Implementation Status & Results Congo, Democratic Republic of Emergency Demobilization and Reintegration Project (P078658)

Similar documents
Implementation Status & Results OECS Countries Telecommunications & ICT Development Project (P088448)

Implementation Status & Results Rwanda Second Emergency Demobilization and Reintegration Project (P112712)

Implementation Status & Results Nigeria Lagos Urban Transport Project 2 (P112956)

Implementation Status & Results Kazakhstan Agricultural Competitiveness Project (P049721)

Implementation Status & Results Central African Republic Multisectoral HIV/AIDS Project (P073525)

Implementation Status & Results Brazil BR-Housing Sector TAL (P050761)

Implementation Status & Results Guinea Development of Inclusive Education in Guinea (P129210)

Implementation Status & Results Swaziland Swaziland Health, HIV/AIDS and TB Project (P110156)

Implementation Status & Results Indonesia ID SPADA in Aceh and Nias (P097605)

Implementation Status & Results Morocco Morocco Urban WS&S Access Pilots (P102527)

Implementation Status & Results West Bank and Gaza Gaza II Emergency Water Project (P065920)

Implementation Status & Results Jordan Jordan - Cultural Heritage, Tourism & Urban Development (P081823)

Implementation Status & Results Indonesia Support for Poor and Disadvantaged Areas Project (P078070)

Implementation Status & Results Dominican Republic DO APL1 Water and Sanitation in Tourist Areas (P054221)

The World Bank Research and Innovation in Science and Technology Project (P121842)

Implementation Status & Results Congo, Democratic Republic of Forest and Nature Conservation Project (P100620)

Implementation Status & Results Benin ebenin Project (P113370)

Public Disclosure Copy

Implementation Status & Results Morocco MA-Rural Roads II (P094007)

Implementation Status & Results Sri Lanka Sri Lanka - Second Health Sector Development Project (P118806)

Implementation Status & Results Congo, Democratic Republic of Forest and Nature Conservation Project (P100620)

Implementation Status & Results Dominican Republic DO APL1 Water and Sanitation in Tourist Areas (P054221)

The World Bank Swaziland Health, HIV/AIDS and TB Project (P110156)

The World Bank Kenya GPE Primary Education Development Project (P146797)

Public Disclosure Copy

Implementation Status & Results Indonesia Health Professional Education Quality Project (P113341)

The World Bank Sustainable Rural Sanitation Services Program for Results (P154112)

Implementation Status & Results Morocco MA-Rural Roads II (P094007)

The World Bank Swaziland Health, HIV/AIDS and TB Project (P110156)

Implementation Status & Results Tanzania Sustainable Management of Mineral Resources (P096302)

Implementation Status & Results Kyrgyz Republic Small Towns Infrastructure & Capacity Building Project (P083377)

Implementation Status & Results Indonesia Support for Poor and Disadvantaged Areas Project (P078070)

The World Bank Kenya GPE Primary Education Development Project (P146797)

Implementation Status & Results Dominican Republic Water and Sanitation in Tourist Areas (P054221)

Implementation Status & Results Cote d'ivoire RCI- Emergency Urban Infrastructure (FY08) (P110020)

Public Disclosure Copy. Implementation Status & Results Report CO APL1 La Guajira Water & Sanitation Infrast and Service Mngmt Proj (P096965)

OBA Urban Sanitation Facility for the Greater Accra Metropolitan Area (GAMA) (P145139)

Implementation Status & Results Montenegro Healthcare System Improvement Project (Montenegro) (P082223)

Implementation Status & Results Guinea National Rural Infrastructure Project (P065127)

Public Disclosure Copy. Implementation Status & Results Report Philippines: Extractive Industries Transparency Initiative Implementation (P128290)

Public Disclosure Copy. Implementation Status & Results Report Second Private Sector Competitiveness and Economic Diversification Prj (P144933)

Public Disclosure Copy. Implementation Status & Results Report Senegal: Extractive Industries Transparency Initiative Implementation (P131626)

Implementation Status & Results Brazil Ceara Regional Economic Development: Cidades do Ceara (P099369)

Public Disclosure Copy. Implementation Status & Results Report Global Partnership for Education Grant for Basic Education Project (P117662)

The World Bank JM Youth Employment in Digital and Animation Industries (P148013)

Implementation Status & Results Report MENA- Desert Ecosystems and Livelihoods Knowledge Sharing and Coordination Project (P130343)

The World Bank Health Professional Education Quality Project (P113341)

The World Bank Burkina Faso - Bagre Growth Pole Project (P119662)

Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

Public Disclosure Copy

Implementation Status & Results Guatemala GUATEMALA Maternal and Infant Health and Nutrition (P077756)

The World Bank Skills Strengthening for Industrial Value Enhancement Operation (P156867)

The World Bank Africa Higher Education Centers of Excellence Project (P126974)

Public Disclosure Copy

INDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU)

Public Disclosure Copy

The World Bank The Gambia - Growth & Competitiveness (P114240)

The World Bank JM Youth Employment in Digital and Animation Industries (P148013)

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

The World Bank Second Karnataka State Highway Improvement (P107649)

The World Bank Serbia Research, Innovation and Technology Transfer Project (P145231)

Public Disclosure Copy

The World Bank Social Accountability Knowledge, Skills, Action and Networking (P147835)

Public Disclosure Copy

The World Bank St. Petersburg Economic Development Project (P069063)

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

The World Bank Romania Secondary Education Project (P148585)

Transitional Demobilization and Reintegration Program QUARTERLY REPORT. July - September 2011

Public Disclosure Copy

Public Disclosure Copy

The World Bank Integrated Growth Poles and Corridor Project 2 (P113971)

The World Bank MDTF-Economic Revitalization of KP and FATA (P124268)

The World Bank Vietnam Climate Innovation Center (VCIC) RETF (P155260)

NATIONAL COMMUNITY EMPOWERMENT PROGRAM IN URBAN AREAS FOR APPROVED ON NOVEMBER 20, 2012 REPUBLIC OF INDONESIA

P4: PACIFIC REGIONAL ICT REGULATORY DEVELOPMENT PROJECT APPROVED ON JULY 30, 2014 UNIVERSITY OF THE SOUTH PACIFIC

DISBURSEMENT REQUEST. Namibia MCA Namibia 28-Jul-08 GR07NAM07001 MCA Namibia Emerging Markets Group Ltd. 11-Mar-09 1-Apr Jun USD

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE SINDH GLOBAL PARTNERSHIP FOR EDUCATION PROJECT

FOR OFFICIAL USE ONLY PROJECT PAPER ON A PROPOSED ADDITIONAL CREDIT IN THE AMOUNT OF SDR5.8 MILLION (US$8.97 MILLION EQUIVALENT) TO THE

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING MADAGASCAR SCALING RENEWABLE ENERGY PROGRAM (SREP) INVESTMENT PLAN (IP)

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF TF-52452) ON A MULTI-DONOR TRUST FUND GRANT IN THE AMOUNT N US$ 183.

The World Bank Gabon Investment Promotion & Competitiveness Project (P129267)

Financing Agreement. (Emergency Demobilization and Transitional Reintegration Project) between REPUBLIC OF BURUNDI. and

Corporate Services Employment Report: January Employment by Staff Group. Jan 2018 (Jan 2017 figure: 1,462) Overall 1,

4/1/2014-6/30/ /1/ /31/2013 1/1/2013-3/31/2013 4/1/2013-6/30/2013 7/1/2013-9/30/2013 1/1/2014-3/31/2014

OFFICIAL DOCUMENTS, Democratic Republic of Congo: IDF Grant for the Private Sector Development and Competitiveness Project IDF Grant No.

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-72830) ON A LOAN IN THE AMOUNT OF EURO 35.0 MILLION (US$ MILLION EQUIVALENT) TO THE

ADB GRANT No PNG (JFPR) EXTENDING THE SOCIOECONOMIC BENEFITS of AN IMPROVED ROAD NETWORK to ROADSIDE COMMUNITIES.

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE MULTI DONOR TRUST FUND FO THE INSTITUTIONAL REFORM AND CAPACITY BUILDING PROJECT TO THE

Egypt National Railways Restructuring Project (ENRRP) Procurement Plan Updated on April 21, 2014

Enlisted Professional Military Education FY 18 Academic Calendar. Table of Contents COLLEGE OF DISTANCE EDUCATION AND TRAINING (CDET):

CHC-A Continuity Dashboard. All Sites Continuity - Asthma. 2nd Qtr-03. 2nd Qtr-04. 2nd Qtr-06. 4th Qtr-03. 4th Qtr-06. 3rd Qtr-04.

Letter No: JA-204/JSDF/IV/2010 April 29, 2010

JANUARY 2018 (21 work days) FEBRUARY 2018 (19 work days)

REPORT 2015/005 INTERNAL AUDIT DIVISION

AFGHANISTAN Afghanistan Reconstruction Trust Fund (Ref: TF050576)

GHA/WATTFP/G01/ , NCB Post Prior Plan 22 Feb Mar Jun 2010 Actual 30 Jun Aug 2010

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF RURAL HEALTH PROJECT LOAN 7551-CN. June 24, 2008 TO THE PEOPLE S REPUBLIC OF CHINA

Analysis of Incurred Claims Trend and Provider Payments

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IDA Aug ,000,000.00

Transcription:

Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Congo, Democratic Republic of Emergency Demobilization and Reintegration Project (P078658) Operation Name: Emergency Demobilization and Reintegration Project (P078658) Project Stage: Implementation Seq.No: 19 Status: ARCHIVED Archive Date: Country: Congo, Democratic Republic of Approval FY: 2004 Product Line: IBRD/IDA Region: AFRICA Lending Instrument: Emergency Recovery Loan Implementing Agency(ies): Unite d'execution du Programme National de Desarmement, Demobilisation et de Reinsertion Key Dates Board Approval Date 25-May-2004 Original Closing Date 31-Mar-2008 Planned Mid Term Review Date 31-Oct-2009 Last Archived ISR Date 15-Apr-2011 Effectiveness Date 09-Nov-2004 Revised Closing Date 30-Sep-2011 Actual Mid Term Review Date 31-Dec-2009 Project Development Objectives Emergency Demobilization and Reintegration Project (P078658) Project Development Objective (from Project Appraisal Document) The objectives of the project are to: (i) demobilize an estimated 150,000 ex-combatants and support their transition to civilian life; and (ii) contribute to the reallocation of Government expenditure from defense to social and economic sectors. Has the Project Development Objective been changed since Board Approval of the Program? Yes No losure Authorized Public Disclosure Authorized Component(s) Component Name Component Cost DEMOBILIZATION 87.00 TRANSITION/REINSERTION 52.30 SPECIAL GROUPS 12.30 REINTEGRATION 39.60 PROGRAM MANAGEMENT 59.10 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Implementation Status Overview Page 1 of 6

After project restructuring in July 2010, a period of four months was required to re contract the existing partners and launch procurement of sub-project inputs. Implementation resumed by the five implementing partners in December 2010 providing livelihood support to ex-combatants through collective associations. This last phase has focused on providing technical and in-kind support to over 1,000 community and ex-combatant associations undertaking farm and non-farm activities. In this way, some 30,000 ex-combatants have been receiving additional reintegration support with a view to sustaining the results of the project. In turn, the extension period has been used for an increase in technical support and supervision missions with a focus on the implementation of a comprehensive Monitoring and Evaluation Plan (one of the key weaknesses identified at the restructuring stage). Beneficiary tracer surveys were started at the end of March by the national statistical institute (INS) and were concluded in July 2011. Those surveys have been used to underpin a series of qualitative and quantitative analysis of various aspects of the program including the following: status of adults, status of children and women, status of children turned to adults during the program and the few handicapped. It has also fed into the final evaluation of the project undertaken by the Government project implementation team. The project has a 98% disbursement rate. The Government is seeking a longer than usual grace period for completion (six months) due to the complexity of the project and the number of partners who will be audited. Locations No Location data has been entered Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Ex-combatants demobilized Number Value 0.00 140000.00 150000.00 Ratio between social sector expenditures and defense expenditures increases Intermediate Results Indicators Date 04-Nov-2004 10-Mar-2011 30-Sep-2011 This remains estimated as final numbers need to be confirmed. This is an estimated target Percentage Value 23.00 235.00 250.00 Date 24-Nov-2004 10-Mar-2011 30-Sep-2011 Data on defense expenditures continues to be unreliable and figures from Government are not confirmed by IMF A full report is being undertaken. Page 2 of 6

Indicator Name Core Unit of Measure Baseline Current End Target Percentage of demobilized ex-combatants Text Value 60% of demobilised ex 64,7% 60% engaged in productive economic activity or schooling one year after demobilization Date combatants (adults) 04-Nov-2004 16-Sep-2011 30-Sep-2012 This is a current project estimate. Children provided with reintegration support Percentage Value 0.00 95.20 80.00 Demobilized ex combatants engaged in reintegation activities three months after demobilization Disabled ex combatants are provided with additional assistance Ex combatants demobilized within three months of effectiveness of additional financing Ex combatants receive 100% of their TSA within four months of demobilization Date 24-Sep-2009 30-Jun-2011 30-Sep-2011 additional financing indicator refers to those released during final phase and not overall number some 8000 children have received reintegration assistance to date. Percentage Value 0.00 0.00 60.00 Date 24-Sep-2008 27-Jul-2009 30-Jun-2010 The demobilization operation was closed in the last quarter of 2009 and the cumulated number of the relaunch of the program remained, i.e. 6014 in September 2011. Yes/No Value Yes Date 24-Sep-2008 31-May-2011 30-Jun-2010 407 receive assistance todate Number Value 0.00 0.00 10000.00 Date 24-Sep-2008 16-Sep-2011 23-Dec-2008 Demobilization did not start until May 2009 Number Value 0.00 5868.00 23000.00 A comprehensive survey is being undertaken for project closure A study on children is being finalized. demobilization did not start until May 2009. Date 24-Sep-2008 16-Sep-2011 30-Sep-2011 additional financing indicator Unchanged from the first quarter of 2011 since D operation has been closed at the last quarter of 2009. Page 3 of 6

Indicator Name Core Unit of Measure Baseline Current End Target Orphaned and vulnerable children aged 0-17 Number Value 0.00 33035.00 28000.00 whose households received free basic external support in caring for the child Date 04-Nov-2004 10-Mar-2011 30-Sep-2011 vulnerable children refer to children released from the fighting forces vulnerable children refer to children released from the fighting forces vulnerable children refer to children released from the fighting forces Error in reinsertion payments Percentage Value 0.00 0.60 5.00 Reinsertion payments made upon discharge from orientation centers Date 30-Jun-2005 16-Sep-2011 30-Sep-2011 Final reconciliation audit. Number Value 0.00 1031800.00 101000.00 Date 04-Nov-2004 16-Sep-2011 30-Sep-2011 first phase only First and second phase. Orientation centers established according to Joint operations plan Yes/No Value Yes Date 04-Nov-2004 27-Jul-2009 31-Dec-2006 Unchanged. 20 centers established and all closed according to plan by December 2006. close of all centers Managment Information System in place Yes/No Value Yes Date 04-Nov-2004 27-Jul-2009 30-Jun-2010 within three months of Unchanged as of 2004. effectiveness Ex combatants demobilized by end of first year Number Value 0.00 40574.00 30000.00 Ex Combatants demobilized within three months of effectiveness of additional financing Ex Combatants engaged in productive economic activity one year after demobilization Date 04-Nov-2004 20053112 31-Dec-2005 As of December 2005 as project was launched in 2004. Number Value 0.00 0.00 10000.00 Date 24-Sep-2008 27-Jul-2009 24-Dec-2008 Demobilization due to insecurity did not start until May 2009 Percentage Value 0.00 88640.00 60.00 Date 04-Nov-2004 16-Sep-2011 20-May-2008 Page 4 of 6

Persons aged 15 and older who received counseling and testing for HIV and received their test result Data on Financial Performance (as of 27-Sep-2011) Financial Agreement(s) Key Dates includes those demobilized under phase one and two Number Value 0.00 6560.00 0.00 Date 04-Nov-2004 27-Jul-2009 31-Dec-2006 service ended when orientation centers closed in 2006 one year from last demobilization under phase one no target number defined as this was voluntary service Project Loan No. Status Approval Date Signing Date Effectiveness Date Closing Date P078658 IDA-H0890 Closed 25-May-2004 10-Jun-2004 09-Nov-2004 30-Sep-2008 P078658 IDA-H3620 Closed 22-Apr-2008 26-May-2008 23-Sep-2008 30-Sep-2011 P085984 TF-52747 Closed 30-Oct-2003 30-Oct-2003 30-Oct-2003 31-Dec-2006 P085984 TF-52748 Closed 09-Dec-2003 09-Dec-2003 15-Dec-2003 30-Sep-2008 P085984 TF-52749 Closed 30-Oct-2003 30-Oct-2003 31-Dec-2006 P086214 TF-52897 Closed 14-Nov-2003 14-Nov-2003 14-Nov-2003 31-Dec-2006 P078658 TF-54242 Closed 26-Oct-2004 26-Oct-2004 09-Nov-2004 31-Mar-2008 Disbursements (in Millions) Project Loan No. Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P078658 IDA-H0890 Closed USD 100.00 96.74 3.26 96.21 0.00 99.00 P078658 IDA-H3620 Closed USD 50.00 50.00 0.00 45.26 3.23 91.00 P085984 TF-52747 Closed USD 4.23 4.23 0.00 4.23 0.00 100.00 P085984 TF-52748 Closed USD 2.12 2.12 0.00 2.12 0.00 100.00 P085984 TF-52749 Closed USD 2.81 2.50 0.31 2.50 0.00 100.00 P086214 TF-52897 Closed USD 12.62 8.12 4.50 8.12 0.00 100.00 P078658 TF-54242 Closed USD 100.00 90.55 9.45 90.55 0.00 100.00 Disbursement Graph Page 5 of 6

Key Decisions Regarding Implementation Agreement on the monitoring and evaluation plan, March 2011 Aide Memoire Restructuring History Board Approved on 26-May-2008, Level two Approved on 17-May-2010 Related Projects P085984-Demobilization and Reintegration of Child Soldiers in Orientale, N. Katanga, Maniema, P086214-Rapid Reaction Mechanism in support of the Demobilization and Reintegration of Ex-combattants in the DRC, P105729-DRC: Emergency Demobilization & Reintegration - Additional Financing Page 6 of 6