Streetlighting Removal Procedure During Construction

Similar documents
Duquesne Light Our Energy...Your Power

O H I O P U B L I C W O R K S C O M M I S S I O N L O C A L T R A N S P O R T A T I O N I M P R O V E M E N T P R O G R A M

February 27, Mr. Benjamin Beresford Mountain Manager Hesperus Ski Area P.O. Box 187 Hesperus, CO RE: Annual Unannounced Inspection

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA

Accounts Payable. A written procedure to process invoice(s) for payment.

Application Process for Individual HCPs

KANSAS CITY REGIONAL TIGER PROJECT PMOC PROGESS REPORT 2014 Fiscal Quarter 1 October 1 December 31, 2013

1. Research Customer Research the various types of renewable energy systems available and decide which system best fits your consumption needs.

REQUEST FOR PROPOSAL. The City of Oneida, NY

RFP-NPP-0922 REQUEST FOR PROPOSALS NEIGHBORHOOD PARTNERS PROGRAM

Source Water Protection Plan Implementation Grant Application

O H I O P U B L I C W O R K S C O M M I S S I O N P R O J E C T G R A N T A G R E E M E N T

AIRPORT SPONSOR USER GUIDE

GAP PROGRAM July 1, 2018-June 30, 2019

POSITION DESCRIPTION

PENNSYLVANIA STATE SNOWMOBILE ASSOCIATION (PSSA) TRAIL GRANT APPLICATION

BID ADDENDUM. Addendum No. 1 DESERT VENDING PROGRAM

UNIVERSITY OF THE WEST INDIES OPEN CAMPUS INFORMATION TECHNOLOGY SCHOOL BASED ASSESSMENT

Trigger / Timing / Frequency: When a new award is received by the University and OSP determines that the award can be accepted.

Instructions on Completing the Capital Analysis & Planning Template

Solar Photovoltaic. Standard Offer Program (SVPSOP) 2018 Program Manual. Rev # Final

KANSAS CITY REGIONAL TIGER PROJECT MONTHLY PROGESS REPORT

NAHB Professional Women in Building Local Council Program Scholarship Distribution Toolkit

UNFUNDED TRANSPORTATION PROJECTS OVERVIEW

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION

Central Area Community Improvement Plan

Home and Community- Based Services Waiver Program. HP Provider Relations/October 2014

PPO 2017 POWER PLANT OPERATOR WORKSHOP MCPHERSON, KANSAS NOVEMBER 14-16, 2017

BUSINESS. New Construction. Save money on qualified construction projects. Read about rebates for your home and business at mid.

ENROLLMENT PACKET FOR THE LOUISIANA MEDICAL ASSISTANCE PROGRAM (Louisiana Medicaid Program) Early Steps (Group)

Retail Façade Improvement Award Program Application Packet

Healthcare Professional Template Letter to Health Plan/PBM: Maintain Coverage for Current MS Medication

Minutes Board of Trustees

Cuyahoga County Public Safety & Justice Services, Public Safety Grants

University of Vermont and State Agricultural College 4-H Program, Inc.

State of West Virginia DEPARTMENT OF HEALTH AND HUMAN RESOURCES Office of Inspector General Board of Review 1027 N. Randolph Ave.

Instruction. Return completed reimbursement application to:

Vanderbilt University Medical Center

Protecting, Maintaining and Improving the Health of Minnesotans

2018 STAR AWARDS ENTRY INFORMATION

REQUEST FOR QUALIFICATIONS STRUCTURAL ENGINEER PROFESSIONAL SERVICES. June 19, 2017

DIRECT CARE STAFF ADJUSTMENT REPORT MEDICAID-PARTICIPATING NURSING HOMES

COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM YEAR 2016/17

APPLICATION FOR CANADA STUDENT GRANT FOR STUDENTS WITH PERMANENT DISABILITIES FOR SERVICES AND EQUIPMENT

SECTION 5310 APPLICATION GUIDELINES FOR 2018 PROJECTS:

AHP Online Project Completion Guide Sponsor Instructions Homeownership Projects

Index: Written: Supersedes: Review: Written/Reviewed by : Approved on: No /06/ /06/15 DAS 17/09/13. Eye Drop Usage Review

must be received by Monday, February 27, 2017.

SUPERVISION REPORT INSTRUCTIONS Licensed Alcohol and Drug Abuse Counselor

Grand Lodge of Michigan Bikes for Books Program

INSTRUCTIONS FOR LPC APPLICATION (Advancing from LAPC) Download this application to advance to LPC from LAPC.

Interpretive Grant Program

April 13, 2007 SUBJECT: GEOMETRIC IMPROVEMENTS OF CITY CONNECTING LINKS OF THE STATE HIGHWAY SYSTEM - FISCAL YEAR 2011

3:00 P.M., LOCAL TIME,

OKLAHOMA BANDMASTERS ASSOCIATION

Housing Rehabilitation Program Administration

U R B A N INIT I A T I V E S (UI) Commitment and Disbursement Procedures for Local Program Administrators Updated March 2013

Non-Federal Cost Share Match Program Grant Implementation Checklist

APPLICATION FOR EMPLOYMENT CLARK COUNTY SHERIFF S OFFICE

Oregon Department of Fish and Wildlife Wildlife Division 3406 Cherry Avenue NE Salem, Oregon 97303

REQUEST FOR PROPOSALS. Uptown Main Street/US 25 Traffic Calming Analysis. Date Issued: June 5, 2018

March 4, Jonathan Huber Huber Rental Properties, LLC 324 Cherry Street Arkadelphia, AR RE: White Elephant Apartments. Dear Mr.

HEBER LIGHT & POWER COMPANY OPERATIONS DEPARTMENT REQUEST FOR PROPOSAL (RFP) Pole Testing and Pole Inventory

Employer Sponsorship Program

User s Guide: Budget and Outcomes Reconciliations

CONTRACT FOR THE PROVISION OF MUNICIPAL ENGINEERING CONSULTING SERVICES TO THE CITY OF AVON, OHIO

Thank you for your request for information, which was received by Essex County Council on 28 th December 2011.

POLICY AND PROCEDURES MANUAL

Applications will be accepted until March 18, 2016

Procurement & Contract Services PO Box , Fairbanks, Alaska ,

Welcome to the MS State Level Registry Companion Guide for

2016 Kansas CTE Summit

KILBRAUR WINDFARM COMMUNITY BENEFIT TRUST FUND (Scottish Charity No SC040268)

REQUEST FOR PROPOSALS

Are you a Fort Campbell High School graduating senior, living at Campbell Crossing? Lendlease Community Fund wants to help you prepare for college.

REQUEST FOR PROPOSALS

805C-LF Conduct Custodian of Postal Effects (COPE) Duties Status: Approved

Community Support Services Grant (CSSG) Program Application Fiscal Year

1.0 General Procurement Information

Massachusetts Bankers Association Scholarship Foundation

INVITATION TO BID. Pinellas County Tax Identification Number: 24/31/16/13069/001/0010

Capacity Building Grant Application

Alpha Kappa Alpha Sorority, Inc. Xi Sigma Omega Chapter!P. O. Box 3381 Gaithersburg, MD

EAGLE SCOUT LEADERSHIP SERVICE PROJECT CHECKLIST

Department of Human Resources Department of Housing and Community Development Electric Universal Service Program

EFSP Phase 33 RFA Questions and Answers

REQUEST FOR QUALIFICATIONS TO PROVIDE PROFESSIONAL ENGINEERING SERVICES CITY OF DADE CITY, FLORIDA. CLOSING DATE: September 19, :00 p.m.

Downtown Retail Interior Improvement Award Program Application Packet

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR HUMANITARIAN AID - ECHO

APPLICATION FOR TECHNICAL ASSISTANCE PROGRAM CONTACT INFORMATION. Progress Energy Carolinas INCENTIVE PROGRAM

PREPARATION OF LOGS: CLINICAL EXAMINATION

INVITATION TO BID (Request for Proposal)

Protecting, Maintaining and Improving the Health of Minnesotans

APPRENTICESHIP PROGRAM FOR MOS OF CENTRAL OFFICE REPAIRER

THE CORRADINO GROUP. RE: DRIC EPE/EIS Project; Job N TCG Project No Invoice No. 10 Progress Report.

Application Guidelines

INSTRUCTIONS FOR REINSTATEMENT, REACTIVATION AND RESUMPTION OF PRACTICE APPLICATION OF A NEW JERSEY LICENSE

EXPORT PROMOTION COUNCIL FOR HANDICRAFTS Tender no. EPCH/IHGF-2017/7 - Tender for Development Of Fair Directory On CARD TYPE USB PEN DRIVE

Downtown Mural Grant Program Guidelines

September 14, 2016 ADDENDUM NO. 1 SPECIFICATION NO FOR REPAIR SERVICES FOR VEHICLE IMMOBILITY DEVICES ( BOOTS )

Transcription:

Streetlighting Removal Procedure During Construction The following procedure describes the process that is required in order to remove existing streetlighting that the City of Overland Park purchased from Kansas City Power and Light (KCP&L). This process is the same whether it is associated with a project or as a stand alone request that is not project related. 1. Will the work be released to construction immediately? (if not, skip to step 9). If Yes, the Contract Specialist (Berry Lutz) will: a. Insert the date in the Date Released to Constr column in the KCP&L Streetlight Buyout Removal Log EXCEL spreadsheet. b. Write a letter to Black & McDonald informing them to release to construction. The letter should reference the Work Request Number, the project name and CIP number. Include the original proposal form signed by the Director of Public Works and a copy of the purchase order that encumbers the funds. c. Copy the following on the letter to Black & McDonald releasing the work to construction: Project Manager Transportation Project Inspector Traffic Maintenance Supervisor Traffic Engineering Technician, Sr (Larry Killer) Manager of Maintenance Operations City Traffic Engineer d. Save a hard copy of the letter in the project paper file and a digital copy in the project file on the K: drive as well as a copy of the digital file in: K:\Operations\Traffic\Street Lighting\KCP&L Buyout\Release to Construction Letters to Black & McDonald e. Skip to step 11 2. If the work will not be released to construction initially, the Contract Specialist (Berry Lutz) will: a. Insert the word HOLD in the Current Status column in the KCP&L Streetlight Buyout Removal Log EXCEL spreadsheet. b. Write a letter to Black & McDonald informing them to hold until further notice. The letter should reference the Work Request Number, the project name and CIP number. Include the original proposal form signed by the Public Works Director and a copy of the purchase order that encumbers the funds. c. Copy the following on the letter to Black & McDonald releasing the work to construction: Project Manager Transportation Project Inspector Traffic Maintenance Supervisor Traffic Engineering Technician, Sr (Larry Killer) City Traffic Engineer d. Save a hard copy of the letter in the project paper file and a digital copy in the project file on the K: drive as well as a copy of the digital file in:

K:\Operations\Traffic\Street Lighting\KCP&L Buyout\Release to Construction Letters to Black & McDonald e. Skip to step 11 3. When the work is finally ready to release to construction, (if it was already released, skip to step 11), the project manager will be required to: a. Write a letter to Black & McDonald informing them to release to construction. The letter should reference the Work Request Number, the project name and CIP number and the purchase order number. b. The project manager will insert the date in the Date Released to Constr column in the KCP&L Streetlight Buyout Removal Log EXCEL spreadsheet. c. Copy the following on the letter to Black & McDonald releasing the work to construction: Project Manager Transportation Project Inspector Traffic Maintenance Supervisor Manager of Maintenance Operations Traffic Engineering Technician, Sr (Larry Killer) City Traffic Engineer d. Save a hard copy of the letter in the project paper file and a digital copy in the project file on the K: drive as well as a copy of the digital file in: K:\Operations\Traffic\Street Lighting\KCP&L Buyout\Release to Construction Letters to Black & McDonald 4. Black & McDonald will inform their staff when to begin the removal process based on the City of Overland Park s correspondence. They will coordinate with Cellnet to make sure they remove any equipment from the poles prior to the removal. 5. When Black & McDonald has completed the removal, they will send the final invoice to the Overland Park project manager or traffic engineering representative and let them know the work has been completed. a. Make sure the invoice references the WR#, the description of work showing the appropriate street(s) and our Purchase Order number. 6. The Overland Park project manager or traffic engineering representative will: a. Perform a field review to insure that all the work, including restoration (if required), is complete b. Save a hard copy of the letter in the project paper file and a digital copy in the project file on the K: drive as well as a copy of the digital file in: K:\Operations\Traffic\Street Lighting\KCP&L Buyout\Invoices from Black & McDonald c. Insert the date into the Field Check column in the KCP&L Streetlight Buyout Removal Log EXCEL spreadsheet. d. Insert the date into the Invoice Date column in the KCP&L Streetlight Buyout Removal Log EXCEL spreadsheet. e. Sign and submit the invoice from Black & McDonald to Berry Lutz and indicate the work is complete 7. The Contract Specialist (Berry Lutz) will: a. Stamp the original copy of the invoice for approval

b. Make one copy of the Invoice and save it in the KCP&L Streetlight Buyout paper file c. Send the original invoice to Finance for payment. 8. Finance will: a. Return a copy of the original invoice to Black & McDonald with our payment. b. Keep the original copy for their files 9. The project manager will write a letter to KCP&L (David Sutphin) telling them what lights have been removed with instructions for them to remove them from their database prior to the next monthly invoice. The information they need is as follows: a. The project name the removals are associated with, along with the CIP number b. The Work Request Number for each street c. The PK numbers associated with each Work Request Number d. The wattage and type (OW or USE, etc.) e. The date each of the Work Requests were completed f. A request to revise the data associated with our account and to adjust the billing amount. g. Copy the following on the letter to KCP&L: City Traffic Engineer Traffic Engineering Technician, Sr. (Larry Killer) Project Manager Manager of Maintenance Operations Traffic Maintenance Supervisor h. Insert the date the letter was sent to KCP&L in the Date Letter Sent to KCP&L column on the Invoice Status tab in the KCP&L Streetlight Buyout Removal Log EXCEL spreadsheet. i. Save a hard copy of the letter in the project paper file and a digital copy in the project file on the K: drive as well as a copy of the digital file in: K:\Operations\Traffic\Street Lighting\KCP&L Buyout\Removal Notice Letters to KCP&L j. Insert the date the lights were removed in the Date Removed column on the Inventory tab in the KCP&L Streetlight Buyout Removal Log EXCEL spreadsheet. 10. The Traffic Engineering Technician (Larry Killer) will: a. Delete the streetlights out of the CAMP database immediately after receiving a copy of the letter to KCP&L b. Track the KCP&L monthly billings and verify that the removed lights have been indicated on the monthly billing c. Insert the date in the Date Deleted from CAMP column in the KCP&L Streetlight Buyout Removal Log spreadsheet d. Insert Complete in the Current Status column in the KCP&L Streetlight Buyout Removal Log EXCEL spreadsheet 11. Traffic Maintenance Supervisor will:

a. Write an email to Black & McDonald (Jennifer Mathes) requesting them to revise the billing agreement they have with the City since lights have been removed from our system. b. The email should be copied to: Manager Operations Manager

August 8, 2013 Jennifer Mathes Black & McDonald 6001 Front Street Kansas City, MO 64120 STREET LIGHT REMOVAL REQUESTS 2014 CDBG NEIGHBORHOOD STREET RECONSTRUCTION CIP PROJECT NUMBER SR-1426 Dear Jennifer: This letter serves as a request for Black & McDonald to provide a cost to remove eighteen (18) streetlights in conjunction with the 2014 CDBG Neighborhood Street Reconstruction project. The streetlights are located on different streets. Therefore, I have listed them on separate work requests. The following identifies each of the streetlights that will need to be removed. I have also included plan sheets showing the locations of each pole. The construction for the project is scheduled to begin March 2014 and be completed by November 2014. The work most likely will not occur on all streets at once. I will provide you a letter releasing each street to construction at the appropriate time. At this time please provide a separate cost to remove the streetlights for each of the work request numbers listed below along with a construction drawing showing the work required. 73rd Street (Metcalf Avenue to Lamar Avenue) Work Request No. 1000 PK-0526, PK-0527, PK-0528, PK-0529, PK-0530, PK-0543, PK-0542, PK-0540, PK-0539 Total of 9 streetlights Glenwood (74 th Street to 75 th Street) Work Request No. 1001 PK-0555, PK-0554, PK-6021 Total of 3 streetlights 78 th Terrace (Walmer to the west) Work Request No. 1002 PK-3669, PK-0597, PK-0598, PK-0599, PK-0600, PK-0601 Total of 6 streetlights If you have any questions or comments, please feel free to contact me at (913) 895-6027. Sincerely, BRUCE L. WACKER, P.E. ASSISTANT CITY TRAFFIC ENGINEER initials Enclosure: Plan Sheet email: Brian C. Shields, P.E., City Traffic Engineer Sean Ruis, Traffic Maintenance Supervisor Contract Specialist Richard Profaizer, Manager of Maintenance Operations Larry Killer, Traffic Engineering Technician, Sr. David Sutphin, KCP&L EXHIBIT 2

6001 Front Street, Kansas City, MO. 64120 Phone: 816-483-0257 Fax: 816-483-5159 SUBMITTED TO: CITY OF LENEXA, KS Proposal DATE: 5/8/2012 PHONE/FAX: 913-915-9600 ATTENTION: JOB NAME MONTY ZIMMERMAN THE RICE HOUSE ADDRESS: JOB LOCATION: 12350 W 87 ST PKWY 87 ST & LACKMAN CITY/STATE/ZIP: ENGINEER/DATE OF PLANS: LENEXA, KS 66215 5/8/2012 SCOPE OF WORK TO BE PERFORMED: TRANSFER UNDERGROUND SERVICE TO NEW KCPL POLE. OUTAGE FOR RICE HOUSE TO BE SCHEDULED DURING OVERTIME HOURS. KCPL WILL TRANSFER SERVICE AND WILL COORDINATE WITH B&MCD. Exclusions and clarifications: 1. Tax is excluded. 2. Any repair or replacement of the existing conduit system, circuit cable or junction boxes is excluded. 3. Any permits or fees are excluded. 4. Any major traffic control is excluded. We propose to complete the project according to the plans for the sum of: SIX THOUSAND, NINE HUNDRED DOLLARS AND NO CENTS----------------------------- ($6,900.00) Authorized Signature: Acceptance of proposal: Date: EXHIBIT 5

November 26, 2014 Jennifer Mathes Black & McDonald 6001 Front Street Kansas City, MO 64120 STREET LIGHT REMOVAL REQUESTS 2014 CDBG NEIGHBORHOOD STREET RECONSTRUCTION CIP PROJECT NUMBER SR-1426 Dear Jennifer: On September 1, 2013, the Director of Public Works approved the following Work Requests: Work Request No. 1000 73rd Street (Metcalf Avenue to Lamar Avenue) Work Request No. 1001 Glenwood (74 th Street to 75 th Street) Work Request No. 1002 78 th Terrace (Walmer to the west) Enclosed are signed copies of your proposals and purchase order(s) for your file. Please process this paperwork and RELEASE TO CONSTRUCTION as soon as you can. We would appreciate at least 48 hours notice prior to removal of any streetlight pole containing traffic control signs (i.e. STOP or YIELD). Please contact Sean Ruis (913-327-6655) if any City traffic control signs need to be removed from the poles prior to removal. After completion of the actual work in the field, please invoice the undersigned and reference the applicable Work Request Number(s). Payment will be made from budgeted City funds. BERRY LUTZ, Enclosures email: Brian C. Shields, P.E., City Traffic Engineer Kyle Kieckmann, P.E., Civil Engineer II Sean Ruis, Supervisor, Public Works Maintenance Ron DeSota, Transportation Project Inspector, Sr Larry Killer, Traffic Engineering Technician, Sr EXHIBIT 8

November 26, 2014 Jennifer Mathes Black & McDonald 6001 Front Street Kansas City, MO 64120 STREET LIGHT REMOVAL REQUESTS 2014 CDBG NEIGHBORHOOD STREET RECONSTRUCTION CIP PROJECT NUMBER SR-1426 Dear Jennifer: On September 1, 2013, the Director of Public Works approved the following Work Requests: Work Request No. 1000 73rd Street (Metcalf Avenue to Lamar Avenue) Work Request No. 1001 Glenwood (74 th Street to 75 th Street) Work Request No. 1002 78 th Terrace (Walmer to the west) Enclosed are signed copies of your proposals and purchase order(s) for your file. Please process this paperwork but DO NOT RELEASE TO CONSTRUCTION UNTIL SO ADVISED IN WRITING BY THIS DEPARTMENT. We would appreciate at least 48 hours notice prior to removal of any streetlight pole containing traffic control signs (i.e. STOP or YIELD). Please contact Sean Ruis (913-327-6655)if any City traffic control signs need to be removed from your facility prior to removal. After completion of the actual work in the field, please invoice the undersigned and reference the applicable Work Request Number(s). Payment will be made from budgeted City funds. BERRY LUTZ, CONTRACT SPECIALIST Enclosures email: Brian C. Shields, P.E., City Traffic Engineer Kyle Dieckmann, P.E., Civil Engineer II Sean Ruis, Supervisor, Public Works Maintenance Ron DeSota, Transportation Project Inspector, Sr Larry Killer, Traffic Engineering Technician, Sr EXHIBIT 9

Last Revised 8/8/13 October 1, 2013 Jennifer Mathes Maintenance Manager Black & McDonald 6001 Front Street Kansas City, MO 64120 RE: REMOVAL OF EXISTING STREET LIGHTS WORK REQUEST NO. 1000 73 RD STREET (METCALF AVE TO LAMAR AVE) WORK REQUEST NO. 1001 GLENWOOD (74 TH STREET TO 75 TH ST) WORK REQUEST NO. 1002 78 TH TERRACE (WALMER TO THE WEST) Dear Jennifer: On September 1, 2013, the Director of Public Works approved the following Work Requests associated with the 2014 CDBG Neighborhood Street Reconstruction project (CIP No. SR-1426): Work Request No. 1000 73rd Street (Metcalf Avenue to Lamar Avenue) Work Request No. 1001 Glenwood (74 th Street to 75 th Street) Work Request No. 1002 78 th Terrace (Walmer to the west) The signed Work Requests and purchase orders have previously been sent to you but the work was not released to construction at that time. At this time, we would like you to RELEASE TO CONSTRUCTION. We would appreciate at least 48 hours notice prior to removal of any streetlight pole containing traffic control signs (i.e. STOP or YIELD). Please contact Sean Ruis (913-327-6655)if any City traffic control signs need to be removed from your facility prior to removal. After completion of the actual work in the field, please invoice the undersigned and reference the applicable Work Request Number(s). Payment will be made from budgeted City funds. Sincerely, BRUCE L. WACKER, P.E. SUPERVISORY CIVIL ENGINEER Email: Brian C. Shields, P.E., City Traffic Engineer Kyle Dieckmann, Civil Engineer II Ron DeSota, Transportation Inspector, Sr Larry Killer, Traffic Engineering Technician, Sr. Sean Ruis, Supervisor, Public Works Maintenance EXHIBIT 10

October 15, 2013 Mr. David Sutphin Kansas City Power & Light P.O. Box 418679 Kansas City, MO 64141-9679 Last Revised 8/8/13 RE: Street Light Removals from Purchased Leased Lights Dear David: The City of Overland Park removed 14 streetlights as part of our roadway improvement projects. Prior to their removal, these streetlights were part of the City s leased lighting purchase with KCP&L that became effective July 1, 2013 with the Streetlight Sale Agreement. The purpose of this letter is to confirm that the streetlight removals listed below have been or will be accurately reflected on the City s bill for this account (Account No. 2528348469). This account is based on estimated energy usage per kilowatt hour calculated in accordance with Tariff Schedule 70, Off-Peak Lighting Service. Therefore, the charge needs to be adjusted for every streetlight that is removed or modified in accordance with Section 4.4 of the Agreement as follows: At any time the City makes any changes to the System that may affect energy consumption, it will provide the Company a report detailing such changes. The Company will adjust its billing as appropriate. The following streetlights were removed on the dates indicated below. Please see the breakdown of wattage, type and PK number: 73 rd Street (Metcalf to Lamar) Five (5) 100W HPS OW: PK-0526, PK-0527, PK-0529, PK-0530, PK-0543, One (1) 250W HPS OW: PK-0528 Three (3) 100W HPS USE: PK-0539, PK-0540, PK-0542 Total of 9 streetlights removed 5/6/14 Glenwood (73 rd Street to 75 th Street) Two (2) 100W HPS OW: PK-0555, PK-6021 One (1) 100W HPS USE: PK-0554, Total of 3 streetlights removed 5/6/14 Riggs Lane (74 th Street to 75 th Street) Two (2) 100W HPS USE: PK-0549, PK-0550 Total of 2 streetlights removed 5/6/14 Please adjust our account accordingly. If you have any questions or comments, please feel free to contact me at (913) 895-6027. Sincerely,

BRUCE L. WACKER, P.E. ASSISTANT CITY TRAFFIC ENGINEER Email: Brian C. Shields, P.E., City Traffic Engineer Rich Profaizer, Maintenance Operations Manager Sean Ruis, Supervisor, Public Works Maintenance Last Revised 8/8/13 Kyle Dieckmann, Civil Engineer II Larry Killer, Traffic Engineering Technician, Sr. EXHIBIT 16