ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

Similar documents
UNCLASSIFIED R-1 ITEM NOMENCLATURE

MEADS DoD Budget FY2013-FY2017. RDT&E U.S. Army

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: RADAR DEVELOPMENT

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: ARMY INTEGRATED AIR AND MISSILE DEFENSE (AIAMD) FY 2012 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Indirect Fire Protection Capability Increment 2-Intercept (IFPC2)

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 R-1 Line #208

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Multi-Platform Electronics

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. Cost To Complete Total Program Element : DIGITAL BATTLEFLD COMM.

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #211

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

BMDO RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 8 R-1 Line #124

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #45

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Weapons and Munitions - Eng Dev

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 R-1 Line #120

UNCLASSIFIED. Cost To Complete Total Program Element : R/SAOC MODERNIZATION. FY 2016 Base FY 2016 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Region/Sector Operation Control Center Modernization Program

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Joint Air-to-Ground Missile (JAGM) FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Counter Narcotics Technology Program Office

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #176

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Joint Air-to-Surface Standoff Missile (JASSM) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. Cost To Complete Total Program Element S750: Mission Training and Preparation Systems FY 2015

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #91

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #89

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Distributed Common Ground/Surface Systems. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Evolved Expendable Launch Vehicle Program (SPACE) - EMD

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #90

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 8 R-1 Line #77

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Other Missile Product Improvement Programs. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

KC-46A Tanker DoD Budget FY2013-FY2017. RDT&E U.S. Air Force

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. Cost To Complete Total Program Element JA6: Joint Air-To-Ground Missile (JAGM)

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Exhibit R-2, RDT&E Budget Item Justification

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Transcription:

Budget Item Justif ication Exhibit R-2 0102419A Aerostat Joint Project Office ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) COST (In Thousands) Jnt Land Atk Msl Def Elevated Netted Sensor-JLENS Actual Estimate Estimate to 464877 355257 360076 Continuing Continuing A. Mission Description and Budget Item Justification: U) The mission of the Joint Land Attack Cruise Missile Defense Elevated Netted Sensor System (JLENS) is to provide elevated, persistent, Over-The-Horizon (OTH) surveillance and fire control quality data on Army and Joint networks enabling protection of the United States, Allied and Coalition forces, as well as critical geo-political assets from Cruise Missiles, Aircraft, Unmanned Aerial Vehicles (UAVs), Tactical Ballistic Missiles (TBMs), Large Caliber Rockets (LCRs), and Surface Moving Targets (SMTs). JLENS is a critical part of the Army's future Integrated Air and Missile Defense (IAMD) architecture and is a Joint Service interest program. A JLENS orbit consists of two systems: a fire control radar system and a wide-area surveillance radar system. Each radar system employs a separate 74-meter tethered aerostat, mobile mooring station, radar and communications payload, processing station, and associated ground equipment. JLENS uses advanced sensor and networking technologies to provide 360-degree, wide-area surveillance and precision tracking of land-attack cruise missiles. This JLENS information is distributed via joint service networks and contributes to the single integrated air picture. JLENS has the capability of detecting and tracking surface moving targets, detecting Tactical Ballistic Missiles at boost phase and Large Caliber Rockets during the ascent phase. JLENS also performs as a multi-role platform to enable extended range command and control linkages, communications relay, and battlefield situational awareness. 0102419A Item No. 148 Page 1 of 9 Exhibit R-2 Aerostat Joint Project Office 169 Budget Item Justification

Budget Item Justif ication Exhibit R-2 0102419A Aerostat Joint Project Office ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) B. Program Change Summary Previous President's Budget () 478204 356434 335071 Current BES/President's Budget () 464877 355257 360076 Adjustments -13327-1177 25005 Congressional Program Reductions -1177 Congressional Rescissions Congressional Increases Reprogrammings -12 SBIR/STTR Transfer -13315 Adjustments to Budget Years 25005 Change Summary Explanation: FY11 Production funding. Adjustments to Budget Year - The FY2010 President's Budget reflects the decision to extend the SDD program and redirect JLENS 0102419A Item No. 148 Page 2 of 9 Exhibit R-2 Aerostat Joint Project Office 170 Budget Item Justification

Budget Item Justif ication Exhibit R-2a 0102419A () ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2a Exhibit) COST (In Thousands) Jnt Land Atk Msl Def Elevated Netted Sensor-JLENS Actual Estimate Estimate to 464877 355257 360076 Continuing Continuing A. Mission Description and Budget Item Justification: (U) The mission of the Joint Land Attack Cruise Missile Defense Elevated Netted Sensor System (JLENS) is to provide elevated, persistent, Over-The-Horizon (OTH) surveillance and fire control quality data on Army and Joint networks enabling protection of the United States, Allied and Coalition forces, as well as critical geo-political assets from Cruise Missiles, Aircraft, Unmanned Aerial Vehicles (UAVs), Tactical Ballistic Missiles (TBMs), Large Caliber Rockets (LCRs), and Surface Moving Targets (SMTs). JLENS is a critical part of the Army's future Integrated Air and Missile Defense (IAMD) architecture and is a Joint Service interest program. A JLENS orbit consists of two systems: a fire control radar system and a wide-area surveillance radar system. Each radar system employs a separate 74-meter tethered aerostat, mobile mooring station, radar and communications payload, processing station, and associated ground equipment. JLENS uses advanced sensor and networking technologies to provide 360-degree, wide-area surveillance and precision tracking of land-attack cruise missiles. This JLENS information is distributed via joint service networks and contributes to the single integrated air picture. JLENS has the capability of detecting and tracking surface moving targets, detecting Tactical Ballistic Missiles at boost phase and Large Caliber Rockets during the ascent phase. JLENS also performs as a multi-role platform to enable extended range command and control linkages, communications relay, and battlefield situational awareness. Accomplishments/Planned Program: Continue System Development and Demonstration (SDD) phase contract activity. 399795 289134 287539 Government System Test and Evaluation 10272 13747 28723 Other contracts and Other Government Agencies (OGAs). 26123 28816 30374 Government Project Management 3242 4056 4054 Government Furnished Equipment(GFE) 25445 9621 9386 Small Business Innovative Research/Small Business Technology Transfer Programs (SBIR/STTR) 9883 464877 355257 360076 B. Other Program Funding Summary To Compl PE 0604869A, Proj M06, Patriot/MEADS Combined Aggregate Program (CAP) 401565 429846 569182 Continuing Continuing SSN C50001, Patriot/MEADS CAP 30957 16406 Continuing Continuing PE 0604802A, ProjS23, SLAMRAAM 33570 33662 11736 Continuing Continuing SSN C81001, SLAMRAAM Production 40349 72920 Continuing Continuing 0102419A () Item No. 148 Page 3 of 9 Exhibit R-2a 171 Budget Item Justification

Budget Item Justif ication Exhibit R-2a 0102419A () ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2a Exhibit) PE 0604820A, Proj E10, SENTINEL 6828 Continuing Continuing PE 060327S34, Proj S34, AMD System of System Engineering and Integration 123712 114673 209531 Continuing Continuing Comment: This program is an integral part of the PEO, Missiles and Space Integrated Air and Missile Defense (IAMD) architecture. C. Acquisition Strategy The JLENS Operational Requirements Document (ORD) calls for initial fielding to Block I requirements (tethered aerostat platforms for Fire Control and Surveillance radars); followed by fielding of Block II (untethered platforms for Fire Control and Surveillance radars); and Block III (both radars on a single untethered platform). There is currently no funding beyond Block I. On 28 Jun 05, the Defense Acquisition Board (DAB) approved the JLENS program for entry into System Development and Demonstration (SDD) as recommended by the Army Acquisition Executive. The DAB elected to maintain oversight of JLENS as an ACAT 1D program as stated in the Acquisition Decision Memorandum signed on 5 Aug 05. The FY2010 President's Budget reflects the Army's POM 10-15 decision to extend the SDD program and redirect JLENS FY11 Production funding. The SDD schedule extension and associated cost growth, as reflected in this submission, result in an Acquisition Program Baseline (APB) breach for both cost and schedule. These impacts will be presented in the next JLENS Selected Acquisition Report (SAR) submitted after the Presidents Budget and a revised APB which will be submitted for approval in FY2009. 0102419A () Item No. 148 Page 4 of 9 Exhibit R-2a 172 Budget Item Justification

ARMY RDT&E C OST ANA LYSIS Exhibit R-3 0102419A () ARMY RDT&E COST ANALYSIS (R3) I. Product Development Method & Type Technology Development (TD) Phase s and Government Sole Source/ Plus Incentive Fee (SS/CPIF) Lightweight X-band Radar Antenna Not Applicable (N/A) or System Development and Demonstration (SDD) Hardware/Software SS/CPIF Performing Activity & Location Raytheon Systems Co. (MA/CA/FL/TX) PYs To Target Value of 301083 301083 301083 Multiple 7811 7811 Raytheon Systems Co. (MA/CA/FL/TX) 242444 373569 1Q 271713 1Q 258816 1Q Cont. Cont. Cont. SDD OGA System Engineering N/A Multiple 7037 4575 1Q 6130 1Q 5558 1Q Cont. Cont. SDD System Engineering s N/A Multiple 23455 20488 1-2Q 21266 1-2Q 23340 1-2Q Cont. Cont. SDD GFE Various N/A Multiple 4105 13986 1Q 2769 1-2Q 1386 1-2Q Cont. Cont. SDD GFE - Cooperative Engagement Transmission Processing Set (CETPS) N/A Multiple 3930 11459 1Q 6852 1Q 8000 1Q Cont. Cont. Subtotal: 589865 424077 308730 297100 Cont. Cont. Cont. II. Support s Method & Type Performing Activity & Location PYs To TD Phase Misc Support N/A Multiple 2084 2084 SDD Govt Intergrated Logistics Support SDD Organizational Support Equipment N/A Multiple 1440 1060 1Q 1420 1Q 1476 1Q Cont. Cont. N/A Multiple Cont. Cont. Subtotal: 3524 1060 1420 1476 Cont. Cont. Target Value of 0102419A () Item No. 148 Page 5 of 9 Exhibit R-3 173 ARMY RDT&E COST ANALYSIS

ARMY RDT&E C OST ANA LYSIS Exhibit R-3 0102419A () ARMY RDT&E COST ANALYSIS (R3) III. Test And Evaluation TD Phase Maintain Test Bed SDD or System Test and Evaluation SDD Government System Test and Evaluation Method & Type Performing Activity & Location PYs To Sole Source/ Plus Fixed Fee (SS/CPFF) CAS-TX, NM 3056 3056 SS/CPIF Raytheon Systems Co. (MA/CA/FL/TX) Target Value of 3787 3838 1Q 2604 1Q 11560 1Q Cont. Cont. Cont. N/A Multiple 10117 10272 1Q 13747 1Q 28723 1Q Cont. Cont. Subtotal: 16960 14110 16351 40283 Cont. Cont. Cont. IV. Management Services SDD or Program Management SDD Government Program Management Method & Type SS/CPIF N/A Performing Activity & Location Raytheon Systems Co. (MA/CA/FL/TX) PEO Missiles and Space, HSV, AL PYs To Target Value of 33030 22388 1Q 14817 1Q 17163 1Q Cont. Cont. Cont. 6301 3242 1-4Q 4056 1-4Q 4054 1Q Cont. Cont. SBIR/STTR 9883 9883 Subtotal: 39331 25630 28756 21217 Cont. Cont. Cont. Project : 649680 464877 355257 360076 Cont. Cont. Cont. 0102419A () Item No. 148 Page 6 of 9 Exhibit R-3 174 ARMY RDT&E COST ANALYSIS

Exhibit R-4 Budget Item Justification 0102419A () Schedule Profile (R4 Exhibit) Event Name FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Program Milestones: (1) Orbit PDR, (2) Orbit CDR PDR 1 CDR 2 Platform Development Platform Fabrication, Integration and Test Fire Control Radar (FCR) Development FCR Fabrication, Integration and Test Surveillance Radar (SuR) Development SuR Fabrication, Integration and Test Communication and Processing Group (CPG) Development CPG Fabrication, Integration and Test Software Development, Integration and Test Software Development, Integration and Test Subsystem/System Level Integration Ss/Sys Level Integration 0102419A () Item No. 148 Page 7 of 9 Exhibit R-4 175 Budget Item Justification

Exhibit R-4a Budget Item Justification 0102419A () Schedule Detail (R4a Exhibit) Schedule Detail FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 Program Milestones: Orbit SRR (4Q FY06) Orbit SFR Orbit PDR IBR Orbit CDR Platform Development 1Q - 4Q 1Q - 4Q 1Q - 4Q Fire Control Radar (FCR) Development 1Q - 4Q 1Q - 4Q 1Q - 4Q Surveillance Radar (SuR) Development 1Q - 4Q 1Q - 4Q 1Q - 4Q Communication and Processing Group (CPG) Development 2Q 1Q 1Q - 4Q 1Q - 4Q 1Q - 4Q Software Development, Integration and Test 1Q - 4Q 1Q - 4Q 1Q - 4Q Subsystem/System Level Integration 3Q - 4Q 0102419A () Item No. 148 Page 8 of 9 Exhibit R-4a 176 Budget Item Justification

May Exhibit R-5 Termination Liability Funding For Major Defense Acquisition Programs 0102419A () Termination Liability Funding For Major Defense Acquisition Programs, RDT&E Funding (R5) 2009 Funding in $000 Program Termination Liability Funding: Remarks: The JLENS Prime Incorporates The "Limitation Of Funds" Clause (DFARS 52.232-22) To Limit The Government's Liability. For The JLENS Program, The "Limitation Of Funds" Clause Limits The Government's Financial Liability Per The To Those Funds Placed On Plus Any Outstanding Commitments Plus s Associated With The Orderly Termination Of ual Actions. 0102419A () Item No. 148 Page 9 of 9 Exhibit R-5 177 Termination Liability Funding For Major Defense Acquisition Programs