SPECIAL SPECIFICATION 1849 ATM Switch Single-Mode OC-12 Module

Similar documents
NeoOne VPN Service Specific Terms and Conditions

OPERATOR'S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL FOR MULTIPLEXER SET AN/FCC-97 (NSN )

1510 Self-Contained Biological Indicator Incubator OPERATION MANUAL

A. General provisions and other electrical systems are specified in other Sections of Division 26.

EZTest Incubator OPERATION MANUAL. 10 Evergreen Drive Bozeman, MT USA (303) Model

Proposal for the Suicide Bomb Detector Model # RDS400

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

ISABELLA COUNTY REQUEST FOR PROPOSALS COMMISSION ON AGING CATV AND HEADEND EQUIPMENT

New England Telehealth Consortium

1. Introduction Features Installation... 5

DEKALB COUNTY GOVERNMENT

1 Customer and Contact Information

Laboratory Accreditation Program CRITERIA

Personal Health Monitoring Services SM VITAL SIGNS TRANSMITTER MODEL: VST 3 TM. Instruction Manual

The University of Texas at San Antonio

EMERGENCY COMMUNICATIONS SYSTEM MAINTENANCE AGREEMENT BETWEEN THE MARIN EMERGENCY RADIO AUTHORITY (MERA) AND THE COUNTY OF MARIN (2005)

ERATE 470 FORM # REQUEST AND REQUEST FOR PROPOSAL (RFP) FOR: Plainview Public Schools

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1041 ASPHALT CONCRETE QUALITY ASSURANCE PROGRAM ADMINISTRATION.

TESTING APPLICATION STANDARD (TAS) IMPACT TEST PROCEDURES

APPRENTICESHIP PROGRAM FOR MOS OF AIR TRAFFIC CONTROL NAVIGATIONAL AIDS TECHNICIAN

Nurse Call System. A Voice over IP Based Solution for Streamlined Communication, Alerting and Workflow

Labor Chapter ALABAMA DEPARTMENT OF LABOR ELEVATOR SAFETY RULES ADMINISTRATIVE CODE CHAPTER LICENSING AND FEES TABLE OF CONTENTS

NEW HAVEN UNIFIED SCHOOL DISTRICT REQUEST FOR BID

UNIFIED FACILITIES GUIDE SPECIFICATION

City of Hays Request for Proposal. Wastewater Treatment Plant Fiber Connectivity

Request for Proposals School Year Project Lafayette County School District 100 Commodore Drive Oxford, MS 38655

TECHNICAL MANUAL OPERATOR'S, UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL

OPERATOR, ORGANIZATIONAL, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST AND

Siemens TEC Unit Vent 0-10V Output Controller. Accessories. Control Applications. Product Description. Product Numbers. Warning/Caution Notation

Request for Proposals VoIP E-Rate Project Perry County School District. 105 Main Street. New Augusta, MS

ERATE 470 FORM # REQUEST AND REQUEST FOR PROPOSAL (RFP) FOR: NETWORKING EQUIPMENT Stanton Community Schools

Request for Proposal Hydraulic Rescue Tools. Date Issued: September 28 th, 2016

Public Address System Norwalk Public Schools REQUEST FOR PROPOSAL 1/16/15 Proposal Response Date:

Medical Grade Power Strips

ELECTRICAL TECHNICIAN I/II/III

Automatic License Plate Recognition System for the Police Department

UNIFIED FACILITIES GUIDE SPECIFICATIONS

THE VERIZON TELEPHONE COMPANIES TARIFF F.C.C. NO. 1 2nd Revised Page 22-1 Cancels 1st Revised Page 22-1 ACCESS SERVICE

The provision of FirstNet s NeoVoice access service is subject to network availability, distance and line sync speed limitations.

LAUREL SCHOOL DISTRICT REQUEST FOR PROPOSAL ERATE Funding Year WIRELESS UPGRADE PROJECT

REQUEST FOR PROPOSAL

Request for Proposal: Cabling

MAIN STREET PALESTINE FAÇADE IMPROVEMENT PROGRAM GRANT APPLICATION PACKET

Request for Proposal: Cabling

City of Gainesville State of Georgia

Callisburg Independent School District Request For Proposal VoIP Phone System

APPLE-l CASSETTE INTERFACE

INVITATION TO BID (ITB) BID # FY

ARMY TB

SOFTWARE TECHNOLOGY PARKS OF INDIA

Solar Photovoltaic. Standard Offer Program (SVPSOP) 2018 Program Manual. Rev # Final

Request for Proposal, erate Year 20 ( ) Wireless (Microwave) WAN, or Equivalent System, District-Wide [Proposal: T]

REQUEST FOR PROPOSAL ERATE Funding Year NETWORK UPGRADE PROJECT

ST. JOSEPH COUNTY, INDIANA REQUEST FOR PROPOSALS ST. JOSEPH COUNTY ELECTION BOARD ELECTRONIC POLL-BOOKS. RELEASED January 19, 2016

WAYNE COUNTY REQUEST FOR PROPOSAL ERATE Funding Year NETWORK UPGRADE PROJECT

INSTRUMENTATION TECHNICIAN I/II/III

PART 573 DEFECT AND NONCOMPLIANCE REPORTS. Nat l Highway Traffic Safety Admin., DOT 573.3

OWENS VALLEY CAREER DEVELOPMENT CENTER

NAVSEA STANDARD ITEM CFR Part 61, National Emission Standards for Hazardous Air Pollutants

PERFORMANCE WORK STATEMENT FOR. Sustainment/Patching Service U.S. AIR FORCE OWNED LAND MOBILE RADIO (LMR) EQUIPMENT. (ASTRO 25 Core System)

Smoke Control BACnet PTEC Unit Vent Controller. Control Applications. Product Description. Product Numbers

TAHOE CITY PUBLIC UTILITY DISTRICT Job Description

COMMISSION DIRECTIVE 2011/18/EU

EQUIPMENT PURCHASE ORDER ADDENDUM BETWEEN UNIVERSITY OF NORTH CAROLINA HOSPITALS AND. Purchase Order Number

ARMY TM AIR FORCE TO 35C MARINE CORPS TM 10155A-13/1

ADVERTISEMENT FOR THE USE AND BENEFIT OF NESHOBA COUNTY, MISSISSIPPI

HEBER LIGHT & POWER COMPANY OPERATIONS DEPARTMENT REQUEST FOR PROPOSAL (RFP) Pole Testing and Pole Inventory

The University of Texas at San Antonio

THE PORT AUTHORITY TRANS HUDDON CORPORATION REQUEST TO QUALIFY ( RTQ ) FOR RTQ#53476: PATH Replacement of Substation No. 8 Contract PAT-773.

REQUEST FOR PROPOSAL ERATE Funding Year NETWORK UPGRADE PROJECT

EXHIBIT A. SCOPE OF SERVICES For EMERGENCY MANAGEMENT SERVICES. Revised 3/10/15

EXHIBIT "A" CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR INSPECTION STAFF

QUALITY ASSURANCE PROGRAM STANDARD. (Basic Requirements: JIS Q 9100)

New England Telehealth Consortium

MICHAEL N. FEUER CITY ATTORNEY REPORT RE:

City of Puyallup City-Owned Fiber Infrastructure Evaluation Project

ELECTRONICS TECHNICIAN I ELECTRONICS TECHNICIAN II

RFP for 2015 E-Rate Funded Wireless Upgrade Project at Four Locations In Thomasville City Schools RFP Reference# 2015Wireless Cabling Contact Mike

Ontario School District 8C

Automated License Plate Reader (ALPR) System. City of Coquitlam. Request for Proposals RFP No Issue Date: January 25, 2017

HYDROELECTRIC COMMUNICATION TECHNICIAN I HYDROELECTRIC COMMUNICATION TECHNICIAN II Range B55/B75 BOD 7/12/2017

REQUEST FOR PROPOSAL for Wide Area Network Design, Configuration and Installation

1. Definitions. See AFI , Air Force Nuclear Weapons Surety Program (formerly AFR 122-1).

NAVSEA STANDARD ITEM CFR Part 61, National Emission Standards for Hazardous Air Pollutants

Key to BEDSIDE External Pulse Generator Controls and Features

Customer Premise Maintenance Policy: Time and Materials & Other Associated Charges

Self Assessment Guide for an Effective Safety and Health Program

RFP # Digital Marquee PROPOSAL OPENING DATE: January 10, 2018

DEPARTMENT OF DEFENSE (DFAR) GOVERNMENT CONTRACT PROVISIONS

Distribution Statement A: Approved for public release; distribution is unlimited.

2015 C&I PROCESS VFD APPLICATION FOR PRESCRIPTIVE REBATES

Ceremonial Bugle Operation Manual and Military Funeral Honors Guide

ITB # Law Enforcement Vehicle Equipment Installation

Incident Reporting, Notification, and Review Procedure

COMDTPUB P16721 NVIC August 25, 2014

Request for Proposal: Alton Middle School NETWORK CABLING

TRICARE Prime Remote Program

THE BELL TELEPHONE Pa. P.U.C.-No. 302 COMPANY OF PENNSYLVANIA Third Revised Sheet 563 Canceling Second Sheet 563 ACCESS SERVICE

HT1611C Timer with Dialer Interface

GAO. EXPORT CONTROLS Sale of Telecommunications Equipment to China. Report to the Chairman, Committee on National Security, House of Representatives

Transcription:

1993 Specifications CSJ 0521-04-223 SPECIAL SPECIFICATION 1849 ATM Switch Single-Mode OC-12 Module 1. Description. Furnish, install, and make fully operational an Asynchronous Transfer Mode (ATM) Switch Single-Mode OC-12 Module in the designated ATM switch as shown on the plans and as detailed in accordance with these specifications. Use the same manufacturer and model for each ATM Switch Single-Mode OC-12 Module furnished. 2. Materials. Provide ATM Switch Single-Mode OC-12 Modules that meet the following requirements. A. General Requirements. Provide only ATM Switch Single-Mode OC-12 Modules that are new, corrosion resistant and in strict accordance with the details shown on the plans and in the specifications. Provide ATM Switch Single-Mode OC-12 Modules that are fully compatible with existing ATM Switch Single-Mode OC-12 Modules and are certified compatible by the manufacturer of the target ATM switch. B. General Features. Provide an ATM Switch Single-Mode OC-12 Module that provides the following general features: Synchronous Optical Network (SONET) signaling Synchronous Digital Hierarchy (SDH) signaling STS-12c/STM-4c framing Minimum of 32,000 unicast connections per module Minimum of 7,000 multicast connections per module Minimum of 8 queues Frame discard Hot-swap capabilities SONET/SDH automatic protection switching (APS)/multiplex section protection (MSP) Clock Accuracy: +20 ppm Point-to-Point (PP) and Point-to-Multipoint (PMP) Permanent Virtual Connections (PVCs) Point-to-Point (PP) and Point-to-Multipoint (PMP) Soft Permanent Virtual Connections (SPVCs) C. Traffic Management. Provide an ATM Switch Single-Mode OC-12 Module that has the following traffic management features: Per-port cell output buffers 1-5 1849

Per-VC queuing Hierarchical traffic shaping Frame discard Generic Cell Rate Algorithm (GCRA) traffic policing G.826 Synchronous Optical Network (SONET) statistics Configurable buffer thresholds Constant Bit Rate (CBR) traffic contract support Available Bit Rate (ABR) traffic contract support Unspecified Bit Rate (UBR) traffic contract support Variable Bit Rate Real Time (VBR-rt) traffic contract support Variable Bit Rate Non-Real Time (VBR-nrt) traffic contract support D. Port Characteristics. Provide an ATM Switch Single-Mode OC-12 Module that has the following port characteristics: One SONET OC-12c/SDH STM-4c port 622.08 Mbps data rate 1550 nm media wavelength +2 to -3 dbm transmit optical power -7 to -29 dbm receive sensitivity Operates over 9 to 26 db path attenuation Minimum of 128,000 cells output port buffer size Allows cells from a single port/virtual Path Identifier (VPI)/Virtual Channel Identifier (VCI) source to be output to a minimum of 8 VPI/VCI destinations on the same output port using a single switching fabric pathway Drives up to 60 km of 8.3/125 µm single-mode fiber optic cable at 622.08 Mbps SC single-mode fiber optic duplex female connector E. Standards. Provide an ATM Switch Single-Mode OC-12 Module that is compliant with the following standards: ATM Forum af-phy-0046.000 International Telecommunications Union Telecommunication Sector (ITU-T) I.432 American National Standards Institute (ANSI) T1E1.2/93-020 ITU-T T1S1/92-185 Telecordia GR-253-CORE F. Management. Provide an ATM Switch Single-Mode OC-12 Module that provides the following management capabilities: Hierarchical per-virtual path (VP)/virtual connection (VC) shaping and scheduling 2-5 1849

Per-VC traffic management Per-VC QoS queuing Cell and packet statistics Statistics/Alarms Alarm Indication Signal (AIS), HCS errors, Loss of Signal (LOS), Loss of Frame (LOF), Loss of Pointer (LOP), Far End Block Error (FEBE), Far End Reporting Failure (FERF), yellow alarm, Bit Interleaved Parity (BIP) errors Simple Network Management Protocol (SNMP) version 2 device status, diagnostic, and alarm monitoring and remote configuration Request for Comments (RFC)-1213-compliant Management Information Base (MIB) files Standard and device specific MIB2 files G. Regulatory Approvals. Provide an ATM Switch Single-Mode OC-12 Module that has been certified to the following regulatory standards: Product Safety: Underwriters Laboratories (UL) Standard 1950 or 60950 Electromagnetic Emissions: Federal Communications Commission (FCC) Part 15, Class A Network Equipment Building System (NEBS) Level 3 compliant H. Environmental. Provide an ATM Switch Single-Mode OC-12 Module that operates in the following environmental conditions: -5ºC to 55ºC operating temperature range -40ºC to 70ºC storage temperature range 5% to 95% relative humidity (non-condensing) 3. Construction Methods. A. General. Provide equipment that utilizes the latest available techniques for design and construction with a minimum number of parts, subassemblies, circuits, cards, and modules to maximize standardization and commonality. Design the equipment for ease of maintenance. Provide component parts that are readily accessible for inspection and maintenance. Provide test points that are for checking essential voltages and waveforms. B. Electronic Components. Provide electronic components in accordance with Special Specification, Electronic Components. C. Mechanical Components. Provide external screws, nuts and locking washers that are stainless steel; no self-tapping screws will be used. Provide parts made of corrosion resistant material, such as plastic, stainless steel, anodized aluminum or brass. Protect materials from fungus growth and moisture deterioration. 3-5 1849

Separate dissimilar metals by an inert dielectric material. 4. Documentation Requirements. Provide five complete sets of operation and maintenance manuals. Include the following: Complete and accurate schematic diagrams. Complete installation procedures. Complete performance specifications (functional, electrical, mechanical and environmental) on the unit. Complete parts list including names of vendors for parts not identified by universal part number such as JEDEC, RETMA, or EIA. Pictorial of component layout on circuit board. Complete maintenance and trouble-shooting procedures. Complete stage-by-stage explanation of circuit theory and operation. 5. Testing Requirements. It is the policy of the Texas Department of Transportation to require performance testing of all materials and equipment not previously tested and approved. If technical data are not considered adequate for approval, samples may be requested for test by the Engineer. The contract period will not be extended for time loss or delays caused by testing prior to final Texas Department of Transportation approval of any items. The equipment referenced to this specification is subject to Design Approval Tests and Factory Demonstration Tests at the equipment manufacturer's facility to determine conformance with all the specification requirements except that the Engineer may accept certification by an independent testing laboratory in lieu of the design Approval Tests, to verify that the Design Approval Tests have previously been satisfactorily completed. The Contractor must arrange for and conduct the tests in accordance with the specification requirements stated herein. Unless otherwise specified, the Contractor is responsible for satisfying all inspection requirements prior to submission for the Texas Department of Transportation's inspection and acceptance. The Engineer reserves the right to have his/her representative witness all Design Approval Tests and Factory Demonstration Tests. Compare the results of each test with the requirements specified herein. Failure to conform to the requirements of any test shall be counted as a defect, and equipment shall be subject to rejection by the Engineer. Rejected equipment may be offered for retest provided all noncompliances have been corrected and retested by the Contractor and evidence thereof submitted to the Engineer. 6. Warranty. Guarantee that equipment furnished and installed for this project will perform according to the manufacturer's published specifications. Warrant equipment against defects and/or failure in design, materials and workmanship in accordance with the manufacturer's standard warranty. Assign to the Department all manufacturers normal warranties or 4-5 1849

guarantees on all electronic, electrical, and mechanical equipment, materials, technical data, and products furnished for and installed on the project. Repair or replace defective equipment, at the manufacturer's option, during the warranty period at no cost to the Department. Provide equipment with 95% of the manufacturer's standard warranty remaining on the date that equipment invoices are submitted by the Contractor for payment. Any equipment with less than 95% of its warranty remaining will not be accepted by the Department. 7. Experience Requirements. Personnel involved in the installation and testing of the ATM Switch Single-Mode OC-12 Module must meet the following requirements: Three years experience in the installation and testing of ATM Switches. Two installed systems where ATM switches, as described within these specifications, are installed and the systems have been in continuously satisfactory operation for at least 2 years. Submit photographs or other supporting documents as proof, and the names, addresses and telephone numbers of the operating personnel who can be contacted regarding the systems. One system with ATM switches (which may be one of the two in the preceding paragraph) which the Contractor can arrange for demonstration to the Engineer and/or his representatives. 8. Training. Conduct a training class (minimum of 2 hours) for up to 10 representatives designated by Texas Department of Transportation on procedures of installation, operations, testing, maintenance and repair of all equipment specified within these specifications. Submit to the Engineer for approval 10 copies of the training material at least 30 days before the training begins. Conduct training within the local area unless otherwise authorized by the Engineer. Customize the training specifically for the TransGuide System. Videotape the entire training on VHS (1/2 in.) tapes and deliver to TransGuide for later use. 9. Measurement. This Item will be measured as each unit furnished, installed, and tested. 10. Payment. The work performed and materials furnished in accordance with this Item and measured as provided under Measurement will be paid for at the unit price bid for ATM Switch Single-Mode OC-12 Module. This price is full compensation for equipment, cables and connectors; documentation and testing; and labor, materials, warranty, training and incidentals. 5-5 1849