Trust Board Meeting : Wednesday 11 March 2015 TB

Similar documents
Full Business Case. County Hospital Outpatients (Executive Summary) May Contents

OUTLINE BUSINESS CASE FOR THE DEVELOPMENT OF A&E SERVICES AT ANTRIM AREA HOSPITAL

CT Scanner Replacement Nevill Hall Hospital Abergavenny. Business Justification

An Outline Business Case for the New Emergency Centre (Phase 1) at New Cross Hospital

Emergency Centre Outline Business Case

Business Case for Capital Works Neonatal Unit at Daisy Hill Hospital

Worcestershire Acute Hospitals NHS Trust

Renal Unit - Full Business Case. Full Business Case Executive Summary. Renal Unit

Debbie Vogler, Director of Business & Enterprise. Kate Shaw, Associate Director of Service Transformation

UNIVERSITY HOSPITALS OF MORECAMBE BAY NHS FOUNDATION TRUST BOARD OF DIRECTORS. Emergency Department Progress Report

GOVERNING BODY MEETING in Public 29 November 2017 Agenda Item 5.4

EXECUTIVE SUMMARY REPORT TO THE BOARD OF DIRECTORS HELD ON 22 MAY Anne Gibbs, Director of Strategy & Planning

Addressing ambulance handover delays: actions for local accident and emergency delivery boards

WALSALL HEALTHCARE NHS TRUST

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 2 November Integrated Health and Social Care Model for Dalweem Care Home, Aberfeldy

Healthwatch Kent Enter & View Programme 2016 Winter Pressures Feb 2016

NHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY MEETING FINANCIAL POSITION AS AT 30TH NOVEMBER C Hickson, Head of Management Accounts

NHS Portsmouth CCG 2013/14 Contract Agreements Summary. Michelle Spandley Deputy Chief Finance Officer May Improving health services

North West London Accident and Emergency Performance Report for the winter of 2016/17. North West London Joint Health Overview and Scrutiny Committee

Urgent and Emergency Care Review update: from design to delivery

November NHS Rushcliffe CCG Assurance Framework

APPENDIX 7C BENEFITS REALISATION PLAN

Strategic Risk Report 1 March 2018

Nottingham University Hospitals Emergency Department Quality Issues Related to Performance

Agenda Item No: 6.2 Enclosure: 4 17/1/02012 Intended Outcome:

NHS England South Escalation Framework

Quality and Safety Strategy

Frail Elderly Assessment Unit (FEAU)

Appendix A: University Hospitals Birmingham NHS Foundation Trust Draft Action Plan in Response to CQC Recommendations

Leicester, Leicestershire and Rutland s Sustainability & Transformation Plan (STP)

: Geraint Davies, Director of Commercial Services

Patient survey report Survey of adult inpatients in the NHS 2009 Airedale NHS Trust

Inpatient and Community Mental Health Patient Surveys Report written by:

Note: 44 NSMHS criteria unmatched

Overall rating for this trust Good. Inspection report. Ratings. Are services safe? Requires improvement. Are services effective?

Frequently Asked Questions (FAQs) Clinical Futures (including The Grange University Hospital)

Taranaki District Health Board

MULTIDISCIPLINARY MEETINGS FOR COMMUNITY HOSPITALS POLICY

Patient survey report Survey of adult inpatients 2016 Chesterfield Royal Hospital NHS Foundation Trust

Report on actions you plan to take to meet CQC essential standards

Our Achievements. CQC Inspection 2016

TRUST BOARD PUBLIC APRIL 2014 Agenda Item Number: 79/14 Enclosure Number: (8) Subject: National inpatient Experience Survey 2013 Prepared by:

Patient survey report Survey of adult inpatients in the NHS 2010 Yeovil District Hospital NHS Foundation Trust

SCOTTISH BORDERS HEALTH & SOCIAL CARE INTEGRATED JOINT BOARD UPDATE ON THE DRAFT COMMISSIONING & IMPLEMENTATION PLAN

BIRMINGHAM CITY COUNCIL SERVICE REVIEWS GREEN PAPER UPDATE: ADULTS SOCIAL CARE INTRODUCTION THE BUDGET NUMBERS

National Inpatient Survey. Director of Nursing and Quality

Governing Body meeting on 13th September 2018

Improving Mental Health Services in Bath & North East Somerset

Norfolk and Waveney STP - summary of key elements

Please find below the response to your recent Freedom of Information request regarding Continence Services within NHS South Sefton CCG.

21 March NHS Providers ON THE DAY BRIEFING Page 1

Key Objectives To communicate business continuity planning over this period that is in line with Board continuity plans and enables the Board:

Your Care, Your Future

Safe staffing for nursing in A&E departments. NICE safe staffing guideline Draft for consultation, 16 January to 12 February 2015

Eastbourne, Hailsham and Seaford CCG Item Number: Formal Governing Body meeting Date of meeting: 13 November /13

Shaping the best mental health care in Manchester

Camden and Islington. Foundation Trust Headquarters. St Pancras Hospital. Highgate Mental Health Centre. Camden and Islington NHS

Urgent & Emergency Care Strategy Update

Wolverhampton CCG Commissioning Intentions

Numerator. Denominator Rationale for inclusion

CQC Mental Health Inpatient Service User Survey 2014

Patient survey report Inpatient survey 2008 Royal Devon and Exeter NHS Foundation Trust

Board pushes ahead with development plans

WOLVERHAMPTON CCG. Governing Body Meeting 9 th September 2014

Tracey Williams (Head of Service Improvement), Kate Danskin (RTC Coordinator)

Summary two year operating plan 2017/18

Unless this copy has been taken directly from the Trust intranet site (Pandora) there is no assurance that this is the most up to date version

Trust Board Meeting: Wednesday 12 March 2014 TB Peer Review Programme Implementation Update

Quality Strategy (Refreshed March 2015)

SUBJECT: NHSL CORPORATE RISK REGISTER. For approval For endorsement X To note. Prepared Reviewed X Endorsed

Any Qualified Provider: your questions answered

Patient survey report Survey of adult inpatients 2012 Sheffield Teaching Hospitals NHS Foundation Trust

Patient survey report Survey of adult inpatients 2013 North Bristol NHS Trust

Premises Assurance Model

ESHT Our ambition to be outstanding by 2020

Right place, right time, right team

BOARD OF DIRECTORS. Sue Watkinson Chief Operating Officer

Operational Focus: Performance

Seven Day Services Clinical Standards September 2017

CARERS POLICY. All Associate Director of Patient Experience. Patient & Carers Experience Committee & Trust Management Committee

Report of the Care Quality Commission. May 2017

Leeds West CCG Business Case for Recurrent or Non Recurrent Funding request.

Overall rating for this trust. Quality Report. Ratings

Section 1 Executive Summary

2020 Objectives July 2016

Emergency admissions to hospital: managing the demand

Contract of Employment

CLINICAL AND CARE GOVERNANCE STRATEGY

Integrated Performance Report Executive Summary (for NHS Fife Board Meeting) Produced in February 2018

Kingston Hospital NHS Foundation Trust Length of stay case study. October 2014

Service Transformation Report. Resource and Performance

NHS Equality Delivery System for Isle of Wight NHS Trust. Interim baseline assessment against the

Patient survey report Survey of adult inpatients 2011 The Royal Bournemouth and Christchurch Hospitals NHS Foundation Trust

NHS Ayrshire and Arran. 1. Which of the following performance frameworks has the most influence on your budget decisions:

Survey of adult inpatients in the NHS, Care Quality Commission comparing results between national surveys from 2009 to 2010

NICE guideline Published: 22 September 2017 nice.org.uk/guidance/ng74

Calderdale and Huddersfield NHS Foundation Trust End of Life Care Strategy

BOARD OF DIRECTORS PAPER COVER SHEET. Meeting Date: 27 May 2009

WAITING TIMES 1. PURPOSE

Agenda Item: REPORT TO PUBLIC BOARD MEETING 31 May 2012

Transcription:

Trust Board Meeting : Wednesday 11 March 2015 Title Business Case for the Refurbishment and Reconfiguration of the bed based areas of the Emergency Assessment Unit at the John Radcliffe Hospital, to deliver improvements in Single Sex Accommodation, Privacy and Dignity and Patient Safety Status For approval History Supported by Business Planning Group 16/2/15 Supported by MRC DME 23/2/15 Supported by TME 26/2/15 Board Lead Mr Paul Brennan, Director of Clinical Services Key purpose Strategy Assurance Policy Performance EAU Page 1 of 21

Executive Summary 1. This business case seeks approval for capital and revenue investment to refurbish and reconfigure the bed-based area within the Emergency Assessment Unit (EAU) at the John Radcliffe Hospital. This will increase capacity, improve patient flow and deliver significant qualitative improvements in single sex accommodation, privacy and dignity and patient safety within the unit. 2. Patients are referred to the EAU by their GP or by the Emergency Department (ED) for a specialist medical opinion. Since the unit was originally designed the volume of presenting patients, their clinical needs and the models of clinical care have changed dramatically. The current facilities and their configuration do not optimally meet the needs of this patient group. Investment is required to refurbish and reconfigure the bed-based area of EAU to enable a high quality service to be sustainably delivered. 3. The proposed reconfiguration will allow significant shortcomings to be addressed in the following areas, to deliver : Improvements to infection control requirements Enhanced privacy and dignity for patients Higher levels of patient confidentiality Clinically appropriate ambulatory care Secure record keeping Compliance with medication policy Compliance and improvement of single sex requirements A more dementia friendly environment Improve the safety of vulnerable patients Improve the clinical safety of staff Additional bed capacity Improvements to clinical processes and flow An enhanced patient experience Allow for enhanced information technology to support high quality, safe clinical care and management 4. The financial implications of this proposal are : Capital investment of 954k (incl. VAT). Provision has been made within the Capital Programme for this development. 8k per annum revenue consequences (capital charges) 5. The procurement route for the works may be by measured term contract, or by competitive tender. It is proposed to delegate authority for selection of the appropriate procurement route to the Director of Finance and Procurement, in consultation with the Director of Clinical Services, and the Director of Development and the Estate. 6. Recommendation It is recommended that the Trust Board approve: Refurbishment of the inpatient area within EAU Capital investment of 954k (incl. VAT) Annual revenue consequences of 8k per annum Delegation of authority for selection of the appropriate procurement route to the Director of Finance and Procurement, in consultation with the Director of Clinical Services, and the Director of Development and the Estate. EAU Page 2 of 21

Business Case for the Refurbishment and Reconfiguration of the bed based areas of the Emergency Assessment Unit at the John Radcliffe Hospital, to deliver improvements in Single Sex Accommodation, Privacy and Dignity and Patient Safety Appendices Appendix A Current EAU layout Appendix B Proposed EAU Works Appendix C Estates Work Estimate Appendix D Equality Analysis Form Background papers (if any) Strategic Objectives that the case will help deliver Proposed date that revenue spend will begin: Proposed date that capital spend will begin: Conclusion of Equality Analysis SO1 To be a patient-centred organisation, providing high quality, compassionate care with integrity and respect for patients and staff delivering compassionate excellence SO4 To provide high quality general acute healthcare to the people of Oxfordshire, including more joined up care across local health and social care services delivering integrated healthcare October 2015 March 2015 This proposal will improve access and the environment within EAU which will benefit all patients who are cared for in this area. Review Date September 2017 Acronyms and abbreviations used Authors EAU Emergency Assessment Unit ED Emergency Department ECIST Emergency Care Intensive Support Team Ms Siobhan Hurley, Operational Service Manager Acute Medicine & Rehabilitation Dr James Price, Clinical Director Acute Medicine & Rehabilitation Ms Louise Rawlinson, Matron Emergency Department / Emergency Assessment Unit Ms Caroline Mills, MRC Service Improvement and CQUIN Manager EAU Page 3 of 21

Lead Finance Manager Lead Estates Manager Mr Andrew Hall, Divisional Business Partner Ms Louise Bishop, Estates Project Manager EAU Page 4 of 21

Business Case for the Refurbishment and Reconfiguration of the bed based areas of the Emergency Assessment Unit at the John Radcliffe Hospital to deliver improvements in Single Sex Accommodation, Privacy and Dignity and Patient Safety 1. Strategic Context and Case for Change 1.1. Overview 1.1.1. The Emergency Assessment Unit (EAU) at the John Radcliffe Hospital accepts referrals from primary care and the Emergency Department (ED) where a specialist medical opinion or observations are required. The EAU plays a key role in supporting the workload of the ED by offering adjacent and complementary care for this patient group. 1.1.2. EAU provides the clinical space for the care of those with mental health issues awaiting specialist input. Currently there is no specified or specifically designed space to meet the needs of this patient group in the department. This space is called a green room. Without this type of space the patient, staff and other people in EAU are placed at risk. 1.1.3. The EAU has a policy of maximum stay of 12 hours within the unit before discharge or admission to other hospital beds. At peak times there is acute pressure to maintain flow in the unit with rapid and frequent changes in the patients being cared for. 1.1.4. The current design of the department no longer supports the needs of patients or the delivery of evidence based models of care recommended for implementation, for example around ambulatory and dementia care. 1.1.5. Environmental challenges to the delivery of high quality care to patients include: Compromises to patient s privacy and dignity Limited areas for confidential patient consultations The size of the medication room is limited and impacts on the ability to provide timely take home medications Toilet facilities are located away from the patient areas 1.1.6. There is currently little differentiation between assessment, ambulatory and bedded treatment areas. 1.1.7. This business case supports the key recommendations from : Emergency Care Intensive Support Team (ECIST), 2014 Care Quality Commission (CQC), 2014 Design Council Reducing Violence in A&E, 2011 http://www.designcouncil.org.uk/projects/reducing-violence-andaggression-ae British Geriatrics Society Silver Book Quality Care for Older People with Urgent and Emergency Care Needs, 2012 http://www.bgs.org.uk/index.php/bgscampaigns-715/silverbookt EAU Page 5 of 21

1.1.8. The Trust Business Plan 2014-16 specified the need for reconfiguration of emergency assessment capacity and facilities. This proposal supports the delivery of this need. 1.1.9. This business case seeks to reconfigure the main inpatient area and interior corridor between EAU and the ED. The department is landlocked by surrounding departments, increasing the importance of utilising available space efficiently. To achieve the most efficient and clinically effective space the works will include: Moving the location of side rooms Introducing appropriately positioned bathroom facilities Increasing private assessment spaces Rationalising the position and size of utility rooms and non-patient spaces. The proposed changes are evidence based to reflect the current and future needs and demands of the department. 1.2. Demand on Services in EAU 1.2.1. The use of EAU as a flexible non-elective medical assessment space is vital to maintaining and managing the flow of admissions into the Trust. The majority of the admissions originate from the ED and require either further medical assessment or high level care prior to moving into another acute hospital bed. 1.2.2. Demand in the past three calendar years is shown below (based on OHIS figures) : Annual admissions Average daily admissions 2012 2013 2014 (forecast out-turn) 21,451 23,462 22,559 59 64 62 1.2.3. It is recognised that congestion in EAU, with limited patient movement away from the unit, has a disproportionate impact on flow throughout the John Radcliffe. With an average of 62 new patients passing through 29 beds and 15 chairs each day the requirement to maintain single sex accommodation and protect the privacy and dignity of the patients is a significant challenge. The current environment does not promote the efficient use of ambulatory space in a separate environment from those requiring bed based care. EAU Page 6 of 21

1.3. Current and Future Size and Layout 1.3.1. Appendix A shows the EAU floor plan. Appendix B shows the construction area for this scheme. The table below provides a summary of the changes to the clinical space within the EAU, resulting from this scheme : Area Current accommodation Proposed accommodation MDT Assessment space 2 (off unit) 3 (on unit) +1 Female beds 8 11 +3 Female side rooms 3 3 0 Male beds 10 8-2 Male side rooms 2 3 +1 Green Room 0 1 +1 Total 25 29 +4 Change 1.3.2. Other changes, such as the moving of toilets, staff bases and linen stores will make more appropriate use of the limited space available. 1.4. Proposed Changes 1.4.1. This proposal will effect the following changes : Improvements to infection control requirements Area Type of change Impact Medication Room Near Patient Testing area Improved size Minimised travel distances for staff Reduces risk of cross contamination New facility Increases speed of diagnosis and medical planning Minimises potential of samples being left on the ward Dirty linen store Improved size Secured area located close to the hospital street to reduce the need for porters to enter the main circulation space of the unit Dirty utility room Improved size Minimised travel distances for staff Reduces risk of cross contamination Enhances infection control Patient toilet and shower facilities Increased number Sex appropriate WC are moved to adjacent clinical area Separate sex appropriate shower facilities EAU Page 7 of 21

Limits movement though the unit Reduces risk of contamination Separate rapid assessment WC limits cross contamination with inpatients Enhanced privacy and dignity for patients Area Type of change Impact Assessment cubicles Improved size Separate, private area for discussions away from bed based areas Appropriate area for personal examinations Patient toilet and shower facilities Increased number Reduction of patients having to leave single sex designated areas Bedded zone New configuration Increased bed numbers Better management of area space to reflect patient population Demarcation of bedded / ambulatory area aiding management of movement of people through areas Higher levels of patient confidentiality Area for change Type of change Impact MDT base Area set back from areas New facilities populated by patients Area outside earshot for telephone calls Assessment cubicles Improved size Separate and flexible areas for discussions / examinations with patients that will not be used as part of the bed base EAU Page 8 of 21

Secure record keeping Area for change Type of change Impact MDT base New facilities Area set back for record storage and review Compliance with medication policy Area for change Type of change Impact Medication room Minimised travel distances for staff Improved size Appropriate secure storage Near Patient Testing area New facility Improved diagnostics prior to medication Compliance and improvement of single sex requirements Area for change Type of change Impact Bedded zone New configuration Better management of area space Increased bed to reflect patient population numbers Demarcation of bedded / ambulatory area aiding management of movement of people through areas Patient toilet and shower facilities Increased number Facilities provided within the sex appropriate area Dementia friendly environment Area for change Type of change Impact Bedded zone New configuration Increased bed numbers Calmer environment with increased side room facilities to be used as required. Spaces to be decorated according to best principles Reduced noise and staff congestion Signage Improved quality Compliance with Silver Book guidance on clear signage to create a clearer environment EAU Page 9 of 21

Improved safety of patients and staff Area for change Type of change Impact Green room New facility For use by psychiatric patients and/or police interviews Provides 3 exit routes for safety Set aside from other patient areas Close access to MDT staff base for monitoring Medication room Improved size Secure and central area for controlled drugs E-prescribing computers to support prescribing Sufficient space for preparation of medication Bedded zone New configuration Increased bed numbers Beds replacing trolleys Reduce instance of pressure sores Additional bed capacity Area for change Type of change Impact Bedded zone New configuration Additional bed and side room Increased bed Reconfiguration of beds to numbers rationalise male / female spilt Beds replacing trolleys Improvements to clinical processes and flow Area for change Type of change Impact Bedded zone New configuration Minimised travel distances for staff Increased bed Improved IT access in appropriate numbers areas Separation of ambulatory patients from inpatients, differentiating pathways MDT base New facilities Dedicated area for MDT working Improved IT access in all areas EAU Page 10 of 21

Enhanced patient experience Area for change Type of change Impact Ambulance turnaround times Improved configuration Reduction in delays in handover from ambulance crews Equalising departmental temperatures New equipment Revision of the Air Handling Unit will allow for appropriate temperature control Assessment cubicles New configuration Increased number Improved privacy Space for sensitive conversations Bedded zone New configuration Increased bed numbers Less interruption by staff Beds rather than trolleys Improved privacy and dignity Calmer environment Medication room Near Patient Testing area Improved size More responsive medication turnaround, limiting time in department New facility Faster diagnostics to improve time to diagnosis and patient turnaround Patient toilet and shower facilities Increased number Improved facilities based on appropriate single sex areas Green Room New facility Acts as a family room which is not currently provided in the unit Safe area for patients with mental health needs Signage Improved quality Clearer direction around department Demarcation of clinical areas. 2. Objectives and Benefits Criteria 2.1. Reduction in complaints 2.1.1. The maintenance of privacy and dignity in this high volume patient flow area is recognised as being challenging to deliver. The proposed improvements will enable some of these issues to be managed more appropriately and reduce the number of complaints received. EAU Page 11 of 21

2.1.2. Improved infrastructure will support the unit in developing models of care that provide a safer environment based on evidence from : Emergency Care Intensive Support Team (ECIST) OUH report, 2014 Care Quality Commission (CQC) OUH reprot, 2014 Design Council Reducing Violence in A&E, 2011 http://www.designcouncil.org.uk/projects/reducing-violence-andaggression-ae British Geriatrics Society Silver Book Quality Care for Older People with Urgent and Emergency Care Needs, 2012 http://www.bgs.org.uk/index.php/bgscampaigns-715/silverbookt Many complaints centre on confidentiality. With the movement of the MDT staff base and accompanying changes, changes in practice can be introduced which will support improvements in this area. 2.2. Improved staff and patient environment 2.2.1. The current environment does not provide an optimal environment that supports the delivery of care to this patient group. 2.2.2. Staff do not have the access to information technology to aid process driven improvements. 2.2.3. The separation of inpatient and ambulatory spaces supports the utilisation of staff to care for the most acutely ill patient. 2.2.4. The reallocation of spaces to support single-sex accommodation will enhance the patient environment. 2.3. Promotion of Ambulatory model 2.3.1. Ambulatory care is a patient focused service where some conditions may be treated without the need for an overnight stay in hospital. 2.3.2. The demarcation of ambulatory spaces from inpatient beds promotes rapid assessment and decision making, improving flow within the department. 2.3.3. Supports the implementation of National Ambulatory Emergency Care guidance from the Institute of Innovation and Improvement. 2.4. Increased Patient Safety 3. Options 2.4.1. As seen in section 1.4, the reconfiguration will allow the limited space of EAU to be used in a way that supports best clinical practice. 3.1. The following options have been considered in the development of this proposal: 3.1.1. Option 1 Do Nothing Risks around safety, privacy & dignity and single sex accommodation will continue. Continued environmental challenges will impact on patient turnaround. EAU Page 12 of 21

3.1.2. Option 2 Reconfiguration of inpatient area within the current footprint to support patient flow and care within the non-elective pathway. 4. Option Appraisal Using Benefit Criteria Benefit criteria Option 1 Do nothing Option 2 Full reconfiguration of inpatient area Increase capacity to better meet patient demand To create an environment that provides single sex accommodation and bathroom facilities Provide a physical environment which supports the development of ambulatory care To enhance the patient experience To improve infection control within the clinical areas To create a calmer and more secure environment for vulnerable patient groups 4.1. The preferred option is Option 2. 5. Financial Analysis of Preferred Option 5.1. Capital and Revenue Costs Element Refit/reconfiguration but assume some new functionality e.g. additional bathrooms Value 000s 954 Estimated % addition to Depreciated Replacement 10% Cost Estimated increase in DRC 000s 95 Estimated remaining useful life 20 Depreciation 000s 4.75 Cost of Capital (year one) 000s 3.24 Total capital charges 000s 7.99 EAU Page 13 of 21

5.1.1. The works relate largely to the reconfiguration of existing space, e.g. removing existing partitions and putting new ones in place. This does not add to the estimated replacement cost of the estate. However there is also an element of increasing the services provided to meet single sex and privacy and dignity requirements, e.g. new bathrooms. This will add some value to the infrastructure, estimated at 10% of gross cost. 5.1.2. Capital costs are 954k (incl. VAT) with revenue consequences of 8k per annum. 5.1.3. There is provision in the Trust Capital Programme to fund this scheme 6. Market Assessment (including commissioner discussions) 6.1. This scheme is consistent with Oxford Clinical Commissioning Group s desire to optimise the use of ambulatory pathways for emergency and urgent care, for clinically appropriate patients. 6.2. This development supports the promotion of dementia friendly environments, the widening of the application of the ambulatory pathway, demarcation between inpatient and ambulatory needs, and the promotion of patient safety in all aspects of clinical care. 7. Benefits realisation 7.1. The table below shows the quantifiable benefits of the proposal and the plan for achieving them: Benefit Increase in clinical capacity Reduction in complaints Increase staff satisfaction Increased use of ambulatory model of care Reduction in incidents relating Performance Measure Number clinical areas available for the management of care Reduction in formal complaints National Staff survey Proportion of patients discharged before midnight Reduction in recorded Current Value Target Value Target Date 2 assessment cubicles 5 side rooms 18 inpatient beds 0 dedicated space for care of patients with Psychological Medicine issue 3 assessment cubicles 6 side rooms 19 inpatient beds 1 dedicated space for care of patients with Psychological Medicine issue Q4 2015/16 17 14 2016/17 TBC 2016/17 29% of attendances 14 10 39% of attendances 2016/17 2016/17 EAU Page 14 of 21

to confidentiality and information governance Reduction in number of falls recorded incidents Recorded incidences of falls. 45 35 2016/17 8. Implementation Plan 8.1. The following table provides an indicative implementation plan : Action Timeline Business Case approved by MRC DME February 2015 Business Case approved by TME February 2015 Business case approved by Trust Board March 2015 Pre-installation works start on site Construction work 6 months Works completed on site Commissioning completed Scheme completed October 2015 8.2. The procurement route for the works may be by measured term contract, or by competitive tender. It is proposed to delegate authority for selection of the appropriate procurement route to the Director of Finance and Procurement, in consultation with the Director of Clinical Services, and the Director of Development and the Estate. 9. Project Management Arrangements 9.1. Estates Project Lead to co-ordinate meetings and planning processes with external contractors and service users 9.2. Dr James Price (Clinical Director for Acute Medicine and Rehabilitation) will be the Project Lead. He will be supported by: Siobhan Hurley, Operational Service Manager for Acute Medicine and Rehabilitation Louise Rawlinson, Emergency Department and Emergency Assessment Unit Matron 10. Management of Risks of Implementation of Proposal 10.1. The table below lists the remaining risks and plan to manage them if the scheme was agreed EAU Page 15 of 21

Risk Impact (I) Likelihood (L) Total (IxL) Mitigating Action Residual Risk Contingency plan to address risk Maintaining service capacity while building works are underway 5 4 20 The programme has been designed to mitigate disruption to the service. Works are provisionally planned to be completed prior to 2015/16 winter period. 8 Managing delivery of the project on time 3 3 9 Project team meetings take place on a regular basis. Continuous review of progress against plan with corrective action taken to address slippage 4 Managing delivery of the project on budget 2 2 4 There are contingencies within the capital projections which will allow for unforeseen capital expenditure to be met 2 11. When and how with the impact and intended effect be reviewed and reported on? 11.1. The impact of the changes will be monitored within the Acute Medicine Directorate Quality and performance structure. 11.2. This will form a standard part of monthly Divisional reporting to TME and the Trust Board on performance. 12. Conclusion 12.1. Since the EAU was originally designed the volume of presenting patients, their clinical needs and the models of clinical care have changed significantly. The current facilities and their configuration do not optimally meet the needs of this patient group. 12.2. Investment is required to refurbish and reconfigure the bed-based area of EAU to enable a high quality service to be sustainably delivered. EAU Page 16 of 21

13. Recommendations 13.1. It is recommended that the Trust Board approve : 13.1.1. Refurbishment of the inpatient area within EAU. 13.1.2. Capital investment of 954k (incl. VAT) 13.1.3. Annual revenue consequences of 8k p.a. 13.1.4. Delegation of authority for selection of the appropriate procurement route to the Director of Finance and Procurement, in consultation with the Director of Clinical Services, and the Director of Development and the Estate. Lead Director: Authors: Paul Brennan, Director of Clinical Services Siobhan Hurley, Operational Service Manager Acute Medicine & Rehabilitation James Price, Clinical Director Acute Medicine & Rehabilitation Louise Rawlinson, Matron Emergency Department / Emergency Assessment Unit Caroline Mills, MRC Service Improvement and CQUIN Manager February 2015 EAU Page 17 of 21

Appendix A Current EAU Layout EAU Page 18 of 21

EAU Page 19 of 21

Appendix B Proposed EAU Works Appendix C Estates Work Estimate EAU Page 20 of 21

Initial Estimate Please note that this Initial Estimate is a preliminary cost based upon outline sketch Project Number 2012.119 Capital Programme Project Name Expansion of EAU Capital Code: 5877 Project Manager Louise Bishop Capital Outturn 13/14: DATE: November 2014 Capital Allocation 14/15: Work Stage Stage 2-8 Charitable Funds: Procurement Strategy MTC therefore no allowance for prelims Total 0 Notes: e.g. cost does not include the following: i) medical equipment - new or relocated Initial Estimate base docs~ GBS Phasing draw ings 6215.172-175B Part 2.2 Month 1-2 Part 2.3 Month 3-4 Part 2.4 Month 4-5 Part 2.5 Month 5-6 Maintenance - total p.a: Construction costs % sub total 0 Construction costs 69,893 208,299 161,724 72,707 Day Works / Out of Hours 2,000 3,000 2,000 2,000 Construction contingencies 10.00 7,189 21,130 16,372 7,471 Sub Total 79,082 232,429 180,096 82,178 Scion Site Manager 15,000 17,500 12,500 12,500 Notes/ Qualification Phasing (Building & Services) 3.00 2,822 7,498 5,778 2,840 sub total 96,905 257,427 198,374 97,518 650,224 Professional fees (VAT 100% recoverable) Assumed 13% of Construction Costs sub total 12,598 33,465 25,789 12,677 84,529 Non works costs Assumed 2% of Construction Costs sub total 1,938.10 5,148.54 3,967.49 1,950.36 13,004 Group 2 & 3 equipment Allowance of 2% Construction Cost Made sub total 1,938.10 5,148.54 3,967.49 1,950.36 13,004 Sub total of Construction Cost (incl. Contingency), Professional fees, Non- Works costs, Group 2 & 3 Equipment costs 113,379 301,189 232,098 114,096 760,762 Area cost Cost per m2 m2 cost based on HPCG's plus allowances for abnormals Planning contingencies % based upon Risk Analysis. % range form 5%-30% (30% advised by NHS at Stage 0) 2.50 2,834 7,530 5,802 2,852 19,019 Total 116,213 308,719 237,900 116,948 779,780.96 Optimism Bias 7.00 8,135 21,610 16,653 8,186 54,585 Inflation - Excluded 0.00 VAT (Excluding Fees) 20.00 22,350 59,373 45,753 22,492 % applied to Construction costs (incl. Contingency), Professional fees, Non works costs and Group 2&3 equipment costs % applied to total Construction costs (inc. Contingency), Professional fees, Non works costs, Group 2&3 equipment costs and Planning contingencies 20% VAT applied to Construction costs (incl. Contingency), Non-works costs, Group 2 & 3 Equipment costs Recoverable VAT 20,40 or 75%. No independent objective assessment of VAT abatement has been undertaken 20.00 4,470 11,875 9,151 4,498 Total Scheme Cost 142,228 377,828 291,156 143,128 954,339 EAU Page 21 of 21