CRS Report for Congress Received through the CRS Web

Similar documents
Navy CVN-21 Aircraft Carrier Program: Background and Issues for Congress

Navy Ford (CVN-78) Class (CVN-21) Aircraft Carrier Program: Background and Issues for Congress

Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress

Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress

Defense Acquisition: Use of Lead System Integrators (LSIs) Background, Oversight Issues, and Options for Congress

DOD Leases of Foreign-Built Ships: Background for Congress

Evolutionary Acquisition an Spiral Development in Programs : Policy Issues for Congress

Aircraft Carriers Enduring and Transformational

Panel 12 - Issues In Outsourcing Reuben S. Pitts III, NSWCDL

April 25, Dear Mr. Chairman:

Navy CG(X) Cruiser Design Options: Background and Oversight Issues for Congress

Defense Surplus Equipment Disposal: Background Information

CRS Report for Congress

Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress

Small Business Innovation Research (SBIR) Program

Make or Buy: Cost Impacts of Additive Manufacturing, 3D Laser Scanning Technology, and Collaborative Product Lifecycle Management on Ship Maintenance

Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress

Veterans Affairs: Gray Area Retirees Issues and Related Legislation

Chief of Staff, United States Army, before the House Committee on Armed Services, Subcommittee on Readiness, 113th Cong., 2nd sess., April 10, 2014.

CRS Report for Congress Received through the CRS Web

March 23, Sincerely, Peter R. Orszag. Honorable Roscoe G. Bartlett, Ranking Member, Seapower and Expeditionary Forces Subcommittee

Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress

CRS Report for Congress

FFC COMMAND STRUCTURE

Air Force Science & Technology Strategy ~~~ AJ~_...c:..\G.~~ Norton A. Schwartz General, USAF Chief of Staff. Secretary of the Air Force

Operational Energy: ENERGY FOR THE WARFIGHTER

Navy Ship Names: Background For Congress

Fiscal Year 2011 Department of Homeland Security Assistance to States and Localities

DoD Countermine and Improvised Explosive Device Defeat Systems Contracts for the Vehicle Optics Sensor System

Acquisition. Air Force Procurement of 60K Tunner Cargo Loader Contractor Logistics Support (D ) March 3, 2006

ASNE Combat Systems Symposium. Balancing Capability and Capacity

Report Documentation Page

Independent Auditor's Report on the Attestation of the Existence, Completeness, and Rights of the Department of the Navy's Aircraft

Exemptions from Environmental Law for the Department of Defense: Background and Issues for Congress

CRS prepared this memorandum for distribution to more than one congressional office.

Engineered Resilient Systems - DoD Science and Technology Priority

Office of the Assistant Secretary of Defense (Homeland Defense and Americas Security Affairs)

Afloat Electromagnetic Spectrum Operations Program (AESOP) Spectrum Management Challenges for the 21st Century

Exemptions from Environmental Law for the Department of Defense: Background and Issues for Congress

February 8, The Honorable Carl Levin Chairman The Honorable James Inhofe Ranking Member Committee on Armed Services United States Senate

Dynamic Training Environments of the Future

Ballistic Missile Defense: Historical Overview

Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress

The Need for a Common Aviation Command and Control System in the Marine Air Command and Control System. Captain Michael Ahlstrom

Opportunities to Streamline DOD s Milestone Review Process

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

Software Intensive Acquisition Programs: Productivity and Policy

Navy Littoral Combat Ship (LCS) Program: Background, Issues, and Options for Congress

Review of Defense Contract Management Agency Support of the C-130J Aircraft Program

The Fully-Burdened Cost of Waste in Contingency Operations

The Coalition Warfare Program (CWP) OUSD(AT&L)/International Cooperation

The Uniformed and Overseas Citizens Absentee Voting Act: Background and Issues

Joint Committee on Tactical Shelters Bi-Annual Meeting with Industry & Exhibition. November 3, 2009

terns Planning and E ik DeBolt ~nts Softwar~ RS) DMSMS Plan Buildt! August 2011 SYSPARS

Potential Savings from Substituting Civilians for Military Personnel (Presentation)

COTS Impact to RM&S from an ISEA Perspective

US Navy Ships. Surface Warfare Officer First Tours

Unmanned Systems Interoperability Conference 2011 Integration of Autonomous UxS into USN Experiments

Rapid Reaction Technology Office. Rapid Reaction Technology Office. Overview and Objectives. Mr. Benjamin Riley. Director, (RRTO)

Fleet Logistics Center, Puget Sound

GAO AIR FORCE WORKING CAPITAL FUND. Budgeting and Management of Carryover Work and Funding Could Be Improved

Seven New Carriers (Maybe)

LCS Mission Modules Program

GAO. FORCE STRUCTURE Capabilities and Cost of Army Modular Force Remain Uncertain

DOD Leases of Foreign-Built Ships: Background for Congress

REQUIREMENTS TO CAPABILITIES

White Space and Other Emerging Issues. Conservation Conference 23 August 2004 Savannah, Georgia

H-60 Seahawk Performance-Based Logistics Program (D )

The Marines Expeditionary Fighting Vehicle (EFV): Background and Issues for Congress

Developmental Test and Evaluation Is Back

United States Army Aviation Technology Center of Excellence (ATCoE) NASA/Army Systems and Software Engineering Forum


Shadow 200 TUAV Schoolhouse Training

Report No. D-2011-RAM-004 November 29, American Recovery and Reinvestment Act Projects--Georgia Army National Guard

National Continuity Policy: A Brief Overview

Required PME for Promotion to Captain in the Infantry EWS Contemporary Issue Paper Submitted by Captain MC Danner to Major CJ Bronzi, CG 12 19

Report No. D February 22, Internal Controls over FY 2007 Army Adjusting Journal Vouchers

Report No. D August 12, Army Contracting Command-Redstone Arsenal's Management of Undefinitized Contractual Actions Could be Improved

United States Military Casualty Statistics: Operation Iraqi Freedom and Operation Enduring Freedom

Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress

Improving the Quality of Patient Care Utilizing Tracer Methodology

DDESB Seminar Explosives Safety Training

2011 USN-USMC SPECTRUM MANAGEMENT CONFERENCE COMPACFLT

at the Missile Defense Agency

Incomplete Contract Files for Southwest Asia Task Orders on the Warfighter Field Operations Customer Support Contract

DON Mentor-Protégé Program

Nuclear Command, Control, and Communications: Update on DOD s Modernization

Navy-Marine Corps Strike-Fighter Shortfall: Background and Options for Congress

Defense Health Care Issues and Data

Military to Civilian Conversion: Where Effectiveness Meets Efficiency

Army Aviation and Missile Command (AMCOM) Corrosion Program Update. Steven F. Carr Corrosion Program Manager

DoD Corrosion Prevention and Control

Ballistic Protection for Expeditionary Shelters

Munitions Response Site Prioritization Protocol (MRSPP) Online Training Overview. Environmental, Energy, and Sustainability Symposium Wednesday, 6 May

Report Documentation Page

Development of a Hover Test Bed at the National Hover Test Facility

CONGRESS OF THE UNITED STATES CONGRESSIONAL BUDGET OFFICE CBO. An Analysis of the Navy s Fiscal Year 2017 Shipbuilding Plan

Cerberus Partnership with Industry. Distribution authorized to Public Release

World-Wide Satellite Systems Program

Navy Nuclear-Powered Surface Ships: Background, Issues, and Options for Congress

Transcription:

Order Code RS20643 Updated February 19, 2002 CRS Report for Congress Received through the CRS Web Summary Navy CVNX Aircraft Carrier Program: Background and Issues for Congress Ronald O'Rourke Specialist in National Defense Foreign Affairs, Defense, and Trade Division The Administration s proposed FY2003 defense budget requests $243.7 million in advanced procurement funding for CVNX-1, an aircraft carrier that the Navy plans to procure in FY2007. The FY2003 budget request includes additional research and development funding for the ship. The Navy plans to gradually evolve the design of its aircraft carriers by introducing new technologies into CVN-77 (an aircraft carrier procured in FY2001), CVNX-1, and CVNX-2 (a carrier planned for procurement around FY2011). The Navy estimates that CVNX-1 will cost $2.54 billion to develop and $7.48 billion to procure, bringing its total acquisition (development plus procurement) cost to $10.02 billion. The Navy estimates that CVNX-2 will cost $1.29 billion to develop and $7.49 billion to procure, for a total acquisition cost of $8.78 billion. A Defense Science Board task force is currently assessing how aircraft carriers should serve the nation s needs in the 21 st century; it is to report its findings by the end of March 2002. This report will be updated as events warrant. Background The Navy s Current Carrier Force. The Navy currently has 12 aircraft carriers and Defense Department plans call for maintaining the force at this level. Table 1 below shows the 12 ships in the current carrier force. The Enterprise is a one-of-a-kind nuclearpowered carrier; all the other nuclear-powered carriers are of the Nimitz (CVN-68) class (with some modifications). Two additional Nimitz-class carriers are under construction the Ronald Reagan (CVN-76), which was procured in FY1995 at a cost of $4.45 billion and is scheduled to enter service in 2002 as the replacement for the Constellation, and the as-yet-unnamed CVN-77, which was procured in FY2001 at a cost of $4.97 billion and is scheduled to enter service in 2008 as the replacement for the Kitty Hawk. The Aircraft Carrier Construction Industrial Base. All U.S. aircraft carriers procured since FY1958 have been built by Newport News Shipbuilding (NNS) of Newport News, VA. NNS is the only shipyard in the country that can build large-deck, nuclearpowered aircraft carriers. The aircraft carrier construction industrial base also includes hundreds of subcontractors and suppliers in dozens of states. Congressional Research Service The Library of Congress

Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE 19 FEB 2002 2. REPORT TYPE 3. DATES COVERED 00-00-2002 to 00-00-2002 4. TITLE AND SUBTITLE Navy CVNX Aircraft Carrier Program: Background and Issues for Congress 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Congressional Research Service,The Library of Congress,101 Independence Avenue SE,Washington,DC,20540-7500 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR S ACRONYM(S) 12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT 11. SPONSOR/MONITOR S REPORT NUMBER(S) 15. SUBJECT TERMS 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT a. REPORT unclassified b. ABSTRACT unclassified c. THIS PAGE unclassified Same as Report (SAR) 18. NUMBER OF PAGES 6 19a. NAME OF RESPONSIBLE PERSON Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18

CRS-2 Table 1. U.S. Navy aircraft carriers Name Hull number Propulsion Length (feet) Full load displacement (tons) Year procured Year entered service Kitty Hawk CV-63 fossil fuel 1,046 84,000 FY1956 1961 Constellation CV-64 fossil fuel 1,046 84,000 FY1957 1961 Enterprise CVN-65 nuclear 1,102 94,000 FY1958 1961 John F. Kennedy CV-67 fossil fuel 1,052 81,000 FY1963 1968 Nimitz CVN-68 nuclear 1,092 92,000 FY1967 1975 Dwight D. Eisenhower CVN-69 nuclear 1,092 92,000 FY1970 1977 Carl Vinson CVN-70 nuclear 1,092 92,000 FY1974 1982 Theodore Roosevelt CVN-71 nuclear 1,092 96,000 FY1980 1986 Abraham Lincoln CVN-72 nuclear 1,092 102,000 FY1983 1989 George Washington CVN-73 nuclear 1,092 102,000 FY1983 1992 John C. Stennis CVN-74 nuclear 1,092 102,000 FY1988 1995 Harry S Truman CVN-75 nuclear 1,092 102,000 FY1988 1998 Navy Aircraft Carrier Acquisition Programs. Navy aircraft carrier acquisition programs currently revolve around three ships CVN-77, CVNX-1, and CVNX-2. CVN-77. As part of its action on the FY2001 defense budget, Congress in 2000 approved $4,053.7 million to complete procurement funding for CVN-77. CVN-77's total procurement cost of $4,974.9 million includes $921.2 million that was provided prior to FY2001. CVN-77 will incorporate a variety of new technologies, including several that are intended to reduce the annual operating and support (O&S) cost of the ship compared to other Nimitz-class ships. Where feasible, some of these new technologies might be retrofitted onto the other 9 Nimitz-class carriers. CVN-77 will require 550 fewer sailors to operate than previous Nimitz-class ships and will feature a new integrated combat system to be made by an industry team led by Lockheed Martin. CVNX-1. CVNX-1 is a further-evolved version of the Nimitz-class design that the Navy plans to procure in FY2007 to replacement for the Enterprise (CVN-65) in 2014. The Navy estimates that CVNX-1 will cost $2.54 billion to develop and $7.48 billion to procure, bringing its total acquisition (development plus procurement) cost to $10.02 billion. Congress appropriated $138.9 million in advanced procurement funding for CVNX-1 in the FY2002 defense budget. For FY2003, the Administration is requesting $243.7 million in advanced procurement funding and additional funding for research and development work on the ship.

CRS-3 The table below shows actual (FY2001-FY2002), requested (FY2003), programmed (FY2004-FY2007), and implied (FY2008) procurement funding for CVNX-1. The FY2002 figure shown reflects an apparent DoD adjustment to the congressionally enacted figure. The large advanced procurement funding figure in FY2004 will fund, among other things, the ship s long-lead-time nuclear-propulsion components. A total of $2,479.8 million, or about 33% of the ship s total procurement cost, is to be provided prior to the procurement year of FY2007. Although CVNX-1 is to be procured in FY2007, Navy plans call for $2,354.8 million, or about 31%, of the ship s total procurement cost to be provided in FY2008. Dividing the final portion of the ship s procurement cost between FY2007 and FY2008 is called split funding and is an apparent departure from the full funding provision a defense budgeting rule imposed by Congress on the Defense Department about 50 years ago that requires the full procurement cost of any item procured through the procurement title of the defense appropriations act (including Navy ships funded in the Shipbuilding and Conversion, Navy [SCN] appropriation account) to be provided in the year in which the item is procured. The Navy apparently split-funded CVNX-1 between FY2007 and FY2008 to relieve financial pressure on the SCN account in FY2007. Table 2. Procurement funding for CVNX-1 (millions of then-year dollars) Fiscal Year 01 02 03 04 05 06 07 08 Total 21.9 136.0 243.7 1,262.9 397.9 417.4 2,645.4 2,354.8 7,480.0 The Navy originally wanted CVNX-1 to be a completely new, next-generation aircraft carrier (hence the name CVNX-1, rather than CVN-78). In May 1998, however, the Navy decided that it could not afford to develop an all-new design for the ship and instead decided to continue to modify the Nimitz-class design with each new carrier that is procured. Under this strategy, CVN-77 and CVNX-1 are to be, technologically, the first and second ships in a series of transitional aircraft carrier designs. An all-new carrier design (including a new hull design different from that of the Nimitz class) might eventually emerge under this strategy, but this would not happen until CVNX-2 at the earliest or, perhaps more likely, CVNX-3. Compared to CVN-77, CVNX-1 would require at least 350 fewer sailors to operate and would feature, among other things, an entirely new and less expensive nuclear reactor plant, a new electrical distribution system, and an electromagnetic (as opposed to steampowered) aircraft catapult system. CVNX-2. Under current Navy long-range plans, CVNX-2 would be procured in FY2011 and enter service in 2018 as the replacement for the John F. Kennedy (CV-67), which will then be 50 years old. The Navy estimates that CVNX-2 will cost $1.29 billion to develop and $7.49 billion to procure, for a total acquisition cost of $8.78 billion. Compared to CVNX-1, CVNX-2 would feature further reductions in crew size, a significantly redesigned flight deck, an electromagnetic aircraft recovery system, and hulldesign improvements.

CRS-4 Defense transformation and aircraft carriers. The Bush Administration has expressed a strong interest in defense transformation, which can be defined as large-scale, potentially discontinuous or disruptive change military technologies, concepts of operations, and organization. For U.S. naval forces, transformation could involve making changes that better prepare the fleet to contend with so-called maritime anti-access/areadenial capabilities such as advanced diesel-electric submarines, anti-ship missiles, and mines that adversaries may deploy to defend their littoral (near-shore) waters against large, capable navies like the U.S. Navy. 1 Some advocates of defense transformation, including Andrew Marshall of the Pentagon s Office of Net Assessment, have raised questions about the future survivability and cost-effectiveness of large aircraft carriers (and other surface ships) against adversaries with capable anti-access/area-denial forces. They have also advocated increased spending on unmanned air vehicles (UAVs) and unmanned combat air vehicles (UCAVs) to accelerate the transformation of naval aviation. Defense Science Board Task Force. On September 6, 2001, E.C. Pete Aldridge, Jr, the Under Secretary of Defense (Acquisition, Technology and Logistics) directed the Defense Science Board to establish a task force to assess how aircraft carriers should service the nation s defense needs in the 21 st century and beyond... The Task Force should concentrate on the increased need to fulfill the presence and warfighting mission that aircraft carriers perform. The carrier battle group has been the mainstay of our combat-credible forward presence and the Task Force should examine its applicability and potential for transformation in the future... The Task Force should explore the aircraft carrier s contribution to joint operations in the littoral. While significant resources are being expended in the evolution of aircraft carriers to improve performance and life cycle cost, it is not expected that there will be sufficient funds to expand the carrier fleet significantly. The Task Force should examine cost/capability tradeoffs in considering the design of carriers appropriate to the future environments in which naval warfare may occur. In exploring all of these issues, the Task Force should examine the broadest range of alternatives... 2 The task force is to report its findings by the end of March 2002. Potential Issues for Congress Potential implications of UAVs and UCAVs. Congress has expressed an interest in unmanned air vehicles (UAVs) and unmanned combat air vehicles (UCAVs) for several years. Congress in 2000 underscored this interest in Section 220 of the FY2001 defense authorization act (H.R. 4205/P.L. 106-398), which states, It shall be a goal of the 1 For more on defense transformation and how it relates to the Navy, see CRS Report RS20851, Naval Transformation: Background and Issues for Congress, by Ronald O Rourke. Washington, 2002. (Updated periodically) 6 p. 2 Memorandum dated September 6, 2001 from The Under Secretary of Defense (Acquisition, technology, and Logistics) to the Chairman, Defense Science Board, on Terms of Reference Defense Science Board Task Force on Aircraft Carriers of the Future.

CRS-5 Armed Forces to achieve the fielding of unmanned, remotely controlled technology such that (1) by 2010, one-third of the aircraft in the operational deep strike force aircraft fleet are unmanned... Many defense analysts believe the value and potential of UAVs and UCAVs have been demonstrated by the war in Afghanistan, where they have been used extensively. One potential question for Congress is whether the Navy s plans for incorporating UAVs and UCAVs into naval aviation are sufficient in scope and urgency. As of last year, the Navy planned on incorporating 6 UCAVs into each carrier air wing (or about 8 percent of each air wing s 75 aircraft) by 2017. This plan does not appear to keep pace with the goal established in Section 220 of the FY2001 defense authorization act. A second potential question for Congress is how UAVs and UCAVs might alter the overall structure of naval aviation, including the carrier fleet. As a part of the Navy s Streetfighter project for generating new naval operational concepts and conceptual ship designs for fighting in contested littoral areas, 3 a class project at the Naval Postgraduate School in Monterrey, CA, recently developed a design for a 13,000-ton UAV/UCAV carrier called Sea Archer that would embark an air wing of 16 UAVs and UCAVs weighing about 15,000 pounds each, plus two manned helicopters. The ship as designed would have a maximum speed of 60 knots (compared with something more than 30 knots for the Navy s aircraft carriers) and an estimated procurement cost of about $1.5 billion. The ship s size and cost could be reduced by lowering its maximum speed to 45 or 50 knots and reducing the size of the UAVs and UCAVs to 10,000 to 12,000 pounds. The ship might enter service as soon as 2020. 4 Potential questions for Congress include: How many UAVs and UCAVs should be incorporated into future carrier air wings, and how should the design of future aircraft carriers be altered, if at all, to take into account the potential for air wings with various mixes of manned and unmanned aircraft? Should the Navy develop and procure a UAV/UCAV carrier? If so, how many UAVs and UCAVs, with what capabilities, should it embark? How might a UAV/UCAV carrier be used, either independent of or in conjunction with aircraft carriers embarking mostly manned aircraft, and how many traditional aircraft carriers and UAV/UCAV carriers should the fleet have? Other potential questions. Other potential questions for Congress concerning carriers include the following:! Carrier survivability. How survivable will carriers be in the future against adversary forces, and how might judgements on prospective carrier survivability affect the size and composition of the Navy s future aircraft carrier force? 3 For more on the Streetfighter project, see CRS Report RS20851, op cit. 4 Woods, Randy. Students Design Small, Fast Carrier At Projected Cost of $1.5 Billion. Inside the Navy, January 7, 2002; Woods, Randy. Students Envision Fast, Stealthy UAV TO Accompany Small Carrier. Inside the Navy, October 15, 2001; Woods, Randy. As Crossbow Design Takes Shape, Students Eye 2040 Readiness Date. Inside the Navy, September 10, 2001.

CRS-6! Design evolution. Does the Navy s plan for evolving the design of its carriers through CVN-77, CVNX-1,and CVNX-2 introduce new technologies and design features at the right pace? Should policymakers reconsider the 1998 to abandon the notion of developing a clean-sheet carrier design? At this juncture, what are the merits of the clean-sheet and evolutionary approaches?! Construction process. Is the process for building aircraft carriers sufficiently modern and efficient? Have the Navy and Newport News Shipbuilding taken adequate advantage of computer-aideddesign technology and modular design and manufacturing techniques to modernize the process for building carriers? How much have these steps reduced the prospective procurement cost of CVNX-1?! Cost growth. The Navy recently has experienced cost growth in its aircraft carrier construction programs. What were the causes of this cost growth, and what steps have the Navy and Newport News Shipbuilding taken to prevent future cost growth?! Stationkeeping multiplier. The stationkeeping multipliers for aircraft carriers i.e., the number of carriers that must be in inventory to keep one carrier continuously on station in various overseas operating areas are higher than the multipliers for other kinds of Navy ships. About 6 U.S.-homeported carriers are required to keep one on station in the Mediterranean, and 7 or more U.S.-homeported carriers are required to keep one on station in the Northern Arabian Sea or Persian Gulf. What is the potential for reducing carrier stationkeeping multipliers through measures such as higher transit speeds to and from the operating areas, greater use of land-based simulators (so as to reduce time at sea spent in non-deployed training operations), double- or multiplecrewing of carriers, or long-duration forward deployments of carriers with rotation of crews that are flown to and from the ship?! Electric drive. The Navy in 1999 issued a report to Congress on electric-drive propulsion technology for Navy ships concluding that the technology would be cost-effective for most kinds of Navy ships, but not for carriers. Have developments in electric-drive technology since 1999 affected this conclusion in any way? 5 5 See CRS Report RL30622, Electric-Drive Propulsion for U.S. Navy Ships: Background and Issues for Congress, by Ronald O Rourke. Washington, 2000. (July 31, 2000) 65 p.