Participating in the 7th Community RTD Framework Programme. Athens 28/2/07 SSH Information Day

Similar documents
PICK-ME Kick-off meeting Political, scientific, contractual and financial aspects

The European Research Council. Pierre Dubosc ERC Executive Agency Unit C2 Grant Agreement Preparation Lyon 07/05/2014

APRE Agency for the promotion of European Research. Introduction to FP7 & Rules for participation in the Seventh Framework Programme ( )

South Africa October 2011

Participation and funding in H2020 actions Ingrid Mariën-Dusak, DG CONNECT

NEGOTIATION GUIDANCE NOTES

Horizon ERA-NET Cofund actions

CAPACITIES PROVISIONAL 1 WORK PROGRAMME 2007 PART 2. (European Commission C(2006) 6849) RESEARCH FOR THE BENEFIT OF SMES

Guideline for Research Programmes Rules for the establishment and implementation of programmes falling under the Programme Area Research

Grant Preparation Forms (GPF) - overview

WORK PROGRAMME 2012 CAPACITIES PART 2 RESEARCH FOR THE BENEFIT OF SMES. (European Commission C (2011)5023 of 19 July)

1 Comav CFS CoM. Disclaimer. can be held

PEOPLE Programme Marie Curie Actions FP7

FP7/ICT: Rules and proposal making. Warsaw, September 2012

CAPACITIES WORK PROGRAMME (European Commission C(2009)5905 of 29 July 2009)

Focusing and Integrating Community Research. 9. Horizontal Research Activities involving SMEs. Work Programme

Horizon 2020 Condensed

CAPACITIES WORK PROGRAMME PART 3. (European Commission C (2011) 5023 of 19 July 2011) REGIONS OF KNOWLEDGE

Negotiation Guidance Notes

From the idea to the project. Gorgias Garofalakis ETAT S.A.

Horizon 2020: rules for participation, proposal submission and evaluation procedure. Monique Bossi APRE- Italy

Focusing and Integrating Community Research. 9. Horizontal Research Activities involving SMEs. Work Programme

CALL FICHE 1 SCIENCE IN SOCIETY 2009

Grant Agreement Preparation Forms

Call title: ERA-NET Call 2012

FCH JTI Piotr Swiatek, NCP Energy

The budget for this call is indicative. The final budget awarded to actions implemented through the call for proposals may vary:

EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE

Version September 2014

How to Write a Competitive Proposal for Framework 7

EU-India Call on Water 2017

EU measures to support RTD and innovation activities performed by SMEs

"ERA-NET Plus Actions"

FP7: Marie Curie Actions

Horizon 2020 Legal Documents

ICTpsp I C T P O L I C Y S U P P O R T P R O G R A M M E. CIP ICT PSP Pilots A, Pilots B, Thematic Networks, Best Practice Networks, PPI Pilots

Call title: Science in Society 2013

Frequently Asked Questions

Education, Audiovisual and Culture Executive Agency GRANT DECISION FOR AN ACTION. Decision Nr

4.Horizon 2020: Rules and procedures! Participant Portal and Documentation

GUIDANCE NOTES ON PROJECT REPORTING

Guidance Notes for preparing the Grant Agreement

STANDARD GRANT APPLICATION FORM 1 REFERENCE NUMBER OF THE CALL FOR PROPOSALS: 2 TREN/SUB

Guidance Notes on Project Management and Reporting

Incentive Guidelines Innovation Clusters

GRANT APPLICATION FORM 1

Do terms like FP6, CORDIS, Specific Programme, Call for

New FP7 Calls. Martina Marian Fondazione Eni Enrico Mattei. Milano, 01/10/2009

SPECIFIC PRIVACY STATEMENT ERCEA ERC- Proposals Evaluation, Grants Management and Follow-up

Republic of Latvia. Cabinet Regulation No. 50 Adopted 19 January 2016

Incentive Guidelines Research and Development - Tax Credits INDUSTRIAL RESEARCH PROJECTS; EXPERIMENTAL DEVELOPMENT PROJECTS; INTELLECTUAL PROPERTY

PEOPLE WORK PROGRAMME (European Commission C(2008)4483 of 22 August 2008)

III. The provider of support is the Technology Agency of the Czech Republic (hereafter just TA CR ) seated in Prague 6, Evropska 2589/33b.

Table 1: Indicative budget lines

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR INTERNAL MARKET, INDUSTRY, ENTREPRENEURSHIP AND SMES

GUIDE FOR APPLICANTS GRANT FOR PROJECT. Call Identifier: PP Closing Date: 15 May 2018

ERA-NET ERA-NET. Cooperation and coordination of national or regional research and innovation activities (i.e. programmes)

Guidelines for Full Proposal Submission. Maritime and Marine Technologies for a new Era

ERA-LEARN 2020: In-Kind/ Institutional ERA-NET-COFUND- Projects An Overview

1. MARIE CURIE CARRIER INTEGRATION GRANTS (CIG)

IMI2 Rules and Procedures 26 July Helsinki. Magali Poinot, Legal Manager

Education, Audiovisual and Culture Executive Agency

Call for proposals DG EAC/21/06

ICT, FET Open LIFT ICT-FP Using Local Inference in Massively Distributed Systems Collaborative Project D 7.1 Quality Assurance Plan

Processing. - The publication of the projects' coordinators' contact details (opt-out);

EUROPEAN COMMISSION Executive Agency for Small and Medium-sized Enterprises (EASME)

Call for proposals. COSME Enterprise Europe Network 2015/2020 COS-WP EUROPEAN COMMISSION

Answers to questions following the call for tender for a Fund Operator for the EEA and Norway Grants Global Fund for Regional Cooperation

HORIZON 2020 PROPOSAL EVALUATION

Fast Track to Innovation Pilot ( ) January 2014

EUROPEAN COMMISSION. Community Research. FP6 Instruments. Implementing the priority thematic areas of the Sixth Framework Programme EUR 20493

Guide for BONUS applicants

Health programme Call New ways for supporting your plans

SocialChallenges.eu Call for grants 2 nd Cut-off date

Info and Networking Day PCP actions in FP7-ICT

IMI2 Rules 16 July Magali Poinot, Legal Manager

Rules and Procedures for IMI Calls for proposals. IMI Webinar 17 July 2017

H2020 Work Programme : Spreading Excellence and Widening Participation Call: H2020-TWINN-2015: Twinning Frequently Asked Questions (FAQ)

Jean Monnet Activities within the Erasmus+ Programme Grant Management & Procedures. Seminar for on-going Erasmus+ Jean Monnet Projects

FP6 Instruments. Implementing the priority thematic areas of the Sixth Framework Programme EUROPEAN COMMISSION. Community Research

GUIDE FOR PROPOSERS. participating in a competitive call for additional contractors in an EU 6 th Framework programme project. Integrated projects

Guide for Applicants. COSME calls for proposals 2017

The IDEAS Work Programme

CALL FOR PROPOSALS HOME/2014/PPXX/AG/SPBX NEW INTEGRATED MECHANISMS FOR COOPERATION BETWEEN PUBLIC AND PRIVATE ACTORS TO IDENTIFY SPORTS BETTING RISKS

Stephen Alexander. Legal & financial considerations for H2020. Legal & Financial NCP. H2020UK National Contact Points

Business Development, Innovation and SMEs Practical Information and Guidance to Applicants

CLUSTER EXCELLENCE PROGRAMME

Incentive Guidelines Network Support Scheme (Assistance for collaboration)

GUIDE FOR ACTION GRANTS 2015

Proposal template European Strategic Cluster Partnerships for smart specialisation investments

2018 Call for Projects on ALS Research

EUROPEAN COMMISSION. Proposal template. Pilot Project Call PP

IMI2 Rules and Procedures 10 July 2014

ERC Consolidator Grant 2016 Administrative forms (Part A) Research proposal (Part B1 and Part B2) Letter of Commitment of the Host Institute

Galileo : EGNSS Awareness raising and capacity building

EEA Financial Mechanisms Programme SMEs Growth Romania 1 st Call for Project Proposals

GUIDANCE HOW TO IMPLEMENT THE PROJECT VIA THE ELECTRONIC MONITORING SYSTEM (PART II)

Horizon Support to Public-Public Partnershiups

Civil Society and local authorities thematic programme South Africa- CSO call for proposals

REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Transcription:

Participating in the 7th Community RTD Framework Programme Athens 28/2/07 SSH Information Day 1

2 Overview How proposals are submitted: the EPSS system What happens next Who can participate Funding schemes Who can receive funding Certification of costs and on the methodology The Guarantee Fund Grant agreement

What is the EPSS? EPSS for FP7 An electronic system enabling project coordinators to prepare and submit their proposal online through the Internet using a web site accessed seamlessly from CORDIS or accessed directly once the participant is registered Operating 7 days a week, operating 24 hours a day, free of charge to the participants, supporting most IT configurations, avoiding a paper based submission costs and issues What is needed to use it? An access to the Internet the faster, the better though the system works even with dial-up connections A A computer most of the platforms are supported, even older ones 3

EPSS for FP7 The FP7 proposal-project project time line EPSS closes Evaluation finishes Project starts Decision is taken The EPSS closes at 17:00:00.000 (read call text) 4

EPSS for FP7 EPSS in the process chain PROPOSALS CALLS PUBLICATION CORDIS PUBLICATION OF RESULTS CORDIS e e ELECTRONIC PROPOSAL SUBMISSION SYSTEM e EVALUATION SUPPORT SYSTEM e RANKING NEGOTIATION COM DECISION e CONTRACTING PROJECT MANAGEMENT FINANCING REPORTING e:denotes electronic information 5 transfer

EPSS for FP7 Steps to submission Identify call and funding scheme on CORDIS Register on the EPSS give basic details on project EPSS mails the user id and password to the proposal co- ordinator Watch your electronic mail! Go straight to the EPSS or go to the EPSS via CORDIS Enter user-id and password, change passwords Set up the consortium or enter participant detail Enter the relevant information & load the part B Submit the proposal and log-out out 6

EPSS for FP7 Using the EPSS successfully The submit button disappears at 17:00:00.000, CET In case of doubt, get support early. Phone. Do not wait No special characters in file names. Stick to A-Z, 0-9, - The system allows multiple submissions. Use the facility but do not abuse. Do not change budgets at the last moment: this may prevent you from getting the proposal submitted on time Do not upload the proposal at the last moment: this invalidates the previous submission Monitor CORDIS, you email should the EPSS encounter technical problems: the two systems are independent 7

Logout and check your email for 8 a confirmation mail EPSS for FP7 How should I proceed as a coordinator? Access the CORDIS website for a specific call, register on the EPSSE Check your electronic mail for the EPSS access details & FAQ Login for accessing the online EPSS Change the passwords for the coordinator and the partners Send the partner s s username and password to the partners Set-up the proposal by indicating the number of participants, their participant id, name and email addresses, once in the registration process and after in the proposal setup screen Edit Part A forms (object, participants, budget) Upload the Part B file (detailed proposal text) Upload Part B annexes if needed or required Validate proposal to ensure basic checks are satisfied Submit the proposal to modify, go back to step 6, 7 or 8 Verify that the system gives a proposal number Logout and check your email for a confirmation mail

Watch http://www.esp-fp7.org for more information What happens next! Once you #submit#

Q1: Can I do it again? Corrections may be done until the deadline BUT please submit early Once the deadline is gone the proposals are unlocked from EPSS and given to the Commission services 10

First check: 11 Q2: What does the Commission do with the proposals? Is the proposal eligible? Attribution of each proposal to an evaluation panel Selection of three evaluators for each proposal All evaluators sign confidentiality and conflict of interest declarations Evaluators are also checked for conflict of interest (broad definition)

The evaluation process Minimum three individual evaluations Consensus meeting consensus report Panel meeting results in a panel report and for each-project and evaluation summary report Evaluation Summary Report is sent to the participants 12

Post-ESR scenarios Any scores below thresholds = out Proposals above thresholds always demand more than available budget Three lists to be funded negotiations start to be rejected rejection decision process reserve list The position of each proposal is communicated to the applicants (in the above order!) Indicative timing in the work- programme 13

WHO can participate? 14

Important definitions Public body: any legal entity established as such by national law, and international organisations. Research organisation a legal entity established as a non-profit organisation which carries out research or technological development as one of its main objectives. Non-profit entity When considered as such by national or international law 15

Important definitions(2) Higher and secondary education establishments Includes universities, schools for applied sciences and similar. SMEs Micro, small and medium-sized enterprises within the meaning of Recommendation 2003/361/EC in the version of 6 May 2003 (OJ L 124, 20.5.2003, p. 36). International cooperation partner countries: FP6 INCO countries three categories according to income per capita will be identified as such in the work programmes low-income, lower-middle middle-income, income, or upper- middle-income. income. 16

Who can participate? Any undertaking, university or research centre or other legal entity, whether established in a: - Member State (MS) - Associated country (Ac), or - Third country Joint Research Centre (JRC) - is deemed to be established in another MS or Ac International organisations and participants from third countries can participate only if in addition to the minima 17

Conditions for participation Minimum condition, general rule, at least 3 independent participants from 3 different MS or Ac Additional conditions can be established by the SP or WP (number or type of participant, place of establishment) Specific conditions may also apply for: Frontier research actions, at least, 1 legal entity established in a MS or Ac Collaborative projects addressing the participation of International Cooperation Partner Countries (ICPC) Minimum: 4 participants, 2 of which from MS or Ac and another 2 from ICPC countries unless otherwise foreseen in the WP. 18

Funding schemes 19

Collaborative projects Funding Schemes Range: from small or medium-scale focused research actions to large-scale integrating projects for achieving a defined objective. Projects should also target special groups such as CSOs and other actors (SMEs) Coordination and support actions Support for activities aimed at coordinating or supporting research activities and policies (networking, exchanges, trans-national national access to research infrastructures, studies, conferences, etc.). 20

Research for the benefit of specific groups Specific groups = Civil society organisations (CSOs) Non governmental, non-profit, not representing commercial interests Aims to develop scientific knowledge related to CSOs activities in order to contribute to public debate CSOs as coordinator or partner 21

Research for the benefit of specific groups CSOs define the questions CSOs outsource the bulk of research to RTD performers which are remunerated accordingly CSOs own the research results Public access Wide public dissemination IPRs provisions in consortium agreement 22

Research for the benefit of specific groups Minimum participation Three CSO in three Member States or Associated Countries Or a network of CSOs established in at least three MS or AC Two RTD performers Project size Max EU contribution : 1 million 23

WHO can receive funding? 24

Eligibility for funding Legal entities from MS and Ac or created under Community law and the JRC International European interest organisations Legal entities established in international cooperation partner countries (ICPC), and International organisations and legal entities from third countries other than ICPC only if: - provided for in SP or WP; or - their contribution is essential for carrying out action; or - provision for funding is provided for in a bilateral agreement between Community and the third country 25

Upper funding limits (1) Reimbursement according to the type of action and/or activity Research and technological development activities: up to 50% of eligible costs, or up to 75% for: Non profit public bodies secondary and higher education establishments research organisations SMEs Security-related related research, for development of capabilities with very limited market size and a risk of market failure and for accelerated equipment development in response to new threats Demonstration activities: up to 50% 26

Upper funding limits (2) Actions that will be reimbursed up to 100%: Frontier research Coordination and support actions Training and career development of researchers (Marie Curie) Management Other activities: Training (not Marie Curie), coordination, networking and dissemination 27

Maximum reimbursement Maximum reimbursement rates of eligible costs Research and technological development (*) Demonstration activities Management of the consortium activities Other activities (**) Network of excellence 50% 75% (***) 100% 100% Collaborative project 50% 75% (***) 50% 100% 100% Coordination and support action 100% (****) 100% (****) (*) Research and technological development includes operational activities directly related to the protection of foreground and coordination of research activities. (**) Other activities means any "specific activity" covered by Annex I. (***) For beneficiaries that are non profit public bodies, secondary and higher education establishments, research organisations and SMEs (****) The reimbursement of indirect eligible costs, in the case of coordination and support actions, may reach a maximum 7% of the direct eligible costs, excluding the direct eligible costs for subcontracting and the costs of reimbursement of resources made available by third parties which are not used on the premises of the beneficiary. 28

Reimbursement of eligible costs Most funding schemes, particularly at beginning of FP7 will use reimbursement of eligible costs Eligible: Actual (average personnel costs may be used if do not differ significantly from actual costs) NEW Incurred within the duration of project In accordance with the beneficiary usual accounting and management principles Recorded in the accounts of beneficiary Used for the sole purpose of achieving the objectives of the project Non-eligible identifiable indirect taxes including VAT (among others ) 29

Direct Costs Participants may charge eligible direct and indirect costs Reimbursement of direct costs: Average personnel costs accepted if: Consistent with the management principles and accounting practices they do not significantly differ from actual personnel costs, and if identified according to a methodology approved by the Commission (NEW( NEW) 30

Indirect Costs Reimbursement of indirect costs: For all: either actual overhead, or simplified method,, or flat rate of 20% of direct costs For Non profit Public Bodies, Secondary and Higher Education establishments, Research Organisations, and SMEs unable to identify real indirect costs may apply for a flat rate of 60% for funding schemes with Research, Technological Development & Demonstration (calls published up to 31.12.2009. 40% from 01.01.2010 to 31.12.2013) For Coordination and Support Actions limit of 7% of direct costs 31

Certification of costs and methodology 32

Certification on financial statements Mandatory for beneficiaries when its requested funding reaches 375,000 Euro except for project of 2 years or less: CFS submitted at the end. If above the threshold, mandatory for every beneficiary, except if a certification on the methodology is provided 33

Certification on the methodology It aims at certifying the methodology of calculating (average) personnel costs and overhead rates Waives the obligation of certificates for interim payments Simplified certificate for final payments Valid throughout FP7, on a voluntary basis, but must be accepted by the EC Particularly aimed at legal entities with multiple participation 34

Certification on the methodology (2) Advantages of certificates on the methodology: The EC will receive consistent certifications and cost claims clean from errors Beneficiaries will gain legal security Beneficiaries in many projects will have to submit less certificates EC and beneficiaries will have less processes to handle EC gains significantly in terms of assurance on legality and regularity 35

Certification on the methodology (3) Auditors will provide information according to a specific format specified via agreed terms of reference (ToR( ToR) ) annexed to the grant agreement (Annex VII) 2 types of certificates: Report of factual findings on expenditure verification certificate on financial statements (Form D) system verification- certificate on the methodology (Form E) 36

Who can provide these certificates? Qualified auditors under the 8th Directive on statutory audits Public bodies, secondary and higher education establishments and research organisations may opt for a competent public officer 37

Third parties Third parties carrying part of the work Subcontracts: : tasks have to be indicated in Annex I Awarded according to best value for money External support services may be used for assistance in minor tasks (not to be indicated in Annex I) Specific cases: : EEIG, affiliates carrying out part of the work (special clause) Third parties making available resources Third parties : : to be indicated in Annex I. Costs may be claimed by the beneficiary Resources free of charge may be considered as receipts 38

The Guarantee Fund 39

40 Implementation Participants are technically responsible to carry out the project jointly and severally towards the Community and have to carry out the work of a defaulting participant But: no more collective financial responsibility as under FP6 Instead: establishment of a participant Guarantee Fund to cover risks

Risk avoidance mechanism (1) Participant Guarantee Fund ( the Fund ): All beneficiaries contribute to the Fund to insure against losses of a defaulting participant The contribution shall not exceed 5% of the EC financial contribution due to each participant Financial interests generated by the Fund will serve to cover financial risk In principle this amount will be reimbursed at the end of the action 41

Risk avoidance mechanism (2) Only if interests are insufficient, the Commission may deduct up to 1% from the Community financial contribution to be returned This retention will not apply to public bodies, entities guaranteed by a MS or Ac, and higher and secondary education establishments Exoneration of verification of financial viability of participants (excluding Coordinators) requesting less than 500.000 EUR No bank/financial guarantee may be requested The Commission has to establish the Guarantee Fund and its modalities of implementation 42

Grant agreement 43

Grant agreement The Commission is about to establish, in close cooperation with Member States, 3 model grant agreements: General model grant agreement (including specific provisions for SMEs, Infrastructures and ERA-NET+) Specific model grant agreement for ERC actions Specific model grant agreement for Marie- Curie actions 44

Terminology Sources: Financial Regulation/Implementing Rules, FP7 and Rules for Participation Contract becomes Grant Agreement Contractor becomes Beneficiary Instruments become Funding Schemes Audit certificate becomes Certificate on Financial Statement The results of the project (knowledge in FP6) becomes Foreground Pre-existing existing know-how becomes Background 45

One pre-financing Payment modalities financing (within 45 days following the date of entry into force) for the whole duration of the action Interim payments based on financial statements (EC contribution= amounts justified & accepted * funding rate) Retention (10%) Final payment 46

47 Consortium agreement Unless exempted by the call for proposals,, participants will have to draw up a consortium agreement, to govern the following: The internal organisation of the consortium The distribution of the Community financial contribution Additional rules on dissemination and use including intellectual property rights arrangements, as appropriate The settlement of internal disputes.

Reporting Periodic reports to be submitted by coordinator 60 days after end of period: overview of progress of the work, including a publishable summary report, use of the resources, and Financial Statement (Form C) Final reports to be submitted by coordinator 60 days after end of project: publishable summary report, conclusions and socioeconomic impact, covering wider societal implications and a plan on use and dissemination of foreground. 48

Reporting (2) Commission has 105 days to evaluate and execute the corresponding payment No tacit approval of reports After reception the Commission may: Approve Suspend the time-limit requesting revision/completion Reject them giving justification, possible termination Suspend the payment 49

Credits: Mr Huber Van Delft Mr Nikos Kastrinos Ms Carmen Hormigo DG Research 50