AMC 30% 40% 10% 20% Electric power(kw) kw 25,44. Rotation speed (rpm) rpm 40,00. Got the Cochlea to reach the maximum availability of water

Similar documents
66CF1005 Certificate lifting equipment with new delivery Pag. 64/03

MMO

smart technologies Neonatal incubator from standard to intensive care

Ontario Sustainable Energy Association

Specifications, Performance & Submittal

Medical Grade Power Strips

Isolette TI500 Neonatal Transport

Power NI Variable Speed Drive Grant 2015/16

TECHNICAL HIGH ANGLE ROPE RESCUE PROGRAM FIRE SERVICE APPLICATION FOR TECHNICAL RESCUE SERVICE

Simply Practical. The Hill-Rom CareAssist ES Hospital Bed

smart technologies Neonatal incubator from standard to intensive care

1510 Self-Contained Biological Indicator Incubator OPERATION MANUAL

May 6, 2002 Revision 2

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE Residential Renewable Electric Generation Incentive Program

The Narragansett Electric Company d/b/a National Grid

National Grid System Reliability Procurement DemandLink Pilot Update

OPERATOR, ORGANIZATIONAL, DS, GS, AND DEPOT MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOL LISTS

ELECTRICAL TECHNICIAN I/II/III

EZTest Incubator OPERATION MANUAL. 10 Evergreen Drive Bozeman, MT USA (303) Model

States Advancing Wind Upcoming Webinars

GUI_missileFlyout v2.01: User s Guide

CONVENIENCE METAL FABRICATION ABRASIVES VENDING SOLUTIONS CORNER STORE RIGHT ON THE FLOOR

ENERGY PERFORMANCE CONTRACTING

Current-compensated Chokes EMC/EMI Chokes RN series

Department of Aerospace Engineering ROCKET COMPETITION SPOT LANDING

DEP ONE STOP SHOP FOR ALL THE DESIGN, CAE,ENGINEERING,OPTIMIZATION NEED

Medical furniture OPTIMA OBSTETRIC BED

CONVENIENCE CORNER STORE RIGHT ON THE FLOOR

Audio. Distribution. Network ADN C1/ADN D1. Quick guide

DEPARTMENT OF THE ARMY TECHNICAL MANUAL OPERATOR'S AND ORGANIZATIONAL MAINTENANCE MANUAL ELECTRONIC MULTIMETERS TS-505A/U

Generator Interconnection System Impact Study Report Carteret County, NC MW Queue #297 Original Submittal Revision 1

ATTACHMENT B. 1. Intent to Bid/Bidder Contact Information Form. 2. Executive Summary. 3. Proposal Characteristics and Term Sheet

Wind for Schools Program Overview

Feed in Tariff Application Form

Commercial Scale. Direct Ownership-Application. Renewable Energy Projects over 10kW. Commercial Block program details can be found at:

National Grid. The Narragansett Electric Company INVESTIGATION AS TO THE PROPRIETY OF PROPOSED TARIFF CHANGES. Testimony and Schedules of:

CHAPTER 35 FIREMAN (FN) NAVPERS A CH-52

PLANNING AND CONSTRUCTION SEMINAR. Robert Romo. Illinois Clean Energy Community Foundation

Le Moyne College. BEICKERT AUDIO 219 Arnold Ave, Syracuse, NY Thomas J. Niland Jr. Athletic Complex SOUND STUDY QUOTATION.

No. 22 in In accordance to articles 152 & 108 / second of Labor Law no. (71) of 1987 we decided to issue the following instructions:

XC16. ELITE SERIES R 410A Two Stage Compressor SilentComfort Technology A I R C O N D I T I O N E R S

Multifamily Affordable Solar Housing. Semi Annual Progress Report. July 30, 2012

APPROVAL OF FULL PLANNING PERMISSION

Multifamily Affordable Solar Housing. Semi Annual Progress Report. July 31, 2013

Declaration of Classification ValiSpore Incubator Manual

PSA 2017 Paper Improved Tornado Missile Risk Analysis Using Nonlinear Finite Element Analysis of Nuclear Power Plant Structures.

ELECTRICAL INSPECTION ACT CANADIAN ELECTRICAL CODE REGULATIONS

Redefining Patient Handling. prevention

BTR-3E ARMOURED TROOP CARRIER CREW TRAINING COMPLEX

COMPRESSOR TECHNICAL OVERVIEW

A story to highlight plights of Solomon Islander Entrepreneurs

INNOVATIVE OPPORTUNITIES FOR FINANCING ENERGY EFFICIENCY UPGRADES

TABLE OF CONTENTS. iii

Redefining Patient Handling. prevention

GE Energy Connections

Main catalog. System pro M compact Surge and lightning protection solutions with QuickSafe technology

Birthing Bed AVE 2. Welcome to this world child

Image 3. exclusive design to meet all your needs

Isolette 8000 plus Neonatal Closed Care

MRI Device Compliance Martin Vogel, PhD Kimberley Poling Application Engineering Team Eastern USA

NAVMC B Ch 7. C Jan Subj: ENGINEER AND UTLITIES TRAINING AND READINESS MANUAL

Workplace Safety and Health (Incident Reporting) Regulations. - What is in this section of the Guide? 2

ENTERPRISE with people in mind

Product Introduction. Specification Sheet. Certificates. Application. Features. Street Light

Technical Supplement For Joint Standard Instrumentation Suite Missile Attitude Subsystem (JMAS) Version 1.0

Isolette 8000 Neonatal Closed Care

Using Lean, Six Sigma to Improve Surgical Services James Pearson J.O.P. Consulting

VFD and Pump Incentive Application for Business Customers

Notice of Operations at London Array Offshore Wind Farm

microfit FAQ Version 4.1

Commissioning Ceremony USS Gabrielle Giffords (LCS-10) Saturday, June 10, 2017 Pier 21 Port of Galveston, Texas

ZEESM. Overview. Special Economic Zone of Social Market Economy Oecusse Pilot Project

TECHNICAL MANUAL UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL

Buck & Boost Transformer Installation Instructions

Tourism priorities under Rural Development Programme in England Chris Elms and Andy Tordoff

May 25, Request for Proposals No Offsite Virtual Net Metering

Ave 2 Birthing Bed. Welcome to the world

Rhode Island Renewable Distributed Generation Standard Contract Enrollment Application and Enrollment Process Rules

Power NI Variable Speed Drive Grant 2017/18

Feel at home. No matter where you stay. TECHNICAL MANUAL

UKRINMASH SIMULATORS

Feed-in Tariff: Draft guidance for renewable installations (Version 5)

CARENDO ERGONOMIC HYGIENE CHAIR WITH UNIQUE CARE RAISER

Renewable Energy Incentive Program. Guidebook

ELECTRONICS TECHNICIAN I ELECTRONICS TECHNICIAN II

Railway Interoperability and Safety Committee. Working document

Corporate Safety Manual. Chapter 14 Near Miss Reporting

City of Signal Hill Wireless Communications Facility Application

Agricultural Energy Program Grant

CM-PIFS Approval of Engine Use with a Thrust Reverser CS-E 10(b) Final CM & CRD published Installations and Fuel

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1041 ASPHALT CONCRETE QUALITY ASSURANCE PROGRAM ADMINISTRATION.

IRENA/ADFD Project Facility Third cycle webinar for applicants. Programme Officer, Seleha Lockwood Website:

Training and Evaluation Outline Report

The Energy Smart New Orleans Plan at the request of the New Orleans City Council and presented by Entergy New Orleans, Inc.

Duquesne Light Company Suppliers Frequently Asked Questions

Project Financing for Industrial Energy

TECHNICAL DAYS, APRIL 2017 ABB Plant Fingerprint Assessment Optimizing Operations. Fernando Tobar, Country Service Manager

COMMERCIAL ITEM DESCRIPTION SPECIFICATION SHEET CIRCUIT BREAKER, 28 VOLTS (V) DC, AUTOMATIC RESET, NONWATERPROOF, 10 AMPERES (A) TO 35 A

December 16, 2016 BY HAND DELIVERY AND ELECTRONIC MAIL

Course Outline (Winter 2017)

Transcription:

AMC AIRMEC offers a type of cochlea turbine (AMC) in a partnership (called AIREN) with other companies production with a solid experience. The AMC-25 is a turbine able to deliver 25 kwe designed for location with medium to low flow (<1mc) and low jumps meager (<5m). The system represents has low impact of civil works and guarantees the respect of the environment: small deposits can pass through the system ensuring the maintenance of the sedimentary structure of the stream the plant, unlike the other turbines, is non-pressurized and has a low rotation speed, this translates into a better guarantee for the safety of the fish fauna if they should come into contact with the implant

AMC Electric power(kw) kw 25,44 Rotation speed (rpm) rpm 40,00 Got the Cochlea to reach the maximum availability of water m3/sec 0,84 Electrical efficiency adim 0,70 Skip available m 4,40 Theoretical power kw 36,35 De (Tube) m 1,50 Di (Tube) m 0,45 L (Tube) mm 7675 Angle with the horizontal degrees 35,00 30% 40% 10% 20%

AVT The micro-turbine AVT is extremely advantageous in terms of cost per kw and for the operation without interruption even at very low wind regimes. The target markets of AVT are: Small and Medium Enterprises (SMEs), farms, beaches and tourist ports, residential homes and condominiums, hotels; signal repeaters, municipalities and other local authorities, state and municipal enterprises, service stations; wind-farm; applications island; energy recovery ventilation ducts AVT is particularly recommended for the embankment and the floors. The special AVT equipment allows the ordinary maintenance without the use of scaffolding or cranes.

AVT Data U.M. AVT010 AVT 060 AVT 180 AVT 300 AVT 600 Nominal power (Max) kw 1 6 18 30 60 Rotor Diameter (D) m 3,0 6,4 13,0 15,2 20,0 Rotor height (H) m 2,2 4,5 6,48 10,5 14 Swept area (DxH) mq 7 29 84 160 280 Maximum rotor speed rpm 53 25 12 10 8 number of turbine blades 3 3 3 3 3 Cut-in m/s 2 2 2 2 2 Cut-in power W 8,1 35,4 103,5 196,5 343,9 Cut-out n.p. n.p. n.p. n.p. n.p. Maximum output power of the wind m/s 14 14 14 14 14 Cooling system alternator vento vento vento vento vento Maximum output current from the alternator V AC 315 315 315 315 315 Duty cycle minimum per year % 80 85 90 90 95 Maximum noise level db 30 30 30 30 30 Weight turbine Kg 60 800 1400 2100 4000 Total weight (N) Kg 400 2500 3200 4500 6000 Horizontal force of the wind 14 m/s (T) Kg 146 638 1867 3546 6205 Horizontal force of the wind100 Km/h (T) Kg 585 2659 7579 11700 25000 DELTA (T) 0,33 0,33 0,33 0,33 0,33 Frequency (F1) Hz 12 6 3 3 1,5 Arm (H1) m 1,3 2,65 3,64 5,65 7,8 Nominal axial moment Mr1 Kgm 51 478 2839 6320 14516 Maximum axial moment Mr2 Kgm 108 650 2167 3250 6500 DELTA (Mr1) 0,25 0,25 0,25 0,25 0,25 Frequency (F2) Hz 12 6 3 3 3 Recommended height pole(p) m 8 8 8 8 12 Weight Pole Kg 500 1000 1400 2000 3000 Foundation side (L)* m 1,9 3 4,2 5 7 Foundation height (h)* m 0,9 1,1 1,5 1,7 2 Safety Coefficient* 1,10 1,11 1,21 1,03 1,29 Maximum voltage CC Volt 444 444 444 444 444 Maximum current A 3 19 57 95 190 N.Of Maintenance brake / emergency discs n.p. 1 2 3 3 Monitoring system for wind n.p. n.p. n.p. n.p. n.p. System of pole orientation n.p. n.p. n.p. n.p. n.p. Safety exit system n.p. n.p. n.p. n.p. n.p. Ordinary maintenance n.p. n.p. n.p. n.p. n.p. Rpm multiplier 2,4 3,8 3,8 5 5 Control system of the turbine n.p. n.p. n.p. n.p. n.p. ANEMOMETER TURBINE GENERATOR POLE BASE

AVT Type AVT010 AVT060 AVT180 AVT300 AVT600 ANEMOMETER Nominal Power kw 1 6 18 30 60 Price (1) 4.858,00 25.000,00 74.000,00 121.000,00 150.000,00 TURBINE /kw /kw 4858 4167 4111 4033 2500 Turnkey price(2) 6.200,00 36.250,00 101.250,00 147.500,00 245.000,00 /kw turnkey /kw 6200 6042 5625 4917 4083 Turbine radius R m 1,5 3,0 4,8 7,1 10,0 Turbine height H m 2,2 4,5 9,0 10,5 14,0 Swept area A mq 6,6 27,0 87,0 150,0 280,0 Horizontal load (Nom.) T Kg 146 598 1928 3324 6205 Horizontal load(28m/s) T(max) Kg 585 2659 7579 11700 25000 Vertical load N Kg 400 2500 3200 4500 6000 Twisting moment Mt Kgm 51 420 2180 5555 14516 Maximum power P(max) W 1648 6740 21718 37446 69899 Nominal rotation speed n rpm 48 24 15 10 7 n.of max rpm n(max) rpm 72 36 22 15 11 GENERATOR POLE BASE

AVT POWER CURVE (W VS M/S) POWER CURVE (W VS M/S) Number of turbine revolutions based on Your wind speed (M/S) NUMBER OF TURBINE REVOLUTIONS BASED ON YOUR WIND SPEED (M/S)

AHT50 The mini wind generator AHT is extremely advantageous in terms of cost per kw and for its efficiency in energy production thanks to the system of control and management of the pitch of the blades according to the intensity of the wind. The carrycot protects the electrical and mechanical apparatus by atmospheric phenomena and particular technical solutions reduce noise during operation. The carrycot is situated on a fifth wheel designed to rotate 360 horizontally, allowing the rotor to align with the direction of the wind. The yaw rate is electro-mechanical, the height of the tower is variable and depends also on the characteristics of wind site. The proposed standard heights are 24 to 36 meters. CONTROLS STAGES Installation stages Setup completed

AHT50 AHT50 POWER CURVE (W VS M/S)