CONTRACTOR S PROGRESS, STATUS AND MANAGEMENT REPORT

Similar documents
CONTRACTOR S PROGRESS, STATUS AND MANAGEMENT REPORT

Opportunities to Streamline DOD s Milestone Review Process

712CD. Phone: Fax: Comparison of combat casualty statistics among US Armed Forces during OEF/OIF

DOING BUSINESS WITH THE OFFICE OF NAVAL RESEARCH. Ms. Vera M. Carroll Acquisition Branch Head ONR BD 251

White Space and Other Emerging Issues. Conservation Conference 23 August 2004 Savannah, Georgia

Shadow 200 TUAV Schoolhouse Training

For the Period June 1, 2014 to June 30, 2014 Submitted: 15 July 2014


Mission Assurance Analysis Protocol (MAAP)

Panel 12 - Issues In Outsourcing Reuben S. Pitts III, NSWCDL

Office of the Assistant Secretary of Defense (Homeland Defense and Americas Security Affairs)

The Fully-Burdened Cost of Waste in Contingency Operations

Improving the Quality of Patient Care Utilizing Tracer Methodology

DON Mentor-Protégé Program

ASAP-X, Automated Safety Assessment Protocol - Explosives. Mark Peterson Department of Defense Explosives Safety Board

Information Technology

Software Intensive Acquisition Programs: Productivity and Policy

DoD Architecture Registry System (DARS) EA Conference 2012

Fleet Logistics Center, Puget Sound

Army Aviation and Missile Command (AMCOM) Corrosion Program Update. Steven F. Carr Corrosion Program Manager

Independent Auditor's Report on the Attestation of the Existence, Completeness, and Rights of the Department of the Navy's Aircraft

Evolutionary Acquisition an Spiral Development in Programs : Policy Issues for Congress

The Security Plan: Effectively Teaching How To Write One

Defense Health Care Issues and Data

Acquisition. Air Force Procurement of 60K Tunner Cargo Loader Contractor Logistics Support (D ) March 3, 2006

Afloat Electromagnetic Spectrum Operations Program (AESOP) Spectrum Management Challenges for the 21st Century

Cerberus Partnership with Industry. Distribution authorized to Public Release

Defense Acquisition: Use of Lead System Integrators (LSIs) Background, Oversight Issues, and Options for Congress

The Coalition Warfare Program (CWP) OUSD(AT&L)/International Cooperation

Wildland Fire Assistance

Joint Committee on Tactical Shelters Bi-Annual Meeting with Industry & Exhibition. November 3, 2009

Integrated Comprehensive Planning for Range Sustainability

DOD Native American Regional Consultations in the Southeastern United States. John Cordray NAVFAC, Southern Division Charleston, SC

DDESB Seminar Explosives Safety Training

terns Planning and E ik DeBolt ~nts Softwar~ RS) DMSMS Plan Buildt! August 2011 SYSPARS

Research to advance the Development of River Information Services (RIS) Technologies

DoD Scientific & Technical Information Program (STIP) 18 November Shari Pitts

Report Documentation Page

Operational Energy: ENERGY FOR THE WARFIGHTER

February 8, The Honorable Carl Levin Chairman The Honorable James Inhofe Ranking Member Committee on Armed Services United States Senate

Fiscal Year 2011 Department of Homeland Security Assistance to States and Localities

2011 USN-USMC SPECTRUM MANAGEMENT CONFERENCE COMPACFLT

Military to Civilian Conversion: Where Effectiveness Meets Efficiency

Drinking Water Operator Certification and Certificate to Operate Criteria/Requirements for US Navy Overseas Drinking Water Systems

Acquisition. Diamond Jewelry Procurement Practices at the Army and Air Force Exchange Service (D ) June 4, 2003

Make or Buy: Cost Impacts of Additive Manufacturing, 3D Laser Scanning Technology, and Collaborative Product Lifecycle Management on Ship Maintenance

United States Army Aviation Technology Center of Excellence (ATCoE) NASA/Army Systems and Software Engineering Forum

Financial Management

Electronic Attack/GPS EA Process

Marine Corps' Concept Based Requirement Process Is Broken

Munitions Response Site Prioritization Protocol (MRSPP) Online Training Overview. Environmental, Energy, and Sustainability Symposium Wednesday, 6 May

Office of Inspector General Department of Defense FY 2012 FY 2017 Strategic Plan

ALLEGED MISCONDUCT: GENERAL T. MICHAEL MOSELEY FORMER CHIEF OF STAFF, U.S. AIR FORCE

Occupational Survey Report AFSC 4A1X1 Medical Materiel

Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress

ASNE Combat Systems Symposium. Balancing Capability and Capacity

Contemporary Issues Paper EWS Submitted by K. D. Stevenson to

Report No. DODIG Department of Defense AUGUST 26, 2013

Preliminary Observations on DOD Estimates of Contract Termination Liability

Determining and Developing TCM-Live Future Training Requirements. COL Jeffrey Hill TCM-Live Fort Eustis, VA June 2010

Perspectives on the Analysis M&S Community

Veterans Affairs: Gray Area Retirees Issues and Related Legislation

Social Science Research on Sensitive Topics and the Exemptions. Caroline Miner

Support for FLIP/ORB. Fred H. Fisher. Final Report to the Office of Naval Research Contract N D-0142 (DO#26)

United States Joint Forces Command Comprehensive Approach Community of Interest

USMC Expeditionary Energy

Tim Haithcoat Deputy Director Center for Geospatial Intelligence Director Geographic Resources Center / MSDIS

Military Health System Conference. Putting it All Together: The DoD/VA Integrated Mental Health Strategy (IMHS)

Incomplete Contract Files for Southwest Asia Task Orders on the Warfighter Field Operations Customer Support Contract

SIMULATOR SYSTEMS GROUP

MILITARY MUNITIONS RULE (MR) and DoD EXPLOSIVES SAFETY BOARD (DDESB)

Small Business Innovation Research (SBIR) Program

The Air Force's Evolved Expendable Launch Vehicle Competitive Procurement

Concept Development & Experimentation. COM as Shooter Operational Planning using C2 for Confronting and Collaborating.

Defense Acquisition Review Journal

Aviation Logistics Officers: Combining Supply and Maintenance Responsibilities. Captain WA Elliott

Chief of Staff, United States Army, before the House Committee on Armed Services, Subcommittee on Readiness, 113th Cong., 2nd sess., April 10, 2014.

Engineering, Operations & Technology Phantom Works. Mark A. Rivera. Huntington Beach, CA Boeing Phantom Works, SD&A

Unclassified/FOUO RAMP. UNCLASSIFIED: Dist A. Approved for public release

Choose to Lose. Tammy Lindberg, Lt Col, USAF, BSC

Click to edit Master title style. How to Submit a Proposal to ONR Navy Gold Coast Small Business Procurement Event August 2012

United States Military Casualty Statistics: Operation Iraqi Freedom and Operation Enduring Freedom

Procedural Guidance for Conducting DoD Classified Conferences

US Coast Guard Corrosion Program Office

Program Management Office, Medical Support Systems

DoD Countermine and Improvised Explosive Device Defeat Systems Contracts for the Vehicle Optics Sensor System

Navy Ford (CVN-78) Class (CVN-21) Aircraft Carrier Program: Background and Issues for Congress

Integrity Assessment of E1-E3 Sailors at Naval Submarine School: FY2007 FY2011

The Need for NMCI. N Bukovac CG February 2009

NORMALIZATION OF EXPLOSIVES SAFETY REGULATIONS BETWEEN U.S. NAVY AND AUSTRALIAN DEFENCE FORCE

Conservation Law Enforcement Program Standardization

Report No. D May 14, Selected Controls for Information Assurance at the Defense Threat Reduction Agency

The Military Health System How Might It Be Reorganized?

Report No. D-2011-RAM-004 November 29, American Recovery and Reinvestment Act Projects--Georgia Army National Guard

Dynamic Training Environments of the Future

Environmental Trends Course Cultural Resources

Report No. D February 22, Internal Controls over FY 2007 Army Adjusting Journal Vouchers

World-Wide Satellite Systems Program

Nuclear Command, Control, and Communications: Update on DOD s Modernization

The Use of Sikes Act Cooperative Agreements for Implementing INRMP Projects

Transcription:

CONTRACTOR S PROGRESS, STATUS AND MANAGEMENT REPORT PRIME: CONTRACT: Gryphon Technologies, LC. 6811 Kenilworth Ave Suite 400 Riverdale, MD 20737 N00014-03-C-0195 DELIVERY ORDER: 0002 REPORT DATE: 15 May 2005 PERIOD OF PERFORMANCE: 1 January 2003 through 30 June 2005 REPORTING PERIOD: April 1, 2005 through April 29, 2005 TITLE: CDRL: SECURITY CLASSIFICATION: CONTRACTING ACTIVITY: REPORT PREPARER: ONR S&T A001 N/A Office of Naval Research ONR 253: Mark Chadwick 703 696-2599 chadwim@onr.navy.mil Ballston Tower One 800 North Quincy Street Arlington, VA 22217-5660 Lon Lawson Gryphon Technologies, L.C. (703) 696-2970

Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE 15 MAY 2005 2. REPORT TYPE N/A 3. DATES COVERED - 4. TITLE AND SUBTITLE Contractor s Progress, Status and Management Report 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Office of Naval Research Ballston Tower One 800 North Quincy Street Arlington, VA 22217-5660 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR S ACRONYM(S) 12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release, distribution unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT 15. SUBJECT TERMS 11. SPONSOR/MONITOR S REPORT NUMBER(S) 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT UU a. REPORT unclassified b. ABSTRACT unclassified c. THIS PAGE unclassified 18. NUMBER OF PAGES 7 19a. NAME OF RESPONSIBLE PERSON Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18

1. Work Accomplished: Financial Analyst: Performing as a Financial Analyst during the month of April 2005, the following actions were completed by Ray Bartholomew. The following bullets (highlighted in blue text) reflect new information that has not been previously reported on a reoccurring basis. The first three weeks of the month focused on responding to various members of the ONR staff concerning the Code 353 Budget Mid-Year execution in regards to Fiscal benchmarks, as well as numerous reprogramming efforts caused by the Fiscal guidance that Code 08 had previously provided in August This concern required daily review of execution expenditures and analysis with spend plans that had been developed. Developed several tailor-made reports for the Director, Deputy Director, and Program Officers to address concerns/projections they had about FY 2005 budget execution. These reports contained such info as: FY 2005 and Outstanding Commitments. Code 35 requested we review the Code 08 web site and determine which funding documents were delinquent in regards to becoming obligated. FY 2005 Uncommitted Status of Funds Big Dog List which identified performers that had been allocated large amount of funds and were not providing adequate documentation in the form of monthly reports/invoices. As a follow-up, I provided detailed award information in order to make the tracking of the monthly reports/invoices much easier for everyone. Assisted Program Managers with: information to expedite obligation of funds Updated expenditure information as access to INRIS was being removed while the building move was taking place. preparation of PR (Procurement Requests) Continued the preparation for the physical move to Liberty Square One scheduled for May 6 th. In conjunction with the move, I was also able to access the new ONR Metaframe network from an off-site location. All previous services, as well as a few new ones (printing from the off-site location), were tested and operated as expected. With the concurrence of the Deputy Director, invited the Code 353 Operations Section to attend the weekly financial review meeting. The purpose of the invite is to coordinate and promulgate known milestones for the remainder of the FY. With the ONR servers scheduled to be unavailable from April 28 to May 2 nd (which in effect, shutdown all network capabilities), I began working on 4 side projects. Update of the Financial Management Handbook Development of a Code 353 Program Officer s Handbook, to include an orientation class. Development of two flow charts on the mechanics of R-2 Budget Exhibits and Congressional Funds Processing. With the Mid-year review and ONR relocation, feedback is not expected until the May timeframe.

As the administrator for the Code 353 Manager s mailing list, I deleted and added records as people departed or joined. Coordinated responses to several tasker assignments by ONR staff members. Code 353 Deputy Director requesting PEN update information in regards to the DDR&E Weapons TARA input. Code 06 requesting that ALL files be removed from the G:Drive. In respect to this, I moved the remaining files to my F:Drive. The following has been previously reported on a reoccurring basis On a weekly basis, briefed the Code 353 Director and Deputy Director on ongoing projects/efforts concerning budget execution. Screened message traffic and ensured financial information was distributed to appropriate Managers. Accepted Invoices from the Managers, received Funding Documents from Code 08, and filed them to the electronic library. Researched and responded to internal and external inquiries about Code 353 s execution status by extracting information from INRIS, STARS, and DISCOVERER. Continued the primary mission of updates to the three financial management tools ( DASHBOARD, STORY, and SPEND PLANS ) for FY 2003, 2004 and 2005. Once promulgated by the Deputy Director, my primary mission should be the updating of FY 2004 and FY 2005 SPEND PLANS ONLY. Executive Assistant: Performing as an Executive Assistant during the month of April 2005, the following actions were completed by Ella Alexander. The following bullets (highlighted in blue text) reflect new information that has not been previously reported on a reoccurring basis. Worked on several Conferences: Directed Energy Weapons-Reston VA, DARPA Tech Symposium-Anaheim CA Developed Correspondence Manual Revised Updated Commandent GO DESK Handbook w/director s info Organized 353 Leadership Meeting/Executed Completed 4 vouchers for Director/Trips/Alex/Detroit/Tampa/Orlando Completed Director s Public Financial Disclosure Form Cancelled Voucher for Registration Fee Quantico Transferred Files to CD Room (prepare for move) Attended Liberty One Move meeting Oversee (Adan-transferring of Director s files)preparation for move Packing for Move(Liberty Center) Prepared Routing slip for 2 Briefs for Deputy Director Completed 3 orders for Directors trip (BGSOC&GWOP) Collaborated w/front Office regarding Directors travel-marybeth/captain Kamp Reviewed a Read A Head brief via Fed-X for Director s GWOP Conf Developed Folder for Director s Bio to use while on Travel

Followed-up and resolved request for Palm Pilot for Deputy Director via AO (not available) Worked together w/adan to post Director s Bio and picture updated on SES website Successfully recommended and executed key for Director s office/via to be closed and locked at all time Registered Director for three Conferences Graphic and WEB Developer. As a Graphics and WEB Developer Adan Perez accomplished the following actions during April 2005, identified as follows: On Going Tasks: Provided technical support in the field of Information Technology to Code 353 and its employee s needs as instructed. Training: Completed intermediate Microsoft Project training class. Completed Activities: (The following support was in the form of developing graphics, providing audio/visual aids, printing and arranging copies, and/or to technically supervise at the given event, making sure all computer presentations worked, microphones, and other technical tasks included in these duties) Provided creation and production of business tools for Code 353 (business cards, name tags, etc) Designed graphics for Code 35 employees to use in presentations. Supported Code 353 employees on PowerPoint briefs. Construct and revised Code 353 Organizational Charts. Updated Seabasing Newsletter links. Provide direct technical support to the Code 353 director. Constructed POA&M for ONR web revisions and updates. Updated HPT&E public site Update pictures and content on EUWP site Updated C4ISR site. Updated FNC website with most current Green Perspective. Revised ONR Code 353 brochure. Formed Department 30 Overview Brief. Composed NRL D&I Brief for Code 353. Updated Thrust Area Quad Charts. Created online repository for NRL documents on Hopper. Printed and mounted USMC posters and art work. Sourced information for ONR 353 display Edited and Composed 353 brochure. Supported Deputy Director on the C2 brief. Composed copies of the annual brief. Sourced FY04 briefs and listed on Hopper.

Supported Director on Achieving a Decision GOWP brief. Supported Code 353 and Department 30 with preparation for network outage. Future Activities: Continue daily dues and tasks. POA for 30 website. Continue work on FNC web revision. Project Engineer Logistics Thrust Area: In direct support of the Logistics Thrust Area Mr. Lawson accomplished the following tasks for the Expeditionary Unit Water Purification (EUWP) program: Finished working the changes to the EUWP WEB pages to include writing the text and integrating the pictures, etc Set up, developed posters, traveled to, and coordinated the EUWP Program member s participation at Senator Domenici and Congressman Pearce s news conference and welcoming of the EUWP GEN 1 Demonstrator to the Tularosa Basin National Desalination Research Facility, Alamogordo, NM on Saturday afternoon, April 2 nd. The following week, in addition to commencing our pre-move (to new building) clean-up, set-up and coordinated the shipping of the EUWP Conference Display Unit, with posters for the American Water Works Association Conference in Oklahoma City, OK for the 11 13 April by Drew Downing TARDEC. Commenced exercising mentorship activities suggested by the Director with select 353 Division personnel subject matter varied but the theme consistent with the Director s desire for establishing a wholesome and aggressive S&T/D&I environment. In coordination with the Deputy Director, set up and conducted a meeting of select ONR personnel with Chuck Mirabile, SPAWAR, San Diego and his team, about the C-CAP program on the 21 st. Engaged in prior activities and administration leading up to, and then attended the EUWP Science and Technology BAA IPT (final proposal selection) Workshop (2 days) 26 th and 27 th April. Subsequently, assisted to set up a separate one day Workshop to address selection of awardees for the Trace Materials (Topic 4) IPT Monday 2 May. Due to ONR s transfer of computer servers from the BCT 1 building to NRL many work a rounds had to be pursued in order to conduct any sort of business for over better than the last week of April challenging, but mission completed with Gryphon Team support.

Project Engineer HPT&E. As Project Engineer Charlene Mattson accomplished the following actions during April 2005, identified as follows: Conducted weekly meetings with Ray Bartholomew to verify the invoice expenditures with the STARS expenditures for ongoing HPT&E projects/efforts concerning budget execution Prepare weekly required reports in support of the HPT&E, including expenditure plans and spend plans Coordinated budgeting activities to include new contracts and contract modifications with PMTRASYS, Orlando FL. Report these budget activities to LCDR Dylan Schmorrow. Completed composing all updated FY05 project data to review and to assemble an updated version of the HPT&E website. Assisted in the preparation of the Kick off Fast C2AP meeting for Naples, Italy, 6 th Fleet. Attended weekly teleconference between NRL, DARPA, NAVSEA, PMTRASYS and ONR to discuss current and future VITRE technologies Assisted in the deployment of an integrated portfolio for Fast C2APS. This a website that helps project teams to collaborate, communicate and organize the government management, government partners and performers. Windows Share Point Services allows teams to create Web sites for information sharing and document collaboration, benefits that help increase individual and team productivity. Including such IT resources as portals, team workspaces, e-mail, presence awareness, and Web-based conferencing, Windows Share Point Services enables users to locate distributed information quickly and efficiently, as well as connect to and work with others more productively. Conducted the HPT&E move to Liberty One. All Code 34 and 353 documents were packed in either boxes or crates. These crates were labeled as well as all computer items, furniture and supporting items. 3. Any significant changes to the contractor s organization or method of operation to the project management network: N/A 4. Problem areas affecting technical or scheduling elements, with background and any recommendations for solutions beyond the scope of the contract:

None 5. Problem areas affecting cost elements, with background and any recommendations for solutions beyond the scope of the contract: None 6. Any trips and significant results: Person Point of Origin Destination Dates Mode of travel C. Mattson Virginia Cherry Hill, NJ 12-24 April POV L Lawson Washington DC Alamogordo, NM 31 Mar 3 April Air 7. Contract schedule status: N/A 8. Plans for activities during the following reporting period: Continued to participate in ONR s move to the new facility.