 in Paris, 2 December 2015, PM, Observer room 02. Support to NAMAs

Public Disclosure Copy

Economic and Social Council

International Energy Demonstration Fund Program Guidelines

Alberta Indigenous Green Energy Development Program Guidelines

Public consultation on the Establishment of the Innovation Fund

Ethiopia: FCPF Readiness Grant FCPFR - FOREST CARBON PARTNERSHIP FACILITY

First BUR of Chile and ICA process

Terms of Reference (ToR) Jordan Innovative Startups and SMEs Fund (ISSF Company) Manager

THE SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom Happiness No: 217/QD-BKHCN Hanoi, February 18, 2014

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism

International NAMA Facility

California s Compliance Offset Program

Hospital Energy Efficiency Program Program (HEEP) Overview for Presentation to LHINs and Health Service Providers

Reporting and Monitoring Guidelines

Peer Reviewed and Innovative Carbon Offsets

TERMS OF REFERENCE CONSULTANCY TO CONDUCT A TRAINING NEEDS ASSESSMENT ON HEALTHCARE WASTE MANAGMENT IN SELECTED HEALTH FACILITIES.

TERMS OF REFERENCE FOR CONSULTANTS

GLOBAL MARKET ACCELERATION FUND (GMAF) Program Guidelines

Accessing the Capacity-building Initiative for Transparency (CBIT) GEF Expanded Constituency Workshop Hammamet, Tunisia July 12, 2017

Public Private Partnerships (PPPs) to promote Cluster Development and Research and Skills Development. PPP Implementation Manual

A new initiative to catalyze high-impact NAMAs and create a vibrant practitioner network on low-carbon development

IMDRF Project: List of international standards recognized by IMDRF management committee members

Transformative Carbon Asset Facility (TCAF): Status update

UNIDO IEE Project vs EED Contributions and opportunities

DIME-GAFSP First Quarterly Progress Report

World Bank Activities in Morocco

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

REQUEST FOR EXPRESSIONS OF INTEREST. AFRICAN DEVELOPMENT BANK Abidjan, Cote d Ivoire

Terms of Reference. 1. Introduction. 2. Background

Ministry of Health (MOH) Christian Health Association of Ghana (CHAG) Memorandum of Understanding and Administrative Instructions

SCF-FIP Grant No. TF0A2243 FIP Investment Plan Preparation Grant for Cameroon Letter Agreement

Purpose of this document is to assist applicants in preparing and submitting programme outlines.

Hilton Mexico City Reforma Av. Juarez #70/Colonia Centro

SERBIA. Preparatory measures for full participation in Erasmus+ INSTRUMENT FOR PRE-ACCESSION ASSISTANCE (IPA II)

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

Public Disclosure Copy

TABLE OF CONTENTS I.INTRODUCTION 2 II.PROGRESS UPDATE 4 III.FINANCIAL MANAGEMENT 7 IV. MOBILIZATION OF RESOURCES 11 V. OUTLOOK FOR

Program Plan For the Energy Efficiency and Renewable Energy Technology Account Under New York s Clean Air Interstate Rules (CAIR)

CASE STUDY: EDUCATION PROJECT IN HAITI

EUROPEAN INVESTMENT BANK

4.10. Ontario Research Fund. Chapter 4 Section. Background. Follow-up on VFM Section 3.10, 2009 Annual Report. The Ministry of Research and Innovation

COPY REGULATION OF THE MINISTER OF FINANCE OF THE REPUBLIC OF INDONESIA NUMBER 223/PMK.011/2012

Transcription:

REPUBLIC OF TURKEY Ministry of Environment and Urbanization General Directorate of Environmental Management Climate Change Department Update on Turkey s PMR Project PA9 / 25-27 May, 2014 Cologne

Project Milestones Turkey s MRP approved at the end of May 2013 World Bank project appraisal at the end of September 2013 Review of implementation arrangements, financial management (FM), procurement plan and arrangements Detailed implementation timeline, sequence of activities prepared Implementation Grant Agreement Signed on December 17, 2013 between Turkish Treasury & World Bank Defines the activities funded by the Grant (based on the MRP), implementing agency, eligible expenditures, grant withdrawals, FM, procurement, reporting requirements etc. Complemented by a Disbursement Letter with detailed instructions on the grant withdrawal and disbursement arrangements Seamless transition from Preparation to Implementation Grant activities

Implementation Project First implementation project with legislative enforcement in the field of climate change Timeline: 3 years (2014-2017 June) Budget: 3 million USD Implementation Body: The Ministry of Environment and Urbanization, General Directorate of Environmental Management, Climate Change Department

The Project Components Piloting use of MRV Analytical Studies on the use of market based instruments Stakeholder training, consultation, public awareness Establishment of project management unit

Implementation Arrangements Project Implementation unit in the Ministry of Environment and Urbanization (MoEU) : In addition to the Ministry s own staff, the Ministry has hired: Project Coordinator Project Assistant Financial Management and Disbursement Specialist

I-MRV Component

MRV System in Turkey Under this regulatory framework Tracking GHGs Emissions there are 3 tracks: Monitoring and Reporting (for Installations) Verification (for Verifiers and Installations) Accreditation (for Verifiers and Accreditation Body) MR - Secondary legislation under preparation by MoEU + stakeholders MRV+A A V - Secondary legislation under preparation by MoEU + stakeholders - Guidance documents under preparation by TURKAK

MRV Legislation in Turkey Turkey sees MRV as the backbone of any future market instrument implementation The regulation on Monitoring of GHGs Emissions (Revised in May 2014) Modeled after the EU ETS MRV regulation Covers industry and energy sectors Monitoring plans submission by October 2014 First Monitoring year 2015 Verified emissions reports in 2016 Covers over 1500 installations at minimum representing 50% of emissions 8

April 12 MRV Legislation January 14 Oct 14 December 14 December 15 April 16 Timeline for Implementation of MRV Regulation 20 months 9 m 3 m 12 months 4 m - Preparation of MR+V legislations Preparation of Monitoring Plans Revised MRV Regulation, May 2014 Approval of Monitoring Plans by MoEU First Monitoring Year by Installations Preparation (and Verification) of Emission Reports in acc. w/mps First Reporting -Preparation and Verification of Emission Reports Capacity building and training activities, establishment of necessary systems, preparation of accreditation legislation Start work today 4 YEARS First emission data

Regulatory framework on Tracking GHGs Emissions Accrediation of Verifiers Step 1: Monitoring Plan Step2: Annual Reporting Candidate Installation fter 2016 Accreditation Monitoring Plan December 2014 GHG Emission Report Competence Verification Body October 2014 Approved Monitoring Plan Verification Body First Reporting in April 2016 (for Emissions in 2015)

Implementation of I-MRV Component

Capacity Building Actitivies Informative and Feedback Meetings with Sectoral Working groups In-depth technical MRV Training course Training arranged for 40 participants from the related Ministries and sector representatives (sectors covered in MRV legislation) In two phases, 27-28 February and 24-28 March 12

Capacity Building Actitivies In-depth technical MRV Training course 1 st Phase: general information about EU-ETS and EU Monitoring and Reporting Regulation (MRR) 2 nd Phase: details of MRR and interactive, sector specific case studies on monitoring plans and emission reports requirements 13

Capacity Building Actitivies In-depth technical MRV Training course 1 st Phase: general information about EU-ETS and EU Monitoring and Reporting Regulation (MRR) 2 nd Phase: details of MRR and interactive, sector specific case studies on monitoring plans and emission reports requirements 14

Implementation Arrangements Pilot I-MRV Implementation in 3 sectors cement, refinery, electricity : Introduction of Pilot I-MRV Programme to Sector Representatives (Cement, Electricity), May 2014 Call for Expression of Interest on Pilot Electricity MRV released, May 2014 Pilot Programme Content Prepared and Timeline Planned, May 2014

MRV Related Actitivies MRR - Secondary legislations and have been prepared and to be published this year Monitoring and Reporting of GHG Emissions Verification of GHG Emissions Related guidelines and templates have also been prepared General guidance for Installations Biomass issues Uncertainty assessment Sampling and analysis Data flow activities and control system 16

Pilot MRV in Electricity Sector MoEU currently preparing TORs for monitoring plans and emission reports Consultant will help with preparation of installationspecific monitoring plans and emission reports Verifiers will provide verification for emission reports Pilot phase to start in August 2014 Monitoring plans for first year and emission reports will be prepared for 3 months Participating installations submit monitoring plans by October 2014 Monitoring of 3 months of emissions at last Q of 2014 Emission reports submitted in February 2015 17

Danke Schön! Project Coordinator: bahar.guclusoy@csb.gov.tr Ministerial Focal Point for the PMR Project: tuba.seyyah@csb.gov.tr yakup.ayan@csb.gov.tr Project assistant: sertac.berber@csb.gov.tr 18