UNCLASSIFIED R-1 ITEM NOMENCLATURE

Similar documents
UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED. Cost To Complete Total Program Element S750: Mission Training and Preparation Systems FY 2015

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: SOF Underwater Systems

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 R-1 Line #208

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Multi-Platform Electronics

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Counter Narcotics Technology Program Office

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing EF4: Integrated Broadcast System

Exhibit R-2, RDT&E Budget Item Justification February 2008

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 8 R-1 Line #77

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Joint Strike Fighter Squadrons

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #232

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 Program Element (Number/Name) PE BB / SOF Visual Augmentation, Lasers and Sensor Systems. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: National Security Space Office

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: NUCLEAR WEAPON MODERNIZATION FY 2012 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #90

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #47

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Unmanned Combat Air Veh(UCAV) Adv Cp/Proto Dev. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Advanced Medium Range Air-to-Air Missile (AMRAAM) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #91

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 R-1 Line #98

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #94

UNCLASSIFIED. Cost To Complete Total Program Element : R/SAOC MODERNIZATION. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Depot Maintenance (NON-IF) FY 2011 Total Estimate. FY 2011 OCO Estimate

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

KC-46A Tanker DoD Budget FY2013-FY2017. RDT&E U.S. Air Force

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #176

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Specialized Undergraduate Pilot Training. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. Cost To Complete Total Program Element 1, , : Evolved Expendable Launch Vehicle

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 6 R-1 Line #231

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: SPECIAL TACTICS/COMBAT CONTROL

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: SOF Soldier Protection and Survival Systems

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Joint Air-to-Surface Standoff Missile (JASSM) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: WEATHER SERVICE. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #211

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: NAVSTAR Global Positioning System (User Equipment) (SPACE)

UNCLASSIFIED R-1 ITEM NOMENCLATURE

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: JOINT PERSONNEL RECOVERY AGENCY (JPRA) FY 2011 OCO Estimate. FY 2011 Total Estimate

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #123

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: KC-10S. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: JOINT PERSONNEL RECOVERY AGENCY (JPRA)

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #213

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 11 R-1 Line #92

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED. Cost To Complete Total Program Element : Hard Target Void Sensing Fuze.

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE K: Minimum Essential Emergency Communications Network (MEECN)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Tactical Data Links. FY 2011 OCO Estimate. FY 2011 Total Estimate

UNCLASSIFIED. Cost To Complete Total Program Element : TECH SURVEIL COUNTER MEAS EQPT. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Transcription:

Exhibit R-2, RDT&E Budget Item Justification: PB 2014 United States Special Operations Command DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 United States Special Operations Command Page 1 of 7 R-1 Line #260 Program Element 25.495 18.091 19.647 0.000-0.000 0.000 0.000 0.000 0.000 0.000 63.233 25.495 18.091 19.647 0.000-0.000 0.000 0.000 0.000 0.000 0.000 63.233 # FY 2013 Program is from the FY 2013 President's Budget, submitted February 2012 ## The Request will be submitted at a later date Note Beginning in FY2014, this Program Element has been consolidated into SM Program Element Program Element 1160403BB, SO Aviation Systems. A. Mission Description and Budget Item Justification The AC/MC-130J program element funds core SOF-unique modifications to replace aging MC-130E Combat Talon I, MC-130P Combat Shadow, MC-130H Combat Talon II, AC-130H Spectre, AC-130W Stinger II, AC-130U Spooky airframes. The 8 AC-130H Spectre, 12 AC-130W Stinger II and 17 AC-130U Spooky airframes will be replaced with MC-130J aircraft modified with the Precision Strike Package (PSP) to achieve the AC-130J configuration. These platforms perform clandestine or low visibility, single or multi-ship low-level missions intruding politically-sensitive or hostile territories; provide air refueling for special operations helicopters and CV-22 aircraft; airdrop of leaflets, small special operations teams, resupply bundles and combat rubber raiding craft; and provide close air support (CAS), air interdiction, armed reconnaissance, escort, and force protection - integrated base defense. Additional capabilities include low-level navigation and in-flight refueling. The Air Force will procure and field basic aircraft, common support equipment, and trainers for USSM. An incremental upgrade approach will be used to incorporate SOF capabilities onto the aircraft. B. Program Change Summary ($ in Millions) FY 2012 FY 2013 Previous President's Budget 18.571 19.647 8.225-8.225 Current President's Budget 18.091 19.647 0.000-0.000 Adjustments -0.480 0.000-8.225 - -8.225 Congressional General Reductions - - Congressional Directed Reductions - - Congressional Rescissions - - Congressional Adds - - Congressional Directed Transfers - - Reprogrammings - - SBIR/STTR Transfer -0.480 - Other Adjustments - - -8.225 - -8.225 Change Summary Explanation Funding:

Exhibit R-2, RDT&E Budget Item Justification: PB 2014 United States Special Operations Command DATE: April 2013 FY 2012: Decrease of -$0.480 million is due to a transfer of funds to Small Business Innovative Research (-$0.480 million). FY 2013: None. : Decrease of $-8.225 million is due to this Program Element being consolidated into SM Program Element 1160403BB beginning. Schedule: None. Technical: None United States Special Operations Command Page 2 of 7 R-1 Line #260

Exhibit R-2A, RDT&E Project Justification: PB 2014 United States Special Operations Command DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 25.495 18.091 19.647 0.000-0.000 0.000 0.000 0.000 0.000 0.000 63.233 Quantity of RDT&E Articles # FY 2013 Program is from the FY 2013 President's Budget, submitted February 2012 ## The Request will be submitted at a later date A. Mission Description and Budget Item Justification The AC/MC-130J project funds core Special Operations Forces (SOF)-unique modifications to replace aging MC-130E Combat Talon I, MC-130P Combat Shadow, MC-130H Combat Talon II, AC-130H Spectre, AC-130W Stinger II, and AC-130U Spooky airframes. The 8 AC-130H Spectre, 12 AC-130W Stinger II and 17 AC-130U Spooky airframes will be replaced with MC-130J aircraft modified with the Precision Strike Package (PSP) to achieve the AC-130J configuration. These platforms perform clandestine or low visibility, single- or multi-ship low-level missions intruding politically-sensitive or hostile territories; provide air refueling for special operations helicopters and CV-22 aircraft; airdrop leaflets, small special operations teams, resupply bundles and combat rubber raiding craft; and close air support (CAS), air interdiction, armed reconnaissance, escort, and force protection - integrated base defense. Additional capabilities include low-level navigation and in-flight refueling. The Air Force will procure and field basic aircraft, common support equipment, and trainers for USSM. USSM will then employ an incremental upgrade approach to incorporate SOF capabilities onto the Air Force-provided aircraft. Conducts development, integration, and testing of aircraft enhancements to meet SOF-unique mission requirements. Enhancements include, but are not limited to, SOF communications, mission processors, aircraft performance enhancements, enhanced situational awareness, electronic warfare and survivability systems, and other SOF mission kits. Provides PSP aircraft infrastructure development. B. Accomplishments/Planned Programs ($ in Millions) FY 2012 FY 2013 Title: AC/MC-130J FY 2012 Accomplishments: Continued development of SOF-unique mission improvements, continued PSP aircraft infrastructure, and SOF mission kits. FY 2013 Plans: Continue SOF-unique mission improvements including, but not limited to, MC-130J Increment 3 development, integration, and test efforts. Develop and test aircraft modification designs for PSP kit installation. Update interface designs based on results of initial design evaluation. 18.091 19.647 0.000 Accomplishments/Planned Programs Subtotals 18.091 19.647 0.000 United States Special Operations Command Page 3 of 7 R-1 Line #260

Exhibit R-2A, RDT&E Project Justification: PB 2014 United States Special Operations Command DATE: April 2013 C. Other Program Funding Summary ($ in Millions) Line Item FY 2012 FY 2013 FY 2015 FY 2016 FY 2017 FY 2018 PROC1: SOF TANKER RECAPITALIZATION 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 99.666 PROC2: AC/MC-130J 61.391 51.484 51.870 51.870 105.105 57.527 58.866 95.694 Continuing Continuing PROC3: PRECISION STRIKE 0.000 73.013 107.687 107.687 184.232 240.382 281.984 278.418 705.250 1,870.966 PACKAGE Remarks D. Acquisition Strategy The basic AC/MC-130J aircraft will be acquired under the United States Air Force HC/MC-130J Recapitalization procurement program. USSM will fund development, integration, test and production/retrofit of SOF-unique mission equipment under this program and the USSM Precision Strike Package program. E. Performance Metrics N/A. United States Special Operations Command Page 4 of 7 R-1 Line #260

Exhibit R-3, RDT&E Project Analysis: PB 2014 United States Special Operations Command DATE: April 2013 Product Development ($ in Millions) Category Item MC-130J AC-130J Method & Type Performing Activity & Location C/Various Lockheed Martin:Atlanta, GA C/Various Lockheed Martin:Lexington, KY Years FY 2012 FY 2013 23.290 13.318 Mar 2012 7.634 Mar 2013 - - - 0.000 44.242 1.592 4.773 Jan 2012 12.013 Jan 2013 - - - 0.000 18.378 Subtotal 24.882 18.091 19.647 0.000 0.000 0.000 0.000 62.620 Target Value of Support ($ in Millions) Category Item Development Support Remarks Method & Type Allot Performing Activity & Location ACS/WIS:Wright Patterson AFB, OH Years FY 2012 FY 2013 0.613 0.000 0.000 0.000-0.000 0.000 0.613 Subtotal 0.613 0.000 0.000 0.000 0.000 0.000 0.000 0.613 Years FY 2012 FY 2013 Project tals 25.495 18.091 19.647 0.000 0.000 0.000 0.000 63.233 Target Value of Target Value of United States Special Operations Command Page 5 of 7 R-1 Line #260

Exhibit R-4, RDT&E Schedule Profile: PB 2014 United States Special Operations Command DATE: April 2013 AC/MC-130J Development/Test FY 2012 FY 2013 FY 2015 FY 2016 FY 2017 FY 2018 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 United States Special Operations Command Page 6 of 7 R-1 Line #260

Exhibit R-4A, RDT&E Schedule Details: PB 2014 United States Special Operations Command DATE: April 2013 Schedule Details Start End Events by Sub Project Quarter Year Quarter Year AC/MC-130J Development/Test 1 2012 4 2018 United States Special Operations Command Page 7 of 7 R-1 Line #260