Sale of S-4E Canal Right-of-Way. Robert M. Brown, Executive Director Board Meeting November 15, 2017

Similar documents
Enlisted Professional Military Education FY 18 Academic Calendar. Table of Contents COLLEGE OF DISTANCE EDUCATION AND TRAINING (CDET):


BOROUGH OF ROSELLE PUBLIC NOTICE ANNUAL NOTICE OF CALENDAR YEAR 2018 WORKSHOP SESSIONS, PRE-AGENDA MEETINGS AND REGULAR MEETINGS

Arizona State Parks Board May 20, 2015

Report to the Legislature

Compliance Division Staff Report

A: STATEMENT OF ACTIVITIES

National Trends Winter 2016

Corporate Services Employment Report: January Employment by Staff Group. Jan 2018 (Jan 2017 figure: 1,462) Overall 1,

Navy ManTech Program. ManTech Update. Tom Hite CTC 15 October 2014

Big Data & Effective Utility Programs

Friday, June 21, 13. Building better communities through the arts

REQUEST FOR PROPOSALS EMERGENCY GENERATOR INSTALL AT THE NEGAUNEE SERVICE CENTER (NSC)

CHC-A Continuity Dashboard. All Sites Continuity - Asthma. 2nd Qtr-03. 2nd Qtr-04. 2nd Qtr-06. 4th Qtr-03. 4th Qtr-06. 3rd Qtr-04.

North Palm Beach Police Department

Recommended Projects for FY2019 State Springs Funding

Request for Proposals School Year Project Lafayette County School District 100 Commodore Drive Oxford, MS 38655

Water Conservation Industrial,Commercial,Institutional (ICI) Audit and Rebate Program. City of Dallas Water Utilities February 13, 2012

Program & Funding Source Responsible Party Status

Program & Funding Source Responsible Party Status

KENYA NATURAL RESOURCE MANAGEMENT PROJECT - WORLD BANK FUNDED PROCUREMENT PLANS (MAY 1st JUNE 30 TH 2010) - WORKS CONTRACTS.

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 P-1 Line #18

Tuesday, April 24, 2018

REQUEST FOR PROPOSAL CITY OF PORT ARANSAS GAS DEPARTMENT FOR NATURAL GAS SUPPLY. RFP # Gas

Procurement Plan Enhancing Quality of Financial Reporting (EQ-FINREP) Grant No:

FOOTE IT NEWS ANALYSIS Bureau of Labor Statistics US Employment Report September 2011

Xcel Energy Colorado DSM Roundtable Discussion. February 13, :00pm to 4:00pm 1800 Larimer, Room 03G01

JANUARY 2018 (21 work days) FEBRUARY 2018 (19 work days)

A. General provisions and other electrical systems are specified in other Sections of Division 26.

Request for Proposals VoIP E-Rate Project Perry County School District. 105 Main Street. New Augusta, MS

Colorado Revised Statute, Part 5 of Article 37.5 of Title 24. STATEMENT OF MUTUAL INTERESTS, BENEFITS AND CONSIDERATION

AIR CONDITIONING AND REFRIGERATION LICENSING STATISTICS ADVISORY BOARD MEETING MARCH 5, 2018

Implementation Status & Results OECS Countries Telecommunications & ICT Development Project (P088448)

GOVERNMENT OF INDIA MINISTRY OF STATISTICS AND PROGRAMME IMPLEMENTATION CENTRAL STATISTICS OFFICE New Delhi Dated: March 10, 2017 PRESS RELEASE

Georgia DOT Local Maintenance Improvement Grant Program. Todd Long, P.E., Deputy Commissioner

Original Revision Total Project Budget: $14,530,000 $47,700,000 $62,230,000 District Funding Commitment Anticipated State Match: $14,530,000 $N/A

UNIVERSITY OF DAYTON DAYTON OH ACADEMIC CALENDAR FALL Incoming First Year students move into UD Housing

KANATA HIGHLANDS URBAN EXPANSION STUDY TERMS OF REFERENCE

FLORIDA INLAND NAVIGATION DISTRICT INTRACOASTAL WATERWAY MAINTENANCE DREDGING SOUTH OF PORT OF PALM BEACH PALM BEACH COUNTY, FLORIDA

Mark Stagen Founder/CEO Emerald Health Services

Foote Partners, LLC Foote Research Group Foote Partners LLC IT Jobs News Analysis May 10, 2016

August 2018 Labor Market Review Reported by: Cassie Janes

PROPINSIGHT A Detailed Property Analysis Report

Sunnybrook: Improving prosthetic care for patients with lower limb amputation

Request for Proposals (RFP) An Alternative Fuels Assessment & Feasibility Study

Change Management at Orbost Regional Health

Florida Online Job Ads Seasonally Adjusted. May 10. May 11. May 12. Nov 09. Nov 11. Nov 10

Reclamation Fee Fiscal-Year Report 2017

Metro Areas See Improvement in April s Unemployment Numbers

Is a dry-dock and internal structural exam required prior to the Coast Guard issuing the initial Certificate of Inspection?

ECONOMIC DEVELOPMENT UPDATE August 2015

Grant Reporting for Faculty Grant Expense Detail

STATISTICAL PRESS NOTICE MONTHLY CRITICAL CARE BEDS AND CANCELLED URGENT OPERATIONS DATA, ENGLAND March 2018

CYPRESS GROVE COMMUNITY DEVELOPMENT DISTRICT BOARD OF SUPERVISORS MINUTES. Date: April 16, :00 A.M.

Attachment A SCOPE OF WORK FOR THE CITIZEN SCRAP TIRE DROP-OFF DAY PROJECT

Reclamation Fee Fiscal-Year Report 2017

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Sunday, March 31, :10 AM 'Pesich, Karen J' Thompson, Thomas RE: UPMC Hamot - South Tower - AcuDose-Rx Add-On Project

CURRENT TRENDS for POLICE HIRING

Hiller Plumbing, Heating, Cooling & Electrical partnered with Total Tech, LLC Transition to Trades (TtT) Fort Campbell, KY

Capital Project Tracking Report

INLAND RAIL - PARKES TO NARROMINE (P2N) INDUSTRY BRIEFING

Intergovernmental Working Group of Experts on International Standards of Accounting and Reporting (ISAR) Sustainability Reporting

MET CALLS IN A METROPOLITAN PRIVATE HOSPITAL: A CROSS SECTIONAL STUDY

Hiller Plumbing, Heating, Cooling & Electrical partnered with Total Tech, LLC Transition to Trades (TtT) Fort Campbell, KY

Improve the Efficiency and Service of the Emergency Room at North Side Hospital

Case Study: Cass Regional Medical Center

EMERGENCY COMMUNICATIONS SYSTEM MAINTENANCE AGREEMENT BETWEEN THE MARIN EMERGENCY RADIO AUTHORITY (MERA) AND THE COUNTY OF MARIN (2005)

SECTION 3 CONSULTATION AND ABORIGINAL MATTERS

School Board of Brevard County, Florida Half-Cent Sales Surtax Internal Audit Fiscal Year

Anna Local Schools. Community Meeting

Commanding General LAW 2200 Lester Street, Suite 120 Quantico, VA Fax:

PROPINSIGHT A Detailed Property Analysis Report

Washington Headquarters Services Military Construction, Defense-Wide FY 2010 Budget Estimates ($ in thousands)

PROJECTS. FOR THE MONTHS OF October-November 2017

Part 1: Applicant Information

New Orleans Hurricane and Storm Damage Risk Reduction System Update

%

Average monthly IT jobs growth in 2015 beating 2014 numbers by more than 2,000 new jobs per month

Draft Bidding Docs and SPN. Bank s NO to bidding docs. Invitat. To Bidder b Goods

Financing Energy Efficiency Projects in Michigan

STRATEGIC PLANNING COMMITTEE AGENDA

PRE-SUBMITTAL CONFERENCE REQUEST FOR QUALIFICATIONS (RFQ)

1222 First Avenue, San Diego, CA Cycle Distributed: 07/08/2013

NYC Health and Hospitals Bellevue Hospital MEP-VT Design RFP. Information Session June 2, 2016 at 3 pm

Calendar of Key Deadlines for Apportionments July 18, 2016

Grand Forks. Police Department

Strategic Fundraising Plan. for the. Gunnison Ranchland Conservation Legacy. July prepared by Susan Lohr

MINUTES OF THE REGULAR MEETING OF THE GURNEE VILLAGE BOARD GURNEE VILLAGE HALL MARCH 20, 2017

PROCUREMENT PLAN KETSANA EMERGENCY RECONSTRUCTION AND REHABILITATION PROJECT (ERRP) COVERING PROJECT PERIOD: THREE YEARS April-01,2011

PERFORMANCE MANAGEMENT MEETING. Health Department:

Catalog. Community and Societal Pediatrics - Jacksonville. Prerequisites. Course Description. Course Faculty and Staff

B. All of the documents in this RFP form the Basis-of-Design for this project.

Quality Management Report 2017 Q2

City of Delray Beach New Rules for Economic Development FCCMA Annual Conference

National Capital Region Medical Transformation Update. DoD Progress on Enhancing World-Class Healthcare Capabilities in the National Capital Region

Board Meeting. Wednesday, June 20, :00 a.m.

EL PASO COUNTY JUDICIAL MANAGEMENT REPORT. 1 st QUARTER FY 2018 (OCTOBER 1 DECEMBER 31, 2017)

Location Factors in the Food Processing Industry

IT job growth slides in October following a spectacular September, as 12,900 jobs are added to U.S. payrolls.

Transcription:

Sale of S-4E Canal Right-of-Way Robert M. Brown, Executive Director Board Meeting November 15, 2017

SITE

Background Request made by Tuttle Land Development to purchase 5.165 acres of S-4E Right-of-Way as part of site plan approval from the Village of Royal Palm Beach

S-4E Canal

S-4E Canal

S-4E Canal Looking West

S-4E Canal Looking West

S-4E Canal East Canal Reach Surplus of Canal and Right-of-Way

S-4E Canal West Canal Reach Surplus of 80 feet of Right-of-Way

S-4 Canal Cross Section

Background Board previously approved surplus and sale of 5.165 acres of S-4E Canal right-of-way in September 2016; appraisal value of $156,644 per acre Updated appraisal conducted by S.F. Holden on September 22, 2017; updated appraisal consisted of an assemblage of eight adjacent parcels for an average value of $221,747 per acre District agreed to average the assemblage value and previous per acre value of $156,644 for a proposed sale price of $189,195 per acre In November 2017, staff recommended to approve the sale the 5.165 acres of surplus S-4E Canal right-of-way for the value of $189,195 per acre, for a total purchase price of $977,192.80 Subject to a letter of authorization from the adjacent landowner(s) for modification of the drainage outfall structure, and proof of notification of sale to the adjacent landowner(s) per District operating policies

Background District received letter from adjacent landowner, 121 Crown Associates, LLC, expressing interest in purchasing portion of right-of-way adjacent to their property On December 22, District sent communication to all interested parties requiring a formal bid process to determine buyer Sealed bids required to be submitted to District on or before January 9 to be opened and awarded to the highest responsive bidder at the January 10 board meeting Bid award is subject to closing on or before January 31, 2018

Questions?

Bid Opening Received two bids Southern Blvd. Villas, LLC - $977,791 The Wallace Law Group - $500,000 (Not responsive)

Staff Recommendation Staff recommends award of bid for purchase of 5.165 acres of S-4E Canal surplus right-of-way to highest responsive bidder,, in the amount of $. Subject to closing purchase on or before January 31, 2018

Questions?

Background (Original Appraisal) Appraisal conducted by S.F. Holden, Inc. on June 15, 2016 Appraisal based on assemblage per acre cost ($128,673) and comparison of Sale 1 per acre cost ($184,615) Appraisal value of $156,644 per acre based on average

Equipment Utilization Overview Tommy Strowd, Director, Operations & Maintenance Anthony LasCasas, Asst. Director, Facilities & Maintenance January 18, 2018

Mower Utilization 3 rd vs. 4 th Qtr 3 rd Qtr 2017 Total Utilization - Mowers 4 th Qtr 2017 Total Mower Utilization 22% 1% 10% 4% 19% 19% Sum of Maint Sum of 3rd Prty Sum of Maint Sum of 3rd Prty Sum of UN Hrs 47% Sum of UN Hrs Sum of Crnt Hrs Sum of Crnt Hrs Sum of OPT Sum of OPT 29% 48% Crnt Hrs Percentage of operation hours Maint Percentage of maintenance and shop hours 3 rd Party Percentage as a result of warranty work or parts delivery delay OPT- Percentage of defined operational duties including, mob/de-mob, scheduled training & other misc. administrative activities UN Percentage of un-defined time including travel time, safety checks, routine greasing, fueling and similar activities

Heavy Equipment Utilization 3 rd Qtr vs. 4 th Qtr Total Utilization Heavy Equipment 3 rd Qtr 2017 Total Utilization Heavy Equipment 4 th Qtr 2017 6% 13% 10% 3% Sum of Maint 4th Qtr 2017 54% 22% Sum of Maint Sum of 3rd Prty Sum of UN Hrs Sum of Crnt Hrs Sum of OPT 58% 22% Sum of 3rd Prty 4th Qtr 2017 Sum of UN Hrs 4th Qtr 2017 Sum of Crnt Hrs 4th Qtr 2017 Sum of OPT 4th Qtr 2017 Crnt Hrs Percentage of operation hours Maint Percentage of maintenance and shop hours 3 rd Party Percentage as a result of warranty work or parts delivery delay OPT- Percentage of defined operational duties including, mob/de-mob, scheduled training & other misc. administrative activities UN Percentage of un-defined time including travel time, safety checks, routine greasing, fueling and similar activities

2017 Total Utilization Total Utilization Mowers 2017 Total Utilization Heavy Equipment 2017 7% 6% 8% 10% 9% Sum of Maint Sum of Maint Sum of 3rd Prty Sum of 3rd Prty 21% Sum of UN Hrs Sum of Crnt Hrs 22% Sum of UN Hrs Sum of Crnt Hrs 56% Sum of OPT 56% Sum of OPT Crnt Hrs Percentage of operation hours Maint Percentage of maintenance and shop hours 3 rd Party Percentage as a result of warranty work or parts delivery delay OPT- Percentage of defined operational duties including, mob/de-mob, scheduled training & other misc. administrative activities UN Percentage of un-defined time including travel time, safety checks, routine greasing, fueling and similar activities

Discussion

Canal Rehabilitation Update January 2018

Tree Clearing Projects January 2017- January 2018 Total Mileage 27.22 mi past 12 months (41.88 mi Oct 2015 to current) LWDD 15.20 mi Contractor Services 9.24 mi Developer 2.78 mi ROW Clearing Completed Remaining Total Cost of Contract Services Expended or Encumbered FY17 $630,785 FY16 $120,475

Tree Clearing Projects January 2017- January 2018 16-8918P.02 16-9933P.04 16-9932P.03 16-9934P.01 16-9935P.04 16-9979P.01 16-9493P.02 16-9943P.01 16-9944P.01 16-9921P.03 16-9955P.01 16-9958P.02 16-9935P.01 16-9960P.01 16-9961P.02 16-10063P.01 16-9921P.06 16-9921P.05 16-9709P.03 16-9921P.05 16-9921P.09 16-9948P.01 17-9897P.14 16-9960P.03 16-9921P.07 16-9964P.01 17-9897P.15 16-9965P.05 16-9949P.01 17-9370P.02 16-9897P.04 16-9949P.01 17-9955P.04 16-9967P.05 17-9827P.06 16-9921P.05 16-10062P.01 16-9959P.01 16-9921P.11 15-9761P.01 16-9897P.03 16-9897P.04 16-9965P.04 16-9967P.03 16-9965P.04 16-9897P.01 17-9973P.02 16-9972P.01 16-9971P.02 17-9931P.05

Tree Clearing Projects January 2017- January 2018 Canal Segment Project # Distance LWDD/Contractor Clearing Status Cost E-3; North/South of L-19 16-9948P.01 0.65 mi LWDD In Progress - E-2W; SW18 to Hillsboro 17-9931P.05 0.20 mi LWDD In Progress - E-1WN; North of L-36W 16-10063P.01 1.76 mi LWDD In Progress - E-4; Thompson Rd to L-18 16-9897P.04 0.32 mi LWDD In Progress - E-4; L-38 to Old Germantown Rd* 16-9897P.15 0.40 mi LWDD Complete - L-39W; S-7 to SR-7 15-9761P.01 0.97 mi LWDD Complete - L-31; West of E-3 16-9960P.03 0.51 mi LWDD Complete - L10; East of E-1 17-9938P.01 0.13 mi LWDD Complete - L13; East of E-1 16-9493P.02 0.18 mi LWDD Complete - E-3;Lake Ida Rd to ~1200ft n/o Via Delray 16-9921P.11 0.56 mi LWDD Complete - L39; Lyons to E-2W & E-2W; L-38 to L-39 16-9965P.02 1.44 mi Developer Complete - Palm State Park Canal 17-10160P.01 0.69 mi LWDD Complete - L-7W; West of SR7 16-9979P.01 0.12 mi LWDD Complete - L-29; West of Lyons 17-9957P.05 0.45 mi Developer Complete - E-3; Lake Worth Rd to L-10 16-9921P.05 1.00 mi LWDD Complete - E-3; Champion to L-38 169921P.07 isolated LWDD Complete - L-38W; S-11 to SR-7 16-9964P.01 0.77 mi Contractor Complete $98,500 L-2; Jog Rd to E-3 16-9933P.04 1.03 mi LWDD Complete - L-25; Acme Dairy Rd to E-2W 16-9955P.01 0.45 mi Contractor Complete $24,500 L-30; Lyons Rd East 16-9958P.02 0.50 mi Contractor Complete $42,000

Tree Clearing Projects January 2017- January 2018 Canal Segment Project # Distance LWDD/Contractor Clearing Status Cost L-23; East of SR-7 16-9953P.01 0.53 mi LWDD Complete - L-33; Smith Sundy Rd to E-2W 16-9961P.02 1.25 mi Contractor Complete $61,000 L-44; E-1 to west of Lyons Rd 17-9973P.02 0.70 mi Contractor Complete $65,900 L-31; Starkey Rd to E-2W 16-9960P.01 0.32 mi Contractor Complete $16,000 L-47; west of Boca Rio Rd 17-9827P.06 0.14 mi LWDD Complete - E-3 1 / 2 2; South of Spanish River Blvd. 16-9972P.01 0.46 mi Contractor Complete $26,000 E-4; Lake Worth Rd to 2 nd Ave 17-9897P.14 0.13 mi Developer Complete - E-3; South of Palmetto Park Rd 16-9921P.13 0.22 mi LWDD Complete - L-43W; West of Coral Ridge Dr 17-9370P.02 0.15 mi Contractor Complete $10,900 L-1; Drexel Rd to E-3 16-9932P.03 0.50 mi LWDD Complete - L-25; Lawrence Rd to east of Knuth Rd 17-9955P.04 0.57 mi LWDD Complete - E-3; South of L-2 to north of L-1 16-9921P.03 0.58 mi LWDD Complete - L-39; West of E-3 16-9965P.05 0.79 mi LWDD Complete - L-16W; Homeland Canal 16-9944P.01 0.96 mi Contractor Complete $54,900 E-4; Congress Ave to L-38 16-9897P.01 0.25 mi LWDD Complete - L-35; E&W of Sims Rd 16-9415P.03 1.00 mi Contractor Complete $34,300 E-3; Lantana Rd to L-15 16-9921P.09 0.80 mi LWDD Complete - E-3 1 / 2 E; L-30 to ~2000ft northeast 16-9959P.01 0.38 mi LWDD Complete - L-20; Hagen Ranch Rd to Jog Rd 16-9949P.01 0.53 mi Contractor Complete $26,900

Tree Clearing Projects January 2017- January 2018 Canal Segment Project # Distance LWDD/Contractor Clearing Status Cost L-16; West of Military Trail 17-9945P.01 0.28 mi LWDD Complete - L-4; East & West of Cleary Rd 16-9935P.01 0.45 mi Contractor Complete $34,000 L-43; E-3 to Military Trail 16-9971P.02 0.50 mi Contractor Complete $29,000 E-3; Clint Moore Rd to L-39 16-9965P.04 1.44 mi LWDD Complete - E-1WS; Hillsboro Canal to SCRP 16-10062P.01 1.46 mi LWDD Complete - E-4; L-38 to Linton Blvd 16-9897P.03 1.02 mi Contractor Complete $10,900 S-7; West of Forest Dale Dr 16-9943P.01 0.34 mi Contractor Complete $49,000 L-40E; E-4 to I-95 16-9967P.03 0.59 mi LWDD Complete - L-3; Mayacco Lakes to Sansburys Way 169934P.01 0.84 mi Contractor Complete $23,685 L-16; East of E-2E 16-9945P.02 0.35 mi Developer Complete - L-14; East of Lyons Rd 16-8918P.03 0.19 mi Developer Complete - *Final grading work on-going ** Final grading work on-going, Encroachment Removals pending

L-31; West of E-3 (0.51 mi)

E-4; L-38 to Old Germantown Rd (0.40 mi)

L-39W; S-7 to SR-7 (0.97 mi)

LWDD SCADA & Electrical Upgrades December 2017

Current Status & Schedule SCADA & Electrical Upgrades CS#1 Underground Walkways and staff Gauges Antenna Tower Emergency Generator Pre-Fabricated Buildings Electrical Upgrades SCADA Control Panels Local Control Central Communications Site Work and Final CS#2 CS#3 95% complete CS#4 CS#6 CS#8 95% complete 95% complete CS#11 CS#12 CS#17W 95% complete

Amount in Percentage Current Status & Schedule SCADA PROJECT PROGRESS 100 90 80 70 60 50 40 30 20 10 0 Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Month % Money Spent % of Work Complete Scheduled Completeion Projected Completion

Contract Change Orders C O # Description Add Cost's 1 Change Material Walkway pilings from 3" pipe to 12" Concrete $0.00 2 Change Material from 17lb Cast Magnesium Anode to 20lb Anode. $0.00 3 The State requirements for distance between Propane Tank and generator requires additional fencing, $0.00 4 Electrical Buildings to be manufacture with floor slabs not separate slabs. $0.00 5 Load Center Panel to be located at Generator for battery charger and coolant heater $0.00 6 Handhole requirements of 48" will be replaced with length required. $0.00 7 Reconnect lighting arrestors on Control Buildings $7,650.00 8 Relocation of new equipment in Electrical Building required because of location of vents. $0.00 9 The service conductors for CS# 1,4,12 and 17W will not be replaced. -$15,250.00 10 Replace 1000 ft. of 7/8 Master Antenna Helix with 1000 ft. of 3/8 LMR Coaxial Cable $0.00 11 Furnish and install a new power meter and cabinet at 17W Control Station. $4,250.00 12 Furnish Material and Labor to modify motor starters for PLC inputs. Wiring from 2 motor starter relays to PLC inputs. $1,645.00 13 Replace Specified Network Server Enclosure with Smaller Rack. $6,371.15 14 Additional Fencing require due to distance required between Propane Tank and other equipment $3,000 *tbd pending small credit Total Change Orders $7,666.15

Underground & Conduits

Walkways & Staff Gages

Antenna Towers

Electrical & SCADA upgrades

Pre-Fabricated Buildings

Central Towers & Communications

Discussion