2. Approve the subject Agreement with Lloyd s Register Quality Assurance for a term of three years and a total amount not-to-exceed $25,000; and

AWARD OF CONSTRUCTION CONTRACT CONTRACTOR: REYES CONSTRUCTION, INC. BERTH 100 WHARF SOUTH EXTENSION AND BACKLANDDEVELOPMENT SPECIFICATION NO.

PUBLIC RELATIONS & LEGISLATIVE AFFAIRS APPROVAL OF AGREEMENT WITH INTERNATIONAL LOBSTER FESTIVALS, INC.

SUBJECT: RESOLUTION NO. - AWARD OF CONTRACT CONSULTANT: ENV AMERICA INCORPORATED ASBESTOS AND LEAD MANAGEMENT CONSULTANT

- AGREEMENT BETWEEN THE CITY OF LOS ANGELES HARBOR DEPARTMENT AND ORACLE AMERICA, INC. FOR SOFTWARE LICENSES, MAINTENANCE AND SERVICES

PUBLIC-PRIVATE PARTNERSHIP PROGRAM, HIGH DESERT CORRIDOR

Met r 0 Met"'fKK'ibn Transportation Authority

Sustainable Freight Advisory Committee Meeting Summary - DRAFT

SUBJECT: REGIONAL RAlL PLANNING AND ENGINEERING BENCH AND REGIONAL RAlL UPDATE. INITIATE PROCESS TO ESTABLISH A REGIONAL RAlL BENCH

MEMORANDUM. July 7, 2016

SUBJECT: RESOLUTION NO. - AWARD OF CONTRACT CONSULTANT: PMWEB, INC. WEB-BASED CONSTRUCTION PROJECT MANAGEMENT SYSTEM

Date SUBJECT: REQUEST FOR PROPOSAL FOR DEVELOPMENT OF THE WILMINGTON OIL FIELD. Dear Vendor:

San Pedro Bay Ports. Technology Advancement Program. Final Guidelines

DATE: OCTOBER 12, 2016 PAGE 2 OF 5 SUBJECT: RESOLUTION NO. - FY2016 FEDERAL PORT SECURITY GRANT PROGRAM, GRANT NO.

TWIC Pilot Test Update Port of Long Beach/Los Angeles

2018 Call for Project Concept Papers

Mitigation Grant Programs Port of Long Beach

State Project No. XXXXXX City Project No. c401807

REQUEST FOR PROPOSAL For East Bay Community Energy Technical Energy Evaluation Services

Technology Advancement Program Guidelines for Proposals

MICHAEL N. FEUER CITY ATTORNEY REPORT RE:

CONNECTING AND TRANSFORMING CALIFORNIA. Ben Tripousis, Northern California Regional Director SPUR Tuesday, October 25, 2016 San Jose, California

- j / <-, rei BOARD OF AIRPORT COMMISSIONERS. e:t. Flin hief Executive Officer REPORT TO THE

1. Welcome and Call to Order a. Presentation of Colors by Newton Station Cadet Color Guard. 2. Public Official Reports a. CD 15 b. Port c.

Public-Private Partnership Program May 2015 Transit Coalition Update

Authorize the Chief Executive Officer to award and execute the following contracts for the Eastside Phase I1 Transit Corridor Project:

Public-Private Private Partnership Projects (P3P) Seminar

Los Angeles World Airports

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

SUBJECT: REQUEST FOR PROPOSALS FOR PORT OF LOS ANGELES WORKFORCE TRAINING CENTER CONSULTANT

San Francisco County Transportation Authority Proposition K Sales Tax Program Allocation Request Form

Economic Development Services Join Us On the Road to Success

SIXTH STREET VIADUCT REPLACEMENT PROJECT MONTHLY EXECUTIVE MEETING REPORT NOVEMBER 2012

Unsolicited Proposals Guidelines. Unsolicited Proposals Guidelines

REQUEST FOR QUALIFICATIONS

Miami-Dade County Expressway Authority. Policy For Receipt, Solicitation And Evaluation Of Public. Private Partnership Proposals

SOP Procurement Standard Operating Procedures Grow Southwest Indiana Region 11 RWB Approval Date: 08/26/2011

PORT OF LONG BEACH DIRECTOR OF PROJECT CONTROLS

$5.2 Billion Transportation Funding Deal Announced, includes $1.5 Billion for Local Streets and Roads

TRANSMITTAL TO CATE COUNCIL FILE NO Deborah Flint. Executive Director Department of Airports

POLICY 6800 PROCUREMENT

REQUEST FOR QUALIFICATIONS FOR DESIGN SERVICES ENGINEERING EDUCATION AND DESIGN CENTER. September 21, 2017

Cotton Belt Rail Corridor Innovative Finance Initiative

RFP No. FY2017-ACES-02: Advancing Commonwealth Energy Storage Program Consultant

Metrolink Budget for FY /Additional Service on the Antelope Valley Line

Corridor Advisory Committee Meeting #52. February 16, :00 PM - 8:00 PM Progress Park Downey Ave, Paramount, CA MEETING SUMMARY

Unsolicited Proposal Policy FAQs

I-15 Corridor System Master Plan San Diego, California to Utah/Idaho border

CRENSHAW/LAX TRANSIT CORRIDOR PROJECT: A New Beginning for the Crenshaw Corridor Through Use of Innovative Procurement Strategies

Project Budget and Schedule Status

LOS ANGELES COUNTY SHERIFF S DEPARTMENT REQUEST FOR INFORMATION RFI NUMBER 652 SH ONLINE TRAFFIC REPORTS (OLTR)

A. Amend the FY LACMTA Budget to add $3,000,000 from Measure R 3% Commuter Rail funds for the Rancho Vista Grade Separation Project

DISCUSSION ITEM EXECUTIVE SUMMARY

Creating an L.A. Waterfront

Port of San Diego Resiliency in Terminal Operations at Tenth Avenue Marine Terminal Renée Yarmy, Program Manager, Energy & Sustainability

OVERVIEW OF UNSOLICITED PROPOSALS

1. SUMMARY 2. PROGRAM OVERVIEW

REQUEST FOR PROPOSAL (RFP) PROFESSIONAL AUDITING SERVICES

Metro. Board Report. File #: , File Type:Informational Report

Local Taxes and Highway Tolls: The New Normal

May 17, To: From: Subject: Program continues to. Overview. Step Two. fixed-guideway. Program. for. Background

Department of Defense DIRECTIVE

CSU Dominguez Hills & DH Foundation University Village-Mixed-Use Development/Market Rate Housing LETTER OF INVITATION REQUEST FOR QUALIFICATIONS

BIDS. (Pages LBPP-1 through LBPP-5)

Association of Metropolitan Planning Organizations Fixing America s Surface Transportation (FAST) Act

NC General Statutes - Chapter 136 Article 19 1

REQUEST FOR PROPOSALS

REQUEST FOR QUALIFICATIONS for ENGINEERING SERVICES

Appendix 5 Freight Funding Programs

Beth Day Director, FTA Office of Project Planning RailVolution October 2011

ANNUAL JOINT OPERATING AND FINANCIAL PLAN BETWEEN THE CITY OF ENCINITAS AND THE COUNTY OF SAN DIEGO DEPARTMENT OF ANIMAL SERVICES

Request for Information No Private Transportation Provider Pilot Program to Ontario Airport

B Request for Proposal for. Qualified Firms. Financial Advisory Services. Grossmont-Cuyamaca Community College District

RFP FOR PROFESSIONAL SERVICES

Lessons Learned for a Transit Public-Private Partnership. Phillip A. Washington, General Manager Regional Transportation District

GEORGE MASSEY TUNNEL REPLACEMENT PROJECT

3. Award and execute contract modifications for up to $1,200,000.

VW Settlement DERA Option. NACAA May 1, 2017

REQUEST FOR PROPOSALS EASTERN COACHELLA VALLEY S ACTION PLAN FOR CLIMATE RESILIENCE BACKGROUND AND GENERAL DESCRIPTION

Below are five basic procurement methods common to most CDBG projects:

TRB National Cooperative Rail Research Program: Report 1. Alternative Funding and Financing Mechanisms for Passenger and Freight Rail Projects

Monthly Progress Report

Posted: December 28, 2015

Massachusetts Bay Transportation Authority. POLICIES & PROCEDURES Design Build Procurement Procedures April 2016

ITS Maryland 2013 Annual Conference October 8, 2013

REVIEW PLAN. San Clemente Storm Damage and Shoreline Protection Feasibility Study

Technology Inquiry Form: Hybrid, Near-Zero and Zero-Emission for Cargo-Handling Equipment

To: From: Subject: Program continues to. Overview. the City of. Background. began the. As part of with both

RFP ADDENDUM NO. 1 DISTRICT RFP NO. SV EDUCATION, CLASSROOM, MISCELLANEOUS SUPPORT FURNITURE AND RELATED PRODUCTS AND SERVICES

3 MAJOR MACKENZIE DRIVE TRANSPORTATION IMPROVEMENTS HIGHWAY 50 TO WESTON ROAD, CITY OF VAUGHAN STATUS UPDATE, PROJECT 8066

REQUEST FOR PROPOSALS

Case Study: Public Access Investment Plan Port Of Los Angeles, CA. Arley Baker

UIC Regional Assembly for Middle-East

Request for Proposals (RFP) For Restaurant Consulting Services 1657 Ocean Avenue

REQUEST FOR INFORMATION REGARDING AN INNOVATIVE PROJECT DELIVERY APPROACH FOR FULL SERVICE COMMERCIAL DRIVER/VEHICLE SERVICES CENTER AND

TRB/AASHTO Environment & Energy Research Conference June 6-9, 2010 Session 47: Lessons Learned from P3 Public Involvement Initiatives

Background Materials

~BEVE~Y AGENDA REPORT

Fixing America s Surface Transportation Act: FAST Act Implications for the Region

ipt BOARD OF AIRPORT COMMISSIONERS REPORT TO THE

Transcription:

DATE: MAY 13,2010 FROM: GOODS MOVEMENT DIVISION SUBJECT: RESOLUTION NO. - ZERO EMISSIONS CONTAINER MOVER SYSTEM REQUEST FOR CONCEPTS & SOLUTIONS: COST SHARING SUMMARY: In the fall of 2008, American Maglev, Inc., Powder Springs, Georgia submitted an unsolicited proposal to the Port of Long Beach (POLB) to construct a zero emissions container mover system (ZECMS) between POLB's Pier A and the Union Pacific Railroad's Intermodal Container Transfer Facility (ICTF) in Carson at no cost to the POLB. The POLB subsequently released on June 3, 2009, a formal Request for Concepts/Solutions (RFCS; see Transmittal 3) to design, build, finance, and operate/maintain a ZECMS between the Ports of Long Beach/Los Angeles (Ports) and the ICTF, and at no cost to the Ports. The POLB developed the RFCS with assistance from the Port of Los Angeles (POLA) and the Alameda Corridor Transportation Authority (ACTA). Seven (7) responses were received by the POLB on October 23, 2009. The Ports/ACTA are presently reviewing the submissions, and interviews with all seven respondents are being held on May 24, 2010. The RFCS process should be completed by June 2010. In the spirit of the "Clean Air Action Plan (CAAP) Master Cost Sharing Agreement" (see Transmittal 3) and the CAAP Technology Advancement Program (TAP), the former City of Los Angeles Board of Harbor Commissioners (Board) president attended several meetings with the former City of Long Beach Board of Harbor Commissioners (POLS SOHC) president in 2008 and 2009, to discuss cost sharing for the RFCS process. From these discussions, the Board presidents felt the two Ports should share equally to pay for half of the costs of several consultants retained by the POLB that were required for the RFCS effort, contingent upon the required subsequent approval of the full BOHC for each Port. It is thus recommended that the Board approve this cost sharing agreement with the POLB, in a maximum amount of $455,995 (50% of the total RFCS phase consultant cost of $911,989) (Transmittal 1). At this time, staff has not recommended participation in any effort beyond this initial RFCS phase.

DATE: MAY 13, 2010 PAGE 2 OF 6 RECOMMENDATION: It is recommended that the Board of Harbor Commissioners: 1. Approve this cost sharing agreement with the POLB, in a maximum amount of $455,995 (half of the total cost of $911,989 for the RFCS phase); 2. Authorize the Executive Director to execute and the Board Secretary to attest to the cost sharing agreement with the Port of Long Beach; and 3. Adopt Resolution No. _ DISCUSSION: POLA-General Atomics ZECMS Demonstration Project Conceptual Design Study - In 2006, several vendors/developers of technologies/systems for moving containers on fixed guideways, powered by electricity and/or electromagnetic mechanisms (e.g., magnetic levitation) lobbied the Ports to implement a system. At that time, the Port was investigating different options to minimize emissions associated with the proposed BNSF Railway near-dock railyard (Southern California International Gateway-SCIG). As such, in 2006, the Port had General Atomics (GA) prepare a conceptual design study of a container maglev system between Terminal Island and the Union Pacific Railroad Intermodal Container Transfer Facility (ICTF) in Carson (GA has a maglev test track at their campus in San Diego). The GA study yielded an estimated implementation cost of $575 million for a 4.7-mile system. Given this excessive cost, and the various other technologies being proposed, the Ports then elected to conduct a comprehensive evaluation of all of the technologies/systems. POLB/POLA Zero Emissions Container Mover System Evaluation - In 2007, the Ports retained a consultant team to assess various proposed ZECMS technologies that were purported to be market ready and technologically appropriate for possible near/mid/long-term implementation. The POLS was the actual contracting agency for this study that cost $167,388. The POLA paid for half of the cost of this study under a different cost sharing agreement which was executed under the auspices of the "Clean Air Action Plan Master Cost Sharing Agreement" (see Transmittal 4). The final report, transmitted to the Board in April 2008, included a detailed review of thirteen (13) systems and/or technologies (see Transmittal 2). No recommendations for further project development were made in the 2007 study. The following briefly summarizes these 13 systems and their proponents: In 2007, most of these technologies were merely basic concepts with no preliminary ZECMS design having been completed.

DATE: MAY 13,2010 PAGE 3 OF 6 One of the technologies/proponents is an operating magnetic levitation passenger train in Shanghai, China. Two proponents have magnetic levitation system test tracks, one with a passenger type railcar and the other with a 20' freight container. POLB Request for Proposal Development - One of the ZECMS study vendors/developers, American Maglev, submitted an unsolicited proposal to the POLB in the fall of 2008 to construct a system between POLB's Pier A and the ICTF at no cost to the POLB. Subsequently, the POLB BOHC instructed staff to develop a request for proposal (RFP) for a potential demonstration project from Pier A to the ICTF. The POLS SOHC also instructed staff to retain the services of the University of Southern California (USC) Keston Institute for Public Finance and Infrastructure Policy (Keston Institute) to evaluate submissions. To assist in this RFP development, the POLB retained the following other consultants with roles and budgets listed in the table below. Firm (contract execution) Role Budgeted Amount Parsons Brinkerhoff (Jan. 2009) RFCS technical requirements $49,620 Psomas (Nov. 2008) Potential alignments/property impacts $149,000 Keston Institute (February 2010) Review/evaluate RFCS submissions $113,369 Brownstein, Hyatt, Farber, Schreck, LLP (April 2009) Legal services: procurement, P3 $500,000 Fulwider Patton, LLP (June 2008) Legal services: patents $100,000 TOTAL $911,989 Approximate Costs expended as of April 1, 2010: $600,000 Through providing support on the RFP development, the City of Long Beach Attorney's Office determined that outside, specialized legal services with expertise in public works procurement (particularly design-build procurement) and Public-Private Partnerships (P3) were needed. Subsequently, on April 20, 2009, the POLS BOHC approved retention of the legal firm of Brownstein, Hyatt, Farber, Schreck, LLP, Los Angeles, California (BHFS). The firm of Fulwider Patton, LLP, Los Angeles, California, who had been previously retained by both Ports for the CAAP TAP for counseling on intellectual property issues, was also utilized by the POLB on this project. Because of the uncertain economic viability, BHFS recommended vetting the financial feasibility of the potential technologies via a Request for Concepts/Solutions first, and then decide if issuing a request for qualifications (RFQ) or RFP is appropriate. Request for Concepts and Solutions - On June 3, 2009, the POLB, in conjunction with the POLA and ACTA, released the RFCS for a Public-Private Partnership to design, build, finance, operate, and maintain/manage a ZECMS between the Ports and the existing/proposed expanded letf, and possibly the proposed BNSF Railway's near

DATE: MAY 13, 2010 PAGE40F6 dock railyard (Southern California International Gateway or SCIG), and at no cost to the Ports or ACTA. Some of the key parameters that apply to the RFCS are: The proposed system is not intended to either diminish or replace on-dock rail loadings. The system would still need to compete financially with drayage; i.e., the Ports could not ban the use of trucks to the near-dock railyard(s). Prospective respondents are instructed to assume that they will be responsible for the costs of all non-port, private right-of-way. Prospective respondents are to assume that this would be a stand-alone project, i.e. one that will be financed without contribution or subsidy by the Ports or ACTA. Seven (7) responses were received by the POLB on October 23, 2009. Only three of the entities reviewed in the 2007 study responded to the RFCS, encompassing three different technologies, thus indicating that very few of the studied technologies had progressed beyond basic concepts. To ensure that sensitive proprietary information contained in each concept document was properly protected during the review process, a confidentiality agreement amongst the Ports and ACTA was executed on December 3, 2009, and the POLA received the seven submissions for review on December 8, 2009. The Keston Institute contract with the Port of Long Beach was executed on February 19, 2010. The Ports, ACTA, and Keston are presently reviewing the submissions and should be completed by June 2010. Potential Long-Term Deployment of ZECMS Technologies - The potential deployment of ZECMS is also presently being analyzed in the following two significant, regional transportation planning/engineering activities that the POLA is actively involved in: 1-710 Corridor Project Environmental Impact Report/Environmental Impact Statement (EIR/EIS) - Market, technology assessment, system requirements, and engineering feasibility studies have been completed for ZECMS technologies as part of the 1-710 Corridor Project EIR/EIS. The Ports and ACTA participated in these efforts, which yielded the following two technical studies (see Transmittal 5): "Alternative Goods Movement Technology Analysis Study" and "Railroad Goods Movement Study." The ZECMS is presently being evaluated in detail as an element of two of the 1-710 project alternatives (see Transmittal 5). The draft EIR/EIS is expected to be released for public review in September 2010. Southern California Association of Governments (SCAG) Comprehensive Regional Goods Movement Plan and Implementation Strategy - In early 2009, SCAG

DATE: MAY 13, 2010 PAGE 5 OF 6 commenced this study, which is being conducted by the same consultant firms that prepared the aforementioned 2007 Ports ZECMS study, as well as the two primary firms working on the 1-710 EIRIEIS. This study will include a conceptual plan for a potential ZECMS throughout the entire region, between the north end of the 1-710 Corridor and the eastern boundary of the SCAG region. The Director of POLA's Goods Movement Division is involved in this effort. POLA Cost Sharing Commitment - In June 2007, the Ports executed the "Clean Air Action Plan Master Cost Sharing Agreement" (see Transmittal 3) for costs to be shared for activities/projects/studies undertaken by both Ports, and a study-specific cost sharing agreement for the aforementioned 2007 ZECMS Evaluation. In the spirit of these agreements and collaboration, on March 20, 2009, former Board president David Freeman met with the former POLB BOHC president James Hankla, and initially agreed to pay for half of the Keston Institute costs. Through subsequent discussions between the former Boards of Harbor Commission presidents, and other meetings with the executive directors, both Ports agreed in November 2009 that the cost sharing would include all consultant costs (this is partly the reason for the delay in submitting this agreement to the Board). Recommended Approval - It is recommended that the Board approve this cost sharing agreement with the POLS, in a maximum amount of $455,995 (half of the total cost of $911,989) for the ongoing RFCS phase of this project. At this time, Harbor Department staff is not recommending participation in any effort beyond this initial RFCS phase. ECONOMIC BENEFITS: Spending under this Board action will have no additional direct employment effect. ENVIRONMENTAL ASSESSMENT: The proposed action is a cost sharing agreement with the POLB for the ZECMS RFCS effort. As an administrative action, the Director of Environmental Management has determined that the proposed action is exempt from the requirements of the California Environmental Quality Act (CEQA) under Article II Section 2(f) of the Los Angeles City CEQA Guidelines. FINANCIAL IMPACT: Funds in the amount of $455,995 for this 50%, one-year cost sharing agreement between the POLA and POLB have been programmed in the approved FY09-10 budget in Work Order #24894, Account #54290, Center #1172, and Program #000. At this time, no funds are being requested beyond FY09-10 and staff is not recommending

DATE: MAY 13, 2010 PAGE 6 OF 6 participation in any effort beyond this initial RFCS phase. Approval of the proposed cost sharing agreement with POLS does not commit the POLA to any other costs beyond maximum amount authorized or the scope of said cost sharing agreement. CITY ATTORNEY: The Office of the City Attorney has prepared and approved as to form and legality this cost sharing agreement. TRANSMITTALS: 1. ZECMS RFCS Cost Sharing Agreement 2. 2007 ZECMS Evaluation Technologies 3. ZECMS Request for Concepts/Solutions 4. CAAP Master Cost Sharing Agreement & 2007 ZECMS Evaluation Cost Sharing Agreement 5. 1-710 Corridor Project EIS/EIR Technical Studies FIS APproval: l.if /J, --/ I/f,v/~ KERRY CARTWRIGHT, P.E. Director of Goods Movement MICH EL R. CHRISTENSEN Dep y Executive Director I (initials) GERA DINE KNATZ, Ph.D. Exec ive Director KC:jb Author: K. Cartwright ZECMS Cost Share Agreement Board memo 5-13-10