Implementation Status & Results Kyrgyz Republic Small Towns Infrastructure & Capacity Building Project (P083377)

Similar documents
Implementation Status & Results Kazakhstan Agricultural Competitiveness Project (P049721)

Implementation Status & Results OECS Countries Telecommunications & ICT Development Project (P088448)

Implementation Status & Results Congo, Democratic Republic of Emergency Demobilization and Reintegration Project (P078658)

Implementation Status & Results Brazil BR-Housing Sector TAL (P050761)

Implementation Status & Results Dominican Republic DO APL1 Water and Sanitation in Tourist Areas (P054221)

Implementation Status & Results Dominican Republic DO APL1 Water and Sanitation in Tourist Areas (P054221)

Implementation Status & Results Nigeria Lagos Urban Transport Project 2 (P112956)

Implementation Status & Results Central African Republic Multisectoral HIV/AIDS Project (P073525)

Implementation Status & Results Sri Lanka Sri Lanka - Second Health Sector Development Project (P118806)

Implementation Status & Results Cote d'ivoire RCI- Emergency Urban Infrastructure (FY08) (P110020)

Implementation Status & Results Dominican Republic Water and Sanitation in Tourist Areas (P054221)

Implementation Status & Results Indonesia Support for Poor and Disadvantaged Areas Project (P078070)

Implementation Status & Results Benin ebenin Project (P113370)

Implementation Status & Results Morocco Morocco Urban WS&S Access Pilots (P102527)

Public Disclosure Copy. Implementation Status & Results Report CO APL1 La Guajira Water & Sanitation Infrast and Service Mngmt Proj (P096965)

Implementation Status & Results Brazil Ceara Regional Economic Development: Cidades do Ceara (P099369)

Implementation Status & Results Jordan Jordan - Cultural Heritage, Tourism & Urban Development (P081823)

Implementation Status & Results Indonesia ID SPADA in Aceh and Nias (P097605)

Implementation Status & Results Swaziland Swaziland Health, HIV/AIDS and TB Project (P110156)

Implementation Status & Results Indonesia Health Professional Education Quality Project (P113341)

Implementation Status & Results West Bank and Gaza Gaza II Emergency Water Project (P065920)

Implementation Status & Results Indonesia Support for Poor and Disadvantaged Areas Project (P078070)

Implementation Status & Results Guinea Development of Inclusive Education in Guinea (P129210)

Implementation Status & Results Guinea National Rural Infrastructure Project (P065127)

Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

Public Disclosure Copy

Implementation Status & Results Montenegro Healthcare System Improvement Project (Montenegro) (P082223)

Implementation Status & Results Rwanda Second Emergency Demobilization and Reintegration Project (P112712)

The World Bank Research and Innovation in Science and Technology Project (P121842)

The World Bank St. Petersburg Economic Development Project (P069063)

Implementation Status & Results Congo, Democratic Republic of Forest and Nature Conservation Project (P100620)

Implementation Status & Results Morocco MA-Rural Roads II (P094007)

Implementation Status & Results Tanzania Sustainable Management of Mineral Resources (P096302)

The World Bank Africa Higher Education Centers of Excellence Project (P126974)

The World Bank Sustainable Rural Sanitation Services Program for Results (P154112)

Public Disclosure Copy. Implementation Status & Results Report Philippines: Extractive Industries Transparency Initiative Implementation (P128290)

Implementation Status & Results Morocco MA-Rural Roads II (P094007)

The World Bank JM Youth Employment in Digital and Animation Industries (P148013)

OBA Urban Sanitation Facility for the Greater Accra Metropolitan Area (GAMA) (P145139)

The World Bank The Gambia - Growth & Competitiveness (P114240)

Implementation Status & Results Guatemala GUATEMALA Maternal and Infant Health and Nutrition (P077756)

Public Disclosure Copy

Public Disclosure Copy. Implementation Status & Results Report Second Private Sector Competitiveness and Economic Diversification Prj (P144933)

The World Bank Swaziland Health, HIV/AIDS and TB Project (P110156)

Implementation Status & Results Congo, Democratic Republic of Forest and Nature Conservation Project (P100620)

The World Bank JM Youth Employment in Digital and Animation Industries (P148013)

INDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU)

Public Disclosure Copy

The World Bank Health Professional Education Quality Project (P113341)

The World Bank Serbia Research, Innovation and Technology Transfer Project (P145231)

The World Bank Kenya GPE Primary Education Development Project (P146797)

Public Disclosure Copy

Implementation Status & Results Report MENA- Desert Ecosystems and Livelihoods Knowledge Sharing and Coordination Project (P130343)

Public Disclosure Copy. Implementation Status & Results Report Senegal: Extractive Industries Transparency Initiative Implementation (P131626)

Public Disclosure Copy. Implementation Status & Results Report Global Partnership for Education Grant for Basic Education Project (P117662)

The World Bank Skills Strengthening for Industrial Value Enhancement Operation (P156867)

The World Bank Burkina Faso - Bagre Growth Pole Project (P119662)

Public Disclosure Copy

The World Bank Second Karnataka State Highway Improvement (P107649)

The World Bank Kenya GPE Primary Education Development Project (P146797)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

Public Disclosure Copy

The World Bank Swaziland Health, HIV/AIDS and TB Project (P110156)

The World Bank Integrated Growth Poles and Corridor Project 2 (P113971)

Public Disclosure Copy

NATIONAL COMMUNITY EMPOWERMENT PROGRAM IN URBAN AREAS FOR APPROVED ON NOVEMBER 20, 2012 REPUBLIC OF INDONESIA

The World Bank Social Accountability Knowledge, Skills, Action and Networking (P147835)

The World Bank Romania Secondary Education Project (P148585)

Public Disclosure Copy

Procurement Plan ENGAGING COMMUNITIES FOR BETTER SCHOOLS IN THE KYRGYZ REPUBLIC PROJECT US$2.73 MILLION EQUIVALENT

Procurement Plan ENGAGING COMMUNITIES FOR BETTER SCHOOLS IN THE KYRGYZ REPUBLIC PROJECT US$2.73 MILLION EQUIVALENT

The World Bank MDTF-Economic Revitalization of KP and FATA (P124268)

Public Disclosure Copy

JANUARY 2018 (21 work days) FEBRUARY 2018 (19 work days)

The World Bank Vietnam Climate Innovation Center (VCIC) RETF (P155260)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

Enhancing regional integration of landlocked developing countries in North and Central Asia through infrastructure connectivity 6 and 7 September

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SINDH GLOBAL PARTNERSHIP FOR EDUCATION PROJECT

Enlisted Professional Military Education FY 18 Academic Calendar. Table of Contents COLLEGE OF DISTANCE EDUCATION AND TRAINING (CDET):

Corporate Services Employment Report: January Employment by Staff Group. Jan 2018 (Jan 2017 figure: 1,462) Overall 1,

STATISTICAL PRESS NOTICE MONTHLY CRITICAL CARE BEDS AND CANCELLED URGENT OPERATIONS DATA, ENGLAND March 2018

Business Incubation and Innovation Development in Kyrgyzstan. Mrs. Zamira Akbagysheva

The Toyota Foundation 2018 International Grant Program Application Form

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

PROCUREMENT PLAN. A. Methods, Thresholds, Review and 18-Month Procurement Plan. 1. Procurement and Consulting Methods and Thresholds

Rajasthan Urban Sector Development Program

BOROUGH OF ROSELLE PUBLIC NOTICE ANNUAL NOTICE OF CALENDAR YEAR 2018 WORKSHOP SESSIONS, PRE-AGENDA MEETINGS AND REGULAR MEETINGS

P4: PACIFIC REGIONAL ICT REGULATORY DEVELOPMENT PROJECT APPROVED ON JULY 30, 2014 UNIVERSITY OF THE SOUTH PACIFIC

Compliance Division Staff Report

ALBERTA TRANSPORTATION North Central Region Edson Area Instrumentation Monitoring Results

Egypt National Railways Restructuring Project (ENRRP) Procurement Plan Updated on April 21, 2014

Tina Nelson, MBA, BSN Lisa Stepp, BSN, RN Rebecca Fyffe, BSN, RN Jessica Coughenour, LPN

1. Project Information: Land Administration and Management Project. The IBRD Loan number is 4851 ALB. The SIDA Grant number is TF090309

GHA/WATTFP/G01/ , NCB Post Prior Plan 22 Feb Mar Jun 2010 Actual 30 Jun Aug 2010

CHC-A Continuity Dashboard. All Sites Continuity - Asthma. 2nd Qtr-03. 2nd Qtr-04. 2nd Qtr-06. 4th Qtr-03. 4th Qtr-06. 3rd Qtr-04.

PERFORMANCE MANAGEMENT MEETING. Health Department:

Colorado Medical-Dental Integration Project (CO MDI)

Quality Management Report 2017 Q2

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE HEALTH SECTOR REFORM PROJECT - PHASE II (APL2) LOAN NO RO January 28, 2005

Procurement Plan Enhancing Quality of Financial Reporting (EQ-FINREP) Grant No:

Transcription:

Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Kyrgyz Republic Small Towns Infrastructure & Capacity Building Project (P83377) Operation Name: Small Towns Infrastructure & Capacity Building Project Project Stage: Implementation Seq.No: 9 Status: ARCHIVED Last Modified : 14-Dec-21 (P83377) Country: Kyrgyz Republic Approval FY: 25 Product Line: IBRD/IDA Region: EUROPE AND CENTRAL ASIA Lending Instrument: Specific Investment Loan Implementing Agency(ies): ARIS -Comm Dev and Investment Agency Key s Board Approval Original Closing 31-Mar-21 Planned Mid Term Review 3-Sep-27 Last Archived ISR 6-Mar-21 Effectiveness 2-May-25 Revised Closing Actual Mid Term Review 26-Nov-27 Project Development Objectives Project Development Objective (from Project Appraisal Document) The development objective of the proposed Project is to improve the availability, quality and efficiency of local infrastructure services for the population of participating small towns. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Component(s) losure Authorized Public Disclosure Authorized Component Name Component Cost SMALL TOWNS INFRASTRUCTURE IMPROVEMENTS COMPONENT 13. INSTITUTIONAL STRENGTHENING COMPONENT.8 STICBP IMPLEMENTATION SUPPORT COMPONENT 1.2 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Implementation Status Overview Despite the political unrest affecting the Kyrgyz Republic since April 21, project implementation has continued, although with some delay. The overall project performance continues to be Satisfactory with works implemented in all 23 small towns of the Kyrgyz Republic. To date, water supply and sanitation systems have undergone some level of rehabilitation in 18 towns; sewerage has been repaired in 2 towns, and 22 towns have received equipment to improve their solid waste management capacity; all 23 small towns have Page 1 of 8

received small grants for rehabilitation of social and cultural infrastructure;and, finally, all towns have received assistance to develop their Performance Improvement Actions Plans with related equipment, training and software. Results Project Development Objective Indicators Improved availability, quality of basic local infrastructure services in participating small towns during project implementation period. Availability of water supply >12 h/d; (in%): Balykchi 84; Cholpon-Ata 13; Jalal-Abad 84; Kant 92; Kara- Suu 27; Kyzyl-K ya ; Mailuu-Suu 22; Naryn 25; Talas 25; Tokmok 79; Uzgen 12. (in%): Balykchi 9; Cholpon-Ata 22; Jalal-Abad 84; Kant 92; Kara- Suu 27; Kyzyl-Kya ; Mailuu-Suu 22; Naryn 25; Talas 25; Tokmok 79;Uzgen 12. 1-Sep-21 (in%): Balykchi 67; Cholpon-Ata 32; Jalal-Abad 95; Kant 95; Kara- Suu 42; Kyzyl-K ya 15; Mailuu-Suu 37; Naryn 37; Talas 42; Tokmok 95; Uzgen 27. (Data based on estimates for both population and service coverage. Project Impact Assessment for towns with completed projects and Baseline Survey for towns with projects financed under Additional Financing in progress. Improved availability, quality of basic local infrastructure services in participating small towns during project implementation period.% covered by MWC 2 times/month (in%): Balykchi 49; Cholpon-Ata 64; Jalal-Abad 8; Kant 83; Mailuu- Suu 45; Tash- Kumir 8; Uzgen 26 This indicator overlaps with "Number of people in urban areas provided with access to regular solid waste collection under the project" (in%): Balykchi 52; Cholpon-Ata 67; Jalal-Abad 85; Kant 87; Mailuu- Suu 5; Tash-Kumir 11; Uzgen 3 1-Sep-21 (Data based on estimates for both population and service coverage. Project Impact Assessment for towns with completed projects and Baseline Survey for towns with projects financed under Additional Financing in progress (in%): Balykchi 65; Cholpon-Ata 75; Jalal-Abad 95; Kant 95; Mailuu- Suu 6; Tash- Kumir 25;; Uzgen 42 Page 2 of 8

Improved efficiency of utilities operating basic infrastructure services in participating small towns during project implementationperiod.energy consumption cost as % of total cost in WS (in %): Cholpon-Ata 44; Jalal-Abd 3; Kant 3.6; Kara-Suu 48.4; (in %): Cholpon-Ata 3; Jalal-Abd 39; Kant 22; Kara-Suu 48.4; Mailuu-Suu 7.2; Naryn 11; Tokmok Mailuu-Suu 5; Naryn 1.3; Tokmok 49; Uzgen 45 48.1; Uzgen 36 1-Sep-29 data from assessment covering more town and being cleaned (in %): Cholpon-Ata 32; Jalal-Abd 25; Kant 25; Kara-Suu 4; Mailuu- Suu 5; Naryn 8.5; Tokmok 4; Uzgen 38 Improved efficiency of utilities operating basic infrastructure services in participating small towns during project implementationperiod. Revenue/cost ratio for WS (some data is year specific) Balykchi 1.6; Batken.5; Isfana.32; Jalal-abad 1; Kant.78; Kara-Kul.33; Kara-Suu.6; Kochkor-Ata.53; Kok-Jangak 1; Kyzyl-Kya 1.5; Mailuu-Suu 1.32.97; Sulukta.32; Tokmok 1.6 Balykchi 1.5; Batken.5; Isfana.32; Jalal-abad 1.7; Kant 1.5; Kara-Kul.33; Kara-Suu.6; Kochkor-Ata.53; Kok-Jangak 1.3; Kyzyl -Kya 1.6; Mailuu-Suu 1.4; Sulukta.32; Tokmok 1.6 1-Apr-21 Balykchi 1.15; Batken.65; Isfana.5; Jalal-abad 1.1; Kant 1.; Kara-Kul.5 ; Kara-Suu.75; Kochkor-Ata.65; Kok-Jangak 1.1; Kyzyl-Kya 1.12 ; Mailuu-Suu 1.4.97; Sulukta.5; Tokmok 1.15 Higher satisfaction of the population with basic infrastructure services in participating small towns during the project implementation period. Decrease in % of households reporting poor W quality Intermediate Results Indicators (in %): Balykchi 7; Cholpon-Ata 43; (in %): Balykchi 7; Cholpon-Ata 43; (in %): Balykchi 5; Cholpon-Ata 3; Kant 11; Kara-Suu 1; Kyzyl-Kya Kant 11; Kara-Suu 1; Kyzyl-Kya Kant 5; Kara-Suu 5; Kyzyl-Kya 1; 2;Mailuu-Suu 19; Naryn 16 Talas 2;Mailuu-Suu 19; Naryn 16; Talas Mailuu-Suu 1; Naryn 8; Talas 8; 16; Tokmok 11 Uzgen 7 16; Tokmok 11; Uzgen 7 Tokmok 5; Uzgen 5 31-May-29 Page 3 of 8

Number of UII and SII subprojects implemented UII 24 SII 87 1-Jun-21 SII: 1 sub-project is at completion stage UII 34 SII 87 Number of UII and SII subproject applications received by ARIS (annually) UII: 7, 6, 6 SII: 42, 38, 37, 23 15-Feb-21 UII: 15, 15, 1, 1, SII: 15, 22, 23, 23, 23 Number of Participating Small Towns (PSTs) implementing UII and SII subprojects. UII: 6, 5, 12, 8, 7 SII 6, 16, 23, 1, 1 15-Feb-21 UII: 7, 1, 1, 7, 5 SII: 1, 15, 15, 15, 15 Number of Town Strategies approved by Small Towns 6 indicator was expelled during Mission in March 21 23 31-May-29 Cumulative 23 Page 4 of 8

Number of Participating Small Towns (PSTs) conducting public hearings on town development strategies indicator was expelled during Mission in March 21 23 31-May-29 Cumulative: 23 Number of Participating Small Towns (PSTs) having prepared Performance Improvement Action Plans (PIAPs) 23 1-Sep-29 Cumulative: 23 Number of Participating Small Towns (PSTs) implementing Performance Improvement Action Plans (PIAPs) 23 1-Sep-29 Cumulative: 23 Number of water utilities that the project is supporting Core Indicator Number 5. 18. 1-Sep-21 18. To be updated once the Project Impact Assessment for towns with completed projects and Baseline Survey for towns with projects financed under Additional Financing are completed (end of April 21) Page 5 of 8

Number of people in urban areas provided with access to Improved Water Sources under the project (Number) (in%): Uzgen 31; Talas 28, Tokmok 9, Balykchi 5; Cholpon- Ata 45; Jalal-Abad 42; Kant 85, Kara-Suu 33, Kyzyl-Kya 76; Naryn 64; Nookat 17 (in%): Uzgen 59.2; Talas 33, Tokmok 9, Balykchi 9.2; Cholpon-Ata 93; Jalal-Abad 82; Kant 88.7, Kara-Suu 33, Kyzyl-Kya 87.6; Naryn68.4; Nookat 56.7 1-Sep-21 Data for other towns being analyzed Number of people in urban areas provided with access to Improved Sanitary under the project indicator introduced in 29 1-Jan-29 Batken 5.5; Maili-Suu 96.6; Naryn 58.4; Talas 33.4 1-Sep-21 Fee collection rate before and after billing system Balykchy Vodokanal 56; waste collection utilities 69; Kant 17; Kara-Kol 77,4; Kyzyl-Kia 82; Mailuu-Suu (Vodokanal) 83; (wastes utility 68,5; Naryn 42; Tash-Kumyr 11; Cholpon-Ata 68; Shopokov 84 Balykchy Vodokanal 88,5; wastes utilities 7;Kant 135;Kara-Kol 82,6; Kyzyl-Kia 67,4; Mailuu-Suu (Vodokanal)86,5;(wastes utility) 94,9; Naryn 8,2; Tash-Kumyr 13; Cholpon-Ata 112,3; Shopokov 98 Page 6 of 8

Number of people in urban areas provided with access to regular solid waste collection under the project (Number) indicator introduced in 29 1-Jan-29 (in %):Uzgen 86; Balykchi 83; Cholpon-Ata 6; Jalal-Abad 57; Kant 88,7; Kyzyl-Kya 75; Naryn 9; Nookat 7;Shopokov 83; Sulukta 6;Kara-Balta 7; Kok- Jangak 6;Tokmok 51,4;Isfana 95; Kara-Kol 54;Kerben 37;Mailuu- 15-Feb-21 To be updated once the Project Impact Assessment for towns with completed projects and Baseline Survey for towns with projects financed under Additional Financing are completed (end of April 21) Data on Financial Performance (as of ) Financial Agreement(s) Key s Project Loan No. Status Approval Signing Effectiveness Closing P83377 IDA-416 Effective 3-Feb-25 2-May-25 P83377 IDA-4556 Effective 2-Apr-29 24-Apr-29 2-Jul-29 P83377 IDA-H139 Effective 3-Feb-25 2-May-25 P83377 IDA-H455 Effective 2-Apr-29 24-Apr-29 2-Jul-29 Disbursements (in Millions) Project Loan No. Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P83377 IDA-416 Effective XDR 8.2 8.2. 8.1.1 99. P83377 IDA-4556 Effective XDR 1.5 1.5. 1.29.21 86. P83377 IDA-H139 Effective XDR 2.1 2.1. 2.2.8 96. P83377 IDA-H455 Effective XDR 1.2 1.2..1 1.1 8. Disbursement Graph Page 7 of 8

Key Decisions Regarding Implementation The project continues to be rated Satisfactory and it is to close on June 3, 211, with ARIS processing the last procurement package for supply of special machinery for municipal utilities. At this stage, given the satisfactory performance of the project and its likely capacity to disburse all funds almost entirely by the closing date, the World Bank's management does not consider an extension justified. On the other hand, as no additional financing could be granted under the emergency response IDA 15 cycle, the World Bank is now considering the Client's request for a repeater project under IDA 16 cycle and a corresponding decision will be communicated to the Government in due course. Restructuring History There has been no restructuring to date. Related Projects P11546-Additional Financing for the Small Town Infrastructure & Capacity Building Project Page 8 of 8