Transportation Management Plan Overview

Similar documents
TMP Development. What is a TMP? TMP Development Process

DEPARTMENT OF TRANSPORTATION. Notice of Intent to Prepare Environmental Impact Statement, I-495 & I-270 Managed

Nevada Department of Transportation Traffic Operations Policy Memorandum Traffic Signal Warrant Approval Process

Policy 5.18 TRAFFIC CRASHES AND OTHER ROAD HAZARDS

Appendix E: Grant Funding Sources

Evaluation Plan. February 2004

Using Railroad-DOT Mitigation Strategies SHRP2 Case Study

2018 STP & CMAQ Project Selection Process

CONTENTS HIGHWAY BRIDGE REPLACEMENT AND REHABILITATION PROGRAM (HBRRP) 6.1 INTRODUCTION

NCHRP Synthesis 20-05/Topic 47-16: Highway Worker Safety

Transportation. Fiscal Research Division. March 24, Justification Review

Dulles Corridor Metrorail Project

1. Report No. 2. Government Accession No. 3. Recipient s Catalog No.

CHAPTER 6 Construction Traffic Management Program. Overview

Interstate Tolling for Wisconsin: Why and How

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM

Contents. FY 2014 YEAR END REPORT Kalamazoo Area Transportation Study

Highway Safety Improvement Program Procedures Manual

SCOTT COUNTY COMMUNITY SERVICES DIVISION

Massachusetts Department of Transportation (MassDOT) Route 3 South Managed Lanes Project DRAFT FOR DISCUSSION PURPOSES ONLY

ATSSA Update AASHTO Committee on Safety

AASHTO Research Advisory Committee Value of Research (VoR) Task Force Conference Call Minutes May 11, 2016

Section 1201: Requirements for Traveler Information

SMALL CITY PROGRAM. ocuments/forms/allitems.

February 12, Request for Proposal Overview Pre-bid Conference

ARRA Overview. ATTWG Symposium Anchorage, AK April 7, 2009

Using Partnerships to Improve Delivery of Programs in VDOT

AASHTO s Highway Safety Manual: Quantification of Highway Safety. Priscilla Tobias, PE Illinois Department of Transportation State Safety Engineer

Smart Portal State of Good Repair Pavement and Bridge. November 8, 2017

Expected Roadway Project Crash Reductions for SMART SCALE Safety Factor Evaluation. September 2016

APPENDIX 5. Funding Plan

Request for Proposal Design- and Construction- Engineering Services

Public Health Accreditation Board Guide to National Public Health Department Reaccreditation: Process and Requirements

2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS

Support by State Departments of Transportation for Local Agency Safety Initiatives

Value Engineering Program Administration Manual (05/16/2018)

Traffic Impact Analysis (TIA) POLICY

CITY OF LA CENTER PUBLIC WORKS

VALUE ENGINEERING PROGRAM

I-80/I- 380 Systems Interchange Reconstruction Construction Manager/General Engineering Consultant Services

ADMINISTRATIVE SPECIALIST

Purpose. Funding. Eligible Projects

Capital District September 26, 2017 Transportation Committee. The Community and Transportation Linkage Planning Program for

TRANSPORTATION FUNDING PROGRAMS

Current Priori6es of FHWA s Traffic Incident Management Program

Tentative Project Schedule. Non-Discrimination i i Laws. Para Preguntas en español

I-35W Bridge. Khani Sahebjam, PE. From Tragedy to Triumph. Vice President HDR Engineering, Inc. Former Deputy Commissioner/Chief Engineer MnDOT

ADMINISTRATIVE CODE BOARD OF COUNTY COMMISSIONERS

Cass County Rural Task Force Call for Projects Deadline: December 12, 2018

Transportation Funding Terms and Acronyms Unraveling the Jargon

Transportation Library Connectivity and Development

Highway Safety Improvement Program (HSIP) Fiscal Year

IMPERIAL COUNTY CLASS TITLE: SENIOR ENGINEER - PUBLIC WORKS (OPTION CLASS)

METHODOLOGY - Scope of Work

Florida Job Growth Grant Fund. Public Infrastructure Grant Proposal. Table of Contents

Iowa DOT Update 2016 APWA Fall Conference JOHN E. DOSTART, P.E.

HB2 Quick Guide To view the latest version of the HB2 Policy Guide:

FEDERAL LANDS ACCESS PROGRAM

Request for Statement of Interest (SOI) Traffic Engineering Services On-call Traffic Engineering Assistance

Small County Outreach Program (SCOP)

Overview. History. History cont d. Safety Circuit Riders: Where are they, what do they do? MINK /24/15

State of Florida Department of Transportation. DISTRICT SIX Attachment A Scope of Services 1/19/2018

The Town will manage the project, administer funding and review project material.

2015 Five-Year County Highway and Bridge Improvement Plan Guide

AWARDS CEREMONY PROGRAM

SMART SCALE Application Guide

Ontario Emergency Medical Services Section 21 Sub Committee. Emergency Medical Services Guidance Note #5

2013 Louisiana Transportation Conference

November 4, 2013 Office of Transportation Public Private Partnerships

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR INSTALLATION & UPGRADE OF BICYCLE FACILITIES (CLASS II & CLASS III) Issued by:

2016 REGIONAL TRANSPORTATION PLAN. Technical Appendix L: Title VI/ Nondiscrimination Program

POSITION DESCRIPTION

Executive Summary. Northern Virginia District (NOVA) Smart Travel Program. Virginia Department of Transportation. December 1999

Overview of Local Highway Safety Improvement Program (HSIP)

Florida s Safe Routes to School Infrastructure Application

FHWA Risk Based Stewardship and Oversight

POSITION DESCRIPTION

Per the requirements of ARRA, all. themselves before asking any question in order to have themselves and the question/answer shown on

Right-of-Way Improvement Standard Chapter 2 Streets Department Plan Review Standards. Right-of-Way Unit March 2015 Rev. June 2015

TIER 2 RAAP Cutoff Dates Schedule\Column Descriptions Rev. 3/19/15

PARTNERSHIPS ACCELERATE ECONOMIC DEVELOPMENT & JOB CREATION. J. Douglas Koelemay, Director

The Maryland Transportation Authority has. Staff Approve Resolution R to amend the FY TIP.

US TOLL ROAD REDUX RAYMOND H. ELLIS, MANAGING DIRECTOR DMJM HARRIS, AECOM TECHNOLOGY CORP.

Memo. Office of State Aid Metro District 1500 West County Rd B2 Roseville, MN Date: April 24, METRO DISTRICT COUNTIES and CITIES

Improving Highway-Rail Grade Crossings Safety in Urban Area of Lagos State, Nigeria

Appendix F Public Meeting Summaries. F1: May 2013 Public Meeting Summary F2: September 2013 Public Meeting Summary

Federal-Aid LPA Design Process Overview. MoDOT St. Louis District Local Programs

I-69 Corridor Segment Committee 1 and 2 Kick-off Meeting April 15 Nacogdoches, Texas

TRAFFIC IMPACT ANALYSIS IMPLEMENTATION. Richard L. Caywood, P.E. Robert W. Hofrichter

School Drop-Off & Pick-Up Management Plan

Special State Funding Programs Breakout Session #5C Funding Programs Track. October 25, 2012

TxDOT Funding and Accelerated Construction Program

August 2007 Thomas Bohuslav Texas Department of Transportation

National Capital Region Transportation Planning Board

Guidance for Locally Administered Projects. Funded Through the NJDOT/MPO Program Funds Exchange. August 27, Revised September 15, 2014

APPENDIX A SCOPE OF WORK

Transportation Alternatives Program Application For projects in the Tulsa Urbanized Area

Funding Programs / Applications A Help Guide on Obtaining Federal and State Funds Breakout Session #3

Section 130 Program Overview and Update. James (Jim) Dahlem FHWA Office of Safety Washington, DC

8/30/ American Public Works Association (APWA) International Congress and Exposition. August 30, 2015

Transcription:

Transportation Management Plan Overview Module 3 Module Outline TMPs and the WZ Rule What is a TMP? Why TMPs? When to Develop TMPs State-of-the-Practice Tools Tips TMP Overview 2 TMP Beginnings Idea for TMP provision in WZ Rule came from Caltrans Caltrans began requiring TMPs in 2000 for all planned activities on the State highway system Implementation of TMPs in CA has helped to significantly reduce delays in work zones In Caltrans District 7, on the I-10 Long-Life Pavement Project, the TMP helped reduce traffic demand by an estimated 57 percent, queue lengths to 2 miles from the originally projected 44 miles, and projected delays from an estimated 1,000,000 to 16,000 TMP Overview total vehicle hours of delay. 3 1

TMPs and the WZ S&M Rule Requires development and implementation of TMPs for all Federal Aid highway projects Required content depends on significance Must always include a Temporary Traffic Control (TTC) Plan For significant projects, TMPs must also have: Traffic operations (TO) component Public information and outreach (PI) component In brief, a significant project is one that the agency expects will cause a relatively high level of disruption. TMP Overview 4 TMPs and the WZ Rule (cont.) Agencies should coordinate with appropriate stakeholders in developing a TMP Provisions for a TMP shall be in the project's Plans, Specifications, and Estimates (PS&Es) DOT and contractor shall each designate a responsible person for implementing the TMP TMP Overview 5 TMPs and PS&Es PS&Es shall either contain: All the applicable elements of a DOTdeveloped TMP, or Provisions for a contractor to develop a TMP (e.g., for design-build jobs) DOT must approve contractordeveloped TMPs DOT must approve contractor-proposed TMP changes TMP Overview 6 2

Responsible Persons Both the DOT and the contractor are required to designate a responsible person: At the project-level Who is appropriately trained Who has primary responsibility and sufficient authority for implementing the TMP and other safety and mobility aspects of the project TMP Overview 7 What is a TMP? Transportation Management Plan Set of coordinated strategies implemented to manage the WZ impacts of a project Scale-able projects with more expected impacts may need more analysis and more strategies TMPs would streamline the process through which road user impacts due to work zones can be properly analyzed and addressed. - MD SHA TMP Overview 8 TMP vs. TCP TCP plan for handling traffic through the use of traffic control devices Once strategy is determined, TCP implements TMP more comprehensive - incorporating broader issues - Public awareness Mobility and safety impacts Stakeholder involvement If not a Significant project, then TMP can equal TCP TMP Overview 9 3

What is a TMP? DOTs create design documents to show how they are going to build a project The TMP shows how the DOT is going to manage transportation needs during a project With today s WZ challenges, a TTC plan may not be enough TMPs = a more comprehensive approach to managing WZ safety and mobility TMP Overview 10 TMPs are a Tool Part of overall WZ management Effective WZ management requires: Understanding the likely impacts of a WZ Safety and Mobility Impacts Choosing a combination of strategies That will address the impacts for that project Implementing those strategies The TMP outlines all that for a project TMP Overview 11 TMP Strategies to Manage Work Zone Impacts Temporary Traffic Control (TTC) Strategies -Traffic control/design approaches -Traffic control devices -Project coordination, contracting, and innovative construction Public Information (PI) Strategies -Public awareness -Motorist information Transportation Operations (TO) Strategies -Demand management -Corridor/network management -WZ safety management -Traffic/incident management & enforcement TMP Overview 12 4

Potential TMP Components Introductory material Executive Summary TMP Roles and Responsibilities Project Description Existing and Future Conditions Work Zone Impacts Assessment TMP Overview 13 Potential TMP Components (con t) Work Zone Traffic Management Strategies TTC Plan Traffic Operations Plan Public Information Campaign TMP Monitoring Requirements Contingency Plans Implementation Costs May be a single document, or several documents/plans compiled together TMP Overview 14 Example: Wisconsin TMP Components Type 1 Traffic Control Plan Public Information and Outreach Type 2, 3, 4 Traffic Control Plan Public Information and Outreach Transportation Operations Incident Management TMP Overview 15 5

Example: Michigan TMP Template Table of Contents: Executive Summary Temporary Traffic Control Plan (TTCP) Transportation Operations Plan (TOP) Public Information Plan (PIP) Delay Calculation Details Alternative Traffic Control Vicinity Map or Location Diagram TMP Overview 16 Michigan TMP Executive Summary Basic description - Location, work type Specific Project Data: Letting Date Anticipated Project Duration (Construction Start Date and Completion Date) Existing Lane Widths Existing Paved Shoulder Widths Existing Aggregate Shoulder Widths Threshold Criteria Which criteria were exceeded? How was delay calculated? What is the source of traffic volumes? Facility Details (e.g., ADT, lanes) Crash Analysis and Safety Review TMP Overview 17 TMP Formats TMPs need to be documented Options include: Single document with all included material Brief document with summaries of analysis results and decisions, where the full documentation is in the project files or similar Powerpoint format has been used Others? Scope, content, level of detail may vary based on DOT policy and impacts TMP Overview 18 6

Why TMPs? WZ management is increasingly complex Increasing traffic volumes using the same roads that agencies need to maintain and rehabilitate Requires traffic management efforts beyond TTC plans Key issues: Safety Mobility Constructability Objective: Achieve constructability without compromising safety and mobility TMP Overview 19 Importance of a TMP What are the benefits of having a well thought-out approach to managing traffic during a construction project? Consider your stakeholders: Contractors Motorists Property owners Project owners Businesses Environment Event organizers, etc. TMP Overview 20 Why TMPs? 7

Is that the impression people have? TMP Overview 22 Why TMPs? Key Benefits A well-planned method for managing traffic flow during construction can: Address safety and mobility impacts of work zones at corridor and network levels Promote efficient and effective construction phasing and staging, minimize contract duration, and control costs Improve safety for workers and road users Minimize traffic and mobility impacts of a work zone TMP Overview 23 Why TMPs? Key Benefits (cont.) A well-planned method for managing traffic flow during construction can: Minimize: Circulation, access, and mobility impacts to local communities and businesses Complaints from road users, businesses, and communities Improve: Intra- and inter-agency coordination Improve public awareness TMP Overview 24 8

Why TMPs? Key Benefits (cont.) Earlier assessment of work zone impacts Can lead to reduced project costs Better documentation of analysis and mitigation of impacts Better coordination and scheduling of projects More basis for reviewing MOT changes requested by the contractor TMP Overview 25 TMPs Lead to Satisfied Drivers In RI, the number of customer complaints about roadwork has decreased In MI, customers have been calling with positive comments about work zones TMP strategies lead to reduced delay and overall impacts to drivers. TMP Overview 26 TMP Development Process (from Developing and Implementing TMPs for Work Zones) TMP Overview 27 9

When is a TMP Developed? TMP development should begin during systems planning and progress through design Conducting TMP analyses early in project development helps ensure: Systems planning and preliminary engineering: TMP development and implementation costs included in the project budget Design: Agencies consider WZ impacts in evaluation and selection of design alternatives For some projects it may be possible to choose a design alternative that alleviates many WZ impacts Final TMP development occurs during DESIGN TMP Overview 28 Caltrans TMP Development Process TMP Overview 29 Wisconsin TMP Process Process - Work Zone Impacts Assessment - Determine Type of TMP - Prepare Initial TMP - Update, Implement, Monitor - Evaluate After Project TMP Overview 30 10

During Design Final assessment of WZ impacts is done, which should affect the choice of: Best construction/staging option(s) Most suitable design and contracting approach Most appropriate WZ traffic management strategies TMP Overview 31 State-of-the-Practice, Tools, and Tips TMP Development and Implementation WZ Self Assessment Most agencies (94%) had a policy for developing TMPs to help manage the WZ impacts of a project 20% score increase from 2006 to 2007 and 2007 to 2008, 8% in 2009, 3% in 2010 A number of agencies have developed TMP teams and tools TMP Overview 33 11

Use of TMP Strategies The agency is expanding WZ management beyond traffic safety and control to address mobility through the consideration and use of transportation operations (TO) and public information (PI) strategies. Number of States 25 20 15 10 5 0 23 21 7 1 0 Supplemental Question 3 Significant Change Changed Somewhat Already Taking Place Before Rule Not Taking Place Before or After Rule Too Early to Tell TMP Overview 34 Virginia TMP Requirements VDOT developed a TMP Guide: Guidelines for acquiring information to develop TMPs Guidance on each Project Team member's role and responsibilities in the development of TMPs Covers Project Managers, Roadway Designers, Traffic Engineers, WZ Safety Coordinators, Public Affairs Managers TMP Overview 35 Maryland TMP Development TMP Guidelines WZ Design Checklist MOT Red Flag Summary TMP Overview 36 12

Maryland TMP Development Summary of Work Zone Impact Management Strategies Public Information and Outreach Plans Development Guidance Public Information and Outreach Template TMP Overview 37 Missouri DOT TMP Strategy Database Helps MoDOT staff select WZ management strategies and develop TMPs in a more systematic way Suggests possible appropriate WZ management strategies based on user inputs Time concerns Public impact Location Traffic flow TMP Overview 38 Missouri DOT TMP Strategies Database The TMP Database is meant to be used at the very beginning of WZ planning to choose the most effective methods from the start, with re-evaluation occurring in the design stage. TMP Overview 39 13

TMPs Need to Be Well-thought out Started early in project development Use a multi-disciplinary approach Coordinated with other projects nearby Contain a combination of strategies Fit the expected level of WZ impacts Funded Updated as needed after project award Implemented! Monitored and adjusted as needed TMP Overview 40 Some Considerations Agency WZ policies E.g., Maximum WZ queue lengths/delays allowed Lane Closure policies/charts Specify when lane closures are permitted Twin Cities Lane Closure Manual Analytical/modeling tools used by the Agency Concerns of stakeholders TMP Overview 41 Key TMP Development Questions Was a TMP developed for the project? Does the TMP consider the expected impacts of the project? Did the agency determine if this is a significant project? Does the TMP contain strategies to manage the identified impacts? Are the strategies reasonable for the level of expected impacts? TMP Overview 42 14

Key TMP Development Questions (cont.) Were key stakeholders involved? Is implementation of the TMP funded? Has a responsible person been designated for the DOT? Has the DOT approved the TMP per its policies/procedures? Are the relevant parts included in the bid package? TMP Overview 43 TMP Resources WZ Safety and Mobility Rule Web Site Example TMPs, development resources Developing and Implementing TMPs for Work Zones Includes a TMP Checklist and matrix of strategies Templates and Samples Online Training coming in 2011 FHWA www.ops.fhwa.dot.gov/wz/resources/final_rule.htm TMP Overview 44 15