ENVIRONMENTAL MANAGEMENT

Similar documents
ENVIRONMENTAL MANAGEMENT

California Accidental Release Prevention (CalARP) Program Overview

INCIDENT INVESTIGATION

USEPA Chemical Accident Prevention Inspection and Enforcement Processes

SCENARIO 19 Emergency Planning for a Propane Bulk Plant

Arizona Tier Two Chemical Inventory. Arizona Emergency Response Commission

Local Emergency Planning Committee Responsibilities

RMP/PSM Update and Pitfalls

CHEMICAL HYGIENE PLAN

Gasket Failure Causes Leak

EOC Procedures/Annexes/Checklists

EMERGENCY PREPAREDNESS POLICY

CHABOT/LAS POSITAS COMMUNITY COLLEGE DISTRICT

Respiratory Protection Plan

Laboratory Chemical Hygiene Plan Research Lab

Fluorine Gas Mist Pot Fails

Review Date: Scope: All CHL Employees and Contractors Originated: 5/15/2017 References: OSHA Revisions:

UST Common Compliance Violations Report FY 2014

HAZARDOUS MATERIALS EMERGENCY. Awareness Level Response Plan 29 CFR (q) and 40 CFR 311

Management Standards. EHS Policy and Program

Guide to WSH (MHI) Regulations

VOCATIONAL SAFETY PROGRAM SELF INSPECTION CHECKLIST

Center for Nano and Micro Manufacturing

Accidental Releases Doting Your i s; Crossing Your t s Bob Presley, C.T., CHMM, A.T. EHS Compliance Dept. Mgr.

Worker Injured Elbow by Lifting Shaft

(2) Identification of operations and activities where hazardous chemicals are used or stored.

REGULATORY DOCUMENTS. The main classes of regulatory documents developed by the CNSC are:

Jefferson Parish Department of Drainage. Emergency Plan

Near-miss Injury Security Officer Hit by Vehicle

JACKSON COUNTY MISSISSIPPI LOCAL EMERGENCY PLANNING COMMITTEE INFORMATION

RCRA, Superfund & EPCRA Hotline Training Module

Incident Command System Awareness Participant Guide May 2016

Implementation Date: JANUARY. Annual Review Date: January 1, 2016/dh Annual Review Date: January 1, 2017/dh Annual Review Date:

Formaldehyde Program. For Compliance with Federal and State Regulated Carcinogen Regulations

HAZARDOUS MATERIAL INCIDENTS

Health, Safety, Security and Environment

MODULE 3 HAZARDOUS MATERIAL OPERATIONS NFPA MISSION-SPECIFIC RESPONSIBILITIES

Wrong PSV Found Installed in Field

KENTUCKY HOSPITAL ASSOCIATION OVERHEAD EMERGENCY CODES FREQUENTLY ASKED QUESTIONS

INSTRUMENTATION TECHNICIAN I/II/III

Laboratory Chemical Hygiene Plan -- Teaching Lab

Lockdown Procedures Policy 2017

NORTH CAROLINA A&T STATE UNIVERSITY Chemical Hygiene Plan

COMDTPUB P16721 NVIC JAN Subj: GUIDELINES FOR QUALIFICATION FOR STCW ENDORSEMENTS FOR ADVANCED FIREFIGHTING

INJURY AND ILLNESS PREVENTION PROGRAM

PUBLIC COMPANY ORLEN LIETUVA OCCUPATIONAL HEALTH AND SAFETY PROCEDURE BDS-6/1 EQUIPMENT UNSEALING AND MAINTENANCE WORKS I. GENERAL PROVISIONS

WarmWise Business Custom Rebates Program Manual

ANNUAL PERFORMANCE REVIEW & EVALUATION INDUSTRIAL SAFETY ORDINANCE

Safety and Health Movement: An Overview p. 1 Developments Before the Industrial Revolution p. 2 Milestones in the Safety Movement p.

Crane Bashes Pipes. Lessons Learned. Volume 03 Issue USW

TITLE 15 - ENVIRONMENT CHAPTER 7 EMERGENCY PLANNING AND COMMUNITY RIGHT-TO-KNOW

Northeast Fire Department Association Operations Date Issued: 12/2003 Date Revised: 8/2011

Physics Department August 2017

WRITTEN HAZARD COMMUNICATION PROGRAM. Prepared for: BORO OF

ANNEX Q HAZARDOUS MATERIALS & OIL SPILL RESPONSE

School District 68 (Nanaimo-Ladysmith)

Worker s Arm Pulled Into Belt and Pulley

A Training Program for Child Care Centers. Disaster Preparation. Developed by the National Association of Child Care Resource & Referral Agencies

ANNEX R SEARCH & RESCUE

Hazardous Materials Awareness & Ops

National Certification Program Study Guide

Trinity School. Health & Safety Policy

The City of Carson RESPIRATORY PROTECTION PROGRAM PLAN

Incident Reporting, Notification, and Review Procedure

Kanawha Putnam Emergency Management Plan Functional Annex. (completed by plan authors) Local / County Office of Emergency Management

Intermediate Care Facilities for the Developmentally Disabled Florida Statutes Chapter 393, Section 067(h)

FEMA Hazard Mitigation Grant Application for Seismic Retrofit of Live Oak Community Center

U.S. CONCRETE, INC. SAFETY POLICY and PROCEDURE MANUAL

Emergency Management and Fire Protection Nuclear Emergency Preparedness and Response. REGDOC , Version 2

Injury and Illness Prevention Program

Placement Center Registration Form

QP29.20 Revision 15 Safety

Attachment J-8 Contractor / Supplier Submittal Register

ADMINISTRATIVE PROCEDURE

Our mission is to prevent work-related injuries and

Request for Proposals Emergency Response Plan, Training and Vulnerability Assessment

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

New Fire Safety Rules Summary Evvie Munley, LeadingAge

Incident Planning Guide Tornado Page 1

EMERGENCY ARRANGEMENTS OF A NUCLEAR POWER PLANT

TEXAS HAZARD COMMUNICATION ACT AND RULES. Sec : EMPLOYEE EDUCATION PROGRAM

FACILITIES MANAGEMENT

Regulatory Guide 3.67 Standard Format and Content for Emergency Plans for Fuel Cycle and Materials Facilities

New England Pipeline Safety Seminar. October 19-20, Pipeline Safety Regulatory Update Portland, Maine

REQUEST FOR STATEMENTS OF QUALIFICATIONS FOR ARCHITECTURAL PROGRAMMING SERVICES

Code of Practice Controlling access to hazardous or sensitive areas

Injury and Illness Prevention Program BrightStar Care of San Francisco & Marin

UC Merced Injury and Illness Prevention Program

Entomology and Nematology

Site Description. CCR Rule (a)(3), Emergency Action Plan (EAP)

Facilities Condition Assessment

In all hazardous materials incidents, the following system will be used:

Reporting and Investigating Injuries and Incidents. Alberta Employment and Immigration

Agency for Health Care Administration

Administration OCCUPATIONAL HEALTH AND SAFETY

Agency Determination. Public Comment Received [150B 21.3A(c)(1)] Federal Regulation Citation

Experiences with Process Safety KPIs at BASF

Baler Gone Wild! Lessons Learned. Volume 03 Issue USW

STATE EMERGENCY FUNCTION (SEF) 10 HAZARDOUS MATERIALS. I. Lead Agency: Colorado Department of Public Safety (CDPS), Colorado State Patrol (CSP).

Procedure: 3.4.1p4. (II. D. 4.) Hazard Communication Program Planning and Hazardous Material Inventory

Transcription:

ENVIRONMENTAL MANAGEMENT PROTECTING PUBLIC HEALTH AND THE ENVIRONMENT 10590 Armstrong Avenue Mather CA 95655 Phone: (916) 875-8550 Fax: (916) 875-8513 emd.saccounty.net RISK MANAGEMENT PLAN GUIDANCE DOCUMENT COUNTY OF SACRAMENTO PROGRAM LEVEL 2 FACILITIES Purpose An RMP is required when a regulated substance is used at a facility in excess of the California Accidental Release Prevention (CalARP) program threshold quantity. An RMP must be completed and submitted to the Sacramento County Environmental Management Department, the Administering Agency for the CalARP Program, in accordance with the California Health and Safety Code, Division 20, Chapter 6.95, Article 2 and the California Code of Regulations (CCR) Title 19 Division 2, Chapter 4.5, Articles 1 through 11. Regulation 19 CCR 2735.5 requires the owner or operator of a stationary source to closely coordinate with the Administering Agency to implement the requirements of this chapter and to determine the appropriate level of documentation required for an RMP to comply with Sections 2745.3 through 2745.9 of 19 CCR Division 2, Chapter 4.5. This guidance describes the documentation required by the Sacramento County Environmental Management Department for the RMP to comply with Sections 2745.3 through 2745.9. Process Upon submission of an RMP (new RMP or 5-Year RMP Update), and after the initial review (referred to as a completeness check) of the RMP, EMD notifies the facility if any deficiencies are present. The facility has 60 days to respond and correct the deficiencies. Once the deficiencies are corrected, EMD issues an acceptance letter and posts a public notice on our website indicating that the RMP is complete. Once posted, EMD will make the RMP available at our office for public review and comment for 45 days. EMD will conduct a final review (referred to as an evaluation review) of the RMP in which public comments are considered and the facility may be required to make technical revisions to the RMP. Format Submit the RMP in a 3-ring binder large enough to allow ease of manipulating the pages in case changes are required, provide a Table of Contents, and provide a revisions page to track changes to the RMP. Additional Information For additional information regarding the CalARP Program or the RMP submittal process, please call our office at (916) 875-8550. Page 1 of 6

RMP Guidance Document Program Level 2 Facilities RMP Required Information/Outline: Executive Summary (Section 2745.3) Include a BRIEF description of the six required elements that must be addressed in the Executive Summary, as specified in Section 2745.3. Do not include information protected by the federal Patriot Acts or other federal or state laws that protect information from terrorist activities. Please note that as of June 28, 2004, release scenarios are no longer included in the Executive Summary. Include descriptions of: Accidental release prevention and emergency response policies at the stationary source. Stationary source and regulated substances handled (presented in a paragraph or as bullets): Primary activities (e.g., manufacturer of polyethylene, pulp mill, or chlorine wholesaler) Processes subject to regulation Quantities handled or stored Use of regulated substances (e.g., chlorine used to produce bleach, treat wastewater, repackage for sale) Major pieces of equipment involved in the covered process Monitoring and detection equipment in each covered process Emergency shutoffs, cutouts, and mitigation equipment in each covered process Program levels for the processes and the reason why level chosen General accidental release prevention program and chemical-specific prevention steps. For example, you may state that you are in compliance with the OSHA PSM rule and the CalARP regulations. You may want to highlight general or specific steps that you believe are keys to your prevention program. These steps may be either technological (e.g., backup systems) or procedural/managerial (e.g., improved maintenance or training). Five-year accident history (e.g., we have had five accidental releases of chlorine in the past five years. The largest release was 1,500 pounds. Nobody offsite was injured, but several houses were evacuated as a precautionary measure during the October 25, 2010, and May 1, 2011, releases). Emergency response program (e.g., source has an emergency response plan that has been coordinated with the community plan. State whether your facility complies with 2765.1 or 2765.2, etc.) Page 2 of 6

RMP Guidance Document Program Level 2 Facilities Summarize planned changes to improve safety (e.g., Hazard Review/ Compliance Audit/Incident Investigation, etc.) Offsite Consequence Analysis (Section 2745.4) Dispersion Modeling: Provide a brief description of the air-modeling dispersion method used. Describe the worst-case scenario (WCS) in which the entire contents of the vessel or pipe are released. Complete the Hazard Assessment Worst Case Scenario Table attached to identify the following: Regulated substance being assessed in the scenario Physical state of the regulated substance Model being used to evaluate the scenario Quantity of the regulated substance that is being released Release rate and release duration Wind speed and atmospheric class Distance to the endpoint Type of topography Public and environmental receptors within the distance Estimate of the population potentially affected Source of the population estimate (use most recently available census data) Passive mitigation measures considered Passive and administrative controls that would limit the quantity of regulated substance that could be released Printouts of the performed dispersion model must be included in the appendix. Site maps describing the impact area of the Worst Case Scenario release. Draw the distance to the endpoint from the facility as the radius of a circle showing distance to endpoint in all directions from the facility. Alternative Case - Provide an Alternative Case Scenario per regulated substance in a process. Complete the Hazard Assessment Alternative Case Scenario Table attached to identify the following: Regulated substance being assessed in the scenario Physical state of the regulated substance Model being used to evaluate the scenario Quantity of the regulated substance that is being released Page 3 of 6

RMP Guidance Document Program Level 2 Facilities Release rate and release duration Wind speed and atmospheric class Distance to the endpoint Type of topography Public and environmental receptors within the distance Estimate of the population potentially affected Source of the population estimate (use most recently available census data) Passive mitigation measures considered Active mitigation considered 5-Year Accident History (Section 2745.5) In the 5-Year Accident History, identify and discuss reportable releases of regulated substance within the past five years. Identify the causes of the releases and corrective actions taken to prevent future occurrences. If any release would be identified as an accident per Title 19 of the CalARP regulations, answer the questions in Section 2750.9(a) and 2750.9(b). Prevention Program & Emergency Response Program Components (Sections 2745.6 & 2745.8) Complete the Program Level 2 Prevention Program Data Elements Table attachment. Prevention Program Summary (Article 5) Discuss each component of the Prevention Program. The RMP Prevention Program section must provide a summary of each program element per section. Note that the summaries provided are intended to represent actual onsite practices. The RMP will be evaluated to determine if the description provided is an actual program description. Safety Information Summarize the safety information program element, what information has been compiled (hazards of the chemical, process and equipment), and how it is maintained. Include a Safety Data Sheet (SDS) of the regulated substance in an Appendix. Hazard Review (HR) Describe HR program element and the results of the most recent HR: o Describe HR methodology upon which this RMP was based o External events analysis information, including: Describe human caused and natural-caused external events considered Page 4 of 6

RMP Guidance Document Program Level 2 Facilities Magnitude or scope of external events considered Operating Procedures Summarize the facility s operating procedures program element. Training Summarize the training program element conducted at the facility. Maintenance Summarize the maintenance program element. Also include if there are maintenance contractors, how the facility and its contractor have ensured that the contractor and its contracted employees that work on the process are trained in the facility s maintenance program. Compliance Audit Summarize the compliance audit program element. Incident Investigation Summarize the incident investigation program element including: Incidents that require investigation Procedure for investigating an incident and who conducts the investigation CalARP Emergency Response Program (Article 7) Summarize the Emergency Response program at the facility. Identify the level of response intended by employees at the site. Discuss coordination actions with the local response agencies. Registration (Section 2740.1) CalARP Registration Provide a CalARP registration form for all regulated substances onsite in a process from Tables 1, 2 or 3. Include the CalARP registration in an appendix. Federal Registration A federal registration form should be submitted as part of the federal submittal packet, if applicable. You must also provide a copy of your federal registration to EMD. Note that the Federal and CalARP registration requirements differ. Include the federal registration in an appendix. RMP Certification (Section 2745.9(b)) Include in the RMP a single certification by the owner/operator that to the best of the signer s knowledge, information, and belief formed after reasonable inquiry, the information submitted is true, accurate, and complete. Appendices The following items are necessary for adequate review of the plan: Offsite Consequence Analysis data Page 5 of 6

RMP Guidance Document Program Level 2 Facilities CalARP Registration Federal RMP Submittal SDS copy for each regulated substance considered in the RMP RMP Format Submit the RMP in a 3-ring binder large enough to allow ease of manipulating the pages in case changes are required. Provide a Table of Contents. Provide a revisions page to track changes to the RMP/RMP documents. 3/6/2015 DK:jm W:\DATA\FORMSARCHIVE\HM\CAL ARP\RMP\RMP GUIDANCE DOC PROGRAM LEVEL 2 2015.DOC Page 6 of 6

Prevention Program Data Elements: Program Level 2 Chemicals Covered Under This Prevention Program NAICS Code Safety Information Date on which the safety information was last reviewed or revised List federal or state regulations or industryspecific design codes and standards used to demonstrate compliance with the safety information requirement Hazard Review (HR) Date of last HR or HR update Technique used Expected or actual date of completion of all changes resulting from the last HR or HR update Major Hazards Identified Toxic release Fire Explosion Runaway reaction Polymerization Over pressurization Corrosion Overfilling Contamination Equipment failure Loss of cooling, heating, electricity, instrument air Earthquake (include the date of the most recent seismic assessment or seismic assessment revalidation) Floods Tornado All other applicable external events Other Process Controls in Use Vents Relief valves Check valves Scrubbers Flares Page 1 of 4

Prevention Program Data Elements: Program Level 2 Manual shutoffs Automatic shutoffs Interlocks Alarms and procedures Keyed bypass Emergency air supply Emergency power Backup pump Grounding equipment Inhibitor additions Rupture disks Excess flow device Quench system Purge system None Other Mitigation Systems in Use Sprinkler system Dikes Fire walls Blast walls Deluge system Water curtain Enclosures Neutralization None Other Monitoring/Detection Systems in Use Process area detectors Perimeter monitors None Other Changes Since Last Hazard Review (HR) Reduction in chemical inventory Increase in chemical inventory Change in process parameters Installation of process controls Installation of process detection systems Installation of perimeter monitoring system Installation of mitigation systems None recommended Page 2 of 4

Prevention Program Data Elements: Program Level 2 None Other Operating Procedures Date of most recent review or revision of operating procedures Person/position responsible for updating operating procedures and ensuring they are accurate Training Program Date of most recent review or revision of training program Type of training provided (classroom, on the job, other) Type of competency testing used (written test, oral test, demonstration, observation, other) Maintenance Program Date of most recent review of revision of maintenance procedures Date of most recent equipment inspection or test Equipment most recently inspected or tested (equipment list) Maintenance contractor(s) Date of most recent evaluation of contractor training Compliance Audit Date of most recent compliance audit Expected or actual date of completion of all changes resulting from the compliance audit Incident Investigation Date of most recent incident investigation Expected or actual date of completion of all changes resulting from the incident investigation Date of most recent change that triggered a review or revision of safety information, HR, operating procedures, maintenance procedures, or training. External Events Analysis Types of natural and human caused external events considered in the HR Page 3 of 4

Prevention Program Data Elements: Program Level 2 The estimated magnitude or scope of external events which were considered. If seismic events are applicable, the parameters used in the consideration of the seismic analysis and which edition of the Building Code was used when the process was designed. Include this information in the Prevention Program Summary Hazard Review section of the RMP. The date of the most recent field verification that equipment is installed and maintained as designed (e.g. mechanical integrity audit). Emergency Response (ER) Plan Identify the level of response intended by facility employees? Is your facility included in the written community ER Plan? Does your facility have its own written ER Plan? Does your facility s ER Plan include procedures for informing the public and local agencies responding to accidental releases? Does your facility s ER Plan include information on emergency health care? Date of most recent review or update of your facility s ER Plan Date of most recent ER Plan training for your facility s employees Local agency with which your facility s ER plan or response activities are coordinated Name of agency Phone number Cal ARP Management Person with overall responsibility for implementation of the Cal ARP Program Page 4 of 4