UNCLASSIFIED R-1 ITEM NOMENCLATURE

Similar documents
UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Multi-Platform Electronics

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Counter Narcotics Technology Program Office

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #44

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Advanced Medium Range Air-to-Air Missile (AMRAAM) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 8 R-1 Line #77

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing EF4: Integrated Broadcast System

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #123

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #47

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 R-1 Line #208

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: National Security Space Office

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY Quantity of RDT&E Articles

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: JOINT PERSONNEL RECOVERY AGENCY (JPRA) FY 2011 OCO Estimate. FY 2011 Total Estimate

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: JOINT PERSONNEL RECOVERY AGENCY (JPRA)

UNCLASSIFIED. Cost To Complete Total Program Element S750: Mission Training and Preparation Systems FY 2015

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #169

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Joint Air-to-Surface Standoff Missile (JASSM) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: C2ISR Tactical Data Link FY 2012 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #146

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : OC-135 Open Skies Sensors

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. Cost To Complete Total Program Element : Hard Target Void Sensing Fuze.

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 6 R-1 Line #231

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE T: Overseas Humanitarian Assistance Shared Information System (OHASIS)

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: NUCLEAR WEAPON MODERNIZATION FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Exhibit R-2, RDT&E Budget Item Justification February 2007

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. Cost To Complete Total Program Element 1, , : Evolved Expendable Launch Vehicle

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Spacelift Range System

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. Cost To Complete Total Program Element JA6: Joint Air-To-Ground Missile (JAGM)

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #89

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #211

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #118

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Multi-Service Systems Engineering FY 2012 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #91

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: Project MDAP/MAIS Code(s): N42

UNCLASSIFIED. Cost To Complete Total Program Element : R/SAOC MODERNIZATION. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 8 R-1 Line #163

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Other Missile Product Improvement Programs. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. Cost To Complete Total Program Element : TECH SURVEIL COUNTER MEAS EQPT. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Biometrics Enabled Intelligence FY 2012 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #91

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 Program Element (Number/Name) PE BB / SOF Visual Augmentation, Lasers and Sensor Systems. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Space & Missile Test & Evaluation Center FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 8 R-1 Line #124

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

KC-46A Tanker DoD Budget FY2013-FY2017. RDT&E U.S. Air Force

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Joint Strike Fighter Squadrons

UNCLASSIFIED FY Quantity of RDT&E Articles

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #94

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Evolved Expendable Launch Vehicle Program (SPACE) - EMD

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #213

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Air Traffic Control/Approach/Landing System (ATCALS) FY 2013 OCO

Transcription:

COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 12.496 13.253 13.683-13.683 14.037 14.565 15.011 15.378 Continuing Continuing 674595: F-16 HARM Targeting System 12.496 13.253 13.683-13.683 14.037 14.565 15.011 15.378 Continuing Continuing Quantity of RDT&E Articles 0 0 0 0 0 0 0 0 0 A. Mission Description and Budget Item Justification The Manned Destructive Suppression (MDS) program element funds the development, procurement, and sustainment of the Air Force's Suppression of Enemy Air Defenses (SEAD) and Destruction of Enemy Air Defenses (DEAD) capabilities. The F-16 HARM Targeting System (HTS) is currently the only programmed reactive SEAD capability and enables targeting the HARM missile in its most lethal 'range known' mode. The program provides F-16 Block 50/52 and Block 40/42 aircraft with the ability to employ the AN/ASQ-213 Pod. With the introduction of HTS Revision 7 (HTS R7) in 2007, the AN/ASQ-213 Pod now has a precision geo-location capability to target Precision Guided Munitions (PGMs) to destroy fixed and mobile enemy air defense elements. Additionally, by relocating the AN/ASQ-213 HTS R7 Pod to the aircraft's left inlet hard point, the F-16 can simultaneously carry the HTS R7 Pod and an Advanced Targeting Pod (ATP). HTS R7 fielding is complete and represents the Air Force's near-term solution for reactive time critical targeting for DEAD until this mission can be transferred to F-35 or a yet to be defined system. HTS R7 derived precision targeting data can be provided to all Joint Forces via Link-16. This effort continues preplanned product improvements (P3I) for the HTS and applies technologies similar to those demonstrated in the Advanced Tactical Targeting Technologies (AT3) program and HTS R7 development. This program is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year. B. Program Change Summary ($ in Millions) FY 2011 FY 2012 Base OCO Total Previous President's Budget 12.937 13.253 13.803-13.803 Current President's Budget 12.496 13.253 13.683-13.683 Total Adjustments -0.441 - -0.120 - -0.120 Congressional General Reductions - - Congressional Directed Reductions - - Congressional Rescissions - - Congressional Adds - - Congressional Directed Transfers - - Reprogrammings - - SBIR/STTR Transfer -0.375 - Other Adjustments -0.066 - -0.120 - -0.120 Air Force Page 1 of 6 R-1 Line #132

Change Summary Explanation No Significant Changes C. Accomplishments/Planned Programs ($ in Millions) FY 2011 FY 2012 Title: P3I R7 Software Upgrade (SWUP) Description: P3I R7 Software Upgrade (SWUP) 10.198 9.490 10.895 FY 2011 Accomplishments: HTS R7.7 SWUP flight testing support and additional software releases for flight testing continued. Studies continued on risk reduction efforts for future P3I phase(s). HTS R7.7 SWUP flight testing continued to include completing all data baseline activities, initial formal developmental flight testing and all associated data analysis, and release of upgraded software for subsequent flight testing. Studies included candidate selection process activities and risk reduction efforts for follow-on upgrades. Mission support, i.e., program management for administrative and technical support activities continued. The major thrusts of this year were preparation and support of continued flight testing activities and risk reduction candidate selection activities for the follow-on P3I effort. This P3I R7 study effort for future phase(s) was a continuation of the HTS P3I effort. FY 2012 Plans: HTS R7.7 SWUP flight testing support and additional software releases for flight testing continues, culminating in the release of R7.7 SWUP software. Studies continue on risk reduction efforts for future P3I phase(s). HTS R7.7 SWUP formal developmental flight testing and all associated data analysis and release of upgraded software will be completed. Risk reduction activities and candidate selection study efforts for follow-on upgrades continue. Also, final steps will be completed to potentially award the R7.8 SWUP development. The major pushes of this year will be releasing R7.7 SWUP software to the field, continued risk reduction candidate selection activities for follow-on P3I efforts, and planned award of the R7.8 SWUP development. Plans: HTS R7.8 SWUP development continues from risk reduction and program definition to software development and preparation for flight testing. Studies continue on risk reduction efforts for future P3I phase(s). Mission support, i.e., program management for administrative and technical support activities continue. The major thrusts of this year are R7.8 SWUP design and code activities and planning for subsequent flight testing. Title: Flight Test Description: Flight Test 1.838 2.969 1.900 FY 2011 Accomplishments: Government flight test operations continued to include test planning and execution activities for HTS R7.7 SWUP CT&E and DT&E efforts, scheduling support for all needed resources and required configurations for each flight test mission. Ground testing Air Force Page 2 of 6 R-1 Line #132

C. Accomplishments/Planned Programs ($ in Millions) FY 2011 FY 2012 continued via anechoic chamber testing, as needed. The test organization continued to conduct each mission to include F-16 test aircraft operations, threat ranges and associated support, air re-fueling, and range control support. Post-mission flight test support for each mission also continued. Initial flight test planning for HTS R7.8 SWUP began. FY 2012 Plans: Government flight test operations continue to include test planning and execution activities for final HTS R7.7 SWUP DT&E efforts, scheduling support for all needed resources and required configurations for each flight test mission. Ground testing continues via anechoic chamber testing, as needed. The test organization continues to conduct each mission to include F-16 test aircraft operations, threat ranges and associated support, air re-fueling, and range control support. Post-mission flight test support for each mission also continues. Initial test planning for HTS R7.8 SWUP continues. Plans: Government flight test operations continue to include test planning, and risk mitigation plans to address scarcity of resources; i.e., aircraft and ranges. This funding also includes test data analysis support and baselining of requirements from actual test data results during HTS SWUP R7.7 flight tests. Title: Mission Planning Description: Joint Mission Planning System (JMPS) (Formerly Air Force Mission Support System (AFMSS)) FY 2011 Accomplishments: Continued mission planning software upgrade effort to include correcting deficiencies, additional engineering software releases and preparations for formal fielding with HTS R7.7 SWUP. FY 2012 Plans: Continue mission planning software upgrade effort to include correcting deficiencies, additional engineering software releases and formal fielding in conjunction with HTS R7.7 SWUP software release. Plans: Continue mission planning in conjunction with HTS R7.8 software upgrade. This effort will begin planning this year to address deficiencies, additional engineering software releases and forward fielding. 0.460 0.794 0.888 Accomplishments/Planned Programs Subtotals 12.496 13.253 13.683 Air Force Page 3 of 6 R-1 Line #132

D. Other Program Funding Summary ($ in Millions) Line Item FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost No other investment funding: N/A 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Continuing Continuing E. Acquisition Strategy The HTS R7 improvement strategy includes accomplishment of risk reduction studies and selection of appropriate contracting strategies for P3I and upgrade of HTS inventory. F. Performance Metrics Please refer to the Performance Base Budget Overview Book for information on how Air Force resources are applied and how those resources are contributing to Air Force performance goals and most importantly, how they contribute to our mission. Air Force Page 4 of 6 R-1 Line #132

Exhibit R-4, RDT&E Schedule Profile: PB 2013 Air Force DATE: February 2012 PE 0207136F: Manned Destructive Suppression PROJECT 674595: F-16 HARM Targeting System Air Force Page 5 of 6 R-1 Line #132

Exhibit R-4A, RDT&E Schedule Details: PB 2013 Air Force DATE: February 2012 PE 0207136F: Manned Destructive Suppression Schedule Details PROJECT 674595: F-16 HARM Targeting System Start End Events Quarter Year Quarter Year R7.7 SWUP Flight Test (DT&E) 1 2011 2 2012 HTS P3I Risk Reduction for Next Phase Contract 3 2011 3 2013 R7.8 SWUP Contract 3 2013 2 2016 R7.8SWUP Flight test (CT&E/DT&E) 3 2014 4 2015 Air Force Page 6 of 6 R-1 Line #132