February 13, 2013 EA

Similar documents
Radiation Protection Program Updates

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C

NRC Public Meeting October 27, 2014

NUCLEAR REGULATORY COMMISSION. [Docket Nos ; NRC ] Northern States Power Company - Minnesota; Prairie Island Nuclear Generating Plant

NRC REGULATORY ISSUE SUMMARY REQUIREMENTS FOR EXEMPT DISTRIBUTION LICENSEE ANNUAL TRANSFER REPORTS

May 23, Docket No License No. DPR-12

DRAFT REGULATORY GUIDE

NEI [Revision 0] Guidelines for a Certified Fuel Handler Training and Retraining Program

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C July 7, 2011

NRC REGULATORY ISSUE SUMMARY RADIATION SAFETY OFFICERS FOR MEDICAL-USE LICENSES UNDER 10 CFR PART 35

HUMBOLDT BAY INDEPENDENT SPENT FUEL STORAGE INSTALLATION LICENSE APPLICATION ENVIRONMENTAL REPORT SAFETY ANALYSIS REPORT

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN

NUCLEAR REGULATORY COMMISSION [NRC ] Preparation of Environmental Reports for Nuclear Power Stations

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN

Preparation of Environmental Reports for Nuclear Power Stations

NUCLEAR REGULATORY COMMISSION [NRC ] Dry Storage and Transportation of High Burnup Spent Nuclear Fuel

AnJEDISON 10 CFR CFR March 31, ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C.

Nuclear Decommissioning: What You Need to Know

DRAFT REGULATORY GUIDE

REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH REGULATORY GUIDE 1.8 (Drafts were issued as DG-1084 and DG-1012)

FENOC AOLVS. February 3, 2000 PY-CEI/NRR-2463L. United States Nuclear Regulatory Commission Document Control Desk Washington, D. C.

Subj: ACQUISITION, USE AND DISPOSAL OF CERTAIN NUCLEAR REGULATORY COMMISSION REGULATED RADIOACTIVE DEVICES AND SOURCE MATERIAL

NUCLEAR REGULATORY COMMISSION [NRC ] Nuclear Regulatory Commission Insider Threat Program Policy Statement

IAEA Safety Standards for Regulatory Bodies Overview and Recent Development

Regulatory Activities Related to Power Reactors Transitioning to Decommissioning

July 29, 2009 WATTS BAR NUCLEAR PLANT NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT /

Canada. Record of Decision. In the Matter of. University of Alberta. Applicant

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is discontinuing a rulemaking

DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC

Department of Defense INSTRUCTION. Occupational Ionizing Radiation Protection Program

TO ALL LICENSEES OF OPERATING PLANTS, APPLICANTS FOR AN OPERATING LICENSE, AND HOLDERS OF CONSTRUCTION PERMITS

Deactivated Nuclear Power Plant Program

NUREG-0800 U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN ADMINISTRATIVE PROCEDURES - GENERAL REVIEW RESPONSIBILITIES

NRC REGULATORY ISSUE SUMMARY TRANSPORTATION OF RADIOACTIVE MATERIAL QUANTITIES OF CONCERN NRC THREAT ADVISORY AND PROTECTIVE MEASURES SYSTEM

Regulatory Approach for License Renewal for Commercial Nuclear Power Reactors in the USA

Life Extension of Nuclear Power Plants

DOD INSTRUCTION DOD LOW-LEVEL RADIOACTIVE WASTE (LLRW) PROGRAM

NRC UPDATE EP REGULATORY ACTIVITIES. Glenn M. Tracy / Kathy Halvey Gibson Office of Nuclear Reactor Regulation

The Code of Conduct on the Safety of Research Reactors

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C April 10, 2018

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

APPENDIX A ENFORCEMENT GUIDANCE MEMORANDA

Department of Defense INSTRUCTION

NUCLEAR REGULATION AND LICENSING OF PNPP-1. Dr. Alumanda M. Dela Rosa Director Philippine Nuclear Research Institute

Oklahoma State University Policy and Procedures INSTITUTIONAL RADIATION SAFETY POLICY

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF REACTOR REGULATION WASHINGTON, DC September 26, 2005

VERIFICATION OF READINESS TO START UP OR RESTART NUCLEAR FACILITIES

GUIDANCE AND EXAMPLES FOR IDENTIFYING 10 CFR 50.2 DESIGN BASES

February 12, Dear Mr. Griffin:

REQUEST FOR PROPOSAL INDEPENDENT CONSULTANT EXPERT OYSTER CREEK SAFETY ADVISORY PANEL

Nuclear Operating Company

Fingerprinting and Criminal History Records Check Requirements for Unescorted Access to Certain Radioactive Material

Commonwealth of Pennsylvania Radiation Protection Act. Report to the General Assembly. Pursuant to Act 31 of 2007

DIRECTIVES. COUNCIL DIRECTIVE 2009/71/EURATOM of 25 June 2009 establishing a Community framework for the nuclear safety of nuclear installations

Research and Test Reactor Licensing Actions and Lessons Learned

U.S. NUCLEAR REGULATORY COMMISSION MANAGEMENT DIRECTIVE (MD) Governmental Relations and Public Affairs

Radiation Licensure and Management (RS100) Course

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

Control Number: Item Number: 209. Addendum StartPage: 0

Exelkn. PSLTR: # U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Title: Radioactive Material Storage

STRENGTHENING REGULATORY REQUERMENTS FOR PHYSICAL PROTECTION IN INDONESIA BASED ON INFCIRC 225 REV.5. Presented by : Suharyanta BAPETEN

NUCLEAR REGULATORY UPDATE

LEGISLATIVE ACTS AND OTHER INSTRUMENTS COUNCIL DIRECTIVE establishing a Community framework for the nuclear safety of nuclear installations

NRC INSPECTION MANUAL IRIB

Marine Safety Center Technical Note

. s%rwcu ~,+ *+ % %vd3a 7 Food and Drug Administration. Center for Devices and

April 4, 2001 SUBJECT: LICENSE AMENDMENT 10, ADMINISTRATIVE CHANGES, CROW BUTTE RESOURCES IN SITU LEACH FACILITY, LICENSE NO.

November 18, Dear Ms. Vietti Cook:

STANDARD OPERATING PROCEDURE 1

PROPOSED RULEMAKING ENVIRONMENTAL QUALITY BOARD

RADIATION PROTECTION PROGRAM THREE-YEAR REGULATORY FEE AND PROGRAM COST ANALYSIS REPORT TO THE ENVIRONMENTAL QUALITY BOARD

NRC REGULATORY ISSUE SUMMARY CONTROL OF RADIATION DOSE TO VISITORS OF HOSPITAL PATIENTS

Overview of the Regulatory Framework for the Safety of Nuclear Power Plants in Romania

DEPUTY SECRETARY OF DEFENSE 1010 DEFENSE PENTAGON WASHINGTON, D.C

Republic of the Philippines Department of Science and Technology PHILIPPINE NUCLEAR RESEARCH INSTITUTE Commonwealth Avenue, Diliman, Quezon City

STATE OF MICHIGAN DEPARTMENT OF HEALTH AND HUMAN SERVICES LANSING

Request for Relief No. 20, Revision 0, for Units I and 2 3rd Ten Year Inservice Inspection Interval

CProgress Energy. Qk4~ May 21, F U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC

Office for Nuclear Regulation (ONR) Quarterly Site Report for Springfields Fuels Limited

NRC Update on Regulatory Activities Affecting Industrial Radiography

Duquesne Light Our Energy...Your Power

A guide to your right to make an. Advance Directive

Technical Basis for the Emergency Preparedness Rulemaking

APPLICATION FOR RENEWAL OF A RADIOACTIVE MATERIAL LICENSE AUTHORIZING THE USE OFINDUSTRIAL RADIOGRAPHY

Certification of Persons Working at Nuclear Power Plants

Licensing of Nuclear Installations

AAPM Responds to Follow up Questions from Congress after Hearing on Radiation in Medicine

NRC INSPECTION MANUAL STSB

Nuclear Safety and Radiation Protection Supervision in France

Decommissioning Licensing Process of Nuclear Installations in Spain Cristina CORREA SÁINZ.

AUDIT REPORT NATIONAL LOW-LEVEL WASTE MANAGEMENT PROGRAM DOE/IG-0462 FEBRUARY 2000

RHODE ISLAND DEPARTMENT OF PUBLIC SAFETY

Iifieate of service. HET AT

Department of Defense INSTRUCTION

DOE ENFORCEMENT PROGRAM ROLES AND RESPONSIBILITIES

Convention on Nuclear Safety

OVERVIEW OF THE NRC'S CONSOLIDATED NMSS DECOMMISSIONING GUIDANCE

The Hashemite Kingdom of Jordan

Department of Defense DIRECTIVE

Transcription:

EA-12-222 February 13, 2013 Mr. Danny L. Pace President, GPU Nuclear, Inc. FirstEnergy Corporation Mail Stop: A-WAC-A3 341 White Pond Drive Akron, OH 44320 SUBJECT: THREE MILE ISLAND NUCLEAR STATION, UNIT 2 (TMI-2) - FAILURE TO SUBMIT POST-SHUTDOWN DECOMMISSIONING ACTIVITIES REPORT- NON-CITED VIOLATION (DOCKET: 05000320) Dear Mr. Pace: On August 14, 2012, GPU Nuclear, Inc. (GPU) notified the U.S. Nuclear Regulatory Commission (NRC) of its intent to submit a TMI-2 plant specific post-shutdown decommissioning activities report (PSDAR) in the second quarter of 2013. GPU s notification letter indicates that the PSDAR is being submitted to meet the requirements of 10 CFR 50.82(a)(4). On March 28, 1979, TMI-2 experienced an accident which resulted in severe damage to the reactor core. TMI-2 has been in a non-operating state since the accident. The accident makes the shutdown of TMI-2 unique from all other reactors. GPU defueled the reactor vessel and decontaminated the facility to the extent that the plant is in a safe, inherently stable condition, known as Post Defueling Monitored Storage (PDMS). The formal transition from post accident to PDMS required NRC approval. GPU obtained NRC approval, with the issuance of License Amendment No. 45 dated September 14, 1993, to maintain TMI-2 in the PDMS state until decommissioning. License Amendment 45 also converted GPU s operating license to a Possession Only License. NRC considers GPU to have submitted a certification of permanent cessation of operations and a certification of permanent fuel removal as of September 14, 1993. In accordance with 10 CFR 50.82(a)(4), the licensee is required to submit a PSDAR prior to or within two years following permanent cessation of operations, specifically September 14, 1995, in this case. However, GPU did not submit a PSDAR by September 14, 1995. This violation was evaluated in accordance with the NRC Enforcement Policy, the current version of which is included on the NRC's Web site at http://www.nrc.gov/aboutnrc/regulatory/enforcement/enforce-pol.html. Failure to submit a PSDAR in accordance with 10 CFR 50.82, would normally be considered as a Severity Level (SL) III violation in accordance with the Policy. However, in consideration of the unique circumstances surrounding permanent cessation of TMI-2 operations (i.e., the licensee maintained the facility in SAFSTOR condition in accordance with its NRC approved PDMS Safety Analysis Report, and there is very low safety and security significance associated with the untimely submittal of the PSDAR), the NRC concluded this violation is more appropriately assessed at SL IV. In accordance with Section 2.3.2 of the Enforcement Policy, this issue has been characterized as a non-cited violation, because the licensee placed the issue into its Corrective Action Program and will restore compliance within a reasonable period of time after the violation was identified, and the violation is neither repetitive nor willful.

D. Pace 2 The NRC has concluded that information regarding the reason for the violation, the corrective actions taken and planned to correct the violation and prevent recurrence, and the date when full compliance was achieved is already adequately addressed on the docket in this letter. Therefore, you are not required to respond to this letter unless the description herein does not accurately reflect your corrective actions or your position. If you contest this NCV or its significance, you should provide a response within 30 days of the date of this letter, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington, D.C. 20555-0001, with a copy to the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001. In accordance with Title 10 of the Code of Federal Regulations Part 2.390 Public inspections, exemptions, and requests for withholding a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC s document system (Agencywide Document Access and Management System (ADAMS)). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room) http://www.nrc.gov/reading-rm/adams.html. Please contact John Buckley at 301-415-6607 to discuss any questions related to this letter. Sincerely, Docket No.: 50-320 cc: TMI-2 Service List /RA/ Larry W. Camper, Director Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs

D. Pace 2 The NRC has concluded that information regarding the reason for the violation, the corrective actions taken and planned to correct the violation and prevent recurrence, and the date when full compliance was achieved is already adequately addressed on the docket in this letter. Therefore, you are not required to respond to this letter unless the description herein does not accurately reflect your corrective actions or your position. If you contest this NCV or its significance, you should provide a response within 30 days of the date of this letter, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington, D.C. 20555-0001, with a copy to the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001. In accordance with Title 10 of the Code of Federal Regulations Part 2.390 Public inspections, exemptions, and requests for withholding a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC s document system (Agencywide Document Access and Management System (ADAMS)). ADAMS is accessible from the NRC Web site at (the Public Electronic Reading Room) http://www.nrc.gov/reading-rm/adams.html. Please contact John Buckley at 301-415-6607 to discuss any questions related to this letter. Sincerely, Docket No.: 50-320 cc: TMI-2 Service List /RA/ Larry W. Camper, Director Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs DISTRIBUTION: MFerdas/RI LKauffman/RI MMcLaughlin, RI PHenderson LSreenivas ML12349A291 OFFICE DWMEP DWMEP DWMEP DWMEP OE NAME JBuckley CHolston MBurgess BWatson NHilton DATE 12/17/12 12/17/12 12/20/12 01/03/13 02/5/13 OFFICE DWMEP DWMEP NAME APersinko LCamper DATE 02/11/13 02/13/13 OFFICIAL RECORD COPY

Three Mile Island - Unit 2 Service List cc: Mr. James H. Lash Chief Nuclear Officer GPU Nuclear, Inc. Mr. Eric Epstein EFMR Monitoring Group 4100 Hillsdale Road Harrisburg, PA 17112 Ms. Heather Long, Deputy Editor The Patriot 812 Market Street Harrisburg, PA 17105 U.S. Environmental Protection Agency Region III Office ATTN: Mr. B. Hoffman EIS Coordinator 3ES30 1650 Arch Street Philadelphia, PA 17103 Ms. Mary Osborne 4951 Highland St. Harrisburg, PA 17111 Ms. Debora Davenport #18 S. 17 th St. Camp Hill, PA 17011 Mr. Irwin Popwsky, Consumer Advocate Department of Justice Strawberry Square, 14 th Floor Harrisburg, PA 17127 Mr. Mark E. Ford Manager PDMS P.O. Box 480 Mr. Bill Noll Site Vice President, TMI-1 P.O. Box 480 Mr. David W. Jenkins, Esq. First Energy Legal Department 76 South Main St. Chairperson Dauphin County Board of Commissioners Dauphin County Courthouse Front and Market Streets Harrisburg, PA 17120 Mr. Ad Crable Lancaster New Era 8 West King Street Lancaster, PA 17601 Director Bureau of Radiation Protection Department of Environmental Protection 13 th Floor, Rachel Carson State Office Bldg. P. O. Box 8469 Harrisburg, PA 17105-8469 Senior Resident Inspector (TMI-1) U.S. Nuclear Regulatory Commission P.O. Box 311 Dr. Judith H. Johnsrud Environmental Coalition on Nuclear Power 433 Orlando Avenue State College, PA 16803-3477 Mr. Dave Atherholt Site Regulatory Assurance Manager, TMI-1 P. O. Box 480 Mrs. Karen Fili Vice President GPU Nuclear Fleet Oversight Mr. Michael J. Casey GPU Nuclear Responsible Engineer TMI-2 FirstEnergy Nuclear Operating Company Mail Stop: A-GO-14

Gregory H. Halnon, Director, FENOC Fleet Regulatory Affairs