CEN/TC278/WG1 & ISO/TC204/WG5 Status report to CEN/TC204 April 2012

Similar documents
This document is a preview generated by EVS

Packaging for terminally sterilized medical devices - Guidance on the application of ISO and ISO (ISO 16775:2014)

CEN Technical Committees Mode of operations

International Cooperation Types of Activities

NATO Ammunition Safety Group (AC/326) Overview with a Focus on Subgroup 5's Areas of Responsibilities

Compensation. Benefits. Expatriation.

Harmonized European standards for construction in Egypt

NORITS - Nordic Interoperable Tolling Systems

OPCW UN JOINT MISSION IN SYRIA

OPCW UN JOINT MISSION IN SYRIA

MEASURING R&D TAX INCENTIVES

M3 Global Research Overview

A European workforce for call centre services. Construction industry recruits abroad

First quarter of 2014 Euro area job vacancy rate up to 1.7% EU28 up to 1.6%

7 th Model ASEM in conjunction with the 11 th ASEM Summit (ASEM11) 20 Years of ASEM: Partnership for the Future through Connectivity

An action plan to boost research and innovation

President s report THIRD EFCC GENERAL ASSEMBLY 17 APRIL 2010, CORFU, GREECE.

The EUREKA Initiative An Opportunity for Industrial Technology Cooperation between Europe and Japan

OPEN CALL FOR PROJECT TEAM EXPERTS European Standard for Patient Summary

THE NATIONAL INVESTMENT IN RESEARCH. Professor Vicki Sara Chair, Australian Research Council

ISO/IEC JTC1/SC7 /N3020

SCIENTIFIC RESEARCH METHODOLOGIES AND TECHNIQUES. Unit 14.c: PROJECT PROPOSAL PREPARATION - EXAMPLES = IMS & ISSS examples =

ECTP towards the future Jesús Rodríguez Chairman of ECTP Support Group Dragados

HEALTH WORKFORCE PRIORITIES IN OECD COUNTRIES (WITH A FOCUS ON GEOGRAPHIC MAL-DISTRIBUTION)

ERC Grant Schemes. Horizon 2020 European Union funding for Research & Innovation

RULES - Copernicus Masters 2017

ECHA Helpdesk Support to National Helpdesks

THE WORLD BANK EXPERIENCE ON RESEARCH & INNOVATION IN THE WESTERN BALKANS

The G200 Youth Forum 2015 has 4 main platforms which will run in tandem with each other:

EURAMET and the European Metrology Research Programme. 2 nd March 2007 TC Mass & Related Quantities. Andy Henson

SOUTH AFRICA EUREKA INFORMATION SESSION 13 JUNE 2013 How to Get involved in EUROSTARS

BRIDGING GRANT PROGRAM GUIDELINES 2018

1 Introduction to ITC-26. Introduction to the ITC and DEPO. October 24 November 11, 2016 Albuquerque, New Mexico, USA Greg Baum

ISO in figures Members. Technical committee structure. Staff. Development of International Standards

PUBLIC. 6393/18 NM/fh/jk DGC 1C LIMITE EN. Council of the European Union Brussels, 1 March 2018 (OR. en) 6393/18 LIMITE

The ERC funding strategy

Current and future standardization issues in the e Health domain: Achieving interoperability. Executive Summary

EUREKA Peter Lalvani Data & Impact Analyst NCP Academy CSIC Brussels 18/09/17

2011 Call for proposals Non-State Actors in Development. Delegation of the European Union to Russia

EAIE FEDORA Summer University IOANNINA (Greece) June Theme : Modern Times : Counselling students in the 21st Century

Exploiting International Life Science Opportunities. Dafydd Davies

Q Manpower. Employment Outlook Survey Global. A Manpower Research Report

FP7 Post-Grant Open Access Pilot: Sixth Progress Report One Year into the Initiative

NOTE BY THE DIRECTOR-GENERAL PROGRESS IN THE ELIMINATION OF THE SYRIAN CHEMICAL WEAPONS PROGRAMME

First Meeting of the Investment Action Group of the Global Alliance for Climate Smart Agriculture (GACSA) Participants Documents to read in advance

NOTE BY THE DIRECTOR GENERAL PROGRESS IN THE ELIMINATION OF THE SYRIAN CHEMICAL WEAPONS PROGRAMME

STUDY TO EXAMINE JOB PROFILE AND TASKS OF TRAIN CREW MEMBERS NOT DRIVING TRAINS BUT PERFORMING OTHER SAFETY CRITICAL TASKS ON BOARD OF TRAINS

Klinisk prövning av medicintekniska produkter Del 2: Kliniska prövningsplaner (ISO :2003)

EUREKA and Eurostars: Instruments for international R&D cooperation

TRENDS IN HEALTH WORKFORCE IN EUROPE. Gaétan Lafortune, OECD Health Division Conference, Brussels, 17 November 2017

Implementation of the System of Health Accounts in OECD countries

1. The number of known arms producers has doubled after the end of the cold war.

Q Manpower. Employment Outlook Survey Global. A Manpower Research Report

The Role and Responsibilities of the Medical Physicist in MRI in Europe

EFLM EUROPEAN FEDERATION OF CLINICAL CHEMISTRY AND LABORATORY MEDICINE

Country Requirements for Employer Notification or Approval

ESSM Research Grants T&C

Q Manpower. Employment Outlook Survey Global. A Manpower Research Report

Health Workforce Policies in OECD Countries

Knowledge Based Capital. in a Company. Stefan Dobrev OECD 13 th February Innovation Sweet-spot

COST. European Cooperation in Science and Technology. Introduction to the COST Framework Programme

CALL FOR APPLICATIONS FOR STATE SCHOLARSHIPS IN HUNGARY 2018/2019

Research on the Global Impact of the Ronald McDonald House Program

Q Manpower. Employment Outlook Survey Global. A Manpower Research Report

PATHWAYS FOR STANDARDS DEVELOPMENT. Developing internationally aligned Australian Standards in the national interest

ISO/TC 59/SC 13 N 526

International Union for Vacuum Science, Technique and Applications

THE ARMS TRADE TREATY REPORTING TEMPLATE

EVC 2018 Statistics. EVC Participants: Geographical breakdown. EVC 2018 : 55 Countries (Total participants :1806)

JACIE in Europe and Belgium. Ivan Van Riet

Erasmus + Call for proposals Key Action 2 Capacity Building in the field of Higher Education (I)

International Credit mobility

ITU Statistical Activities

ERASMUS+ INTERNSHIP MOBILITY?

APPENDIX B: Organizational Profiles of International Digital Government Research Sponsors. New York, with offices in Geneva, Vienna, and Nairobi

OECD Webinar on alternatives to long chain PFCs Co-organized with the Stockholm Convention Secretariat 18 April 2011

Resource Pack for Erasmus Preparatory Visits

EU Stress Tests and National Action Plans

Unmet health care needs statistics

The industrial competitiveness of Italian manufacturing

General Assembly Twenty-first session Medellin, Colombia, September 2015 Provisional agenda item 8(II)(c)

BE MOBILE! > L AUNCH BREAK < FROM 15 TH TO 30 TH NOVEMBER THE PROFESSORS PROMOTING PRESENT PARTNER SCHOOLS

Form 4: New Work Item Proposal. Reference number: ISO/NP Circulation date: (to be given by Central Secretariat)

Personnel. Staffing of the Agency's Secretariat. Report by the Director General

EUREKA An Exceptional Opportunity to extend Canadian company reach to Europe, Israel and South Korea

Healthcare Practice. Healthcare PanelBook 2017

Minutes of the 66th General Meeting of the Wireless Innovation Forum 21 to 23 June 2010

Integrating mental health into primary health care across Europe

THE ARMS TRADE TREATY REPORTING TEMPLATE

HEALTH CARE NON EXPENDITURE STATISTICS

NOTE BY THE DIRECTOR GENERAL PROGRESS IN THE ELIMINATION OF THE SYRIAN CHEMICAL WEAPONS PROGRAMME

New work item proposal Outsourcing

Terms of Participation 2018

Best Private Bank Awards 2018

International ICT data collection, dissemination and challenges

A Platform for International Cooperation

FCCC/SBSTA/2017/INF.8

Frank Fowlie. Office of the Ombudsman. Remarks at Marrakesh Public Forum. June 28, Check against delivery

Responsible Care The Chemical Industry Contribution to Sustainability

1st German-Swedish Call for Proposals for joint R&D projects by Small and Medium sized Enterprises (SMEs)

Transcription:

[CEN/TC278/WG1 N1589] CEN/TC278/WG1 & ISO/TC204/WG5 Status report to CEN/TC204 April 2012 Jesper Engdahl Jesper Engdahl, WG Convenor Rapp Trans AG Hochstrasse 100 CH-4018 Basel, Switzerland Phone: +41 61335 78 53 e-mail: jesper.engdahl@rapp.ch Johan Hedin, WG Secretary Hybris Konsult AB Ormbergsvägen 16 S-117 67 Stockholm, Sweden Phone: +46 8 658 15 25 e-mail: johan.hedin@hybris.se

Overview of work items under development (1) Architecture and technology independent FprCEN/TS 16439 Security framework (CEN WI 270, WI adopted in Feb 2011, TC278 N2429) FprCEN ISO/TS 17444-1 Charging performance Part 1: Metrics (CEN WI 273, WI adopted in Feb 2011, TC278 N2430; ISO NP adopted in 2011-08, TC204 N2830) prcen/ts 17444-2 Charging performance Part 2: Examination framework (CEN WI 328, WI adopted in March 2012, TC278 N2666; ISO NP letter ballot, closing on 2012-05-28, TC204 N2909) prcen/tr Guidelines for EFC-applications based on in-vehicle ITS Stations (CEN WI 315, adopted in 2011-08, TC278 N2538) How to apply EFC standards to multi-modal transport services using common payment media ISO/TR is being drafted 1

Overview of work items under development (2) DSRC-based EFC ISO/WD-TS 16875 Interface definition between DSRC OBE and external in-vehicle devices (ISO WI adopted in 2012-03, TC204 N2912) EN 15509 Interoperability application profile for DSRC (CEN WI 327, revision) 2

Overview of work items under development (3) Autonomous EFC prcen/ts Secure monitoring for autonomous toll systems Compliance checking (CEN WI 282, adopted in 2011-08, TC278 N2539) CEN PNWI TS EFC - Secure monitoring for autonomous toll systems Trusted recorder (TC278 N2333) 3

EFC application standards overview (4) Frameworks Tests 14907-1 Test Procedures DSRC-based EFC Requirements EFC-tech. independent 17573 EFC Architecture 17574 Security Profiles Autonomous-EFC Requirements Tests 16439 Security Framework Toolboxes 14907-2 DSRC-OBU Tests 14906 AID for DSRC-EFC 12855 Info Exchange 17575-1/2/3/4 AID Auto.-EFC 16401, etc Auto-test (4*2 parts) 25110 AID, IC-cards 17444-1/2 Charging Perf. Indic. XXXXX Sec.Mon: CC 16875 Interface OBE+ XXXXX Sec.Mon: TR Profiles 15876-1/2 IAP Test 15509 IAP for DSRC-EFC TS XXXX IAP for Info Exchange 16331 IAP for Auto-EFC 12813 CCC for Auto-EFC 13143-1/2 CCC Test 13141 LAC for Auto-EFC 13140-1/2 LAC Test Technical Reports TR 16040 Urban DSRC TR 16152 First Mount OBE TR 16092 Pre-Paid Req. TR 16219 Value Added Serv. TR XXXXX EFC on ITS stations 4 TR XXXXX Common payment media

FprCEN/TS 16439 Security framework Objectives - Security framework, defining a framework and necessary elements for interoperable EFC systems - Support for the European Electronic Toll Service Scope - Threat analysis asset-based and attack-based assessment - Requirements specification - Security measures focusing on the interoperable interfaces - Trust model and Basic key management requirements Status - WI adopted in Feb 2011 (TC278 N2429) - TC review completed (TC278 N2549 in 2011-09) - Internet Engineering Task Force s specifications normative (TC278 N2656) - CRR (TC278 N2654) - Draft submitted 2012-03 for FV (WG N1524) - Provisional FV period : 2012-05-22 -- 08-22 Drafting is supported by PT133 5

FprCEN ISO/TS 17444-1 Charging performance Part 1: Metrics Objectives - Charging performance metrics for discrete and continuous charging schemes to support procurement and service level agreements Scope - Charging performance metrics information: - Charge reports - Toll declarations - Billing details - Invoicing accuracy on the level of user accounts Status - WI adopted in Feb 2011 (TC278 N2430) - For TC information (TC278 N2522) and internal WG review, closing on 2011-08-31. ISO NP adopted in 2011-08 (TC204 N2830). - CEN TC review / ISO working draft comments: TC278 N2607 - CRR (TC278 N2651) - Draft (WG N1572) submitted in 2012-02 for parallel CEN FV / ISO DTS ballot - Provisional FV / DTS ballot period: 2012-05-27 -- 08-27 Drafting is supported by PT134 6

prcen ISO/TS 17444-2 Charging performance Part 2: Examination framework Objectives - Charging performance evaluation and monitoring for discrete and continuous charging schemes to support procurement and service level agreements Scope - Definition of the methods (data collection, processing...) to support the evaluation and monitoring of the Charging performance metrics defined in part 1 Outside the scope - Specific numeric performance bounds, or average or worst-case error bounds in percentage or monetary units - Evaluation of the expected performance of a system based on modelling and measured data from trial at another place Status and target - CEN WI adopted in March 2012 (TC278 N2666) - ISO NP letter ballot, replies by 2012-05-28 (TC204 N2909) - Latest working draft: WG N1582, considerable progressed cf with N2909 - CEN TC review / ISO working draft for comments only (2 months):2012-07 - CEN FV / ISO DTS ballot: 2013-02 Drafting is supported by PT134 7

prcen TR WI 278315 Guidelines for EFC-applications based on in-vehicle ITS stations Objective : - Assessment of the technical and operational feasibility of using a generic ITS Station @ ETSI EN 302 665 ITS Com arch" for EFC applications Scope - Comparison of the ITS and EFC architectures - Core requirements for operation of an EFC app on an ITS Station - Potential synergies between EFC and ITS applications - Requirements for the ITS Station to support EFC apps - Recs on standards needed to support deployment of or actions to reduce barriers for deployment of EFC applications on an ITS Station Status and target - WI adopted in 2011-08 (TC278 N2538) - TC review: 2012-07 - FV: 2013-04 EC grant application signed in Dec 2011. Experts selected and kick-off meeting being organised 8

How to apply EFC standards to multi-modal transport services using common payment media Objective and scope - Assess the potential need to extend the EFC standards suite (e.g. ISO 17573 and EN ISO 12855) to provide a suitable support for on-board account EFC systems - Assess the potential need to standard an interface between EFC and other transport services, e.g. public transport Status and target - ISO/TR is being drafted - DTR ballot: 2013-04 9

ISO/WD-TS 16785 - Interface definition between DSRC-OBE and external in-vehicle devices Interface definition between DSRC-OBE and external invehicle devices - Idea originating from Japan (editorial support from Korea, Singapore, etc) - DRSC-based OBU that might be combined with external devices (GNSS, cellular etc) - Scope: To define the interface between DSRC based OBE and external unit to cope with diversified tolling schemes Status and target - PWI TS adopted in Nov 2010 (TC204 N2674, Nov 2010) - Latest working draft (WG N1547) - ISO TS WI adopted in March 2012 (N2912, result of NP letter ballot) - ISO working draft for comments only: 2013-02 - ISO DTS ballot: 2013-07 10

EN 15509 Interoperability application profile (IAP, rev) Objectives - Interoperability, equipment compatibility, best industry practice - Support the European EFC Directive (2004/52/EC) Scope - DSRC requirements - EFC functions and data, security and ICS proforma Status and target - Result of review enquiry (TC278 N2556, 2009-09) - Decision to revise 15509 (TC278 Res 025-2011) - Draft ready for CEN Enquiry: 2012-07 - Draft ready for FV: 2013-04 11

prcen/ts WI 278282 Secure monitoring for autonomous toll systems Compliance checking Objective - Support for the Toll Charger to check the trustworthiness of the toll declarations from the Toll Service Provider whilst respecting the privacy of the user Scope - Secure monitoring concept and stake holder reqs - Transactions and data - Using whenever possible existing standards (CEN/ISO TS 12813, EN CEN/ISO 12855, CEN/ISO TS 17575-1...) Status and target - CEN WI adopted in 2011-08 (TC278 N2539) - TC review: 2012-07 - FV: 2013-02 EC grant application signed in Dec 2011. Experts selected and kick-off meeting being organised 12

Miscellaneous (1) Recently approved EFC standards - CEN ISO/TS 14907-2 Test procedures for user and fixed equipment Part 2: Conformance test for the OBU application unit (TC278 N2573) and published in 2011-11 - EN ISO 12855 EFC - Information exchange between service provision and toll charging (TC278 N2606, published in 2012-02) - CEN/TS 16331 EFC Interoperable application profiles for autonomous systems (CEN/TC278 N2598, published in 2012-03) - Evaluation of equipment for conformity to CEN ISO/TS 17575: 6 standards published in 2012-03 CEN ISO/TS 16407-2 (TC278 N2613) CEN ISO/TS 16401-1/2 (TC278 N2609-2610) CEN ISO/TS 16410-2 (TC278 N2615) CEN ISO/TS 16403-1/2 (TC278 N2611-N1612) - CEN ISO/TS 13140-2 Evaluation of on-board and roadside equipment for conformity to CEN ISO/TS 13141-2 (TC278 N2608, published in 2012-03) - EN 15876-1:2010/A1 Evaluation of on-board and roadside equipment for conformity to EN 15509 Part 1: TSS & TP (TC278 N2623 in 2012-02) 13

Miscellaneous (2) SR of CEN ISO/TS 25110 on-board account using ICC closed on 2012-03-15. 11 confirmed the TS, 1 with minor corrections (N2914) Submitted work item proposal - Secure monitoring Trusted recorder, CEN NWIP, Res 27 by correspondence, replies by 2012-05-18 (N2670) Ideas for future work - Profile standard for EN ISO 12855 Information exchange between Service provision and Toll charging ; a questionnaire (TC278 N2655) circulated to collect stakeholders requirements and experiences - Potentially Framework to support suitability for use assessment 14

Miscellaneous (3) EFC 2006 Grant Agreement - 2 ENs and 4 TS EFC 2007 Grant Agreement - 1 EN, 15 TS and 4 TRs EFC 2010 Grant Agreement - Security framework & Charging performance metrics (TC278 N2362) - Target : 3 TS - approval expected by H1/2013 EFC 2011 Grant Agreement (2011-38) - Secure monitoring for autonomous toll systems Compliance checking - Guidelines for EFC-applications based on in-vehicle ITS stations - Target : 1 TS and 1 TR approval expected by mid 2014 - Experts selected and kick-off meetings being organised EFC 2012 Grant Agreement Application (2012-20) - Secure monitoring for autonomous toll systems Trusted recorder - Interoperable application profiles for information exchange between Service Provision and Toll Charging - Coordination of PTs and support to the EC - Application submitted in March 2012 15

Miscellaneous (4) Review of 15638-6 TARV Regulated applications in response to the request by its main editor. The current draft covers charging, whereas this is the core scope of WG5 and its EFC suite of standards. It is recommended to remove charging from 15638-6 s normative elements and refer to the EFC suite of standards, where appropriate. Review and input to ITS reference architecture (TS 14813 rev) terms and open distributed processing model (WG N1562-1563, ISO 17573) QA procedures for ITS/EFC standardised terms and data definitions (WG N1583) Overview of CEN and ISO standards development stages (TC278 N2660) supports the coordination within the WG and between the TCs Intellectual property and patent rights Monitoring and initial assessment of potentially relevant new patent or patent applications (WG N1549 and N1584) M338 progress report to the ITSCG (TC278 N2633) 16

CEN/TC278/WG1 and ISO/TC204/WG5 Recent meetings: Next meetings: Members: 25-26 January 2012, Warsaw (Poland) 11-12 April 2012, Delft (the Netherlands) 27-28 June 2012, Zürich (Switzerland) 16-17 October 2012, Moscow (Russia) 23-24 January 2013 (tbc) Australia, Austria, Canada, China, Czech Republic, Finland, France, Germany, Italy, Japan, Korea, Netherlands, Norway, Poland, Portugal, Slovenia, South Africa, Spain, Sweden, Switzerland, United Kingdom In total 47 expert members from 21 countries (15 CEN) Subgroups: Liaisons: SG1 - Trond Foss: Info exchange, architecture, security SG2 - Jean François Jouen: DSRC based EFC, testing SG5 - Ian Catling: GNSS/CN based EFC EC DG TREN, EC Electronic Toll Committee, ETSI ITS, CEN/WG3 & ISO/WG8, CEN WG16 & ISO /WG18, ISO/WG16, IEEE 1609, CEN/TC224/WG11 17

Team of EFC standardisation experts WG meeting in Stockholm in October 2011 (courtesy of Sweco) 18

Convenor s recommendations to TC204 1. Noting the result of the systematic review ballot on CEN ISO/TS 25110 (TC204 N2914), ISO/TC204 resolves to launch a minor revision of CEN ISO/TS 25110 Electronic fee collection - Interface definition for on-board account using ICC and subsequently send the updated draft to the parallel CEN FV / ISO DTS ballot, pending successful comment resolution 2. Noting the result of ISO/NP TS 16785 ballot (TC204 N2912), ISO/TC204 resolves for the following work item ISO/WD-TS 16785 Electronic fee collection - Interface definition between DSRC OBE and external in-vehicle devices to prepare an updated draft and subsequently send it to working draft - comments only ballot (3 months) 19

TC204 Tampa WG5-related resolutions - status Res no Content Status 869 ISO TC204 resolves to launch the DTS ballot for the following work item, under CEN lead, subject to prior decision by CEN TC278: CEN ISO/TS 17444-1 - Electronic fee collection Charging performance Part 1: Metrics 870 ISO TC204 resolves to work in parallel with CEN TC278 under CEN lead on the following work item and submit it for NP ballot and subsequently for CD ballot, subject to prior decision by CEN TC278: CEN ISO/TS 17444-2 Electronic fee collection Charging performance Part 2: Examination framework Comment resolution report in CEN/TC278 N2651. Draft CEN ISO/TS 17444-1 submitted for parallel CEN FV / ISO DTS ballot in 2012-02. CEN/TC278 adopted a new work item for the development of TS 17444-2 in its resolution 006-2012 (CEN/TC278 N2666, 2012-03-22). The same work item is subject to ISO NP letter ballot (N2909), replies by 2012-05-28. 20

Provisional WG5 room requirements for TC204 meeting in Moscow, Russia, October 2012 Tuesday, 16th of October: 1 meeting room for some 35 persons - SG1 in the morning - SG5 in the afternoon 1 meeting room for the afternoon for some 15 persons (SG2) Wednesday, 17th of October : 1 meeting room for some 35 persons (WG plenary), potentially including an outreach event with Russian EFC stakeholders Joint WG meetings in conjunction with the TC204 October 2012 meeting? Anticipated desire to meet and discuss - Fee and fare w TC204/WG8 - EFC app on ITS stations w TC204/WG18 21

Completed Work (1) - Architecture and technology independent EN ISO 12855 ISO 17573 CEN ISO/TS 17574 CEN TR 16092 CEN TR 16152 CEN TR 16219 CEN ITR CEN ITR EFC - Information exchange between service provision and toll charging (published in 2012-02) EFC - System architecture for vehicle-related tolling (published in 2010-12, replacing ISO TS 17573:2004) EFC Guidelines for security protection profiles (2nd ed published in 2009-09) EFC - Requirements for pre-payment systems (adopted in 2010-08, target publication date 2011-03-02) EFC Personalisation and mounting of first mount OBE (published in 2011-03) EFC Value added services based on EFC on-board equipment (published in 2011-07) Integration of payment systems for transport services (CEN/TC278 N278, 1994-03-17) Definition of Threats and Security Controls for the Charging Interface in Electronic Fee Collection (CEN/TC278 N780, 1997-10) 22

Completed Work (2) DSRC-based EFC EN ISO 14906 CEN ISO/TS 14907 EFC - application interface definition for DSRC (3rd edition published in 2011-10) EFC - Test procedures user and fixed equipment Part 1: Description of test procedures (3rd ed published in 2010-06) Part 2: Conformance test for the onboard unit application interface (2nd ed in 2011-11) EN 15509 EFC - Interoperable application Profile for DSRC (published 2007-05) EN 15876 CEN ISO/TS 25110 EFC Conformity evaluation of on-board and roadside equipment to EN 15509 Part 1: Test suite structure and test purposes (2010+A1:2012) Part 2: Abstract test suite (published 2011-04) EFC - Interface definition for on-board account using ICC (approved in 2008-10) CEN TR 16040 EFC - Requirements for urban DSRC systems (published in 2010-06) CEN ITR AFC requirements for DSRC (CEN/TC278 N318, 1994-08) CEN ITR EFC - Requirements for Integrated Circuit Cards (CEN/TC278 N779, 1997-10) 23

Completed Work (3) Autonomous and support for autonomous EFC systems CEN ISO/TS 17575 EFC - Application interface definition for autonomous systems Part 1: Charging (published in 2010-06) Part 2: Communication and connection to the lower layers (published in 2010-06) Part 3: Context data (published in 2011-04) Part 4: Roaming (published in 2011-04) CEN/TS 16331 EFC Interoperable application profiles for autonomous systems (published in 2012-03) 24

Completed Work (4) Autonomous and support for autonomous EFC systems CEN ISO/TS 16407 CEN ISO/TS 16401 CEN ISO/TS 16410 CEN ISO/TS 16403 EFC Evaluation of equipment for conformity to CEN ISO / TS 17575-1 Part 1: Test suite structure & test purposes (published in 2011-10) Part 2: Abstract test suite (published in 2012-03) EFC Evaluation of equipment for conformity to CEN ISO / TS 17575-2 Part 1: Test suite structure & test purposes (published in 2012-03) Part 2: Abstract test suite (published in 2012-03) EFC Evaluation of equipment for conformity to CEN ISO / TS 17575-3 Part 1: Test suite structure & test purposes (published in 2011-10) Part 2: Abstract test suite (published in 2012-03) EFC Evaluation of equipment for conformity to CEN ISO / TS 17575-4 Part 1: Test suite structure & test purposes (published in 2012-03) Part 2: Abstract test suite (published in 2012-03) 25

Completed Work (5) Autonomous and support for autonomous EFC systems CEN ISO/TS 12813 EFC - Compliance check communication (Published in 2009-11) CEN ISO/TS 13143 CEN ISO/TS 13141 EFC - Evaluation of on-board and roadside equipment for conformity to CEN ISO/TS 12813 Part 1: Test suite structure and test purposes (published in 2011-04) Part 2 : Abstract test suite (published in 2011-05) EFC Localisation augmentation communication (published in 2010-02) CEN ISO/TS 13140 CEN ITR EFC - Evaluation of on-board and roadside equipment for conformity to CEN ISO/TS 13141 Part 1: Test suite structure and test purposes (published in 2011-04) Part 2: Abstract test suite (published in 2012-03) Application requirements for EFC systems based on GNSS/CN (CEN/TC278 N798, 1997-11) 26