PROJECT INSPECTION SERVICES

Similar documents
PROGRAM PLANNING AND DESIGN MANAGEMENT SERVICES

This request for qualifications seeks the following type of service providers:

San Francisco Unified School District 135 Van Ness Avenue, Room 215 San Francisco, California, Phone

ARCHITECTURAL DESIGN I ENGINEERING AND RELATED PROFESSIONAL SERVICES FOR THE NEW WILLIE L. BROWN JR. MIDDLE SCHOOL

SANTA ROSA CITY SCHOOLS DISTRICT. 211 Ridgway Avenue Santa Rosa, CA Request for Proposals For Architectural Services

NEW HAVEN UNIFIED SCHOOL DISTRICT REQUEST FOR BID

Chabot-Las Positas Community College District

REQUEST FOR PROPOSAL (RFP) # CONSULTANT SERVICES FOR DEVELOPMENT OF A DISTRICT SUSTAINABILITY PLAN

Westside Community Schools Request for Qualifications Architectural Design and Engineering Services Prairie Lane Elementary School March 1, 2018

Request for Qualifications and Proposals (RFQ/P) #564. for. Program and Construction Management Services

REQUEST FOR QUALIFICATIONS AND PROPOSALS (RFQ/P) RFQ # ARCHITECTURAL SERVICES Bond Measure G

REQUEST FOR QUALIFICATION FOR PREPARATION OF FACILITIES MASTER PLAN AND FUTURE ARCHITECTURAL SERVICES

CAMPBELL UNION HIGH SCHOOL DISTRICT

Chabot-Las Positas Community College District

REQUEST FOR QUALIFICATIONS G ELLUCIAN (Datatel) COLLEAGUE CONVERSION TO MS SQL AND RELATED UPGRADES PROJECT

REQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services

REQUEST FOR QUALIFICATIONS RFQ NO Orange Coast College Classroom Modernization Project

Request for Qualifications B Hazardous Material Surveying, Testing and On-Site Observation Firms. RFQ Due Date: October 1, :00 P.M.

Morgan Hill Unified School District

REQUEST FOR PROPOSALS

RFQ A-07 / FOR FF&E CONSULTING AND COORDINATION SERVICES FOR VARIOUS MEASURE B BOND PROJECTS

Developer Impact Fee Annual and Five Year Reports for the Fiscal Year Ending June 30, San Francisco Unified School District.

CITY OF INGLEWOOD Residential Sound Insulation Program

BUTTE COUNTY DEPARTMENT OF WATER AND RESOURCE CONSERVATION REQUEST FOR PROPOSALS TO

Galt Joint Union High School District Marengo Rd Galt, CA Elizabeth Kaufman, Superintendent REQUEST FOR QUALIFICATIONS / PROPOSALS

ARCHITECTURAL, LANDSCAPE, AND ENGINEERING CONSULTING SERVICES

REQUEST FOR QUALIFICATIONS AS-NEEDED CONSULTING PROJECT MANAGER

REQUEST FOR PROPOSALS. For: As needed Plan Check and Building Inspection Services

Southern Kern Unified School District

Request for Qualifications B Geotechnical Investigations / Professional Services Firms. RFQ Due Date: October 8, :00 P.M.

A. PROJECT INFORMATION

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS TO PROVIDE ON-CALL ENGINEERING SERVICES FOR CONSTRUCTION MANAGEMENT AND INSPECTION

Request for Proposals Architectural Services Re: Fremont High School (RFP No date advertised July 17, 2014) ADDENDUM No. 2 (AUGUST 7, 2014)

Request for Proposals September Review and Evaluate the Azusa Light & Water Meter Replacement Project RFP

REQUEST FOR PROPOSAL FOR POLICE OPERATIONS STUDY. Police Department CITY OF LA PALMA

REQUEST FOR PROPOSALS PROFESSIONAL ENGINEERING SERVICES WATER SYSTEM RELIABILITY STUDY CITY OF MT. PLEASANT WATER DEPARTMENT

REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC)

REQUEST FOR QUALIFICATIONS QUALITY ASSURANCE & COST MANAGEMENT SERVICES. For the

REQUEST FOR QUALIFICATIONS FOR Energy Services Master Agreement

REQUEST FOR QUALIFICATIONS AS-NEEDED EXECUTIVE ARCHITECTS

REQUEST FOR QUALIFICATIONS. Design Professional Services

REQUEST FOR STATEMENTS OF QUALIFICATIONS CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR CSJ: PASS-THROUGH FINANCE PROJECT

CITY OF PORT HUENEME COMMUNITY DEVELOPMENT DEPARTMENT REQUEST FOR PROPOSAL FOR BUILDING & SAFETY SERVICES

REQUEST FOR QUALIFICATIONS TO PROVIDE ON-CALL ENGINEERING SERVICES FOR CONSTRUCTION MANAGEMENT AND INSPECTION

Proposals due May 18 th, 2018 at 4:30 PM. Indicate on the Sealed Envelope Do Not Open with Regular Mail.

SACRAMENTO REGIONAL SOLID WASTE AUTHORITY REQUEST FOR PROPOSALS FOR CONSULTING SERVICES FOR A REGIONAL GREEN WASTE PROCESSING FACILITY

Associated with the District s Measure A Bond Program and Facilities Improvement Projects

REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES Burbank School District 111 March 2016

REQUEST FOR PROPOSAL FOR ARCHITECTURAL SERVICES PACIFICA LIBRARY PROJECT

Colquitt Regional Medical Center

REQUEST FOR QUALIFICATIONS AS-NEEDED CONSULTING EXECUTIVE ARCHITECT

REQUEST FOR PROPOSALS (RFP) For Electrical Engineering Design Services City Hall Switchgear Replacement October 28, 2016

Issued: April 22, Submittal Deadline Date. Friday, May 13, 2016 at 4:00 p.m.

Dakota County Technical College. Pod 6 AHU Replacement

REQUEST FOR QUALIFICATIONS (RFQ) AIRPORT ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT MINOT INTERNATIONAL AIRPORT

REQUEST FOR QUALIFICATIONS

REQUEST FOR PROPOSAL FOR: Grant Writing & Post-Award/Project Implementation Technical Assistance River Valley Community College BID #RVC15-09

Request for Proposals for Construction Manager at Risk Watertown Community Center

The School Board of Polk County, Florida. Selection Process for Architectural & Engineering Services

REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF

REQUEST FOR PROPOSALS

Request for Qualifications

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS

CITY OF HONDO ENGINEERING REQUEST FOR QUALIFICATIONS

Massachusetts Bay Transportation Authority. POLICIES & PROCEDURES Design Build Procurement Procedures April 2016

Request for Proposals and Qualifications for. Owner s Representative Services (RFP) August Farmington Public Schools. Farmington Town Hall

REQUEST FOR ARCHITECTURAL SERVICES ACTIVITY CENTER

Request for Statements of Qualifications Architectural Services

San Mateo County Project Development Unit. Issued: August 4, 2017 Responses due: September 1, 2017 at 2:30 pm. Sam Lin, Manager

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES WESTSIDE ELEMENTARY 1210 JIMMY ANN DRIVE DAYTONA BEACH, FLORIDA 32117

Request for Qualifications. Professional Design and Construction Services as a Design-Builder. For. Delhi Township Fire Station

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS POLICY ON CONSULTANT SELECTION. October 2011

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR INSTALLATION & UPGRADE OF BICYCLE FACILITIES (CLASS II & CLASS III) Issued by:

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS. General Contractor Construction Manager (GC/CM) Services. Modernization Project

LOCKHART INDEPENDENT SCHOOL DISTRICT

REQUEST FOR QUALIFICATIONS EXECUTIVE ELECTRICAL ENGINEER I-5 ELECTRICAL SWITCH STATION UNIVERSITY OF CALIFORNIA, SAN DIEGO. CPM Project No.

SONOMA COUNTY JUNIOR COLLEGE DISTRICT. RFQ #1054 for Engineering & Design Services For Districtwide Energy Management/Sustainability Projects

District Office Building Seismic Retrofit At Contra Costa Community College District 500 Court St. Martinez, CA March 21, 2016

Knights Ferry Elementary School District

CITY OF LOMITA REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES TO PROVIDE BID PROPOSAL FOR

REQUEST FOR QUALIFICATIONS/ REQUEST FOR PROPOSALS #

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES DELTONA MIDDLE 250 ENTERPRISE ROAD DELTONA, FLORIDA MASTER PLAN PROJECT NO.

REQUEST FOR PROPOSALS

QUALIFICATIONS QUESTIONAIRE REQUEST FOR PROPOSALS BY THE GUILFORD COUNTY BOARD OF EDUCATION FOR CONSTRUCTION MANAGER AT RISK

REQUEST FOR PROPOSALS FOR. ENVIRONMENTAL ANALYSIS and ENTITLEMENTS REPORT FOR the SFUSD ArtsCenter Campus

CITY AND COUNTY OF SAN FRANCISCO DEPARTMENT OF ELECTIONS

REQUEST FOR PROPOSAL NEW MARKET TAX CREDIT CONSULTANT SERVICES

REQUEST FOR STATEMENTS OF QUALIFICATIONS FOR ARCHITECTURAL PROGRAMMING SERVICES

DOING BUSINESS WITH THE. Orange County Board of County Commissioners. Orange County Procurement Division

All proposals must be received by August 30, 2016 at 2:00 PM EST

Request for Statements of Qualifications Construction Management and General Contractor at Risk San Mateo County Replacement Correctional Facility

CITY OF FRESNO AIRPORTS DEPARTMENT REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSULTING SERVICES FRESNO YOSEMITE INTERNATIONAL AIRPORT

REQUEST FOR PROPOSALS. Design-Build of General Aviation Terminal Building. RFP# AIR/17-012, page 1

201 North Forest Avenue Independence, Missouri (816) [September 25, 2017] REQUEST FOR PROPOSAL GRADUATION CAPS AND GOWNS

University of California, Merced Central Plant/Telecommunications Reliability Upgrade

REQUEST FOR PROPOSALS FOR AS-NEEDED PROJECT MANAGEMENT AND INSPECTION SERVICES FISCAL YEARS 2017 THRU 2019

REQUEST FOR QUALIFICATIONS

Transcription:

REQUEST FOR QUALIFICATIONS PROPOSITION A 2011 SCHOOL BOND PROGRAM PROJECT INSPECTION SERVICES MAY 2012 Page 1 of 13

TABLE OF CONTENTS REQUEST for QUALIFICATIONS ADVERTISEMENT A. INTRODUCTION 1. Insurance Requirements 2. Description of Projects and Scope of Work 3. Description of Project Inspection Services 4. Methodology of Contracting for Project Inspection Services 5. Billing Rates B. SELECTION 1. Process of selection 2. RFQ Addenda C. CONTENTS OF PROPOSALS and EVALUATION CRITERIA 1. Introductory/Cover Letter 2. Professional Qualifications & Experience, Project Approach 3. Billing Rates 4. DVBE requirements 5. Insurance 6. Prior Claims 7. Evaluations Criteria and Scoring Chart D. RFQ SCHEDULE E. EXHIBITS 1. Exhibit A - Prop A 2011 Bond Language Page 2 of 13

ANNOUNCEMENT REQUEST FOR QUALIFICATIONS PROPOSITION A 2011 SCHOOL BOND PROGRAM PROJECT INSPECTION SERVICES The San Francisco Unified School District is accepting Statements of Qualifications (SOQs) for Project Inspection Services (IOR). Proposals must be submitted in Room 207 of 135 Van Ness Avenue, San Francisco no later than: 2:00 p.m. on May 30, 2012 This Request for Qualifications (RFQ) seeks teams with the following types of experience: Inspector Requirements: All inspectors must have at least a DSA Certification of Class III. List each project inspector DSA classification, certification number and hourly rate. Professional References: List at least three (3) professional verifiable references including name, title/position, telephone number, project name and the project inspector s responsibilities, for each project inspector. Project Experience: Provide a list of projects summarizing California DSA Project Inspector experience over the last five (5) years. For each project include; the contact name and phone number, brief description of the work, schedule and construction cost. Request for Qualifications information packages will be available on May 8, 2012 online at: http://www.sfusd.edu/en/doing-business-with-sfusd/current-rfps-rfqs-and-rfis.html The information package will provide a detailed description of the informational items required in the submission package. Any addenda issued to this RFQ will also be posted online. The provisions of Public Contract Code as defined in the State Allocation Board regulation for implementation of Disabled Veteran Business Enterprise Goals shall apply to these projects. Page 3 of 13

A. INTRODUCTION The San Francisco Unified School District Bond Program is seeking Statement of Qualifications from consultants to provide project inspection services during construction and through Project Completion for projects included in the SFUSD Prop A 2011 Bond Program. The attached Exhibit A to this RFQ provides a list of the school sites included in the 2011 Bond Program. DVBE participation will be required as part of this proposal, at minimum, good faith efforts must be demonstrated. Statements of Qualifications should be submitted with three (3) bound hard copies in 8-1/2" x 11 format. Suggested length of SOQ is 16 pages single sided or 8 pages double sided (excluding resumes). Deliver or mail the SOQs to: Maureen Shelton Director of Construction, Bond Program San Francisco Unified School District 135 Van Ness Avenue, Room 207 San Francisco, CA 94102-5207 All participating firms must have an established office within a 30-mile radius of the city limits of San Francisco. All questions and comments must be emailed to our Contracts Administrator, Fe Bongolan at BongolanF@sfusd.edu. All SOQs are due by 2:00 PM on May 30, 2012. Late submittals will not be considered. 1. Insurance Requirements Firms awarded contracts will be required to maintain in full force and effect, and at their own expense, the following insurance policies with companies certified with the California Insurance Commission. Please include the name of your firm's/joint venture teams insurance company (ies) in your proposal. The following insurance policies are required in order for your firm/joint venture team to qualify for participation in this work: Worker's Compensation Insurance in compliance with California law General Liability Insurance($ 1 million/per occurrence) Automobile Insurance ($1 million/per occurrence) Professional Liability Insurance ($1 million per occurrence and $2 million aggregate) If any policy is written on a Claims Made Form, the consultant must provide a project specific policy to continue the coverage for two (2) years beyond the date of the individual project completion. Prior to issuance of a Notice to Proceed, your firm must provide the District with fresh-wet signed certificate(s) of insurance that includes the following: Page 4 of 13

A separate endorsement naming the San Francisco Unified School District, its Board, Officers and employees as additional insured parties on General Liability policies, endorsements must be submitted with the certificate; Should any of the above described policies be canceled before the expiration date thereof, the issuing company will mail 30 days written notice to the certificate holder. 2. Description of Projects and Scope of Work The Prop A 2011 Bond Program provides for school building improvements which may include modernization of the facilities, accessibility upgrades, health, life safety, seismic upgrades, and infrastructure and maintenance improvements. A list of the 2011 project sites is included in Exhibit A. The District anticipates initial services to commence work in June 2012. 3. Description of Project Inspection Services Scope of Project Inspection Services The submitting team must demonstrate experience in services which include but not limited to the following: General Must perform specific duties in accordance with Title 24, Part 1 (Sections 4-333, and 4-342) and current edition of ADAAG. The Inspector works under the direction of the Architect of Record (AOR). The inspector is supervised by the Construction Manager (CM) and the District. The project inspector must keep a log of time spent on site and provide that information to the district appointed onsite District Representative. SFUSD will have District Representatives review monthly invoices and hours submitted for each IOR on every project. The Inspector must coordinate work with the District Project Manager, Construction Manager, Superintendent, Architect and any other consultant as needed. The Inspector does not have the authority to direct the Contractor to perform work or to stop the work of construction. The Inspector needs to alert the onsite District Representative of any issue that may impede (only under extreme circumstances and emergencies can the Inspector stop work). Must have a thorough understanding of all requirements of the construction documents. Inspect of all portions of the work including but not limited to compliance with the requirements of the approved construction documents and SFUSD district Standards. Inspect work for quality and identify, document, and report all construction deviations from the requirements of the DSA approved construction documents and/or SFUSD district standards and upload report to District s Project Management Software (PMS). Inspect work and immediately report any Health and Life safety related items (ie mold, etc) Submittal of verified reports (Form DSA-6). At the conclusion of the project any outstanding deviations must be noted on the Form DSA-6 and upload to PMS. Page 5 of 13

Contract Administration Requests Maintain the most current DSA-stamped and initialed construction documents at the job-site in an organized and include all addenda s, RFI s and ASI s. Must be posted to both the drawings and the specifications and note that a change has been made to that page. These documents need to be readily accessible for the DSA field inspectors, District and Construction Manager for review. The inspector must also maintain current code books which are readily accessible for the DSA representatives, GC, District consultants during construction: they include, but not limited to, Building Codes: Title 24, Part 1 (Administrative Code); Title 24, Part 2, Volumes 1, 2, and 3 (Building Code); Title 24, Part 3 (Electrical Code); Title 24, Part 4 (Mechanical Code); Title 24, Part 5 (Plumbing Code) and Title 24, Part 6 (Energy Code) and current edition of ADAAG. The code edition must be as referenced on the DSA approved plans and specifications. Provide written documentation confirming compliance with ADAAG and DSA and upload to the District s Project Management Software (PMS) Maintain copies of DSA approved deferred approval documents. Maintain copies of DSA approved Field Change Documents. Maintain copies of DSA approved change orders. A copy of AOR approved shop drawings, samples and submittals. Test and Inspection List (Form DSA-103) provide a hard copy to the onsite District Representative and upload to PMS. Test and special inspection reports provide a hard copy to the onsite District Representative and upload to PMS. Provide copies of all issues deviation reports and logs provide a hard copy to the onsite District Representative and upload to PMS. Provide daily inspection reports uploaded to PMS under daily reports. One hard copy needs to be filed on site with the inspector and another hard copy needs to be delivered to the onsite District Representative. Provide semi-monthly reports need to the onsite district representative and upload to PMS. Schedule and coordinate with all special testing and laboratory inspections and assist in validating invoices. Attend weekly onsite construction meetings, preconstruction meetings and any other special meetings as required by the district. 4. Methodology of Contracting for Project Inspection Services The District will determine project assignments for the selected pool of consultants firms. Contracts will be awarded to selected firms based on accepted project assignments and agreed to cost proposals. Being selected to the pool does not commit the District to contracting with any given consultant or guarantee work will be assigned. Fees shall be negotiated based on the firm s project assignments and current standard billing rate as submitted in the SOQ. Page 6 of 13

5. Billing Rates Provide the billing rates for each DSA classification and any other proposed staff that make up your core team. Make sure that the employee types (billing line entries) clearly correlates with the project-specific titles. Assume the following: Consultant will provide computer and mobile phones for its team. Final selection of proposed staff is subject to District approval. District to provide a furnished field office during construction phase only Consultant required to invoice monthly District Representative will review monthly invoices and hours submitted for each IOR on every project. B. SELECTION PROCESS 1. Project Inspection Team The District will create a pool of Project Inspection firms from which it can assign specific projects. All SOQs will be scored through a preliminary screening process outlined in section C along with verification of reference contacts. Those firms who qualified through the preliminary screening process may be invited to participate in the final screening process which may consist of an interview. Specific information regarding the interview will be available upon notification of the firm completing the preliminary screening. The District reserves the right to make a selection or terminate the selection process anytime during the RFQ process. 2. RFQ Addenda All questions and comments must be emailed to our Contracts Administrator, Fe Bongolan at BongolanF@sfusd.edu. Written questions accepted from May 8 May 18, 2012 Addenda (if required) posted to web site after May 22, 2012 C. CONTENT OF PROPOSALS AND EVALUATION CRITERIA Please provide the following information in the order given below. SOQs will be carefully evaluated for completeness and ability to perform the work indicated based on the information provided in the following categories: Page 7 of 13

1. Introductory/Cover Letter (maximum length: 1 page, 0 points max.) a) The full name and address of the firm or project team. b) Confirm that the office is within 30 miles of the SFUSD facilities office located at 135 Van Ness Avenue in San Francisco, CA. c) Name, email address and phone number of a designated contact person. d) A brief description of your firm s typical services. 2. Professional Qualifications and Experience, Project Approach (maximum length: 10 pages, 40 points max.) a) Firms Project Experience: (15 pts) Clearly demonstrate your firm s ability to successfully furnish the services described in Exhibit A of this RFQ with the team members mentioned in this SOQ. 1. Provide a list of projects summarizing California DSA Project Inspector experience over the last five (5) years. For each project include: the contact name and phone number, brief description of the work, schedule and construction cost. 2. Provide a list at least three (3) professional references from previous clients including name, title/position, telephone number, project name and responsibilities performed for the firm. b) Inspector Project Experience: (25pts) Clearly demonstrate each Project Inspector s ability to successfully furnish the services described in Section A.3-Description of Project Inspection Services of this RFQ. 1. Provide each Inspectors DSA Classifications, certification number and any other licenses and/or certifications the individual may have. 2. Provide a summary of each team member s involvement with California DSA Projects, as a Project Inspector, over the last over the last five (5) years. For each project include: the contact name and phone number, brief description of the work, schedule and construction cost. 3. Also include any experience with State and Local Agencies: Department of State Architect (outside of Project Inspection), Dept of Substance Control (DTSC),Office of Public Schools (OPSC) and California Dept of Education (CDE), Public Utilities (PG&E, SFPUC, SFDPW, SFPD) 4. Describe what your individual approach was to quality assurance and quality control for each project. 3. Billing Rates and Fees (maximum length: 1 page, 5 points max.) Provide hourly rate for each DSA classification and any other employee anticipated to be assigned to the project. Make sure that the employee type matches billing line entries and clearly correlates with the project-specific titles. 4. DVBE Goals (maximum length: 2 pages 5 points max.) If your firm or team can meet DVBE goals, indicate how, either directly or though subconsultants or sub-contractors. Page 8 of 13

5. Insurance (maximum length: 1 page, 5 points max.) Provide copy of current insurance coverage issued by Consultant s Insurance carrier that meets minimum District requirements (see page 4, section A.1). 6. Prior Claims (maximum length: 1 page, 10 points max. and max. deduct 10) Provide a complete listing of the formal (written) claims presented to the firm, joint venture partners, outside consultants, and/or in the past three (3) years include: a. The name of the claimant. b. A brief description of the claim. c. The dollar value of the claim. d. Whether the claim was accepted, rejected, or if settlement of any type was made in full or part without admission of guilt or negligence. If handling of the claim is still in process, clearly indicate resolution pending. e. End the list with statement Under penalty of disbarment I certify this list to be complete and accurate. Have the statement dated and signed by a company principal or senior representative. In the case that the firm, joint venture partners, outside consultants, and/or subcontractors as a group do not have any errors or liability claims presented in the past three years submit the statement Under penalty of disbarment I certify that firms, joint venture partners, outside consultants, and/or subcontractors represented by this Qualifications do not have any claims associated with errors or liability in the past three years. Have this statement signed and dated by a company principal or senior representative. SUGGESTED LENGTH OF PROPOSAL/SUBMITTAL: 16 pages single sided or 8 pages double sided Excluding resumes MAXIMUM POINTS POSSIBLE: 65 points Page 9 of 13

7. EVALUATION CRITERIA SCORING SHEET Evaluation Criteria: IOR Points Score Introductory Cover Letter (maximum length- 1 page) 0 Professional Qualifications and Experience, Project Approach (maximum length- 10 pages) 40 a) Firms Project Experience: (15pts) Clearly demonstrate your firm s ability to successfully furnish the services described in Exhibit A of this RFQ with the team members mentioned in this SOQ. 1. Provide a list of projects summarizing California DSA Project Inspector experience over the last five (5) years. For each project include: the contact name and phone number, brief description of the work, schedule and construction cost. 2. Provide a list at least three (3) professional references from previous clients including name, title/position, telephone number, project name and responsibilities performed for the firm. b) Inspector Project Experience: (25pts) Clearly demonstrate each Project Inspector s ability to successfully furnish the services described in Section A.3-Description of Project Inspection Services of this RFQ. 1. Provide each Inspectors DSA Classifications, certification number and any other licenses and/or certifications the individual may have. 2. Provide a summary of each team member s involvement with California DSA Projects, as a Project Inspector, over the last over the last five (5) years. For each project include: the contact name and phone number, brief description of the work, schedule and construction cost. 3. Also include any experience with State and Local Agencies: Department of State Architect (outside of Project Inspection), Dept. of Substance Control (DTSC),Office of Public Schools (OPSC) and California Dept. of Education (CDE), Public Utilities (PG&E, SFPUC, SFDPW, SFPD) 4. Describe what your individual approach was to quality assurance and quality control for each project. Billing Rates and Fees (maximum length- 1 page) 5 Provide hourly rate for each DSA classification and any other employee anticipated to be assigned to the project. Make sure that the employee type matches billing line entries and clearly correlates with the project-specific titles.. DVBE Goals (maximum length- 2 pages) 5 Complete the State forms for DVBE participation, or describe how your team will encourage DVBE participation in these projects. Insurance (maximum length- 1 page) 5 Provide copy of current insurance coverage issued by Consultant s Insurance carrier that meets minimum District requirements (see page 4, section A.1). Prior Claims (maximum length - 1 page) 10 Provide a complete listing of the formal (written) claims presented to the firm, joint venture partners, outside consultants, and/or in the past three (3) years include: a. The name of the claimant. b. A brief description of the claim. c. The dollar value of the claim. d. Whether the claim was accepted, rejected, or if settlement of any type was made in full or part without admission of guilt or negligence. If handling of the claim is still in process, clearly indicate resolution pending. e. End the list with statement Under penalty of disbarment I certify this list to be complete and accurate. Have the statement dated and signed by a company principal or senior representative. In the case that the firm, joint venture partners, outside consultants, and/or subcontractors as a group do not have any errors or liability claims presented in the past three years submit the statement Under penalty of disbarment I certify that firms, joint venture partners, outside consultants, and/or subcontractors represented by this Qualifications do not have any claims associated with errors or liability in the past three years. Have this statement signed and dated by a company principal or senior representative. TOTAL SCORE (Maximum points) 0-65 Page 10 of 13

D. RFQ SCHEDULE RFQ SCHEDULE MILESTONES (Subject to Change) Advertise RFQ May 8, 2012 Written questions accepted May 8 May18, 2012 Addenda (if required) posted to web site after May 22, 2012 SOQ Due Date May 30, 2012 at 2:00 pm Shortlist Notification June, 2012 Interviews (If Applicable) July/August 2012 The District reserves the right, at its sole discretion, to modify RFQ requirements, cancel the selection process, amend the schedule, or selection process. Proposers shall not be reimbursed for any costs associated with the preparation of proposals in response to this RFQ. END OF REQUST FOR QUALIFICATIONS Page 11 of 13

EXHIBIT A PROPOSITION A 2011 BOND Facilities that will have this work performed include the following: Argonne Elementary School Bret Harte Elementary CDC Cesar Chavez Elementary School Daniel Webster Elementary School & CDC El Dorado Elementary School Enola Maxwell Campus (ISA) Frank McCoppin Elementary School & CDC Garfield Elementary School & CDC George Moscone Elementary School George Peabody Elementary School Gordon J Lau Elementary School Guadalupe Elementary School Ida B Wells High School James Lick Middle School Jean Parker Elementary School & CDC John Yehall Chin Elementary School Jose Ortega Elementary School Junipero Serra Elementary School & CDC Lafayette Elementary School Las Americas CDC Longfellow Elementary School McAteer Campus (School of the Arts) McKinley Elementary School Miraloma Elementary School Monroe Elementary School & CDC Paul Revere Annex Paul Revere Elementary School Philip & Sala Burton High School Campus Presidio Middle School Redding Elementary School & CDC Robert Louis Stevenson Elementary School Rooftop Elementary School - Nancy Mayeda Campus Roosevelt Middle School Sarah B. Cooper Child Development Center Sheridan Elementary School Starr King Elementary School Sunnyside Elementary School Tule Elk Park Child Care Center Visitacion Valley Elementary School Visitacion Valley Middle School Yick Wo Elementary School George Washington High/Seismic Retrofit Lowell High School/Seismic Retrofit Willie L. Brown, Jr. School Former San Miguel Elementary School Page 12 of 13 680 18th Avenue 950 Hollister Avenue 825 Shotwell Street 465 Missouri Street 70 Delta Street 655 De Haro Street 651 6th Avenue 420 Filbert Street 2576 Harrison Street 251 6th Avenue 950 Clay Street 859 Prague Street 1099 Hayes Street 1220 Noe Street 840 Broadway Street 350 Broadway Street 400 Sargent Street 625 Holly Park 4545 Anza Street 801 Treat Avenue 755 Morse Street 555 Portola Drive 1025 14th Street 175 Omar Way 260 Madrid Street 610 Tompkins Street 555 Tompkins Street 400 Mansell Street 450 30th Avenue 1421 Pine Street 2051 34th Avenue 500 Corbett Avenue 460 Arguello Street 940 Filbert Street 431 Capitol Avenue 1215 Carolina Street 250 Foerster Street 2110 Greenwich Street 55 Schwerin Street 450 Raymond Street 2245 Jones Street 600 32nd Avenue 1101 Eucalyptus Drive 2055 Silver Avenue* 300 Seneca Street

GREEN SCHOOL YARDS Argonne Elementary School Cesar Chavez Elementary School Daniel Webster Elementary School & CDC El Dorado Elementary School Frank McCoppin Elementary School & CDC Garfield Elementary School & CDC George Moscone Elementary School George Peabody Elementary School Gordon J Lau Elementary School Guadalupe Elementary School Jean Parker Elementary School & CDC John Yehall Chin Elementary School Jose Ortega Elementary School Junipero Serra Elementary School & CDC Lafayette Elementary School Longfellow Elementary School McKinley Elementary School Miraloma Elementary School Monroe Elementary School & CDC Paul Revere Annex Paul Revere Elementary School Redding Elementary School & CDC Robert Louis Stevenson Elementary School Rooftop Elementary School - Nancy Mayeda Campus Sheridan Elementary School Starr King Elementary School Sunnyside Elementary School Visitacion Valley Elementary School Yick Wo Elementary School Lower priority facilities for the use of these funds include: Bret Harte Elementary CDC Enola Maxwell Campus (ISA) Ida B Wells High School James Lick Middle School Las Americas CDC McAteer Campus (School of the Arts) Philip & Sala Burton High School Campus Presidio Middle School Roosevelt Middle School Sarah B. Cooper Child Development Center Tule Elk Park Child Care Center Visitacion Valley Middle School Yick Wo Elementary School Willie L. Brown, Jr. School 680 18th Avenue 950 Hollister Avenue 465 Missouri Street 70 Delta Street 651 6th Avenue 420 Filbert Street 2576 Harrison Street 251 6th Avenue 950 Clay Street 859 Prague Street 840 Broadway Street 350 Broadway Street 400 Sargent Street 625 Holly Park 4545 Anza Street 755 Morse Street 1025 14th Street 175 Omar Way 260 Madrid Street 610 Tompkins Street 555 Tompkins Street 1421 Pine Street 2051 34th Avenue 500 Corbett Avenue 431 Capitol Avenue 1215 Carolina Street 250 Foerster Street 55 Schwerin Street 2245 Jones Street 1035 Gilman Street 655 De Haro Street 1099 Hayes Street 1220 Noe Street 801 Treat Street 555 Portola Drive 400 Mansell Street 450 30th Avenue 460 Arguello Street 940 Filbert Street 2110 Greenwich Street 450 Raymond Street 2245 Jones Street 2055 Silver Avenue Page 13 of 13