St. George Branch (New Armour Annex)

Similar documents
Enclosed please find the inspection report for the above-referenced location.

Enclosed please find the inspection report for the above-referenced location.

Enclosed please find the inspection report for the above-referenced location.

May 15, Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN Wilson School Asbestos Inspection IEA Project #

HS16 Asbestos Management

Stoughton Public Library. Feasibility & Design Study Report by CBT January 28, 2011

Instructions to Bidders Asbestos Abatement

Facilities Services Division

FORT RUCKER Environmental Document

Training Course Catalog

Northern Arizona University Asbestos O&M Program Second Revision: Implemented Feb 23, 2017

ASBESTOS MANAGEMENT PLAN

ASBESTOS ABATEMENT AND DEMOLITION/RENOVATION NOTIFICATION FORM

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

City of Waterbury Safety & Security Assessment

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

Capital Fund Financing Program OMB No Expires 4/30/2011 Part I: Summary PHA Name: Housing Authority of the City of Warner Robins

TSI TSI. TSItraining.com. Check out our multi-state approvals and recognition U.S. POSTAGE PAID WILLOUGHBY, OH PERMIT NO.

November 7, 2013 November 7, To establish an asbestos management program for County facilities and projects.

Asbestos Management Plan Commercial Services and Development, University of Tasmania

ASBESTOS ABATEMENT WORK PLAN APARTMENT BUILDINGS AT 80 BIRCH STREET AND 92 WALNUT STREET LEWISTON, MAINE BID #

Hawthorne Community Redevelopment Agency Facade Beautification Grant Program 2012

DOWNTOWN FAÇADE IMPROVEMENT GRANT

Associated with the District s Measure A Bond Program and Facilities Improvement Projects

ASBESTOS MANAGEMENT PLAN

Asbestos Management Plan for an Essex County Council premises

Asbestos Management Policy

ASBESTOS MANAGEMENT PLAN

YOU MUST HAVE ALL ITEMS LISTED BELOW:

CITY OF BLUE EARTH AGENDA CITY COUNCIL WORKSESSION MONDAY MAY 21, 4:30 P.M.

ASBESTOS POLICY PROCEDURES & GUIDANCE

2018 TRAINING SCHEDULE

IMR Plan. IMR Funds available for 2017/2018 are as follows:

REQUEST FOR PROPOSAL (RFP)

McCracken Power Plant

ASBESTOS MANAGEMENT PLAN

Asbestos Management Procedure

HARRIETT FULLER RUST FACADE PROGRAM

EXISTING CONDITIONS

FAÇADE IMPROVEMENT MATCHING GRANT PROGRAM

FAÇADE & INFRASTRUCTURE IMPROVEMENT PROGRAM GRANT APPLICATION PACKET

School Energy Efficiency Project Grant IWAS Application Instructions

Guidelines on a Grant on the Purchase of Roof Insulation and Double Glazing Products for Domestic Use that Reduce the Consumption of Energy.

Asbestos - Duty to Manage & Learning From its Mismanagement

Wilmington Downtown Incorporated. Facade Improvement Program POLICIES AND PROCEDURES Updated 8/30/17

ASBESTOS MANAGEMENT. Policy and Arrangements. Oxfordshire County Council December 2013

Façade Improvement Program Application for Participation

2018 OPEN ENROLLMENT SCHEDULE Environmental, Health & Safety Training State & Federal EPA Accredited Programs

STRATFORD MIDDLE SCHOOL RENOVATION AND ADDITION

Right to Refuse The City of Coralville reserves the right to reject any and all quotes.

REQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services

Centennial Infant and Child Centre. Emergency Management Policy and Procedures:

Fiscal Year 2018 COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM Application for Funding

Green Building Incentive Guidelines

An electronic copy of this document is available on the SC intranet and the Learning Gateway.

Belmar Business Partnership, Inc. Business Development Committee

Asbestos Notification Form ANF-001 Instructions and Supporting Materials

Duties of a Principal

Present: Dr. Thomas Baynum, Leslie Anderson, Chanda Dowell, Doug Hoenig, Dr. Bettie Truitt, Karen Mowers

Green Building Incentive Program Guidelines & Procedures

Tile Moving And Handling Assessment Nursing

Tapping the Future: CSC Student Design Competition 2017 /2018 cscdesignchallenge.ca

Commercial White Box Grant Program

2018 Facility Master Plan

Attitudes to Residential Asbestos Assessments

FACADE IMPROVEMENTS INCENTIVE PROGRAM for EXISTING COMMERICAL BUILDINGS

SAFE STATE ENVIRONMENTAL PROGRAMS ADMINISTRATIVE CODE

SERVICES REQUEST FOR PROPOSAL (RFP) FOR JANITORIAL

ABUDHABI INDIAN SCHOOL DISASTER MANAGEMENT POLICY-STANDARD OPERATING PROCEDURES FOR EVICTION

MAIN STREET PALESTINE FAÇADE IMPROVEMENT PROGRAM GRANT APPLICATION PACKET

Emergency Management Policy and Procedures

School Safety Audit Checklist

Historic Resources Commission

Public Copy/Copie du public

3. Mission. To publish instructions for the conduct, recordkeeping, and reporting of the Asbestos Control Program.

Downtown Interior Improvement Grant Program Application Packet

PROGRAM GUIDE. ELIGIBLE APPLICANTS To be eligible to apply to the program:

Dallas County Community College District Bond Program. July 10, 2007

MODEL PLAN. (Name of School) INDOOR ENVIRONMENTAL QUALITY MANAGEMENT PLAN

One-Time Grant for Non-Designated Commercial Heritage Property Application Package Deadlines: March 1 and October 1 (Updated: April, 2016)

Downtown Retail Interior Improvement Award Program Application Packet

City Wide Signage Grant Program

ABRIDGED SUMMARY OF CATEGORICAL USE OF FORCE INCIDENT AND FINDINGS BY THE LOS ANGELES BOARD OF POLICE COMMISSIONERS

RULES OF DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF SOLID WASTE MANAGEMENT CHAPTER LEAD-BASED PAINT ABATEMENT TABLE OF CONTENTS

- request for determination of eligibility meets the documentation

City of Cambridge. Designated Heritage Property Grant Program

2014 SAHBA Member Awards Categories & Submission Information

Salida School District, R-32-J Central Administration Office 310 East 9 th Street Salida, Colorado 81201

INSIGNIA OF APPROVAL INFORMATION BOOKLET

City of Aurora Façade Improvement Matching Grant Program

Emergency Codes - Ouellette Campus

Façade Improvement Program Fiscal Year Program Description

July 1, 2017 EMERGENCY PROCEDURES FOR DEPARTMENT OF ALLIED HEALTH SCIENCES IN BONDURANT HALL

Norcross Downtown Development Authority

REQUEST FOR PROPOSAL (RFP) Design And Construction NEW RESTROOM CONSTRUCTION

I. Asbestos Abatement Grant Program Summary

NEW BRAUNFELS DOWNTOWN DEVELOPMENT/MAIN STREET PROGRAM FACADE IMPROVEMENT GRANT PROGRAM GUIDELINES

Business Façade Improvement Program Available

CULTURAL HISTORY The Columbia Rosenwald School

Arapahoe County Weatherization Income Guidelines for Traditional Weatherization Services

Transcription:

ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO SCHOOL DIST 299 14-016-2990-0018 St. George Branch (New Armour Annex) Chicago, IL, 60608 DATE LAST THREE YEAR REINSPECTION WAS COMPLETED 3/26/2013 If the address on this form is different than the address of the building, submit a written explanation. SECTION II (Please type or print) PLEASE COMPLETE THE FOLLOWING FOR YOUR THREE YEAR REINSPECTION: DATE REINSPECTION COMPLETED: 5/16/2016 IDPH INSPECTOR LICENSE NUMBER: IDPH LICENSED INSPECTOR NAME (Please Print): Steven Doran IDPH MP LICENSE NUMBER: 100-03613 IDPH LICENSED MANAGEMENT PLANNER NAME (Please Print): DESIGNATED PERSON (Please Print): Robert Christlieb ENROLLMENT 281 Daniel Juneau PHONE: (773) 553-3197 5/16/2016 Signature of Designated Person Date SECTION III PLEASE COMPLETE THE FOLLOWING INFORMATION FOR ANY CHANGES WITHIN THE SCHOOL DISTRICT. School building has been sold. Date of Sale: School has been closed. Date closed: School building has been demolished. School building is asbestos free since last reinspection: Please explain in writing why the school building is now asbestos free and include the supporting documentation. If a new school building has been added to the district, submit either and exclusionary statement or a management plan and inspection report. Include the complete name, address and city of school building. Explain in writing if the address of the building is different than the address on this form: IL-482-1026 Revised 10.03

THREE YEAR REINSPECTION CHICAGO SCHOOL DIST 299 St. George Branch (New Armour Annex) Chicago, IL, 60608 Unit: 22061 Building ID: IDPH ID Number: 14-016-2990-0018 REPORT DATE: Monday, May 16, 2016 Prepared for: 125 S. Clark Street Chicago, IL 60603 Prepared by: 600 West Van Buren St., Ste 500 Phone (312) 762-2900 Fax (312) 782-5145 DO NOT REMOVE FROM SCHOOL REQUIRED BY FEDERAL LAW

April 28, 2016 Mr. R. Kent Cook Asbestos Program Illinois Department of Public Health 525 West Jefferson Street Springfield, Illinois 62761 Re: - 2016 Three-Year Reinspections Dear Mr. Cook:, Managing Environmental Consultant (MEC), conducted the ThreeYear Reinspections and performed management plan updates for the (CPS) facilities in Region 3,4,5 Elementary Schools. Please update your records with the following information. School District: 299 Unit: School: St. George Branch (New Armour Annex) Region: 04 IDPH ID: 14-016-2990-0018 Building ID: Address: Chicago, IL, 60608 Building Contact: James, Michael Contact Phone: 773-914-8233 Current Building Owners: Review 05/16/2016 Inspector: Steven Doran Management Planner: Daniel Juneau Inspector IDPH License: Management Planner IDPH License: 100-03613 If you have any questions or comments, please contact us at (312) 762-2900 Sincerely, Daniel Juneau 100-03613

Environmental Notification to Occupants To: Faculty, Staff and Parents From: April 28, 2016 RE: St. George Branch (New Armour Annex), Unit 22061 Chicago, IL, 60608 Dear Faculty, Staff and Parents, This letter is to notify you that the 2016 asbestos three year re-inspection has been completed at St. George Branch (New Armour Annex), following the Federal Asbestos Hazard Emergency Response Act (AHERA), 40 CFR Part 763, Subpart E and is available for your review at the main office of the school. Although asbestos-containing materials have been identified at St. George Branch (New Armour Annex), there is no reason to believe that any threat to the health of students or staff exists at this time. CPS will continue to carefully monitor the condition of asbestos-containing materials and if conditions warrant, all appropriate steps will be taken to maintain the health and safety of all building occupants. If you have any questions regarding this matter or require additional information, please feel free to contact Robert Christlieb, the designated Local Education Authority's Designated Person at (773) 5533197.

Table of Contents I. School and Inspection Information II. Executive Summary III. Methodology IV. Abatement History V. Reassessments and Recommendations VI. Conclusions Table I: Inspector's Reinspection Findings Table II: Management Planner's Review APPENDICES: Appendix A: Assessment Sheets, Drawings and Photos Appendix B: Inspector and Management Planner Licenses Appendix C: Laboratory Accreditations Appendix D: Laboratory Results Appendix E: Chain of Custody Forms

SCHOOL AND INSPECTION INFORMATION 1. School Information School: St. George Branch (New Armour Annex) Address: IDPH ID: 14-016-2990-0018 Contact: James, Michael 2. Unit: Chicago, IL, 60608 Building ID: Phone: 773-914-8233 Description of Facility Original Construction: 1901 Total Square Footage: 51568 Current Occupancy: 281 3. Additional Construction: No of Floors: 3 Fax: (312) 782-5145 Inspector Inspector Name: Steven Doran Inspector IDPH license # 6. Phone: (773) 553-3197 Managing Environmental Consultant MEC: Contact: Dan Juneau Address 600 West Van Buren St., Ste 500 Phone: (312) 762-2900 5. 1908 LEA Designated Person Contact: Robert Christlieb Address: 125 South Clark Street, 17th Floor Chicago, IL 60603 4. Region: 04 Signature: 4/28/2016 Management Planner Management Planner Name: Daniel Juneau Management Planner IDPH license # 100-03613 7. Review 05/16/2016 8. LEA Designated Person's Acknowledgement Signature: 05/16/2016 The reinspection report and recommendations have been received by me and appropriate action will be taken by the School District. Signature: 5/16/2016 Name: Robert Christlieb Unit : St. George Branch (New Armour Annex) Building:

II. EXECUTIVE SUMMARY was retained by the (CPS) to perform a three-year asbestos reinspection of the St. George Branch (New Armour Annex). This inspection was conducted in accordance with the United States Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act (AHERA) part 763.92 (b), and the ongoing Operations and Maintenance Program (O&M) originally designed in the School's Asbestos Management Plan. The purpose of this three-year reinspection is to record any condition changes in the asbestos-containing building material (ACBM) in the school since the previous three-year reinspection and the six-month periodic surveillance, to identify, assess, and include any Homogeneous Areas (HA) not identified in the Management Plan, and to recommend an appropriate response action to manage asbestos. The inspector conducted a three-year reinspection of this facility under Illinois Department of Public Health (IDPH) school reinspection requirements and AHERA, sections 763.85 and 763.88. The main building and each addition to the main building, if constructed at different dates, were inspected separately. Laboratory accreditations are included in Appendix C, laboratory results are included in Appendix D, and chain of custody forms are included in Appendix E. Note: During previous inspections, some of the HA(s) were identified together as 9" x 9" floor tile (FT), mastics assoc. with 9" x 9" FT, 12" x 12" FT, mastics assoc. with 12" x 12" FT, pipe insulation, etc. Some of these HA(s) have been re-identified by areas that are uniform in color, texture, construction date, application date, and general appearance. The inspector has determined the following: A. The following HAs have changed assessment categories for Building : Unit: 22061 17 Plaster 61 12" x 12" Beige Floor Tile 62 12" x 12" Beige Floor Tile Mastic 64 12x12 Gray Floor Tile with gray/white specks 65 Mastic on 12x12 Gray FT with gray/white specks 70 Mastic associated w/ 12x12 Brown Speckled Floor Tile 83 Carpet Mastic St. George Branch (New Armour Annex) Building:

B. The following new homogenous areas have been identified for Building : Unit: 22061 83 Carpet Mastic 84 Plaster Patching St. George Branch (New Armour Annex) Building:

C. This reinspection covered only physically accessible and visible areas and materials that were identified in the LEA's management plan. The following materials were concealed and/or contained in areas that were inaccessible for sampling and have been classified as : 1 11 15 17 1A 2 21 22A 23 23A 25 26 27 28 29 2A 3 30 31 33 34 35 36 37 38 39 4 41 42 43 44 47 48 54 55 56 Unit: 22061 12" x 12" Brown w/cream & Dark Brown Flecks FT 9" x 9" White/Cream/Tan Multi-Flecked Floor Tile Black Linoleum Plaster 12" x 12" Brown w/cream & drk Brwn FT Mastic 12" x 12" Beige w/red Wood, Cream & Tan Flecks Floor Tile - REMOVED Spotlight Wiring Insulation Joint Compound of Sheet Rock Material Black Vinyl Step Cap Material Black Vinyl Step Cap Material Adhesive Beaver Board Exterior Metal Window Caulk - Not AHERA Metal Window Glide Insulation Ext. Metal Window Glass Glazing Material-Not AHERA Interior Metal Window Glass Glazing Material 12"x12"Beige w/red Wood/Cream/Tan Flecks FT Mastic Wood Grained Linoleum Metal Pipe Collar Caulk Wall Board Material 12" x 12" Off-White Floor Tile 12" x 12" Off-white Floor Tile Mastic 12" x 12" Dark Beige w/mix Speckles Floor Tile 12"x12"Dark Beige w/mix Speckles Floor Tile Mastic 9" x 9" Chocolate Floor Tile 9" x 9" Chocolate Floor Tile Mastic 9" x 9" Rust Floor Tile Green and White Linoleum Pink Fire Proof Curtain Maroon Fire Proof Curtain Fire Door Insulation Boiler Rope Gasket Masonite/Marlite With Wood Texture Masonite/Marlite With Beige Smooth Finish Boiler Stack Insulation Caulking Compound Masonite/Marlite With White Smooth Finish Masonite/Marlite w/beige & Pink Mix Smooth Finish St. George Branch (New Armour Annex) Building:

59 5B 60 61 62 63 64 65 66 67 68 69 6A 70 71 72 73 79 80 81 82 83 Trowled on Plaster Tar Paper Under 12x12 FT Grey Roofing Material - Not AHERA 12" x 12" Beige Floor Tile 12" x 12" Beige Floor Tile Mastic Chalk Board/Poster Board Adhesive 12x12 Gray Floor Tile with gray/white specks Mastic on 12x12 Gray FT with gray/white specks Gray Ceramic Floor Tile Grout Black Ceramic Tile Grout Black Ceramic Tile Adhesive 12x12 BrownSpeckled Floor Tile 12" x 12" Lt. Green w/dark Green Streaks FT Mastic Mastic associated w/ 12x12 Brown Speckled Floor Tile Beige Ceramic Tile Grout 12" x 12" Blue floor tile Mastic for 12" x 12" floor tile 12"x12" Blue Mottled VFT 12"x12" Blue Mottled VFT Mastic 12"x12" Green Mottled VFT 12"x12" Green Mottled VFT Mastic Carpet Mastic The following areas were deemed to be inaccessible: 1A 32 62 63 65 68 70 80 82 83 12" x 12" Brown w/cream & drk Brwn FT Mastic Mastic Under Wall Board Material 12" x 12" Beige Floor Tile Mastic Chalk Board/Poster Board Adhesive Mastic on 12x12 Gray FT with gray/white specks Black Ceramic Tile Adhesive Mastic associated w/ 12x12 Brown Speckled Floor Tile 12"x12" Blue Mottled VFT Mastic 12"x12" Green Mottled VFT Mastic Carpet Mastic Materials were also listed as "assumed" if they were in good condition and sampling was not conducted to avoid damage. This reinspection was conducted by Steven Doran, IDPH License #. The Management Plan was updated by Daniel Juneau, IDPH License # 100-03613. Inspector and Management Planner Licenses are included in Appendix B. Unit: 22061 St. George Branch (New Armour Annex) Building:

III. METHODOLOGY Tasks performed on-site included the following: IV. 1. Review current management plan, identify HA(s) and extract appropriate information. 2. Examine and verify abatement records. 3. Touch and visually and physically reinspect and reassess the condition of all friable known or assumed ACBM. 4. Touch and visually and physically reinspect all non-friable known or assumed ACBM to determine whether these materials have become friable since the last inspection or periodic surveillance. 5. Identify any condition changes that may affect Hazard Ranking of known ACBM or ACBM, as well as any HA(s) that have become friable since the last reinspection. 6. Collect bulk samples from each newly discovered friable HA or previously assumed and submit for laboratory analysis. 7. Tabulate reinspection findings and submit for management planner review and recommendations with appropriate response actions based on the AHERA Damage Category of the ACBM. 8. Submit reinspection findings and management planner recommendations to the LEA within thirty (30) days for inclusion into the management plan. ABATEMENT HISTORY The information collected from the existing management plan and inspection report(s) and from interviews with the school official revealed that the following asbestos abatement was conducted at the school since the previous Three year Reinspection. Abatement Dates: V. REASSESSMENTS AND RECOMMENDATIONS The reassessments and recommendations are summarized in Tables I and II on the following pages. Detailed Hazard Assessment Sheets and Drawings and Photos (if applicable) are included in Appendix A. VI. CONCLUSIONS The St. George Branch (New Armour Annex) Building Three-Year reinspection has been completed and response actions have been recommended for both friable and non-friable materials. A timely execution of the response actions recommended will enable the LEA and the Designated Person(s) to effectively manage the existing ACBM. This three-year reinspection report should be inspected in the current Management plan at the CPS Central Office, and one (1) copy should be kept at the school for use when planning any renovation and/or demolition activities in areas where ACBM has been identified. Also, periodic surveillance documentation and any summary reports from any response actions that are executed at the school should be used to update the Management Plan. Unit: 22061 St. George Branch (New Armour Annex) Building:

Table I Inspector's Reinspection Findings

School St. George Branch (New Armour Annex) Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) 762-2900 Fax: (312) 782-5145 Inspector's Comments are Summarized at the End of the Report HA No Material Description 1 12 12" x 12" Brown w/cream & Dark Brown Flecks FT 9" x 9" Tan Floor Tile w/ Dark Brown Streaks Abated 9" x 9" Tan w/dark Brown Streaks Floor Tile Mastic Abated 9" x 9" White/Cream/Tan Multi-Flecked Floor Tile 9" x 9" white/cream/tan Multi flecked FT Mastic Sub Floor Wood Like Material 15 16 Black Linoleum Spray-on Insulation 17 Plaster 1A 21 12" x 12" Brown w/cream & drk Brwn FT Mastic 12" x 12" Beige w/red Wood, Cream & Tan Flecks Floor Tile - REMOVED Spotlight Wiring Insulation 22 22A Drywall Material Joint Compound of Sheet Rock Material 23 Black Vinyl Step Cap Material 50 LF 23A Black Vinyl Step Cap Material Adhesive 50 LF 25 26 Beaver Board Exterior Metal Window Caulk - Not AHERA 27 Metal Window Glide Insulation 28 Ext. Metal Window Glass Glazing 10 10A 11 11A 2 Material Quantity 450 Material Units Material Location Asbestos Type Material Category Friable Damage Type Stage in Basement ASSUMED N NONE Office Washroom ABATED Office Washroom ABATED Room 205 ASSUMED 205 & Library CHR None Moderate Rooms 112 A-C, library CHR None Moderate ASSUMED UNDEFINE D ASSUMED SURFACE Y NONE 0 Yes ASSUMED N NONE 0 No N NONE 0 Not a suspect material Throughout 1st and 2nd Floor 15,000 450 Stage in Basement ASSUMED 50 LF Lunchroom and Gym ASSUMED Boy's Toilet in Basement Stairway Steps by Main Office Stairway Steps by Main Office 2nd Floor Hallway Room 403 E Wall Center Window, Room 407 SW Corner Window, Main Office SW Corner Window Rm 403 E wall center window, Rm 407 SW corner wall, Main office SW corner window Throughout the ASSUMED ASSUMED N NONE ASSUMED N NONE ASSUMED ASSUMED ASSUMED ASSUMED Damage Quantity 0 Damage Units Change in Assessment Category No Damage Category ACBM with the potential for damage Damage Reason Disturbance Potential LOW Any remaining friable ACBM or friable suspect ACBM ACBM with the potential for damage LOW No ACBM with the potential for damage LOW 0 No No ACBM with the potential for damage ACBM with the potential for damage LOW 0 LOW LOW

School St. George Branch (New Armour Annex) Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) 762-2900 Fax: (312) 782-5145 Inspector's Comments are Summarized at the End of the Report HA No Material Description Material Quantity Material Units Material Location Material Category Friable Damage Type ASSUMED ASSUMED ASSUMED ASSUMED ASSUMED CHR ASSUMED N NONE ASSUMED ASSUMED ASSUMED N N 3 30 31 Material-Not AHERA Interior Metal Window Glass Glazing Material 12"x12"Beige w/red Wood/Cream/Tan Flecks FT Mastic Wood Grained Linoleum Metal Pipe Collar Caulk Wall Board Material 32 Mastic Under Wall Board Material 33 12" x 12" Off-White Floor Tile 34 12" x 12" Off-white Floor Tile Mastic 35 12" x 12" Dark Beige w/mix Speckles Floor Tile 36 37 38 39 4 40 41 12"x12"Dark Beige w/mix Speckles Floor Tile Mastic 9" x 9" Chocolate Floor Tile 9" x 9" Chocolate Floor Tile Mastic 9" x 9" Rust Floor Tile Green and White Linoleum 9" x 9" Rust Floor Tile Mastic Pink Fire Proof Curtain 1 EA Engineer's Office Auditorium Stage ASSUMED ASSUMED ASSUMED ASSUMED CHR ASSUMED 42 Maroon Fire Proof Curtain 1 EA Auditorium Stage ASSUMED 43 44 45 46 47 48 Fire Door Insulation Boiler Rope Gasket Brown Vinyl Baseboard Brown Vinyl Base Board Adhesive Masonite/Marlite With Wood Texture Masonite/Marlite With Beige Smooth Finish Interior Brick Material Boiler Room Boiler Room Auditorium Stage Auditorium Stage Room 415 Room 415 ASSUMED ASSUMED TSI 29 2A 49 5 9" x 9" Dark Brown w/tan and Cream Streaks FT Building Throughout the Building Room 215 Asbestos Type 1,500 Room 209 Room 203, 207 & 212 Throughout Building Main Office Closet and Toilet, and Engineer's Office Main Office Closet and Toilet, and Engineer's Office Main Office E Side by Wall, W wall Center, and SW Corner Main Office Engineer's Office Engineer's Office Engineer's Office Boiler Room Southeast Corner Main Office Areas and 215 ASSUMED ASSUMED Damage Quantity Damage Units Change in Assessment Category Damage Category 0 No ACBM with the potential for damage None NONE 0 No NONE 0 No ACBM with the potential for damage ACBM with the potential for damage Damage Reason Disturbance Potential LOW Moderate LOW LOW CHR None Moderate

School St. George Branch (New Armour Annex) Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) 762-2900 Fax: (312) 782-5145 Inspector's Comments are Summarized at the End of the Report HA No Material Description 50 51 Interior Brick Mortar Exterior Brick Material - Not AHERA 52 Exterior Brick Mortar - Not AHERA 53 Exterior Door Caulking - Not AHERA 54 Boiler Stack Insulation Caulking Compound Masonite/Marlite With White Smooth Finish Masonite/Marlite w/beige & Pink Mix Smooth Finish 12" x 12" Chocolate Floor Tile 55 56 57 58 59 Material Quantity Material Units Mastic w/sub Floor Material Under 12x12 Grey Floor Tile Trowled on Plaster 60 61 950 62 12" x 12" Beige Floor Tile Mastic 950 63 Chalk Board/Poster Board Adhesive 64 66 12x12 Gray Floor Tile with gray/white specks Mastic on 12x12 Gray FT with gray/white specks Gray Ceramic Floor Tile Grout 5B 6 140 1,800 1,800 1,200 67 Black Ceramic Tile Grout 250 68 Black Ceramic Tile Adhesive 250 69 12x12 BrownSpeckled Floor Tile 325 65 Asbestos Type Material Category NO_ACBM NO_ACBM CHR ASSUMED TSI Room 215 ASSUMED Room 215 ASSUMED Room 215 (Under HA 64) Room 215 CHR None Moderate CHR None Moderate Throughout Building Main Office Areas and 215 ASSUMED SURFACE CHR None Moderate ASSUMED ASSUMED ASSUMED N NONE 0 Yes ASSUMED N NONE 0 Yes ASSUMED N NONE 0 No ASSUMED N NONE 0 Yes ASSUMED N NONE 0 Yes ASSUMED N NONE 0 No ASSUMED N NONE 0 No ASSUMED N NONE 0 No ASSUMED N NONE 0 No Boiler Room Northeast Side of Building Northeast Side of Building Main East Entrance Door Boiler Room 9"x9" Dark Brown w/tan and Cream Streaks FT Mastic Tar Paper Under 12x12 FT Grey 12" x 12" Light Green w/dark Green Streaks FT Roofing Material - Not AHERA 12" x 12" Beige Floor Tile 5A Material Location Service Hallway to Main Office Roof Main Office, 112A & 112B Rooms Main office, 112A & 112B All Classrooms Rooms 110, 110A, and 215 Rooms 110, 110A, and 215 Basement Boys and Girls Restrooms Basement Restrooms Basement Restrooms 1st Floor Teachers Lounge Washroom Foyer Friable Damage Type Damage Quantity Damage Units Change in Assessment Category Damage Category ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage Damage Reason Disturbance Potential LOW LOW LOW LOW LOW LOW LOW LOW LOW

School St. George Branch (New Armour Annex) Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) 762-2900 Fax: (312) 782-5145 Inspector's Comments are Summarized at the End of the Report HA No Material Description 6A 12" x 12" Lt. Green w/dark Green Streaks FT Mastic Mastic associated w/ 12x12 Brown Speckled Floor Tile 70 Material Quantity 325 Material Units 71 Beige Ceramic Tile Grout 72 73 79 12" x 12" Blue floor tile Mastic for 12" x 12" floor tile 12"x12" Blue Mottled VFT 7A Mastic/Tar Paper Under 9x9 Drk Green w/tan Streaks 7B 9" x 9" Dark Green w/cream and Tan Streaks 8 80 1' x 2' Black Border Tile Abated 12"x12" Blue Mottled VFT Mastic 1,800 81 12"x12" Green Mottled VFT 1,000 82 12"x12" Green Mottled VFT Mastic 1,000 83 Carpet Mastic 950 84 Plaster Patching 8A Mastic & Tar Paper Under 1' x 2' Black Border Tile Abated 9"x9"Deep Burgundy w/cream and Red Wood Streaks FT ABATED 9"x9"Deep Burgundy w/cream/red Wood Strk FT Mastic ABATED 9 9A 1,800 Material Location Asbestos Type Material Category Friable Damage Type N NONE Service Hallway to Main Office 1st Floor Teachers Lounge Washroom Foyer 1st Floor Teachers Lounge Washroom Rm 116 Library Rm 116 Library Room 116,211, 2nd Floor Elevator Lobby Distributed Under Floor Tile in Rm 117-A and Toilet Distributed Under Floor Tile in Rm 117-A and Toilet Engineer's Office Room 116,211, 2nd Floor Elevator Lobby 1st Floor Elevator Vestibule, Room 111, 117A 1st Floor Elevator Vestibule, Room 111, 117A Room 214 w/ Adjacent Hall 1st Floor Fire Escape Engineer's Office ASSUMED ASSUMED ASSUMED None ASSUMED ASSUMED ASSUMED None None NONE CHR None Moderate CHR None Moderate ABATED ASSUMED N NONE 0 No ACBM with the potential for damage ASSUMED N NONE 0 No ACBM with the potential for damage LOW ASSUMED N NONE 0 No ACBM with the potential for damage LOW ASSUMED N NONE 0 Yes ACBM with the potential for damage LOW NO_ACBM ABATED Office Washroom ABATED Office Washroom ABATED N Damage Quantity 0 Damage Units Change in Assessment Category Damage Category Yes ACBM with the potential for damage Damage Reason Disturbance Potential LOW Moderate 0 No ACBM with the potential for damage Low LOW Moderate LOW Moderate

School St. George Branch (New Armour Annex) Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) 762-2900 Fax: (312) 782-5145 Inspector's Comments are Summarized at the End of the Report Reinspection Date 4/28/2016 Inspector Name Inspector's Comments Steven Doran 5/15/2016 Inspector's IDPH License Number / Expiration Date HA Number: 1 10 10A 11 11A 12 15 16 17 1A 2 21 22 22A 23 23A 25 26 27 28 29 2A 3 30 Inspector Comments: Brown w/ Orange Flecks Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016

School St. George Branch (New Armour Annex) Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) 762-2900 Fax: (312) 782-5145 Inspector's Comments are Summarized at the End of the Report HA Number: 31 32 33 34 35 36 37 38 39 4 40 41 42 43 44 45 46 47 48 49 5 50 51 52 53 54 55 56 57 Inspector Comments: Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016

School St. George Branch (New Armour Annex) Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) 762-2900 Fax: (312) 782-5145 Inspector's Comments are Summarized at the End of the Report HA Number: 58 59 5A 5B 6 60 61 62 63 64 65 66 67 68 69 6A 70 71 72 73 79 7A 7B 8 80 81 82 83 84 Inspector Comments: Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed in Main Office - Tile is tan w/ streaks Not observed in Main Office - Tile is tan w/ streaks Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed - Underneath floor tile in room

School St. George Branch (New Armour Annex) Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) 762-2900 Fax: (312) 782-5145 Inspector's Comments are Summarized at the End of the Report HA Number: 8A 9 9A Inspector Comments:

Table II Management Planner's Review

School Address St. George Branch (New Armour Annex) Unit Building ID Chicago, IL, 60608 Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) 762-2900 Fax: (312) 782-5145 Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response 1 10 12" x 12" Brown w/cream & Dark Brown Flecks FT 9" x 9" Tan Floor Tile w/ Dark Brown Streaks Abated 9" x 9" Tan w/dark Brown Streaks Floor Tile Mastic Abated 9" x 9" White/Cream/Tan Multi-Flecked Floor Tile 9" x 9" white/cream/tan Multi flecked FT Mastic Sub Floor Wood Like Material Black Linoleum Spray-on Insulation Plaster 450 Stage in Basement Office Washroom Abated No 0 6 ACBM with the potential for damage Follow O&M Plan Office Washroom Abated Room 205 205 & Library Rooms 112 A-C, library 15,000 Not a suspect material Throughout 1st and 2nd Floor Chrysotile Chrysotile Undefined SURFACE Yes 0 Follow O&M Plan 450 Stage in Basement No 0 21 22 22A 23 23A 25 26 12" x 12" Brown w/cream & drk Brwn FT Mastic 12" x 12" Beige w/red Wood, Cream & Tan Flecks Floor Tile - REMOVED Spotlight Wiring Insulation Drywall Material Joint Compound of Sheet Rock Material Black Vinyl Step Cap Material Black Vinyl Step Cap Material Adhesive Beaver Board Exterior Metal Window Caulk - Not AHERA 7 Any remaining friable ACBM or friable suspect ACBM 6 ACBM with the potential for damage 50 LF Lunchroom and Gym No 0 LF 6 ACBM with the potential for damage Follow O&M Plan 50 50 LF LF No No 0 0 LF LF 6 ACBM with the potential for damage 6 ACBM with the potential for damage Follow O&M Plan Follow O&M Plan 27 Metal Window Glide Insulation 28 Ext. Metal Window Glass Glazing Material-Not AHERA Interior Metal Window Glass Glazing Material 12"x12"Beige w/red Wood/Cream/Tan Flecks FT Mastic Wood Grained Linoleum Metal Pipe Collar Caulk Boy's Toilet in Basement Stairway Steps by Main Office Stairway Steps by Main Office 2nd Floor Hallway Room 403 E Wall Center Window, Room 407 SW Corner Window, Main Office SW Corner Window Rm 403 E wall center window, Rm 407 SW corner wall, Main office SW corner window Throughout the Building Throughout the Building Room 215 Room 209 10A 11 11A 12 15 16 17 1A 2 29 2A 3 30 Follow O&M Plan

School Address St. George Branch (New Armour Annex) Unit Building ID Chicago, IL, 60608 Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) 762-2900 Fax: (312) 782-5145 Management Planner's Comments Summarized at the End of the Report HA Num Material Description 31 32 33 Wall Board Material Mastic Under Wall Board Material 12" x 12" Off-White Floor Tile 34 12" x 12" Off-white Floor Tile Mastic 35 12" x 12" Dark Beige w/mix Speckles Floor Tile 36 12"x12"Dark Beige w/mix Speckles Floor Tile Mastic 9" x 9" Chocolate Floor Tile 9" x 9" Chocolate Floor Tile Mastic 9" x 9" Rust Floor Tile Green and White Linoleum 9" x 9" Rust Floor Tile Mastic Pink Fire Proof Curtain Maroon Fire Proof Curtain Fire Door Insulation Boiler Rope Gasket Brown Vinyl Baseboard Brown Vinyl Base Board Adhesive Masonite/Marlite With Wood Texture Masonite/Marlite With Beige Smooth Finish Interior Brick Material 9" x 9" Dark Brown w/tan and Cream Streaks FT Interior Brick Mortar Exterior Brick Material - Not AHERA Exterior Brick Mortar - Not AHERA Exterior Door Caulking - Not AHERA Boiler Stack Insulation Caulking Compound Masonite/Marlite With White Smooth Finish Masonite/Marlite w/beige & Pink Mix Smooth Finish 12" x 12" Chocolate Floor Tile Mastic w/sub Floor Material Under 12x12 Grey 37 38 39 4 40 41 42 43 44 45 46 47 48 49 5 50 51 52 53 54 55 56 57 58 Material Quantity Material Units 1,500 1 1 EA EA Material Location Asbestos Type Material Category Room 203, 207 & 212 Throughout Building Main Office Closet and Toilet, and Engineer's Office Main Office Closet and Toilet, and Engineer's Office Main Office E Side by Wall, W wall Center, and SW Corner Main Office Chrysotile Engineer's Office Engineer's Office Engineer's Office Chrysotile TSI TSI Engineer's Office Auditorium Stage Auditorium Stage Boiler Room Boiler Room Auditorium Stage Auditorium Stage Room 415 Room 415 Boiler Room Southeast Corner Main Office Areas and 215 Boiler Room Northeast Side of Building Northeast Side of Building Main East Entrance Door Boiler Room Room 215 Room 215 Room 215 (Under HA 64) Room 215 Chrysotile No ACBM No ACBM Chrysotile Chrysotile Chrysotile Friable Damage Quantity Damage Units Damage Category Response No 0 6 ACBM with the potential for damage Follow O&M Plan No No 0 0 EA EA 6 ACBM with the potential for damage 6 ACBM with the potential for damage Follow O&M Plan Follow O&M Plan

School Address St. George Branch (New Armour Annex) Unit Building ID Chicago, IL, 60608 Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) 762-2900 Fax: (312) 782-5145 Management Planner's Comments Summarized at the End of the Report HA Num 59 5A 5B 6 60 61 62 63 64 65 66 67 68 69 6A 70 71 72 73 79 7A Material Description Floor Tile Trowled on Plaster 9"x9" Dark Brown w/tan and Cream Streaks FT Mastic Tar Paper Under 12x12 FT Grey 12" x 12" Light Green w/dark Green Streaks FT Roofing Material - Not AHERA 12" x 12" Beige Floor Tile 12" x 12" Beige Floor Tile Mastic Chalk Board/Poster Board Adhesive 12x12 Gray Floor Tile with gray/white specks Mastic on 12x12 Gray FT with gray/white specks Gray Ceramic Floor Tile Grout Black Ceramic Tile Grout Black Ceramic Tile Adhesive 12x12 BrownSpeckled Floor Tile 12" x 12" Lt. Green w/dark Green Streaks FT Mastic Mastic associated w/ 12x12 Brown Speckled Floor Tile Beige Ceramic Tile Grout 12" x 12" Blue floor tile Mastic for 12" x 12" floor tile 12"x12" Blue Mottled VFT Material Quantity 950 950 140 1,800 1,800 1,200 250 250 325 325 1,800 Material Units 7B Mastic/Tar Paper Under 9x9 Drk Green w/tan Streaks 9" x 9" Dark Green w/cream and Tan Streaks 8 80 1' x 2' Black Border Tile Abated 12"x12" Blue Mottled VFT Mastic 1,800 81 12"x12" Green Mottled VFT 1,000 Material Location Asbestos Type Material Category Throughout Building Main Office Areas and 215 Chrysotile SURFACE Service Hallway to Main Office Roof Main Office, 112A & 112B Rooms Main office, 112A & 112B All Classrooms Rooms 110, 110A, and 215 Rooms 110, 110A, and 215 Basement Boys and Girls Restrooms Basement Restrooms Basement Restrooms 1st Floor Teachers Lounge Washroom Foyer Service Hallway to Main Office 1st Floor Teachers Lounge Washroom Foyer 1st Floor Teachers Lounge Washroom Rm 116 Library Rm 116 Library Room 116,211, 2nd Floor Elevator Lobby Distributed Under Floor Tile in Rm 117A and Toilet Distributed Under Floor Tile in Rm 117A and Toilet Engineer's Office Room 116,211, 2nd Floor Elevator Lobby 1st Floor Elevator Vestibule, Room Friable Damage Quantity Damage Units Damage Category Response No No No No No No No No No 0 0 0 0 0 0 0 0 0 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage Follow O&M Plan Follow O&M Plan Follow O&M Plan Follow O&M Plan Follow O&M Plan Follow O&M Plan Follow O&M Plan Follow O&M Plan Follow O&M Plan No 0 6 ACBM with the potential for damage Follow O&M Plan No 0 6 ACBM with the potential for damage Follow O&M Plan Chrysotile Chrysotile Abated No 0 6 ACBM with the potential for damage Follow O&M Plan No 0 6 ACBM with the potential for damage Follow O&M Plan

School Address St. George Branch (New Armour Annex) Unit Building ID Chicago, IL, 60608 Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) 762-2900 Fax: (312) 782-5145 Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units 82 12"x12" Green Mottled VFT Mastic 1,000 83 84 8A Carpet Mastic Plaster Patching Mastic & Tar Paper Under 1' x 2' Black Border Tile Abated 9"x9"Deep Burgundy w/cream and Red Wood Streaks FT ABATED 9"x9"Deep Burgundy w/cream/red Wood Strk FT Mastic ABATED 950 9 9A Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response No 0 6 ACBM with the potential for damage Follow O&M Plan No ACBM Abated No 0 6 ACBM with the potential for damage Follow O&M Plan Office Washroom Abated Office Washroom Abated 111, 117A 1st Floor Elevator Vestibule, Room 111, 117A Room 214 w/ Adjacent Hall 1st Floor Fire Escape Engineer's Office

School Address St. George Branch (New Armour Annex) Unit Building ID Chicago, IL, 60608 Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) 762-2900 Fax: (312) 782-5145 Management Planner's Comments Summarized at the End of the Report 5/16/2016 Review Date Manager Planner Name Daniel Juneau 100-03613 5/15/2016 Manager IDPH License No/Expiration HA Number 1 10 10A 11 11A 12 15 16 17 1A 2 21 22 22A 23 23A 25 26 27 28 29 2A 3 Management Comments if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M

School Address St. George Branch (New Armour Annex) Unit Building ID Chicago, IL, 60608 Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) 762-2900 Fax: (312) 782-5145 Management Planner's Comments Summarized at the End of the Report HA Number Management Comments 30 31 32 33 34 35 36 37 38 39 4 40 41 42 43 44 45 46 47 48 49 5 50 51 52 53 if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M

School Address St. George Branch (New Armour Annex) Unit Building ID Chicago, IL, 60608 Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) 762-2900 Fax: (312) 782-5145 Management Planner's Comments Summarized at the End of the Report HA Number Management Comments 54 55 56 57 58 59 5A 5B 6 60 61 62 63 64 65 66 67 68 69 6A 70 71 72 73 79 7A if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M

School Address St. George Branch (New Armour Annex) Unit Building ID Chicago, IL, 60608 Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) 762-2900 Fax: (312) 782-5145 Management Planner's Comments Summarized at the End of the Report HA Number Management Comments 7B 8 80 81 82 83 84 8A 9 9A Do Not disturb top layer of tile. Continue O&M

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 1 12" x 12" Brown w/cream & Dark Brown Flecks FT HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Stage in Basement 450 COMMENTS: Brown w/ Orange Flecks Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 1 12" x 12" Brown w/cream & Dark Brown Flecks FT Stage in Basement 450 0 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 10 9" x 9" Tan Floor Tile w/ Dark Brown Streaks Abated HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Office Washroom COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 10 9" x 9" Tan Floor Tile w/ Dark Brown Streaks Abated Office Washroom In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 10A 9" x 9" Tan w/dark Brown Streaks Floor Tile Mastic Abated HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Office Washroom COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 10A 9" x 9" Tan w/dark Brown Streaks Floor Tile Mastic Abated Office Washroom In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 11 9" x 9" White/Cream/Tan Multi-Flecked Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 205 COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 11 9" x 9" White/Cream/Tan Multi-Flecked Floor Tile Room 205 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 11A 9" x 9" white/cream/tan Multi flecked FT Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate 205 & Library COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 11A 9" x 9" white/cream/tan Multi flecked FT Mastic 205 & Library In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 12 Sub Floor Wood Like Material HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Rooms 112 A-C, library COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 12 Sub Floor Wood Like Material Rooms 112 A-C, library In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 15 Black Linoleum HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 15 Black Linoleum In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 16 Spray-on Insulation HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Undefined FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Not a suspect material COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 16 Spray-on Insulation Not a suspect material In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 17 Plaster HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Throughout 1st and 2nd Floor 15000 COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 17 Plaster Throughout 1st and 2nd Floor 15000 0 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 1A 12" x 12" Brown w/cream & drk Brwn FT Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Stage in Basement 450 COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 1A 12" x 12" Brown w/cream & drk Brwn FT Mastic Stage in Basement 450 0 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 2 12" x 12" Beige w/red Wood, Cream & Tan Flecks Floor Tile REMOVED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 2 12" x 12" Beige w/red Wood, Cream & Tan Flecks Floor Tile - REMOVED In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 21 Spotlight Wiring Insulation HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Lunchroom and Gym 50 LF LF COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 21 Spotlight Wiring Insulation Lunchroom and Gym 50 LF 0 LF In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 22 Drywall Material HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 22 Drywall Material In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 22A Joint Compound of Sheet Rock Material HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boy's Toilet in Basement COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 22A Joint Compound of Sheet Rock Material Boy's Toilet in Basement In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 23 Black Vinyl Step Cap Material HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Stairway Steps by Main Office 50 LF LF COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 23 Black Vinyl Step Cap Material Stairway Steps by Main Office 50 LF 0 LF In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 23A Black Vinyl Step Cap Material Adhesive HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Stairway Steps by Main Office 50 LF LF COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 23A Black Vinyl Step Cap Material Adhesive Stairway Steps by Main Office 50 LF 0 LF In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 25 Beaver Board HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 2nd Floor Hallway COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 25 Beaver Board 2nd Floor Hallway In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 26 Exterior Metal Window Caulk - Not AHERA HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 403 E Wall Center Window, Room 407 SW Corner Window, Main Office SW Corner Window COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 26 Exterior Metal Window Caulk - Not AHERA Room 403 E Wall Center Window, Room 407 SW Corner Window, Main Office SW Corner Window In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 27 Metal Window Glide Insulation HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Rm 403 E wall center window, Rm 407 SW corner wall, Main office SW corner window COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 27 Metal Window Glide Insulation Rm 403 E wall center window, Rm 407 SW corner wall, Main office SW corner window In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 28 Ext. Metal Window Glass Glazing Material-Not AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout the Building COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 28 Ext. Metal Window Glass Glazing Material-Not AHERA Throughout the Building In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 29 Interior Metal Window Glass Glazing Material HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout the Building COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 29 Interior Metal Window Glass Glazing Material Throughout the Building In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 2A 12"x12"Beige w/red Wood/Cream/Tan Flecks FT Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 215 COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 2A 12"x12"Beige w/red Wood/Cream/Tan Flecks FT Mastic Room 215 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 3 Wood Grained Linoleum HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 3 Wood Grained Linoleum In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 30 Metal Pipe Collar Caulk HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 209 COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 30 Metal Pipe Collar Caulk Room 209 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 31 Wall Board Material HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 203, 207 & 212 COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 31 Wall Board Material Room 203, 207 & 212 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 32 Mastic Under Wall Board Material HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: Chrysotile FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Throughout Building 1500 COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 32 Mastic Under Wall Board Material Throughout Building 1500 0 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 33 12" x 12" Off-White Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Main Office Closet and Toilet, and Engineer's Office COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 33 12" x 12" Off-White Floor Tile Main Office Closet and Toilet, and Engineer's Office In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 34 12" x 12" Off-white Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Main Office Closet and Toilet, and Engineer's Office COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 34 12" x 12" Off-white Floor Tile Mastic Main Office Closet and Toilet, and Engineer's Office In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 35 12" x 12" Dark Beige w/mix Speckles Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Main Office E Side by Wall, W wall Center, and SW Corner COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 35 12" x 12" Dark Beige w/mix Speckles Floor Tile Main Office E Side by Wall, W wall Center, and SW Corner In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 36 12"x12"Dark Beige w/mix Speckles Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Main Office COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 36 12"x12"Dark Beige w/mix Speckles Floor Tile Mastic Main Office In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 37 9" x 9" Chocolate Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Engineer's Office COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 37 9" x 9" Chocolate Floor Tile Engineer's Office In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 38 9" x 9" Chocolate Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Engineer's Office COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 38 9" x 9" Chocolate Floor Tile Mastic Engineer's Office In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 39 9" x 9" Rust Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Engineer's Office COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 39 9" x 9" Rust Floor Tile Engineer's Office In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 4 Green and White Linoleum HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 4 Green and White Linoleum In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 40 9" x 9" Rust Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Engineer's Office COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 40 9" x 9" Rust Floor Tile Mastic Engineer's Office In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 41 Pink Fire Proof Curtain HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Auditorium Stage 1 EA EA COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 41 Pink Fire Proof Curtain Auditorium Stage 1 EA 0 EA In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 42 Maroon Fire Proof Curtain HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Auditorium Stage 1 EA EA COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 42 Maroon Fire Proof Curtain Auditorium Stage 1 EA 0 EA In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 43 Fire Door Insulation HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler Room COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 43 Fire Door Insulation Boiler Room In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 44 Boiler Rope Gasket HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler Room COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 44 Boiler Rope Gasket Boiler Room In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 45 Brown Vinyl Baseboard HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Auditorium Stage COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 45 Brown Vinyl Baseboard Auditorium Stage In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 46 Brown Vinyl Base Board Adhesive HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Auditorium Stage COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 46 Brown Vinyl Base Board Adhesive Auditorium Stage In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 47 Masonite/Marlite With Wood Texture HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 415 COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 47 Masonite/Marlite With Wood Texture Room 415 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 48 Masonite/Marlite With Beige Smooth Finish HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 415 COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 48 Masonite/Marlite With Beige Smooth Finish Room 415 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 49 Interior Brick Material HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler Room Southeast Corner COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 49 Interior Brick Material Boiler Room Southeast Corner In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 5 9" x 9" Dark Brown w/tan and Cream Streaks FT HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Main Office Areas and 215 COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 5 9" x 9" Dark Brown w/tan and Cream Streaks FT Main Office Areas and 215 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 50 Interior Brick Mortar HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler Room COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 50 Interior Brick Mortar Boiler Room In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 51 Exterior Brick Material - Not AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Northeast Side of Building COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 51 Exterior Brick Material - Not AHERA Northeast Side of Building In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 52 Exterior Brick Mortar - Not AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Northeast Side of Building COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 52 Exterior Brick Mortar - Not AHERA Northeast Side of Building In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 53 Exterior Door Caulking - Not AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Main East Entrance Door COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 53 Exterior Door Caulking - Not AHERA Main East Entrance Door In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 54 Boiler Stack Insulation Caulking Compound HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler Room COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 54 Boiler Stack Insulation Caulking Compound Boiler Room In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 55 Masonite/Marlite With White Smooth Finish HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 215 COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 55 Masonite/Marlite With White Smooth Finish Room 215 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 56 Masonite/Marlite w/beige & Pink Mix Smooth Finish HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 215 COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 56 Masonite/Marlite w/beige & Pink Mix Smooth Finish Room 215 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 57 12" x 12" Chocolate Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Room 215 (Under HA 64) COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 57 12" x 12" Chocolate Floor Tile Room 215 (Under HA 64) In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 58 Mastic w/sub Floor Material Under 12x12 Grey Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Room 215 COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 58 Mastic w/sub Floor Material Under 12x12 Grey Floor Tile Room 215 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 59 Trowled on Plaster HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Building COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 59 Trowled on Plaster Throughout Building In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 5A 9"x9" Dark Brown w/tan and Cream Streaks FT Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Main Office Areas and 215 COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 5A 9"x9" Dark Brown w/tan and Cream Streaks FT Mastic Main Office Areas and 215 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 5B Tar Paper Under 12x12 FT Grey HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 5B Tar Paper Under 12x12 FT Grey In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 6 12" x 12" Light Green w/dark Green Streaks FT HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Service Hallway to Main Office COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 6 12" x 12" Light Green w/dark Green Streaks FT Service Hallway to Main Office In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 60 Roofing Material - Not AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Roof COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 60 Roofing Material - Not AHERA Roof In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 61 12" x 12" Beige Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Main Office, 112A & 112B 950 COMMENTS: Not observed in Main Office - Tile is tan w/ streaks Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 61 12" x 12" Beige Floor Tile Main Office, 112A & 112B 950 0 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 62 12" x 12" Beige Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Rooms Main office, 112A & 112B 950 COMMENTS: Not observed in Main Office - Tile is tan w/ streaks Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 62 12" x 12" Beige Floor Tile Mastic Rooms Main office, 112A & 112B 950 0 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 63 Chalk Board/Poster Board Adhesive HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW All Classrooms 140 COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 63 Chalk Board/Poster Board Adhesive All Classrooms 140 0 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 64 12x12 Gray Floor Tile with gray/white specks HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Rooms 110, 110A, and 215 1800 COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 64 12x12 Gray Floor Tile with gray/white specks Rooms 110, 110A, and 215 1800 0 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 65 Mastic on 12x12 Gray FT with gray/white specks HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Rooms 110, 110A, and 215 1800 COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 65 Mastic on 12x12 Gray FT with gray/white specks Rooms 110, 110A, and 215 1800 0 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 66 Gray Ceramic Floor Tile Grout HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Basement Boys and Girls Restrooms 1200 COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 66 Gray Ceramic Floor Tile Grout Basement Boys and Girls Restrooms 1200 0 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 67 Black Ceramic Tile Grout HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Basement Restrooms 250 COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 67 Black Ceramic Tile Grout Basement Restrooms 250 0 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 68 Black Ceramic Tile Adhesive HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Basement Restrooms 250 COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 68 Black Ceramic Tile Adhesive Basement Restrooms 250 0 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 69 12x12 BrownSpeckled Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW 1st Floor Teachers Lounge Washroom Foyer 325 COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 69 12x12 BrownSpeckled Floor Tile 1st Floor Teachers Lounge Washroom Foyer 325 0 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 6A 12" x 12" Lt. Green w/dark Green Streaks FT Mastic HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Service Hallway to Main Office COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 6A 12" x 12" Lt. Green w/dark Green Streaks FT Mastic Service Hallway to Main Office In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 70 Mastic associated w/ 12x12 Brown Speckled Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW 1st Floor Teachers Lounge Washroom Foyer 325 COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 70 Mastic associated w/ 12x12 Brown Speckled Floor Tile 1st Floor Teachers Lounge Washroom Foyer 325 0 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 71 Beige Ceramic Tile Grout HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate 1st Floor Teachers Lounge Washroom COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 71 Beige Ceramic Tile Grout 1st Floor Teachers Lounge Washroom In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 72 12" x 12" Blue floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Rm 116 Library COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 72 12" x 12" Blue floor tile Rm 116 Library In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 73 Mastic for 12" x 12" floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Low Rm 116 Library COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 73 Mastic for 12" x 12" floor tile Rm 116 Library In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 79 12"x12" Blue Mottled VFT HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Room 116,211, 2nd Floor Elevator Lobby 1800 COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 79 12"x12" Blue Mottled VFT Room 116,211, 2nd Floor Elevator Lobby 1800 0 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 7A Mastic/Tar Paper Under 9x9 Drk Green w/tan Streaks HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Distributed Under Floor Tile in Rm 117-A and Toilet COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 7A Mastic/Tar Paper Under 9x9 Drk Green w/tan Streaks Distributed Under Floor Tile in Rm 117-A and Toilet In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 7B 9" x 9" Dark Green w/cream and Tan Streaks HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Distributed Under Floor Tile in Rm 117-A and Toilet COMMENTS: Not observed - Underneath floor tile in room Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 7B 9" x 9" Dark Green w/cream and Tan Streaks Distributed Under Floor Tile in Rm 117-A and Toilet In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Do Not disturb top layer of tile. Continue O&M Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 8 1' x 2' Black Border Tile Abated HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Engineer's Office COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 8 1' x 2' Black Border Tile Abated Engineer's Office In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 80 12"x12" Blue Mottled VFT Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Room 116,211, 2nd Floor Elevator Lobby 1800 COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 80 12"x12" Blue Mottled VFT Mastic Room 116,211, 2nd Floor Elevator Lobby 1800 0 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 81 12"x12" Green Mottled VFT HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW 1st Floor Elevator Vestibule, Room 111, 117A 1000 COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 81 12"x12" Green Mottled VFT 1st Floor Elevator Vestibule, Room 111, 117A 1000 0 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 82 12"x12" Green Mottled VFT Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW 1st Floor Elevator Vestibule, Room 111, 117A 1000 COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 82 12"x12" Green Mottled VFT Mastic 1st Floor Elevator Vestibule, Room 111, 117A 1000 0 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 8A Mastic & Tar Paper Under 1' x 2' Black Border Tile Abated HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Engineer's Office COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 8A Mastic & Tar Paper Under 1' x 2' Black Border Tile Abated Engineer's Office In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 9 9"x9"Deep Burgundy w/cream and Red Wood Streaks FT ABATED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Office Washroom COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 9 9"x9"Deep Burgundy w/cream and Red Wood Streaks FT ABATED Office Washroom In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 9A 9"x9"Deep Burgundy w/cream/red Wood Strk FT Mastic ABATED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section 763.85 and 763.88 of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Office Washroom COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 9A 9"x9"Deep Burgundy w/cream/red Wood Strk FT Mastic ABATED Office Washroom In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (New Homogeneous Area) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM CURRENT INSPECTION 84 Plaster Patching 1st Floor Fire Escape MATERIAL CATEGORY: ASBESTOS TYPE: No ACBM DISTURBANCE POTENTIAL: FRIABLE: CONDITION: AHERA DAMAGE CATEGORY: ACCESSIBILITY: DAMAGE REASON: DAMAGE REASON: DAMAGE REASON: COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 84 Plaster Patching 1st Floor Fire Escape In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: COMMENTS: Management Planner's Signature: 05/16/2016

Inspector Assessment Form (New Homogeneous Area) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM CURRENT INSPECTION 83 Carpet Mastic Room 214 w/ Adjacent Hall 950 MATERIAL CATEGORY: FRIABLE: No ASBESTOS TYPE: DISTURBANCE POTENTIAL: LOW AHERA DAMAGE CATEGORY: CONDITION: 6 ACBM with the potential for damage ACCESSIBILITY: Not Reachable 0 DAMAGE REASON: DAMAGE REASON: DAMAGE REASON: COMMENTS: Inspector's Signature: 04/28/2016

Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 83 Carpet Mastic Room 214 w/ Adjacent Hall 950 0 In accordance with Sections 763.88 and 763.90 of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections 763.88 and 763.90 with the following recommendations. The RESPONSE ACTION recommendation is: COMMENTS: Management Planner's Signature: 05/16/2016

APPENDIX B Inspector and Management Planner Licenses