Standard Operating Procedure: Stormwater BMP Inspections

Similar documents
LOCAL STORMWATER BMP IMPLEMENTATION PROGRAM PROJECT APPLICATION INSTRUCTIONS

Water Quality Improvement Program. Funding Application Guide

BMPs eligible for funding under the Grants in Aid pilot project were based on the draft MRGP, and included the following:

ANNUAL STANDARDS AND SPECIFICATIONS

1. MS4 Operator Name: ST. CLAIR TOWNSHIP & ROAD DISTRICT. 2. MS4 Operator Mailing Address: 107 SERVICE STREET SWANSEA IL Street City State Zip

EXHIBIT "A" SCOPE OF SERVICES FOR DISTRICT WIDE NPDES CONSULTANT SERVICES FINANCIAL PROJECT NO

NYC S GREEN INFRASTRUCTURE PROGRAM AND USE OF GRANT FUNDING FOR DESIGN & CONSTRUCTION

Guidance and Instructions for the Implementation of Land Disturbing Activities on Fort Jackson

Vanderburgh County s Qualifications to Manage a Construction Site Run-off Control Program with the County Engineer as MS4 Operator.

Submission, Review, and Approval Procedures

STORMWATER UTILITY. CREDIT MANUAL and GRANT PROGRAM DRAFT MAY credit_manual_v7.2.docx

I. Introduction. II. Goals of the Program

Lexington s Stormwater Quality Projects Incentive Grant Program

Section 5 BMP Implementation and Evaluation 5.1 Introduction

NPDES Small MS4 General Permit (ARR040000) Annual Reporting Form

TOWN OF GREENWICH Annual Department Operational Plan (FY )

PLEASE READ CAREFULLY THERE ARE SEVERAL REVISIONS EXPANDING ELIGIBILITY

SECTION 4. Construction Site Runoff Control Program

Presentation Outline

Skipp kropp Steptoe & Johnson PLLC

HENRICO COUNTY ENVIRONMENTAL COMPLIANCE MANUAL CHAPTER 13

Instructions on Filling out the Western WA Phase II Municipal Stormwater Permit Annual Report Form for Cities and Counties

1. The purpose of this Program is to provide a framework for asset management of separate sanitary sewer systems to meet the following goals:

Construction Site TPDES Inspector Workshop. Erik Hobson EPSIII/Resource Protection and Compliance

FY 2018 Watershed-Based Funding Pilot Program Policy

Georgia FOG Alliance Awards Program Inspection Form

ANNUAL REPORT FORM FOR INDIVIDUAL NPDES PERMITS FOR MUNICIPAL SEPARATE STORM SEWER SYSTEMS (RULE (2), F.A.C.)

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

City of Culver City. Staff Report

Plan of Development Review Process County of Henrico, Virginia

Cumberland County Conservation District Strategic Plan Adopted June 23, 2009

Virginia Clean Water Revolving Loan Fund (VCWRLF) Water Quality Improvement Fund (WQIF) Stormwater Local Assistance Fund (SLAF)

SEPTIC MAINTENANCE PROGRAM RULES (ARTICLE 10)

MEETING DATE: December 8, 2016 ITEM TYPE: Action Consent Discussion. TITLE: Authorization of Cost Share Funding 2016 Fall Non-Homeowner Projects

Need for Private Investment

Bureau of Point and Non-Point Source Management

MASSACHUSETTS WATER RESOURCES AUTHORITY

The City of Franklin has already expressed its intention to opt-in and administer the program locally.

Sec moves to amend H.F. No as follows: 1.2 Delete everything after the enacting clause and insert:

REQUEST FOR PROPOSALS Town of Brattleboro, VT

PUBLIC NOTICE. Michael Baker International Mr. Edward Smail 4425 Belle Oaks Drive North Charleston, South Carolina 29405

Watershed-based Funding: Pilot program

1 Milwaukee Metropolitan Sewerage District Green Solutions Guidelines

King County Flood Control District 2017 Work Program

NPDES ANNUAL REPORT Phase II MS4 Permit ID # FLR04E_0 9_-_4_

DGLVR Program Attachment E Approved March 22, 2018

PA Chesapeake Bay Watershed Implementation Plan Agricultural Section Strategy to Fill Gaps Update September 2011

IMPLEMENTATION SCHEDULES

ORDINANCE NO. 640 NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF FRUITLAND, IDAHO:

Expanding Visibility for Coastal San Luis RCD. Coastal San Luis Resource Conservation District (CSLRCD) 1203 Morro Bay, Suite B, Morro Bay, CA, 93442

Stormwater Management Incentives Program Grant Manual

Tennessee Department of Agriculture--Water Resources Program

Standard Training Prospectus.

Grant All-Detail Report Drainage Ditch Inventory and Inspection (SEDLCP) 2014

Erosion Control and Water Management Program Policy

MASONVILLE COVE ENVIRONMENTAL EDUCATION CENTER AND ENVIRONMENTAL EDUCATION OUTREACH PROGRAMS

Chesapeake Bay Program Partnership s Basinwide BMP Verification Framework. CBP Partnership s Principals Staff Committee September 22, 2014

2008 Combined Clean Water Legacy Grant Application Id#: Use TAB key to move from field to field

1. Select the proper auth type code. For renewals, ensure the auth type code matches the primary facility (PF) fee category.

Educational Facility Solutions Group May 2018

AUG JOINT PUBLIC NOTICE Savannah District/State of Georgia

Florida Department of Environmental Protection

Chesapeake Bay Restoration Strategy FAQs

Michigan s Volunteer River, Stream, and Creek Cleanup Program Grant Application Package Fiscal Year 2018

Conservation Partners Legacy Grant Application

Ontario Community Environment Fund (OCEF) Application Guide 2017 Grants

Transportation Alternatives (TA) Northeast Minnesota Workshop

I. NPDES Permits BUREAU OF MINING PROGRAMS

PA Chesapeake Bay Watershed Implementation Plan Agricultural Section Strategy to Fill Gaps Update February 2012

Chesapeake Bay Trust Grant Opportunities: Stormwater, Watersheds, and Floodplain Management

SUMMARY REPORT. OPERATIONS and MAINTENANCE PLANS and CRITERIA. HOUSATONIC RIVER and NAUGATUCK RIVER FLOOD PROTECTION PROJECTS SECTION 1

Clean Water Assistance - Todd (SWCD)

SCOPE OF WORK/WORK PLAN

I. Preliminary Data Management and Fee Processing (Administrative Staff)

Jefferson Parish Department of Drainage. Emergency Plan

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA JANUARY 25, 2017

GREEN STORMWATER INFRASTRUCTURE DESIGN PROCESS WORKFLOW PACKET

Illicit Discharge Detection and Elimination MCM #3

FAIRFAX WATER WATER SUPPLY STAKEHOLDER OUTREACH PROGRAM GRANT APPLICATION GUIDELINES AND FORMS FISCAL YEAR 2018

This Approval does not cover the use of the Exceptional Quality biosolid in a trial composting with "green waste".

Full Proposal Due Date: Thursday, April 12, 2018 by 11:59 PM Eastern Time

Procedures for Reporting BMP Implementation Data to the Chesapeake Bay Program Office

Rio Grande Water Fund Request for Proposals 2018

CONSERVATION DISTRICT (SWCD)

CAPITOL REGION COUNCIL OF GOVERNMENTS REQUEST FOR INFORMATION (RFI) FOR STORMWATER MANAGEMENT PLANNING SERVICES

Section 2 Public Engagement and Participation

Hurricane Sandy Coastal Resiliency Competitive Grants Program

2016 REQUEST FOR PROPOSALS

FUNDING OPPORTUNITIES SUSAN HARRIS MONTGOMERY COUNTY CONSERVATION DISTRICT

NPDES PERMIT NO. The authority granted by coverage under this General Permit is subject to the following further qualifications:

2019 Outreach and Restoration Grant Program Application Package

FY 2016 Clean Water Fund Competitive Grants Policy

Flip Your Strip Park Strip Lawn Conversion Program MEMBER AGENCY TURN-KEY WATER CONSERVATION PROGRAM

Conservation Partners Legacy Grant Application

CITY OF TACOMA STORMWATER MANAGEMENT PROGRAM

July 5, JOINT PUBLIC NOTICE Savannah District/State of Georgia

Job Description City of St. Clair

APPENDIX J FUNDING SOURCES

Department of Environmental Quality

CAMDEN COUNTY SOIL CONSERVATION DISTRICT 423 COMMERCE LANE, SUITE #1 WEST BERLIN, NJ (FAX) MEETING AGENDA

Transcription:

Standard Operating Procedure: Stormwater BMP Inspections Issue Date: 12/20/2016* Version: 2 Review Frequency: Annual Reasons for Procedure The University of Virginia (UVA) has a permit to operate a Municipal Separate Storm Sewer System (MS4) issued by the Virginia Department of Environmental Quality. This permit authorizes UVA to discharge stormwater pursuant to the Virginia Stormwater Management Program and the Virginia Stormwater Management Act (VSMA). UVA has installed best management practices (BMPs) that reduce the flow of storm runoff and reduce the amount of pollutants leaving the practice. In order for these BMPs to operate efficiently, they must be periodically inspected and have maintenance performed on them. 1.0 Purpose The purpose of this procedure is to outline the process involved with setting up and conducting inspections of stormwater BMPs and initiating follow-up maintenance. 2.0 Scope This procedure applies to staff in Environmental Resources, Landscaping, and Utility Systems Distribution. 3.0 Responsibility 3.1 Environmental Resources Staff The SWM and E&SC Program Administrator, with support from the Civil Engineer, is responsible for keeping these procedures up-to-date, overseeing the BMP maintenance program for compliance with regulatory requirements, and providing periodic training on conducting thorough BMP inspection, and providing technical support for maintenance activities. 3.2 Supervisors Supervisors are responsible for ensuring their staff s compliance with this procedure. Supervisors are to train their employees on how to follow these procedures, using the most recent version of the SOP. 3.3 BMP Inspectors Personnel must follow the correct procedures in accordance with the latest version of this SOP. Specific responsibilities are explained in the procedures described below.

4.0 Procedures 4.1 Add New BMPs to Inventory Once record drawings are available for each new BMP installed on Grounds, the Program Administrator must ensure that the BMP is added to our GIS system and AiM. These databases must contain the following information: A UVA-specific, unique identifier in the following format: SB##-BLDG-N o SB## is the watershed sub-basin, e.g., ME06 or MO3A o BLDG is the four digit building number the BMP is associated with o N is a sequentially assigned number. BMP type A general description of the BMP s location, including latitude and longitude (to be determined by GIS staff) Acres treated by the BMP, including total acres, as well as a breakdown of pervious and impervious areas The date the BMP was brought online (MM/YYYY). The sixth order hydrologic unit code (HUC) in which the BMP is located. Meadow Creek watershed is JR14; Moores Creek watershed is JR15; and Ivy Creek watershed is JR07. The name of the impaired water segments within each HUC (e.g., Meadow Creek, Moores Creek or Ivy Creek) The date of the most recent inspection conducted on the BMP. 4.2 General Inspection Frequencies and Responsible Parties UVA FM has developed BMP inspection checklists tailored to each type of BMP and also the group performing the inspection (Landscaping or Utilities). Below is a list of the frequencies at which inspections are established in AiM: BMP Type Landscaping Inspections Utilities Inspections Biofilter Monthly, Semi-Annual Semi-Annual Extended Detention (Dry) Pond Monthly, Semi-Annual Semi-Annual Grass Channel Monthly, Semi-Annual Annual Infiltration Monthly, Semi-Annual Semi-Annual Page 2

BMP Type Landscaping Inspections Utilities Inspections Permeable Pavers Monthly, Annual Semi-Annual Rip Rap Channels Monthly, Semi-Annual Annual Underground/Manufactured (specific to practice, location) n/a Monthly, Quarterly, Semi-Annual, Annual Vegetated Roofs Semi-Annual n/a Wet Ponds & Wetlands Monthly, Semi-Annual Monthly, Semi-Annual Other timing recommendations include: Conduct semi-annual inspections within 72 hours after a significant rain event to look for signs of ponding water. Conduct semi-annual inspections in spring and fall before/after plants are in full foliage so as to better see any erosion problems. If possible, conduct at least one inspection per year during a rain event. 4.3 Pre-Inspection Preparation AiM provides reminders of when the inspections should be conducted, and includes the detailed inspection checklists tailored to the group and frequency. The inspector should print semi-annual and annual inspection checklists to take into the field; monthly checklists may be printed or viewed on a mobile device. If unfamiliar with a BMP, the inspector should review the annotated maps available for each BMP that highlights contributing drainage area, inlets, forebays, outlets and other key features. These maps are available electronically in AiM and/or in the network folder G:\\PERMITTING\Stormwater\BMP Inspection Reports\_BMP Maps\. The inspector may need the following tools during their inspection: PPE (boots, sunscreen, bug spray, etc.) Clipboard with checklists and pen Camera Container for trash Shovel and/or rake and container for collected debris Cleanout pipe opening tool, Manhole puller Flashlight, and Page 3

Sludge judge or other tool for gauging sediment building up in underground structures. 4.4 Inspection Process Monthly - The inspector should review the monthly checklist/routine maintenance items for completeness. The checklist does not need to be turned in, but the monthly inspection must be marked as completed in AiM. Quarterly/Semi-Annual/Annual Inspections - The inspector should review each checklist item, rate the severity of any problems identified, and attempt to fix them. Items that should be reviewed during the inspection and potential remedies to common problems are provided on the checklists. The inspector should clearly indicate on the inspection checklist if a problem was fixed, is scheduled to be fixed at another time (e.g., mowing or invasives removal), or requires engineering or funding support to be completed. If follow-up work is recommended, refer to the procedures in Section 4.5 of this SOP. Completed quarterly, semi-annual, and annual checklists must be submitted to the Program Administrator and the task marked as completed in AiM. General - Trash removed from the BMP should be taken to an appropriate dumpster near the BMP or in the FM Yard. Leaves, sticks, and other naturally derived organic matter can be taken to the compost yard on Observatory Hill and placed in the leaf composting area. There cannot be any other litter or trash in this material and it cannot contain free liquids (i.e., it cannot be dripping wet). Do not leave this material piled adjacent to the outlet structure or other areas in or near the BMP. 4.5 Follow-up Maintenance Process The Program Administrator reviews the completed inspection checklists for follow-up maintenance needs. All problems identified on the checklists will be summarized in a tracking spreadsheet located at G:\\PERMITTING\Stormwater\BMP Inspection Reports\ SWM BMP inspection results.xlsx. Checklist items are ranked by the inspector using a scale of 0 to 3 where: 0 = Good condition. Well maintained, no action required. 1 = Moderate condition. Adequately maintained, routine maintenance needed. 2 = Degraded condition. Poorly maintained, routine maintenance and repair needed. 3 = Serious condition. Immediate need for repair or replacement. The Program Administrator or Civil Engineer should field verify any problems ranked 2 or 3. If these rankings are confirmed, they will work with the Landscaping and Utilities Department to develop a maintenance plan, identify the needed resources (e.g., materials, outside contractors, etc.), and secure the project funding. Problems ranked 1 require routine maintenance that in-house staff should be able to perform or contract for directly. Separate phases shall be created in AiM to track inspections, routine maintenance, and nonroutine maintenance. All inspection and maintenance work performed on a BMP should be Page 4

billed against the BMP so the Program Administrator and Supervisors gain a better understanding of the true costs of maintaining the practices. Post-inspection follow-on work can either be set up as a new phase in AiM under the associated PM template or a new work order can be set up, but ensure it is associated with the BMP s asset number and asset funding method. If the inspector has any questions related to the BMPs and especially if they are uncertain of how to maintain the practices, they are to contact the Program Administrator or Civil Engineer. 4.6 Documentation and Reporting Completed quarterly, semi-annual, and annual inspection checklists must be turned into the Program Administrator for scanning and filing. Inspection records must be retained for five years from the date of inspection. Staff should also provide to Environmental Resources estimates of the quantity of sediment removed from BMPs during maintenance activities for inclusion in the annual MS4 permit report. Additional information to include in the annual MS4 permit report includes: Information on each new or modified BMP installed during the fiscal year, Number of BMP inspections completed. Construction record drawings for a BMP must be maintained in perpetuity or until the BMP is removed. 5.0 Annual Review of Procedure/Training The Supervisors for Environmental Resources, Landscaping, and Utility Systems Distribution are responsible for conducting annual training and annual reviewing of this procedure with the appropriate staff as referenced in Section 3.2. 6.0 Regulatory impacts Minimum Control Measure 5 in UVA s MS4 Permit 1 requires adequate long-term operation and maintenance of the stormwater BMPs in accordance with written inspection and maintenance procedures. The BMPs shall be inspected at least once per year, and maintenance shall be performed on them as necessary. *Printed versions of SOPs with previous review dates are considered current as long as the version number is the same as the current version. Current versions of all SOPs are maintained on the UVA Environmental Resources website. 1 General Permit No: VAR040073, General Permit for Discharges of Stormwater from Small Municipal Separate Storm Sewer Systems. Page 5