MEASUREMENT, REPORTING AND VERIFICATION FRAMEWORK FOR NON- ANNEX I PARTIES UNDER THE CONVENTION

Similar documents
INTRODUCTION TO BIENNIAL UPDATE REPORTS (BURs)

INTERNATIONAL CONSULTATION AND ANALYSIS

Nationally Appropriate Mitigation Actions by Developing Country Parties

Agreed outcome pursuant to the Bali Action Plan

PART I: GENERAL APPROACH TO THE REVIEW. A. [Applicability

Accessing the Capacity-building Initiative for Transparency (CBIT) GEF Expanded Constituency Workshop Hammamet, Tunisia July 12, 2017

GEF: Investing in Robust MRV Systems for Mitigation

Workshop Objective, Expectations and Agenda

UNFCCC Capacity Building Activities on National Greenhouse Gas Inventories of non-annex I Parties

Framework Convention on Climate Change

PROGRESS REPORT ON THE CAPACITY-BUILDING INITIATIVE FOR TRANSPARENCY

First BUR of Chile and ICA process

The UNFCCC NAMA Registry

Operation of the registry of nationally appropriate mitigation actions

GEF-6 FULL-SIZED PROJECT FOR ENDORSEMENT PROJECT TYPE: Full-sized Project TYPE OF TRUST FUND:GEF Trust Fund

The UNFCCC NAMA Registry Facilitating design and implementation of mitigation actions in developing countries

Methodologies for the reporting of financial information by Parties included in Annex I to the Convention

Annex 2 GUIDELINES FOR USERS OF THE JOINT IMPLEMENTATION PROJECT DESIGN DOCUMENT FORM

Main outcomes from the Lima climate change conference

Annex Template for the call for input

Technical paper on the sixth review of the Financial Mechanism

GEF-6 GEF SECRETARIAT REVIEW FOR FULL-SIZED/MEDIUM-SIZED PROJECTS THE GEF/LDCF/SCCF TRUST FUND. GEF Focal Area (s): Climate Change.

How GIZ supports partner countries in the preparation of their INDCs

Measures to facilitate the implementation of small-scale afforestation and reforestation project activities under the clean development mechanism

Report of the Global Environment Facility to the Conference of the Parties. Progress report on the Capacity-building Initiative for Transparency

NAMA Fair Side-event at COP-21 in Paris, 2 December 2015, PM, Observer room 02. Support to NAMAs

GEF SECRETARIAT REVIEW FOR FULL/MEDIUM-SIZED PROJECTS* THE GEF/LDCF/SCCF/NPIF TRUST FUNDS

Initial Proposal Approval Process, Including the Criteria for Programme and Project Funding (Progress Report)

Status of the GCF portfolio: pipeline and approved projects

NAMAs and the PACIFIC NAMA GUIDELINES

Seventh Report of the Green Climate Fund to the Conference of the Parties to the United Nations Framework Convention on Climate Change

Article 6 of the Paris Agreement

Summary of UNFCCC Submissions

United Nations Framework Convention on Climate Change GUIDANCE FROM THE CONFERENCE OF THE PARTIES AND RESPONSES BY THE GLOBAL ENVIRONMENT FACILITY

GIZ technical support on MRV in the West African region

United Nations Framework Convention on Climate Change GUIDANCE FROM THE CONFERENCE OF THE PARTIES AND RESPONSES BY THE GLOBAL ENVIRONMENT FACILITY

PROCEDURE FOR ACCREDITING INDEPENDENT ENTITIES BY THE JOINT IMPLEMENTATION SUPERVISORY COMMITTEE. (Version 06) (Effective as of 15 April 2010)

United Nations Development Programme. Country: Armenia PROJECT DOCUMENT

Guidance materials on Auditing Climate Change

Summary of UNFCCC Submissions

Phnom Penh, Cambodia preferred, but work can be done remotely. Location : Application Deadline : July 20 th, Languages Required : English

Australia s submission on strategies and approaches for scaling up climate finance

International NAMA Facility

Report of the Green Climate Fund to the Conference of the Parties

GEF Support for Intended Nationally Determined Contributions (INDCs) & Lessons Learned

Partnership on Transparency in the Paris Agreement

GEF/C.41/Inf.11 October 7, GEF Council Meeting November 8-10, 2011 Washington, D.C.

International Climate Initiative and NAMA Facility

Capacity Building Project for Measurement, Reporting and Verification (MRV) of Greenhouse Gas (GHG) Emission Reduction in Africa

A new initiative to catalyze high-impact NAMAs and create a vibrant practitioner network on low-carbon development

Combined Clarification Notes I VI. published on 21 October 2016

PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR)

Workstream III: Operational Modalities Sub-workstream III.2: Managing Finance Background note: Thematic windows

Lessons learnt from fast-start finance

FCCC/CP/2016/6. Distr.: General 30 August 2016 Arabic Original: English GE (A) * *

STDF MEDIUM-TERM STRATEGY ( )

Responses to inquiries Call for proposals (CFP) 2012-S1 for hosting the Climate Technology Centre

TABLE OF CONTENTS I.INTRODUCTION 2 II.PROGRESS UPDATE 4 III.FINANCIAL MANAGEMENT 7 IV. MOBILIZATION OF RESOURCES 11 V. OUTLOOK FOR

Report of the Global Environment Facility to the Twenty-third Session of the Conference of the Parties to the United Nations Framework Convention on

REQUIRED DOCUMENT FROM HIRING UNIT

GLOBAL CARBON TRUST VERIFICATION MANUAL. v Global Carbon Trust - All rights reserved

THE GREEN CLIMATE FUND AND NATIONAL CLIMATE PLEDGES LEADING TO PARIS Ned Helme, President

GEF s Role and Activities for Climate Change Mitigation

ANNOTATED PROVISIONAL AGENDA I. INTRODUCTION. A. Background. B. Purpose and objectives

Regional meeting on the Strategic Approach to International Chemicals Management

II. Background Information

Australia s National Guidelines and Procedures for Approving Participation in Joint Implementation Projects

FCCC/SBSTA/2017/INF.8

Report on Activities of the Secretariat

National Dialogue Initiative

with Environment and Sustainable Development Agency for Republic of Mali 17 March 2015 Strategic Frameworks and Country Programming

Report on the independent review of the effective implementation of the Climate Technology Centre and Network

Under the United Nations Framework Convention on Climate Change

Indonesia - FCPF Readiness Preparation Grant FCPFR - Forest Carbon Partnership Facility

Status of the Fund s portfolio: pipeline and approved projects

PART I: PROJECT INFORMATION 1. PROJECT LINKAGE TO NATIONAL PRIORITIES, ACTION PLANS AND PROGRAMS

Accessing financing from the Green Climate Fund

GLOBAL NAMA FINANCING SUMMIT: SETTING THE STAGE FOR OUR DISCUSSIONS Copenhagen, Denmark

Report of the Global Environment Facility to the Conference of the Parties

Review of the initial proposal approval process

United Nations Environment Programme

Overview Schedule. SESSIONS OF THE SUBSIDIARY BODIES 1 11 June 2015, Bonn, Germany

Global strategy and plan of action on public health, innovation and intellectual property

GEF SECRETARIAT REVIEW FOR FULL/MEDIUM-SIZED PROJECTS* THE GEF/LDCF/SCCF TRUST FUNDS

The undertaking involves 4 NGOs/CSOs under separate contract as follows:

Best practices and challenges in supporting MRV in developing countries

Standing Committee on Finance

The What, Who and How of the Partnership for Market Readiness (PMR)

Capacity building through training and development of financing proposals for climate-relevant projects and programs

Directive for the Austrian JI/CDM Programme

Global Climate Funds. The Climate Investment Funds and the Green Climate Fund CLIFFORD POLYCARP

PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR) MEXICO

with the Corporación Andina de Fomento (CAF) for Republic of Chile 16 March 2017 Entity Support & Strategic Frameworks

Bangladesh: Forest Investment Program (FIP) Technical Mission, October 16-20, 2016 Aide Memoire

FCCC/CP/2015/4. United Nations. Report of the Global Environment Facility to the Conference of the Parties

Terms of Reference. International Consultant GEF Project Development Specialist

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism

JICA Technical Cooperation Project: Activities and outcomes. Satoshi Iemoto

ACI AIRPORT SERVICE QUALITY (ASQ) SURVEY SERVICES

Argentine Republic's Readiness Preparation - Readiness Fund for Forest Carbon Partnership Facility (FCPF) FCPFR - Forest Carbon Partnership Facility

Transcription:

MEASUREMENT, REPORTING AND VERIFICATION FRAMEWORK FOR NON- ANNEX I PARTIES UNDER THE CONVENTION Twelfth Workshop on Greenhouse Gas Inventories in Asia (WGIA12) and the GHG inventory workshop, Bangkok, Thailand, 4-7 August 2014 Alma Jean, Programme Officer Non-Annex I Support, Mitigation, Data and Analysis

Presentation Outline I. UNFCCC Context II. Overview of the MRV Framework for Developing Countries I. International MRV I. National Communications II. Biennial Update Reports III. International Consultation and Analysis II. REDD-plus MRV III. Domestic MRV

UNFCCC Context - Objective of the Convention The ultimate objective of this Convention and any related legal instruments that the Conference of the Parties may adopt is to achieve, in accordance with the relevant provisions of the Convention, stabilization of greenhouse gas concentrations in the atmosphere at a level that would prevent dangerous anthropogenic interference with the climate system. Such a level should be achieved within a time-frame sufficient to allow ecosystems to adapt naturally to climate change, to ensure that food production is not threatened and to enable economic development to proceed in a sustainable manner.

UNFCCC Context Genesis of MRV Decision 1/CP.13 - Bali Action Plan, available here http://unfccc.int/resource/docs/2007/cop13/eng/06a01.pdf#page=3 Paragraph 1: Decides to launch a comprehensive process to enable the full, effective and sustained implementation of the Convention.by addressing (b) Enhanced national/international action on mitigation of climate change, including, inter alia, consideration of: (i) Measurable, reportable and verifiable nationally appropriate mitigation commitments or actions..by all developed country Parties. (ii) Nationally appropriate mitigation actions by developing country Parties in the context of sustainable development in a measurable, reportable and verifiable manner;

Overview of Measurement, Reporting and Verification Framework International MRV National communications Biennial update reports (BUR) International consultation and analysis (ICA) REDD+ MRV Modalities for MRV of REDD+ activities Voluntary - obtain and receive payments for results-based actions Domestic MRV General guidelines to describe the domestic MRV of domestically supported NAMAs Voluntary use CONSULTATIVE GROUP OF EXPERTS

I. NATIONAL COMMUNICATIONS

Relevant Provisions of the Convention Article 4 1. All Parties, taking into account their common but differentiated responsibilities and their specific national and regional development priorities, objectives and circumstances, shall: a) Develop, periodically update, publish and make available national inventories of anthropogenic emissions by sources and removals by sinks of all greenhouse gases not controlled by the Montreal Protocol, using comparable methodologies to be agreed upon by the Conference of the Parties Article 12 1. each Party shall communicate a) A national inventory of anthropogenic emissions b) A general description of steps taken or envisaged by the Party to implement the Convention; and c) Any other information that the Party considers relevant to the achievement of the objective of the Convention http://unfccc.int/essential_background/convention/items/6036.php

Reporting for National Communications 1. Guidelines for the preparation of national communications from Parties not included in Annex I to the Convention- Adopted in 2002-Decision 17/CP.8: http://unfccc.int/resource/docs/cop8/07a02.pdf#page=2 1. A User manual for non-annex I Parties a) Elaborates on the guidelines to assist Parties in preparing their national communications b) Provides effective and efficient use of these guidelines http://unfccc.int/files/essential_background/application/pdf/userman_nc.pdf

Guidelines for the Preparation of National Communications: Objectives a) To assist NAI Parties in meeting their reporting requirements; b) To encourage the presentation of information in a consistent, transparent, comparable and flexible manner; c) To facilitate the presentation of information on support required for the preparation of national communications; d) To serve as policy guidance to the operating entity of the financial mechanism of the Convention, for the timely provision of financial support needed by NA1 Parties in order to fulfill their reporting requirement; e) To ensure that the COP has sufficient information to carry out its responsibility for assessing the implementation of the Convention by Parties.

Scope of the National Communication I II National Circumstances National greenhouse gas (GHG) Inventory III IV V Programmes containing measures to mitigate climate change, Programmes to facilitate adequate adaptation to climate change Other relevant information VI Constraints and gaps and related financial, technical capacity needs 7

I. National Circumstances A description of their national and regional development priorities, objectives and circumstances upon which they will address climate change and its adverse impacts Information regarding their specific needs and concerns arising from the adverse effects of climate and/or the impact of the implementation of response measures A description of existing institutional arrangements relevant to the preparation of their national communications on a continuous basis

II. National Greenhouse Gas Inventory A national inventory of anthropogenic emissions by sources and removals by sinks of all greenhouse gases (GHGs) not controlled by the Montreal Protocol a) Initial national communications (1994); Second national communication (2000), Third national communication? Methodologies a) Revised 1996 Intergovernmental Panel on Climate Change (IPCC) Guidelines for National Greenhouse Gas Inventories b) IPCC Good Practice Guidance and Uncertainty Management in National Greenhouse Gas Inventories Reporting a) Describe procedures and arrangements undertaken to collect and archive data for the preparation of national GHG inventories b) Estimates of anthropogenic emissions by sources and removals by sinks Methodologies used to estimate c) Reporting tables 1 and 2 / Sectoral tables and worksheets

III-IV. General Description of Steps Taken or Envisaged to Implement the Convention a) General description of steps taken or envisaged towards formulating, implementing, publishing and regularly updating national or regional programmes containing measures to facilitate adequate adaptation to climate change Methodological approaches Best able to reflect vulnerability/adaptation measures Reporting Scope of vulnerability, adaptation assessment. b) General description of steps taken or envisaged towards formulating, implementing, publishing and regularly updating national or regional programmes containing measures to mitigate climate change Methodological approaches Available and appropriate in order to formulate and prioritize Reporting Information on programmes and measures planned or implemented, sectors, results.

V. Other Relevant Information Transfer of Technologies Research and systematic observation Education, training and public awareness Capacity building Information and networking

VI. Constraints and Gaps, and Related Financial, Technical and Capacity Needs Describes any constraints and gaps, and related financial, technical and capacity needs Proposed or implemented activities for overcoming gaps and constraints Financial resources and technical support for the preparation on national communications a) Provided by themselves, GEF, Annex II Parties b) Bilateral or multilateral institutions for activities related to climate change List of project for financing Opportunities for the implementation of adaptation measures Relevant needs and/or areas for capacity building

Benefits of the National Communications Process Provides information to the COP; Serves as a tool for planning/ decision making at the national level; Provides the opportunity to address climate change in a systematic manner by providing opportunities to explore possibilities for taking climate change considerations into account, to the extent feasible, in relevant social, economic and environmental policies and actions; Provides information to donors about potential adaptation and mitigation projects; Provides information (e.g. best practices, technology needs, etc.) to other stakeholders (possibilities to explore different networks and forms of cooperation); Builds capacity of national experts.

UNFCCC Enhanced Reporting Requirements Initial Guidelines (10/CP.2) Revised Guidelines (17/CP.8) Biennial update reports (1/CP.16; 2CP.17)

Decision 1/CP.16 Enhanced reporting- paragraph 60-66 Frequency for national communications a) Submission every four years Submit biennial update reports (BURs) a) Updates of national GHG inventories/report b) Mitigation actions/ their effects c) Support needed & received International Consultation and Analysis (ICA) a) BURs b) Modalities and guidelines http://unfccc.int/resource/docs/2010/cop16/eng/07a01.pdf#page=2

Decision 2/CP.17 Adopted Guidelines for the preparation of biennial update reports for non-annex I Parties (annex III) Modalities and guidelines for ICA (annex IV) Submission NAI Parties should submit their first BUR by December 2014 Subsequent BUR shall be submitted every two years Summary of parts of NC Stand alone update report Inventory year Minimum, no more than four years prior to the date of submission/more recent The first round of the ICA (NA-I) will commence within six months of submission of the first round of BUR The guidelines should be reviewed and revised as appropriate/cop Decisions http://unfccc.int/resource/docs/2011/cop17/eng/09a01.pdf#page=4

Decision 2/CP.17 (cont d.). Recognized the CGE could also play an important role in facilitating technical advice and support for the preparation and submission of the first BUR Urged NAI Parties to submit their request to the GEF for support Urged and requested the GEF to make support available to NAI Parties for preparation of BURs, as early as possible in 2012 and on the basis of agreed full cost

II. REPORTING GUIDELINES FOR BIENNIAL UPDATE REPORTS

Reporting for Biennial Update Reports 1. UNFCCC Biennial update reporting guidelines for Parties not included in Annex I to the Convention 2. Adopted at COP 17 1. Decision 2/CP.17, annex III 2. Available here: http://unfccc.int/resource/docs/2011/cop17/eng/09a01.pdf#page=4

Biennial Update Reporting Guidelines Objectives Scope National GHG inventory Mitigation actions FTC needs and support received Submissions

Overview of the Biennial Update Reporting Guidelines(cont d.) Objectives Scope National GHG inventory Mitigation actions FTC needs and support received Submissions Objective 1 Objective 2 Objective 3 Objective 4 Objective 5 Objective 6 To assist NAI Parties in meeting their reporting requirements To encourage the presentation of information in a consistent, transparent, complete, accurate and timely manner To enable enhanced reporting by non-annex I Parties on mitigation actions and their effects, needs and support received To provide policy guidance to an operating entity of the financial mechanism for the timely provision of financial support To facilitate the presentation of information on finance, technology and capacity-building support needed and received, including for the preparation of biennial update reports To facilitate reporting, to the extent possible, on any economic and social consequences of response measures

Overview of the Biennial Update Reporting Guidelines (cont d.) Objectives Scope National GHG inventory Mitigation actions FTC needs and support received Submissions Scope of biennial update reports is defined in Section II, paragraph 2 of the BUR guidelines: To provide an update to the most recently submitted national communication on: National circumstances and institutional arrangements National GHG inventory Mitigation actions and their effects - methodologies and assumptions Constraints and gaps, and related financial, technical and capacity needs - support needed and received Level of support received for the preparation and submission of BUR Domestic MRV Any other relevant information

Overview of the Biennial Update Reporting Guidelines (cont d.) Objectives Scope National GHG inventory Mitigation actions FTC needs and support received Submissions Guidelines/ methodologies Inventory year(s) Decision 17/CP.8 (or any later guidelines in future), Inventory for year: calendar year no more than four years prior to the date of the submission, or more recent years Revised 1996 IPCC Guidelines, the GPG 2000 Subsequent biennial update reports: cover a calendar year that does not precede the submission date by more than four years GPG 2003 (LULUCF) Time series: back to the years reported in the previous national communications (encouraged) Encouraged to submit summary information tables of inventories for previous submission years (e.g. for 1994 and/or 2000 reported in previous national communications)

Overview of the Biennial Update Reporting Guidelines (cont d.) Objectives Scope National GHG inventory Mitigation actions FTC needs and support received Submissions Elements- should 17/CP.8:Table 1-National greenhouse gas inventory of anthropogenic emissions by sources and removals by sinks of all greenhouse gas. 17/CP.8:Table 2 national Greenhouse gas inventory of anthropogenic emissions of HFCs, PFCs and SF 6 http://unfccc.int/resource/docs/cop8/07a02.pdf 27

Overview of the Biennial Update Reporting Guidelines (cont d.) Objectives Scope National GHG inventory Mitigation actions FTC needs and support received Submissions Elements that are Encouraged Time series: back to the years reported in the previous national communications Key Category analysis (KCA) Quality Control and Quality Assurance (QA/QC) Uncertainty Assessment

Overview of the Biennial Update Reporting Guidelines (cont d.) Objectives Scope National GHG inventory Mitigation actions and their effects FTC needs and support received Submissions Methodologies and assumptions Objectives of the action and steps taken or envisaged to achieve that action Progress of implementation of the mitigation actions and the underlying steps taken or envisaged, and the results achieved, such as estimated outcomes (metrics depending on type of action) and estimated emission reductions, to the extent possible International market mechanisms In tabular format Description of domestic MRV arrangements

Overview of the Biennial Update Reporting Guidelines (cont d.) Objectives Scope National GHG inventory Mitigation actions FTC needs and support received Submissions Constraints and gaps, and related financial, technical and capacity-building needs Financial resources, technology transfer, capacity-building and technical support received from the GEF, Annex II Parties and other developed country Parties, the GCF and multilateral institutions for activities relating to climate change, including for the preparation of the current biennial update report Technology needs, which must be nationally determined, and on technology support received

Overview of the Biennial Update Reporting Guidelines (cont d.) Objectives Scope National GHG inventory Mitigation actions FTC needs and support received Submissions A single document, in electronic format Language: English or any one of the official United Nations languages Additional or supporting information may be supplied through other documents, such as a technical annex

Support for the Reporting Process Technical Assistance The CGE developed training materials on the preparation of national communications and BURs http://unfccc.int/national_reports/nonannex_i_natcom/training_material/methodological_docume nts/items/7914.php Global/regional training workshops Limited sub-regional GHG inventory pilot capacity building initiatives UNFCCC online support Financial Assistance National communications Access up to US$500,000 Biennial update reports Access up to US$352,000 GEF Agency/via direct access Additional resources, if required, STAR Allocation. Project can be combined to include NC and BURs Access up to US$ 852,000 UNEP/UNDP

Support for the reporting process (cont d.) CGE supplementary training materials: biennial update reports are available here: http://unfccc.int/national_reports/nonannex_i_natcom/training_material/methodological_documents/items/7915.php CGE Regional Training Workshops for 2014 Schedule of CGE BUR Workshops REGION VENUE DATE Latin America and the Caribbean Panama City 16-18 July 2014 Africa Region Togo 18-20 August 2014 Pacific and Eastern Europe Armenia 8-10 September 2014

Submission of Biennial Update Reports By decision 2/CP.17, paragraph 41(a)..Non-Annex I Parties, consistent with their capabilities and the level of support provided for reporting, should submit their first biennial update report by December 2014; the least developed country Parties and small island developing States may submit BURs at their discretion. The provisions here very explicitly grants flexibility to SIDS and LDCs in submission of their first BURs. Non-Annex I Parties that are not SIDS or LDCs have a deadline for submission of the reports by December 2014. BUR preparation and submission is beneficial to all Opportunity to build trust Showcase actions and efforts Highlight challenges and needs

Institutional Arrangements for Reporting for non-annex I Reporting Given the increased frequency of reporting implied by BURs, effective institutional arrangements will be even more important for their preparation. Effective institutional arrangements are important for the presentation of information in a consistent, transparent, complete and timely manner. Institutional arrangements will need to be adapted to the particular requirements of BURs, as well as to the national circumstances of non-annex I Parties and their level of support, and should build on existing institutional arrangements, if appropriate. Preparing a BUR every two years will likely require that non-annex I Parties transition from what have often been temporary institutional arrangements for the preparation of NCs towards a more continuous, sustained process involving permanent national teams. Funding to prepare BURs, including institutional arrangements, is to be provided by the GEF.

III. INTERNATIONAL CONSULTATION AND ANALYSIS

International Consultation and Analysis COP 17 adopted the modalities and guidelines for international consultation and analysis (ICA), noting that the ICA of the BUR is non-intrusive, non-punitive and respectful of national sovereignty and aims at increasing transparency of mitigation actions their effects. (contained in Annex IV of 2/CP.17). First rounds of ICA will commence within six months of the submission of the first BURs (June 2015). Frequency of participation in ICA for the subsequent rounds, will be determined by the frequency of submission of BURs, with flexibility to LDCs and SIDS. ICA also aims at facilitate universal participation by all developing countries. It will be conducted under the SBI. COP 18 adopted the composition, modalities and procedures of the team of technical experts under international consultation and analysis http://unfccc.int/resource/docs/2013/cop19/eng/10a02.pdf#page=12

International Consultation and Analysis Workflow Submission of BURs- Dec 2014 International consultation and analysis ICA will commence within 6 months of submission of the first BURs by developing country Parties Composition of TTE Technical analysis of BURs by TTE Draft summary report (SR)(within 3 months) of the technical analysis) Review and comment on draft SR by the Party concerned (within 3 months of receipt) Final SR by TTE & the Party concerned (within 3 months of receipt of comments) Technical analysis Final SR noted by SBI and posted on UNFCCC.int Facilitative exchange of views Record of the facilitative sharing of views OUTPUTS OF INTERNATIONAL CONSULTATION AND ANALYSIS A workshop under SBI - a one- to three-hour session for each Party or group of Parties A brief presentation by the Party or Parties concerned on their biennial update report, followed by oral questions and answers among Parties

International Consultation and Analysis Process Technical Analysis Role of the TTE Conduct the technical analysis of the BURs submitted by non-annex I Parties Preparation of a summary report as an output of the technical analysis Role of the Secretariat Selection of the TTE Provide administrative and technical support to the TTE Report to the CGE on a semiannual basis on the composition of the TTE Role of the non-annex I Parties Preparation and submission of the first BUR Review and comment of the draft summary report Role of the CGE Preparation of the TTE training programme and proficiency assessment Periodic advice to the secretariat in the selection of a TTE

Output of the Technical Analysis by the TTE (Decision 20/CP.19, paragraph 15 (a) 15.. The TTE shall: (a) Identify the extent to which the elements of information of the guidelines contained in decision 2/CP.17, annex IV, are included in the BUR of the Party concerned;.the information reported should include: The national greenhouse gas inventory report Information on mitigation actions and its effects Including a description of such actions The associated methodologies and assumptions The progress made in their implementation and, An analysis of their impacts Information on domestic measurement, reporting and verification Information on support received.

Output of the Technical Analysis by the TTE (Decision 20/CP.19, paragraph 15 (b) 15..The TTE shall: (b) Undertake a technical analysis of information contained in the BUR as outlined in the UNFCCC biennial update reporting guidelines for Parties not included in Annex I to the Convention contained in annex III to decision 2/CP.17, and any additional technical information that may be provided by the Party concerned; Analyse the information reported Determine what information has been reported as per the requirements in 15 (a) How the information was generated

Output of the Technical Analysis by the TTE (Decision 20/CP.19, paragraph 15 (c) 15..The TTE shall: (c) In consultation with the Party concerned, identify capacity-building needs in order to facilitate reporting in accordance with annex III to decision 2/CP.17, and participating in international consultation and analysis in accordance with annex IV to decision 2/CP.17, taking into account Article 4, paragraph 3, of the Convention. Capacity building needs To enhance the preparation of subsequent BURs Facilitate participation in the ICA process

REDD-plus MRV (Decision 14/CP.19) Data and information on REDD+ to be reported as technical annexes to the BURs MRV data and information on REDD+ conducted as a part of ICA (technical analysis) by two independent LULUCF experts included in the team of technical experts for the technical analysis Additional requirements for the technical analysis Result in a technical report Voluntary; applicable only for those developing country Parties seeking to obtain and receive payments for resultsbased actions

REDD-plus MRV (Decision 14/CP.19) Cont d. 11. Further decides that, as part of the technical analysis referred to in decision 2/CP.17, annex IV, paragraph 4, the technical team of experts shall analyse the extent to which: (a) There is consistency in methodologies, definitions, comprehensiveness and the information provided between the assessed reference level and the results of the implementation of the activities referred to in decision 1/CP.16, paragraph 70; (b) The data and information provided in the technical annex is transparent, consistent, complete and accurate; (c) The data and information provided in the technical annex is consistent with the guidelines referred to in paragraph 9 above; (d) The results are accurate, to the extent possible; http://unfccc.int/resource/docs/2013/cop19/eng/10a01.pdf#page=39

Domestic MRV: Decision 21/CP.19 Principles General, voluntary, pragmatic, non-prescriptive, non-intrusive and country driven Purpose Provide general guidelines for voluntary use Recognizing, using and reporting on domestic MRV of NAMAs Establish and/or recognize the institutions, entities, arrangements and systems involved in domestic MRV Measure domestically supported NAMAs, including the collection and mgt. of relevant and available information and the documentation of methodologies Verify domestically supported NAMAs, including the use of domestic experts using domestically developed processes http://unfccc.int/resource/docs/2013/cop19/eng/10a02.pdf#page=12

In Conclusion: Operational details of the MRV framework under the Climate Change Convention for developing country Parties are now complete In the light of enhanced reporting, developing countries need: a) Continued technical assistance, capacity-building and financial support b) To strengthen the existing institutional arrangements or establish new ones, and maintain them in a robust manner to ensure that they are functioning on a continuous basis The current MRV framework can serve as a basis for the MRV under the 2015 agreement, which is currently under negotiation

THANK YOU