Pursuant to the Public Utility Holding Company Act of 2005 ("PUHCA 2005"), 1 and

Similar documents
AUSTIN ENERGY REQUEST FOR PROPOSALS (RFP) FOR THE PURCHASE OF RENEWABLE CAPACITY & ENERGY FROM RENEWABLE ENERGY RESOURCES

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

PacifiCorp 2017S SOLAR Request for Proposals. Bidder s Conference Portland November 21, 2017

MCE Feed-In Tariff for Distributed Renewable Generation

The Narragansett Electric Company d/b/a National Grid

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No.

SOUTH CAROLINA ELECTRIC & GAS COMPANY REQUEST FOR PROPOSALS FOR SOLAR PHOTOVOLTAIC DISTRIBUTED ENERGY RESOURCES AT TWO DESIGNATED SITES

Request for Proposals and Specifications for a Community Solar Project

CHUGtt=::---

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. GenOn Energy Management, LLC ) Docket No. ER REQUEST FOR REHEARING

Energy. Request For Proposals for Renewable Power Supply Resources

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) )

The Narragansett Electric Company d/b/a National Grid

November 13, Ms. Kimberly Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

CONSUMERS ENERGY COMPANY REQUEST FOR PROPOSALS SOLAR GENERATION PROJECTS. Bids Due: July 28, :00 noon EPT (Jackson, MI) Issued.

FEED-IN TARIFF LICENSEE TRANSFER

Application for the Social Venture Fund (SvF)

2018 RENEWABLE ENERGY GROWTH PROGRAM

Federal and State Incentives for Wind Development

Business Requirements Specification

SCE s CALIFORNIA RENEWABLE ENERGY SMALL TARIFF (CREST) PROGRAM

Commercial Scale. Direct Ownership-Application. Renewable Energy Projects over 10kW. Commercial Block program details can be found at:

Feed-in Tariff Scheme: Guidance for Licensed Electricity Suppliers

Implementation of HB 2941, Section 3 Community Solar Program Design August 11, Reminder Please add your name to the sign in sheet.

THE INTERNET INCUBATOR: STRUCTURES AND ISSUES

CENTRAL MUNICIPAL POWER AGENCY/SERVICES

Renewable Energy Tax Incentives Program

Solar Electricity For Community Buildings Pilot Program. Workbook

Case MDL No Document 378 Filed 10/20/15 Page 1 of 8 BEFORE THE UNITED STATES JUDICIAL PANEL ON MULTIDISTRICT LITIGATION

1.4 On 19 May 2011 the WA State Government announced a reduction in the Subsidy rate from 40c/kWh to 20c/kWh effective from 1 July 2011.

POLICIES, RULES AND PROCEDURES

Utility RFPs for Renewable

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE Residential Renewable Electric Generation Incentive Program

To ensure system protection is coordinated among operating entities.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. NORTH AMERICAN ELECTRIC ) RELIABILITY CORPORATION ) Docket No.

Rhode Island Renewable Distributed Generation Standard Contract Enrollment Application and Enrollment Process Rules

Energy Efficiency Alberta Residential and Commercial Solar Program Terms and Conditions

2017 All Source Request for Proposals for Electric Power Supply and Load Management Resources. Pre-Bid Meeting

Approved Project Sponsor s Participating TO Application Process Clean-Up. Proposal and Tariff

microfit FAQ Version 4.1

Georgia Power s Renewable Portfolio. Kings Bay Naval Solar Project. Potential Future Military Projects

For additional information or questions, please contact s.c. department of commerce:

Application form for Commissioning Generation Facility Registration by a Market Participant. including explanatory notes

PAVING THE WAY FOR GRID MODERNIZATION. Presenter December 2016

May 25, Request for Proposals No Offsite Virtual Net Metering

Costs and Benefits of Net Energy Metering: Request for Information. AGENCY: Office of Energy Policy and Systems Analysis, Department of Energy.

Legal RFP Questions and Answers February 14, 2014

Transcontinental Gas Pipe Line Company, LLC Leidy Southeast Project Docket No. RP15-

Funded in part through a grant award with the U.S. Small Business Administration

Funding Renewable Energy Projects on Tribal Lands

Energy Efficiency Alberta Residential and Commercial Solar Program Guidebook

Multifamily Affordable Solar Housing. Semi Annual Progress Report. July 30, 2012

Multifamily Affordable Solar Housing. Semi Annual Progress Report. July 31, 2013

DRAFT PROPOSAL REQUIREMENTS

FEMA Mission Statement and Critical Objectives MISSION STATEMENT: CRITICAL OBJECTIVES: Science. Advocacy. Communication

BRAND REPORT FOR THE 6 MONTH PERIOD ENDED JUNE 2017

Feed-in Tariff: Guidance for licensed electricity suppliers (Version 2)

I-605 CORRIDOR HOT SPOT INTERCHANGES

Project Application Webinar

Duquesne Light Our Energy... Your Power

107 FERC 61,053 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Memo of Understanding - Evergreen Options Grant Award

Agenda Date: 2/28/18 Agenda Item: BA CLEAN ENERGY ORDER

411 Seventh Avenue IS" 1. Floor Pittsburgh. PA February 24, 2016

( Creative Invite ). Create digital wallpaper art for Dell Official Rules

( Creative Invite ). Design the logo for Plan C Studios Official Rules

RULE-MAKING ORDER EMERGENCY RULE ONLY. CR-103E (October 2017) (Implements RCW and )

1. Research Customer Research the various types of renewable energy systems available and decide which system best fits your consumption needs.

A. Charity or Tax-Exempt Business? Sustainability through Social Enterprise. CAPLAW 2011 National Training Conference

Promotion of Renewable Energy Sources in the Domestic Sector PV Grant Scheme 2016/PV/ERDF - Application Part A

IN THE CIRCUIT COURT OF THE COUNTY OF HENRICO

To Give or Not to Give: A Comprehensive Analysis of Stark s Non-Monetary Compensation Exception

Applicant Information Booklet

Funding Availability for Small Shipyard Grant Program; Application Deadline. AGENCY: Maritime Administration, Department of Transportation

STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-2, SUB 1089 BEFORE THE NORTH CAROLINA UTILITIES COMMISSION

( Creative Invite ). Create a print design for Harvey Nichols Official Rules

Transcontinental Gas Pipe Line Company, LLC Bayonne Delivery Lateral Project Docket No. CP

CONSUMERS ENERGY COMPANY REQUEST FOR PROPOSALS WIND GENERATION PROJECTS. Bids Due: July 28, :00 noon EPT (Jackson, MI) Issued.

Should Electricity Sectors in Developing Countries be Unbundled?

Renewable Energy Bonus Scheme - solar hot water rebate. Guidelines and application form

New Solar Homes Partnership. Web Tool Application Guide

Production Device Registration

New Solar Homes Partnership Program Webinar

Standard FAC Facility Ratings. A. Introduction

THE DORSEY & WHITNEY FOUNDATION

Public Workshop Examining Contact Lens Marketplace and Analyzing Proposed Changes

Iifieate of service. HET AT

WarmWise Audits & Rebates Contest Drawing PA-7 OFFICIAL RULES

( Creative Invite ). Design stage visuals for HI-LO s debut show Official Rules

Job Development Investment Grant (JDIG) N.C. Gen. Stat. 143B to 143B

Health Care Alert. CMS Update: New Rules for Home Health Agencies Undergoing Ownership Changes. Further Update (July 23, 2010)

The U.S. Government Role in FDI Attraction. SelectUSA.gov

California Self-Generation Incentive Program Evaluation

Request for Qualifications for Selected San Francisco Public Utilities Commission Construction Projects

The Boeing Company Special Provision (SP1) Representations and Certifications (13 NOV 2001)

THE CITY OF SEATTLE CITY LIGHT DEPARTMENT 2012 REQUEST FOR PROPOSALS. Long-Term Renewable Resources And/or Renewable Energy Certificates

PPEA Guidelines and Supporting Documents

( Creative Invite ). Create artwork capturing contrast Official Rules

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) )

Sponsorship Agreement/Sub-Grant Posted Date June 6, 2016 Due Date for Applications Cycle 1: Cycle 2: July 15, 2016 January 13, 2017

Transcription:

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Solar Star Oregon II, LLC ) Docket No. EG17- -000 NOTICE OF SELF-CERTIFICATION OF EXEMPT WHOLESALE GENERATOR STATUS OF SOLAR STAR OREGON II, LLC Pursuant to the Public Utility Holding Company Act of 2005 ("PUHCA 2005"), 1 and Section 366.7(a) of the regulations of the Federal Energy Regulatory Cornrnission ("Cornrnission"), 2 Solar Star Oregon II, LLC ("Applicant") submits this notice of selfcertification ("Notice") of its status as an "exempt wholesale generator" ("EWG") as defined in Section 366.1 of the Cornrnission's regulations. 3 In support of this Notice, Applicant states as follows: I. CORRESPONDENCE, COMMUNICATIONS, AND SERVICE Applicant requests that all correspondence, communications, and service concerning this Notice be directed to the following persons, and that their names and addresses be placed on the official service list for this proceeding: 4 Jack Semrani Senior Counsel/Regulatory & Transactions SunPower Corporation 2900 Esperanza Crossing Austin, TX 78758 Tel: (512) 953-4471 jack.semrani@sunpower.com George D. (Chip) Cannon, Jr. Scott D. Johnson Akin Gump Strauss Hauer & Feld LLP 1333 New Hampshire Avenue, N.W. Washington, D.C. 20036 Tel: (202) 887-4000 Fax: (202) 887-4288 ccannon@akingump.com sdjohnson@akingump.com 1 Pub. L. No. 109-58, 1261-77, 119 Stat. 594, 972-78 (2005). 2 18 C.F.R. 366.7(a) (2016). 3 Id. 366.1. 4 Applicant requests waiver of 18 C.F.R. 385.203(b)(3) to tbe extent necessary to allow each person listed to be included on the official service list for this proceeding.

II. DESCRIPTION OF APPLICANT Applicant is a Delaware limited liability company formed for the purpose of developing, constructing, owning, and operating the Gala Project (the "Project"), an approximately 56 MW (nameplate) photovoltaic electric power generating facility to be located in Crook County, Oregon and to engage in all other lawful businesses activities consistent with EWG status. Applicant's principal place of business is 1414 Harbour Way South, Richmond, California 94804. Applicant is not currently engaged in any business activities other than those associated with the development, construction, ownership, and future operation of the Project. Applicant is an indirect, wholly-owned subsidiary of SunPower Corporation ("SunPower"), a Delaware corporation whose shares are publicly traded on the NASDAQ. SunPower is a vertically-integrated solar products and services company that designs, manufactures and delivers high-efficiency and high-reliability solar photovoltaic panels and electricity generating systems to residential, business, government and utility customers. SunPower is headquartered in San Jose, California, and has offices in North America, Europe, Australia, Africa, and Asia. III. DESCRIPTION OF THE PROJECT The Project is currently expected to begin trial operation and testing in August 2017 and achieve commercial operation in October 2017. Once completed, Applicant will own and operate the Project, which will be comprised of an approximately 56 MW (nameplate) photovoltaic electric power generating facility (the "Generating Facility") and related real property and infrastructure. The Project will include interconnecting transmission facilities necessary to connect the Generating Facility to the PacifiCorp transmission system to permit - 2 -

Applicant to make wholesale sales of electricity therefrom. 5 All of the net output of the Project will be sold at wholesale under a long-term power purchase agreement ("PPA"). 6 IV. REPRESENTATIONS REGARDING EWG STATUS Pursuant to Section 366.7(a) of the Commission's regulations, Applicant makes the following representations to demonstrate that it satisfies the requirements for EWG status: 1. Applicant represents that it will be engaged directly and exclusively m the business of owning and operating the Project and selling electric energy at wholesale, except to the extent that Applicant may engage in certain activities incidental to the wholesale sale of electric energy that the Commission has determined do not violate the exclusivity requirement for EWG status. Such incidental activities might include, but are not necessarily limited to: the sale of ancillary services; 7 the resale or reassignment of excess transmission capacity; 8 the purchase and sale of congestion revenue rights needed to operate the Project; 9 certain project development and financing activities associated with the Project; 10 the sale of "green" power certificates or credits associated with power produced by the Project or other eligible facilities owned and/or operated by Applicant; 11 5 Applicant does not yet have market-based rate authorization from the Commission. Applicant plans to apply to the Commission for authorization to sell electric energy, capacity, and ancillary services at market-based rates pursuant to Section 205 of the Federal Power Act, 16 U.S.C. 824d (2012), prior to any sale of power from the Project. 6 Under the PPA, title and risk of loss related to the net electric energy output (and any related ancillary services or capacity attributes) from the Project will transfer from Applicant to the buyer at the Delivery Point as defined in the PPA. To ensure that Applicant's sales to the buyer under the PPA are wholesale sales, the buyer will sell and transfer title to all of the net electric energy output generated by the Project to the buyer's certified Electricity Service Supplier, as defined under Oregon law, or another third party at the Delivery Point or at such other delivery point as is determined by the buyer and its third-party buyer. 7 See, e.g., Duke Energy Oakland, LLC, 83 FERC 1f 61,304 (1998); Sithe Framingham LLC, 83 FERC 1f 61,106 (1998). 8 See, e.g., Compafiia Hidroelectrica Dona Julia S. De R.L., 85FERC1f 61,336 (1998). 9 See Duquesne Power, L.P., 106FERC1f 61,104 (2004). 10 See KeySpan-Ravenswood, Inc., 88 FERC 1f 62,073 (1999); AEP Res., Project Mgmt. Co., 74 FERC 1f 61,202 (1996); Southern Elec. Wholesale Generators, Inc., 66FERC1f 61,264 (1994). - 3 -

leasing or renting property to third parties, provided that all revenues above a nominal amount from activities not reasonably incidental to the ownership or operation of the Project and sales of electric energy at wholesale are donated to charity or transferred to a non-affiliate; 12 entering into agreements relating to facilities to be shared with an affiliated EWG or EWGs and used in the operation of eligible facilities; 13 or such other activities incidental to the sale of electric energy at wholesale that are consistent with the Commission's EWG precedent. 2. Applicant represents that the Project will be an "eligible facility," as defined in Section 32(a)(2) of the Public Utility Holding Company Act of 1935, as incorporated by reference in Section 1262(6) of PUHCA 2005 14 and Section 366.l of the Commission's regulations, 15 because the Project will be used for the generation of electric energy exclusively for sale at wholesale. 16 3. Applicant represents that the Project will not include any transmission or distribution facilities other than those interconnecting transmission facilities necessary to interconnect the Project to the transmission grid and to permit the sale of the output of the Project at wholesale. 4. Applicant represents that it is not currently engaged in, and has no plans to engage in, foreign or domestic sales of power at retail. All of the electric energy generated by the Project will be sold exclusively at wholesale within the United States. 5. Applicant represents that no portion of the Project is or will be owned or operated by an "electric utility company" that is an "affiliate" or "associate company" of Applicant, as 11 See Madison Windpower, LLC, 93 FERC ii 61,270 (2000). 12 See, e.g., Duke Energy Hot Spring, LLC, 98 FERC ii 61,287 (2002). 13 See Buffalo Gap Wind Farm 2, LLC, 118 FERC ii 61,069, at PP 2, 14 & n.3 (2007). 14 42 u.s.c. 16451(6) (2012). 15 18 C.F.R. 366.1. 16 In addition to generating facilities, "eligible facilities" include "interconnecting transmission facilities necessary to effect a sale of electric energy at wholesale." 15 U.S.C. 79z-5a(a)(2) (2000). -4-

20170 209-5148 FERC PDF (Unofficial) 2/9/2017 10:19:16 AM such terms are defined m Section 366.1 of the Commission's regulations, 17 other than an affiliated EWG. 6. Applicant represents that there are no existing leasing arrangements involving the Project under which Applicant is the lessor. 7. Applicant represents that no rate or charge for, or in connection with, the construction of the Project, or for electric energy to be produced by the Project, was in effect under the laws of any state as of October 24, 1992. As such, no determination or certification by a state commission is necessary prior to certification of Applicant as an EWG. V. SERVICE Pursuant to Section 366.7(a) of the Commission's regulations, 18 Applicant is serving a copy of this Notice on the Oregon Public Utility Commission, the state regulatory authority of the state in which the Project is located. VI. CONCLUSION Based on the foregoing facts, statements, and representations, Applicant satisfies the requirements for EWG status. Respectfully submitted, Jack Semrani Senior Counsel/Regulatory & Transactions SunPower Corporation 2900 Esperanza Crossing Austin, TX 78758 Tel: (512) 953-4471 jack.semrani@sunpower.com Dated: February 9, 2017 Isl Scott D. Johnson George D. (Chip) Cannon, Jr. Scott D. Johnson Akin Gump Strauss Hauer & Feld LLP 1333 New Hampshire Avenue, N.W. Washington, D.C. 20036 Tel: (202) 887-4000 Fax: (202) 887-4288 Attorneys for Applicant 17 18 C.F.R. 366.1. 18 Id. 366.7(a). - 5 -

20170.209-5148 FERC PDF (Unofficial) 2/9/2017 10:19:16 AM CERTIFICATE OF SERVICE I hereby certify that I have this day served the foregoing Notice of Self-Certification of Exempt Wholesale Generator Status of Solar Star Oregon II, LLC on the Oregon Public Utility Commission. Dated at Washington, D.C., this 9th day of February, 2017. Isl Scott D. Johnson Scott D. Johnson Akin Gump Strauss Hauer & Feld LLP 1333 New Hampshire Avenue, N.W. Washington, D.C. 20036 Tel: (202) 887-4218

Document Content(s) Solar Star Oregon II, LLC EWG Self-Certification.PDF... 1-6

FEB14 '17 At-110:24 RCl,10 Johnson, Scott D. From: Sent: To: Subject: efiling@ferc.gov Thursday, February 09, 2017 3:38 PM Johnson, Scott D.; efilingacceptance@ferc.gov FERC Acceptance for Filing in EG17-57-000 Acceptance for Filing The FERC Office of the Secretary has accepted the following electronic submission for filing (Acceptance for filing does not constitute approval of any application or self-certifying notice): -Accession No.: 201702095148 -Docket(s) No.: EG17-57-000 -Filed By: Solar Star Oregon II, LLC -Signed By: George Cannon, Scott Johnson -Filing Type: Exempt Wholesale Generator Request -Filing Desc: Notice of Self-Certification of Exempt Wholesale Generator Status of Solar Star Oregon II, LLC under EG17-57. -Submission Date/Time: 2/9/2017 10:19:16 AM -Filed Date: 2/9/2017 10:19:16 AM Your submission is now part of the record for the above Docket(s) and available in FERC's elibrary system at: http://elibrarv.ferc.gov/idmws/file list.asp?accession num=20170209-5148 If you would like to receive e-mail notification when additional documents are added to the above docket(s), you can esubscribe by docket at: https://ferconline.ferc.gov/esubscription.aspx Thank you again for using the FERC Electronic Filing System. If you need to contact us for any reason: E-Mail: efiling@ferc.gov mailto:efiling@ferc.gov (do not send filings to this address) Vo ice Mail: 202-502-8258. 1