Precision Strike Association

Similar documents
NDIA 2009 Munitions Executive Summit

COL Paul Hill Project Manager

SCIENCE & TECHNOLOGY ENABLING ARMAMENTS ACQUISITION MODERNIZATION

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

Current Force. Current Force

Development and Fielding of the Excalibur XM982 Warhead

2017 NDIA Munitions Executive Summit. COL M. Gutierrez, Project Manager, Maneuver Ammunition Systems MAR 2017

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

Excalibur - a Successful Swedish/U.S. Development Program

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

Analysis of Precision Mortar fires for the IBCT

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

Mr. William Sanville Project Manager Maneuver Ammunition Systems

JAVELIN ANTITANK MISSILE

Technology Demands on the Future Industrial Base

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

Advanced Warhead Technologies

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY TACTICAL MISSILE SYSTEM (ATACMS) BLOCK II

FCT and SOCOM Shoulder Fired Weapons

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Single Manager for Conventional Ammunition

ARDEC Cluster Munition Replacement Technologies (CMRT) S&T Concepts

Precision Guided Mortar Munition (PGMM) XM395

S&T Advances Future Munitions Development Joseph A. Brescia, David Fair and Kevin T. Hayes

Naval Surface Fire Support

UNCLASSIFIED. Cost To Complete Total Program Element ED8: Paladin Integrated Management (PIM)

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 21 R-1 Line #102

Ammunition Enterprise Cross-Service Update

To obtain additional copies of this report, contact the Secondary Reports Distribution Unit at (703) (DSN ) or fax (703)

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #45

Precision Fires Rocket and Missile Systems. Brief to PSA. COL David Rice PFRMS, Project Manager. Any Warfighter, Anywhere, All The Time UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

PGK and the Impact of Affordable Precision on the Fires Mission

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

Soldier Division Director David Libersat June 2, 2015

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED UNCLASSIFIED

2011 Munitions Executive Summit. OSD Perspective

2018 NDIA Armament Systems Forum COMMITMENT. &SOLUTIONS Act like someone s life depends on what we do.

Prepared for Milestone A Decision

ACQUISITION OF THE ADVANCED TANK ARMAMENT SYSTEM. Report No. D February 28, Office of the Inspector General Department of Defense

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Joint Air-to-Ground Missile (JAGM) FY 2012 OCO

UNCLASSIFIED. Close Combat Weapon Systems JAVELIN. Systems in Combat TOW ITAS LOSAT

US Army Munitions Requirements -- ASAALT/PEO Perspective

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Weapons and Munitions - Eng Dev

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Next Gen Armored Reconnaissance: ARV Introduction and Requirements. - Brief to Industry-

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

Small Diameter Bomb Increment I (SDB I) Precision Strike Association Annual Program Review

Retaining Lethality Overmatch Through Science & Technology

2014 NDIA Joint Armaments Conference

26 February PM Panel Discussion. Jim Shields

Project Manager Soldier Weapons Ammunition Programs

18. WARHEADS AND GUIDANCE SYSTEMS

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

FORCE XXI BATTLE COMMAND, BRIGADE AND BELOW (FBCB2)

Alternatives for Success. One Program s Unconventional Structure

JOINT AIR-TO-SURFACE STANDOFF MISSILE (JASSM)

M855A1 Enhanced Performance Round (EPR) Media Day

NAVY AREA THEATER BALLISTIC MISSILE DEFENSE (NATBMD)

Chapter I SUBMUNITION UNEXPLODED ORDNANCE (UXO) HAZARDS

Summary Report for Individual Task Issue Fire Orders for Direct Fire Mission Status: Approved

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Lightweight Small Arms Technologies The Final Installment (or is it?)

UNCLASSIFIED. FY 2018 Base FY 2018 OCO

A udit R eport. Office of the Inspector General Department of Defense. Report No. D October 31, 2001

Development and Fielding of the Guided Multiple Launch Rocket System (GMLRS) Unitary Warhead

USMC Small Arms Modernization Brief

Project Manager Close Combat Systems

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. Cost To Complete Total Program Element JA6: Joint Air-To-Ground Missile (JAGM)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

APEX Armor Piercing with Explosive The Dual Purpose Round for the F-35. Eva Friis Vegard Sande

Moving Target Artillery Round (MTAR) 2016 NDIA Armament Systems Forum

Air Armament Symposium All in Today Shaping Tomorrow

Future Combat Systems Industry Day Briefing

Mission Based T&E Progress

MISSILE S&T STRATEGIC OVERVIEW

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Flight Controlled Mortar (FCMortar) for Precision Urban Mortar Attack (PUMA)

PROGRAM EXECUTIVE OFFICE MISSILES AND SPACE

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. R-1 Program Element (Number/Name) PE D8Z / Prompt Global Strike Capability Development. Prior Years FY 2013 FY 2014 FY 2015

Tuesday 13 September 2016:

Steven Costa Program Manager, Ammunition Marine Corps Systems Command

DoD Countermine and Improvised Explosive Device Defeat Systems Contracts for the Vehicle Optics Sensor System

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

Transcription:

Precision Strike Association (Affordable Precision Munitions) Distribution Statement A: Chris Grassano Project Manager 9 June 2009 1

Agenda Small Caliber EXACTO Medium Caliber Programmable Airburst Munition (PABM) 40mm Efforts Large Caliber Advanced Kinetic Energy (AKE) Advanced d Multi-Purpose (AMP) Mid-Range Munition (MRM) 2

EXACTO (EXtreme ACcuracy Tasked Ordnance) Today Tomorrow Vertical Dispersio on Vertical Dispersio on Horizontal Dispersion Horizontal Dispersion Deadly Accuracy at Extreme Range

EXACTO is a system composed of: EXACTO Concept An optical guidance system that provides information to direct the projectile to the target regardless of environmental or target perturbations An actively-controlled 50-caliber projectile that uses this information for realtime directional flight control EXACTO delivers high accuracy against moving targets under environmental conditions

Acquisition Strategy Three phase program: Phase I: Component Development, Preliminary Design and Performance Validation Phase II: System Integration and Prototype Demonstration Phase III: Operational Assessment/Transition Progression to subsequent program phases contingent on meeting end of phase go/no go criteria and availability of funds

Medium Caliber Precision Munitions: Areas of Focus Current Effort: FCS 30mm Programmable Airburst Munition Potential ti Future Efforts: 40mm Suite of Munitions Increased Yield Precision, Steerable Munitions

Current Efforts: FCS 30mm Programmable Airburst Munition Warhead High Explosive Air Burst with Base Mounted Fuze Hardened Nose for Performance Against Materiel Targets PBXN-5 Explosive Zirconium Incendiary Cartridge Aluminum Case Single Base Propellant M36A2 Percussion Primer Fuze Operating Modes Point Detonate Point Detonate Delay (up to 1 ms) Air Burst Self-Destruct: Detonates at Maximum Mission Time Status: PABM-T Fuze Design accepted by Army, Navy working mods Joint Qualification Test to Date Resulted in 43% Functional Failures Approximately $1.5M additional required to Achieve >85% Reliability FCS program cuts may end this program

Future Efforts: 40mm Suite of Munitions BLUF: There are currently NO requirements for 40mm accuracy / lethality lit improvements but: t Increased explosive yield has been mentioned by soldiers in the field Future Requirements may call for steerable/ guided munitions and associated sighting systems: 4 40mm rounds have room for micro-electronics New platforms (i.e. M320 GLM) allow for longer rounds 1.1

PM-Large Caliber 120mm Ammunition Strategic Capabilities Plan FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 Beyond Line Of Sight (BLOS) MRM ACAT II MRM SDD MRM Prod CA38 M1028 Canister Anti-Personnel? MS C FRP/MR Multi-Purpose CA05 M908 Obstacle Reduction MS B AMP SDD MS C AMP Prod Projected C791 M830A1 MPAT Funded Anti-Tank, Anti-Helo Unfunded Armor Defeat AKE CA26 M829A3 MS B AKE SDD DU DP AKE Prod MS C Not in Prod 105mm Strategy Dev 105mm Strategy Implementation Current Production Contracts 120mm M829A3 M1028 M865 & M1002 MY IV M865 & M1002 MY V M865 & M1002 MY VI 105mm M467A1 M1040 M1040 Follow-on 9

M829E4 (AKE) APFSDS-T Description & Requirement The M829E4 is the 5 th Generation 120mm Kinetic Energy Cartridge Developed to Provide the Abrams M1A2 SEP with Heavy Armor Defeat Capabilities M829E4 Provides M1A2 the Capability to Engage and Destroy Main Battle Tanks with Advanced ERA at extended ranges Status/Key Accomplishments EMD/ Production Acquisition Prepared Draft RFP Released Industry Day Complete Milestone B Documentation Being Prepared Top Level Schedule Acquisition Plan: Full & Open Competition to Select Two Phase I EMD Competitors Contract is for EMD Phase I (FY10) With Options For EMD Phase II, LRIP, FRP I, FRP II Down select Based Upon Shoot-Off & Updated d Proposals Restrict To Depleted Uranium (AEROJET) M829E4 10

AMP 120mm (Advanced Multi Purpose) Description Incorporate the Performance of M908 (Obstacle Reduction), M830 (HEAT), M830A1 (MPAT), and M1028 (Canister) within a Single Cartridge Mutli-Mode Programmable Fuze Reduced Logistic Footprint Adds Capability of Engaging g Infantry in Open at Significantly Increased Range Breach Rebar (Concrete Reinforced Wall) Airburst Technology Program Start planned for FY14 Requirements Defeat ATGM Team 30 x50 Hole in Wall Bunker Defeat Defeat Light Armor BMP with ERA Infantry / Anti-Personnel 11

AMP Summary AMP Video 12

AMP Video 13

Mid Range Munition Description & Requirement Mid Range Munition (MRM) Round is First Generation Fire and Forget Gun-launched Precision-guided Munition Materiel Solution For Beyond Line Of Sight (BLOS) Capability Gap Originally Developed to Provide Future Combat System (FCS) Mounted Combat System (MCS) Current Design Is Interoperable With Abrams Provides Capability to Engage & Destroy High Value Moving and Stationary Enemy Targets Throughout Area Of Operations up to 12km Dual Mode Gun Launched Precision Munition Semi Active Laser (SAL) Imaging Infra-red (IIR) Key Accomplishments Successful Cartridge Integration Test Dec 08: Fired From Abrams M1A2 SEP Autonomous Shot Using IIR Hit T-72 at 5.2km IIR seeker searched, acquired & tracked No external queuing SAL Shot Successful Against Moving T-72 at 8.7km Dual Mode Shot (SAL and IIR) Successful Against Stationary T-72 At 5.2km Airframe and Propulsion Test Sequences Underway Warhead Down-Select Completed Target set Includes: Main Battle Tanks Light Armor MRM Self-propelled Artillery Air Defense Artillery Earth and Timber Bunkers 14

Modes of Operation Three Modes of Operation (Video) 15

MRM Video 16

Affordability Cost Drivers of the System Yield Material Attrition Test Capability Assembly Time Inspection Time ODC/Transport Burden Rates Labor Rates Index Support Innovation Workshops Design Cost Contributors Test Cost Contributors CRO Refinement CRO Exploration Emphasis On System 42% Performance Test Time TE Reliability Does Not 40% Support 10% Cost Requirement SEPM Business Models Manufacturing Cost Contributors Programmatic Cost Contributors 8% CCB Approval Requirement Trades Guide Costs System Definition That Supports Cost Requirement

Refining Cost Reduction Opportunities

Enabling An Affordable Solution Know your cost targets Document and understand your entire value stream Aggressively identify cost reduction opportunities and submit them to the opportunity register Eliminate waste in EMD and LRIP Identify requirements that t drive cost and flow it back to systems Design to eliminate current production rework drivers Incorporate Critical Parameter Management to ensure your design is within manufacturing process capability Make affordability part of your performance development goals

MRM Current Situation MRM Program was Initially Funded to Support the Future Combat System (FCS) Mounted Combat System (MCS) MRM is Required to be Fully Compatible with the Abrams Cannon An Abrams Capabilities Development Document (CDD) is Currently in Staff which Contains a Key Performance Parameter (KPP) for the Beyond Line of Sight (BLOS) Mission that only MRM can Fulfill FY10 President s s Budget Indicated Zero Funding for MRM Government Direction Provided to the System Contractor regarding the following: Reduction of Program Scope Utilize Existing Funding to Work Critical EMD Efforts and Close-Out Activities The Revised Plan will Continue at a Reduced Level at which point the Program will either be Restructured t or Terminated 20

Summary Advancing g Precision Munitions Across Calibers Providing Improved Capabilities Pursuing Cost Reduction and Affordability Lean Innovation Committed to Providing the Warfighter with the most Reliable, Lethal and Affordable Ammunition Available