Expedited Bridge Replacement Program

Similar documents
US Army Corps of Engineers Periodic Inspection Report 9 Update. Dallas City Council June 3, 2009

KYOVA Interstate Planning Commission

RESOLUTION OF THE BOARD OF DIRECTORS OF THE OHIO KENTUCKY INDIANA REGIONAL COUNCIL OF GOVERNMENTS

Ohio Department of Transportation. Transportation Funding for LPAs

LPA Programs How They Work

Texas Department of Transportation Corpus Christi District

Five-Year County Highway and Bridge Improvement Plan Guide

In-Step, In Line, On Time. Robert F. Tally Jr. FHWA Indiana Division Administrator Monday, November 16, 2009

HIGH COUNTRY RURAL PLANNING ORGANIZATION (RPO) 2015 STIP PROJECT SOLICITATION AND RANKING PROCESS

QUALIFICATIONS BASED SELECTION FOR PROFESSIONAL SERVICES GUIDELINES FOR QUALIFICATION STATEMENTS INDEPENDENCE, OHIO JANUARY 2014 PREPARED BY:

Appendix B Review Matrix Text & Table Footnotes

2015 Five-Year County Highway and Bridge Improvement Plan Guide

2013 Louisiana Transportation Conference

CITY OF SPOKANE VALLEY Request for Council Action

Georgia DOT Local Maintenance Improvement Grant Program. Todd Long, P.E., Deputy Commissioner

I-95 Southbound Collector-Distributor (CD) Lanes - Rappahannock River Crossing From Exit 130 (Route 3) To Exit 133 (Route 17)

Local Evaluation of Requests for Letters of Map Change Year Seven

BRF-009-9(73) IA 9 Black Hawk Bridge

NAPA COUNTY BOARD OF SUPERVISORS Board Agenda Letter

VERMONT AGENCY OF TRANSPORTATION. FY2018 Budget. Joe Flynn, Secretary of Transportation House Appropriations Committee February 27, 2017

STATE HIGHWAY (SH) 34 FEASIBILITY STUDY PUBLIC MEETING

Preliminary Review and. Reference Guide Sections 4.2 and 4.3

Bridging the Gap: Transition into Practice for the New Nurse

Request for Qualifications For

Memorandum. Trinity River Corridor Project Committee Members: David A. Neumann (Chairman) Vonciel Jones Hill Steve Salazar (Vice-Chair) Delia Jasso

Appendix E Federal and State Funding Categories

Genoa Township Area Road and Bridge Projects

Workshop on Context-Sensitive Solutions. John Deatrick, Chair, AASHTO Task Force on CSS Subcommittee on Design Annual Meeting June 12, 2007

L e t t e r o f I n t e r e s t : S t r u c t u r e s D e s i g n ( B r i d g e ) - S t a t e w i d e

Federal, State, Local Funding and Assistance Programs. Nicole Fox, Iowa DOT Office of Local Systems

Route 58 PPTA Project Finance Plan Annual Update Hillsville to Stuart Corridor. Submitted By:

JOINT PROCESS REVIEW OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION S LOCAL GOVERNMENT ADMINISTERED FEDERAL-AID PROGRAM

BOWLING GREEN - WARREN COUNTY METROPOLITAN PLANNING ORGANIZATION

Appendix F Public Meeting Summaries. F1: May 2013 Public Meeting Summary F2: September 2013 Public Meeting Summary

EMERGENCY OPERATIONS DISASTER RECOVERY

INDIAN RIVER COUNTY METROPOLITAN PLANNING ORGANIZATION

Federal-Aid LPA Design Process Overview. MoDOT St. Louis District Local Programs

State Project No. XXXXXX City Project No. c401807

Better Cultural, Arts and Recreational Amenities. Trinity Watershed Management

Memo. Office of State Aid Metro District 1500 West County Rd B2 Roseville, MN Date: April 24, METRO DISTRICT COUNTIES and CITIES

Smart Portal State of Good Repair Pavement and Bridge. November 8, 2017

RESOLUTION NO. WHEREAS, the City of Cheyenne desires to participate in the Business Ready Community, Community Readiness Grants Program; and

CONTENTS HIGHWAY BRIDGE REPLACEMENT AND REHABILITATION PROGRAM (HBRRP) 6.1 INTRODUCTION

THE CORRADINO GROUP. DRIC EPE/EIS Project; Job No TCG Project No Invoice No. 51 Progress Report. April 3, 2009

Update on Federal Rail Grants to NCDOT

ACTION TRANSMITTAL No

Plan Quality and Review

Highway Safety Program Update

Tribal Transportation Program Delivery Guide

TABLE OF CONTENTS EXECUTIVE SUMMARY

Innovative Project Finance

Central Florida Expressway Authority Multimodal Investment Assessment Status Report and Update

THE CORRADINO GROUP. RE: DRIC EPE/EIS Project; Job N TCG Project No Invoice No. 10 Progress Report.

BOWLING GREEN - WARREN COUNTY METROPOLITAN PLANNING ORGANIZATION

Transportation Improvement Program for Lake, Porter, and LaPorte Counties, Indiana for

New Draft Section 408 Policy Document EC

STIP. Van Argabright November 9, 2017

MiTIP APPLICATION PACKET

REQUEST FOR QUOTATIONS

2015 Statewide Bridge Sufficiency Rating Report - Condensed

SCOTT COUNTY COMMUNITY SERVICES DIVISION

Amendment 3 of Horizon 2030 Metropolitan Transportation Plan Amendment 3 of FY 2011 FY 2015 Transportation Improvement Program.

CFLHD Organizational and Program Overview FEDERAL LAND ACCESS PROGRAM (FLAP) 55 th ACE Annual Conference

Quality Management Guideline July, 2017

ftp://ftp.dot.state.oh.us/pub/districts/d06/download/january%202018%20programmatic/del /

1.0 EXECUTIVE SUMMARY

NCAT Pavement Test Track

UPDATE OF THE SIGNAL TIMING MANUAL

Indiana LTAP. Local Government Asset Management and Pavement Preservation

Understanding the. Program

Urban Stuff Breakout Session # 3. September 19, 2018 Moderator Michael Fulcher Program Manager, VDOT Staunton District

HIGH COUNTRY RURAL PLANNING ORGANIZATION (RPO) 2014 STIP PROJECT SOLICITATION AND RANKING PROCESS

ANNUAL REPORT. Pursuant to: Chapters 36 and 152 of the 2011 Acts of Assembly of the Virginia General Assembly

Megan P. Hall, P.E. Local Programs Engineer. Federal Highway Administration Washington Division. March 14, 2017

FHWA Initiatives. Mary Stringfellow Program Delivery Team Leader FHWA Louisiana Division PH

Welcome to Webinar on Accelerated Bridge Construction

2011 ASFPM. Flood Risk Management: The Winning Ticket. Call For Presenters. May 15 20, 2011 Louisville, KY

Brownfields Conference Oklahoma City, OK May 22, What is FHWA?

REQUEST FOR PROPOSAL

Proposal for the Tulare/Kern Funding Area

Big Sky Regional Peer Exchange on Federal-aid Highway Program Financial Management

REQUEST FOR QUALIFICATIONS FOR PROFESSIONAL SERVICES

Nevada Department of Transportation Traffic Operations Policy Memorandum Traffic Signal Warrant Approval Process

PENNSYLVANIA TURNPIKE COMMISSION. Reference No. E-056

FEDERAL LANDS ACCESS PROGRAM

TRANSPORTATION POLICY COMMITTEE 1:00 p.m., Thursday, January 24, 2008 KIPDA Conference Room AGENDA

Guidance for Locally Administered Projects. Funded Through the NJDOT/MPO Program Funds Exchange. August 27, Revised September 15, 2014

SCOPE OF SERVICES FOR CONSULTING ENGINEERING SERVICES PROJECT DEVELOPMENT AND ENVIRONMENT STUDY AND DESIGN

Public Notice No. PUBLIC NOTICE ANNOUNCING REGIONAL CONDITIONS AND WATER QUALITY CERTIFICATION FOR NATIONWIDE PERMITS

Virginia Beach. of One of America s. An Exciting Opportunity to Shape the Infrastructure. Most Amazing Big Cities!

CITY OF SPOKANE VALLEY Request for Council Action

Updated Hurricane Harvey s Fiscal Impact on State Agencies PRESENTED TO SENATE FINANCE COMMITTEE LEGISLATIVE BUDGET BOARD STAFF

VALUE ENGINEERING PROGRAM

MULTI-STAKEHOLDER APPROACH TO VALUE-BASED HEALTHCARE

Click to edit Master title style

Mark A. Doctor, PE CAREER PATH

Subject: Request for Proposal Route 99 Interchanges at Hammett Road and Kiernan Avenue

Historic Bridge Rehabilitation and Approaches to Programmatic Agreements

Special State Funding Programs Breakout Session #5C Funding Programs Track. October 25, 2012

FHWA SAFETY UPDATE. Michael Griffith Director, Office of Safety Technologies

Transcription:

Expedited Bridge Replacement Program Proposed program for select BRX BRO & BRZ KYTC & FHWA Kevin F. Damron, P.E. Executive Director for Office of Project Development Kentucky Transportation Cabinet kevin.damron@ky.gov

EBRP Is Not For This Project! The Louisville - Southern Indiana Ohio River Bridges Project

EBRP Is Not This Project!

EBRP Is Not Even For This Project! Eggner s Ferry Bridge Over Kentucky Lake

EBRP Is For This Project! CR 1096 in Muhlenberg County (2-1087)

EBRP Is For This Project! KY 2124 in Hancock County (2-1082)

Expedited Bridge Replacement Program Nationally: 605,000 Bridges 11% Structurally Deficient Kentucky: 14,000 Bridges WHY EBRP? 9% Structurally Deficient State City County Total (14,000) 8,976 181 4,820 Structurally Deficient 588 15 580 Functionally Obsolete 3,243 247 1,489

WHY EBRP? 192 Bridge Projects in the 2010 Highway Plan 31 Projects Let and Awarded for Construction 57 Projects R/W Authorized & Letting Scheduled 104 Projects Only in Design Stage 259 Bridge Projects in the 2012 Highway Plan 112 New Bridge Projects 147 Bridge Projects from 2010 Highway Plan Project Development is not Keeping Up!

Project Development Process Same for All+ Projects (reviews, submittals, approvals, etc.) Large or Small Complex or Not Major or Minor Impacts

Expedited Bridge Replacement Program SIMPLER PROCESS FOR SIMPLER PROJECTS Typical Bridge Replacement Costs Roadway Design 47% $117,500 Bridge Plans 13% $32,500 Geotechnical 13% $32,500 Environmental 10% $25,000 Survey 9% $22,500 Drainage 5% $12,500 Miscellaneous 3% $7,500 Total Design Cost $250,000

Expedited Bridge Replacement Program SIMPLER PROCESS FOR SIMPLER PROJECTS Expedited Bridge Replacement Study EBRP Projects Qualified by Planning (DNA)Document Apply Betterment Standards / Practical Design Completes Preliminary Engineering & Hydraulics Completes Environmental Approval (CE Level 1) Eligible for Final Design, R/W, Utilities Funding Opportunities to Group Projects for Design & Const Simpler Project Requires Less R/W & Utilities Delivers Project to Letting in the Biennium (2 years)

2012 Highway Plan Evaluation 259 Bridge Replacement Projects 2012 Highway Plan included 112 New Bridge Projects

91 Bridge Replacement Projects ADT < 1500 Vehicles Local & Collector Highways 2012 Highway Plan included 112 New Bridge Projects

60 Bridge Replacement Projects At Current Location or Adjacent to Existing 2012 Highway Plan included 112 New Bridge Projects

54 Bridge Replacement Projects Minimal or No FEMA Floodway Concerns 2012 Highway Plan included 112 New Bridge Projects

48 Bridge Replacement Projects Eligible for EBRP CE Level 1 Approval 2012 Highway Plan included 112 New Bridge Projects

2012 Highway Plan Conclusion Expedited Bridge Replacement Program 48 Bridge Projects 2012 Highway Plan included 112 New Bridge Projects

Bridges in the 2014 Highway Plan 192 Bridge Projects in the 2010 Highway Plan 31 Projects Let and Awarded for Construction 259 Bridge Projects in the 2012 Highway Plan 112 New Bridge Projects 147 Bridge Projects from 2010 Highway Plan 291 Bridge Projects in Draft 2014 Highway Plan 75 New Bridge Projects 216 Bridge Projects from 2012 Highway Plan

2014 Draft Highway Plan Bridge Maintenance Identified 176 Candidates

2014 Draft Highway Plan Fall 2013-68 EBRP Bridge Project Candidates Completed through Phase I Design with CE I Approval

2014 Draft Highway Plan January 2014-27 EBRP Bridge Projects Out of 75 Total New Bridges

2014 Draft Highway Plan 12 EBRP Bridge Projects (DRUC) 14 Bridges with Design Funded in the Biennium

Expedited Bridge Replacement Program SIMPLER PROCESS FOR SIMPLER PROJECTS Expedited Bridge Replacement Study EBRP Projects Qualified by Planning (DNA)Document Apply Betterment Standards / Practical Design Completes Preliminary Engineering & Hydraulics Completes Environmental Approval (CE Level 1) Eligible for Final Design, R/W, Utilities Funding Opportunities to Group Projects for Design & Const Simpler Project Requires Less R/W & Utilities Delivers Project to Letting in the Biennium (2 years) Anticipated to be a Consultant Driven Program

Questions? Bridge Seminar February 4, 2014 KYTC will use these 12 projects to Pilot the EBRP concept through construction