UNCLASSIFIED UNCLASSIFIED

Similar documents
FOREIGN COMPARATIVE TEST (FCT) PE D FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005

FOREIGN COMPARATIVE TESTING (FCT) PROGRAM YOUR ENTRY INTO THE U.S. DEFENSE MARKET. Col Linda Palmer, USAF Program Manager

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 6 R-1 Line #29

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item No. 4 Page 1 of 6

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #10

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #45

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Multi-Platform Electronics

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Landmine Warfare and Barrier Advanced Technology. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO

Exhibit R-2, RDT&E Budget Item Justification February 2008

UNCLASSIFIED R-1 ITEM NOMENCLATURE

ML 4 ML 3 ML 5 ML 2 PL 5001 ML 21 ML 15 ML 22 1C 950 1C 350 1C 111 1C 450 S1 P1

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : OC-135 Open Skies Sensors

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: SOF Soldier Protection and Survival Systems

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 Program Element (Number/Name) PE BB / SOF Visual Augmentation, Lasers and Sensor Systems. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing P130: Foreign Comparative Testing

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Landmine Warfare and Barrier Advanced Technology FY 2012 OCO

Project Manager Munitions Executive Summit

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Soldier Systems - Warrior Dem/Val

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Missile Defense Agency Advanced Research Overview Distribution Statement A: Approved for public release; distribution is unlimited.

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Major T&E Investment. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Strategic Environmental Research and Development Program (SERDP) FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #9

Ammunition and Explosives related Federal Supply Classes (FSC)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2012 OCO

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 10 R-1 Line #100

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #96

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 21 R-1 Line #102

UNCLASSIFIED. R-1 Program Element (Number/Name) PE D8Z / Industrial Base Analysis and Sustainment Support. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #146

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

FCT and SOCOM Shoulder Fired Weapons

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #98

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 8 P-1 Line #33

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 9 R-1 Line #20

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #142

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing EF4: Integrated Broadcast System

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Initial Operational Test & Evaluation FY 2012 OCO

Exhibit R-2, RDT&E Budget Item Justification February 2007

Department of Industrial Policy & Promotion

UNCLASSIFIED FY 2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2008 Exhibit R-2

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 8 R-1 Line #77

FOR IMMEDIATE RELEASE No June 27, 2001 THE ARMY BUDGET FISCAL YEAR 2002

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Soldier Division Director David Libersat June 2, 2015

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

Low Altitude Air Defense (LAAD) Gunner's Handbook

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 20 R-1 Line #121

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

Transcription:

Exhibit R-2, RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) DATE: February 2003 APPROPRIATION/BUDGET ACTIVITY Defense Wide RDT&E,D BA6 R-1 ITEM NOMENCLATURE Foreign Comparative Testing (FCT) PE 0605130D8Z COST (In Millions) FY2002 FY2003 FY2004 FY2005 FY2006 FY2007 FY2008 FY2009 Total Program Element (PE) Cost 34.839 26.873 34.873 35.705 36.221 36.807 37.641 38.335 A. Mission Description and Budget Item Justification The mission of the FCT program is to test and evaluate foreign non-developmental items (NDI) identified by the Services and Combatant Commanders in order to avoid costly and time-consuming U.S. new start acquisition programs. The FCT program is Congressionally mandated in Title 10, USC, Section 2350a. FCT tests and evaluates conventional defense equipment, munitions, and technologies manufactured and developed by major allies of the United States and other friendly foreign countries to determine the ability of such equipment, munitions, and technologies to satisfy United States military requirements or to correct operational deficiencies. While the testing of NDI and items in the late state of the development process are preferred, the testing of equipment, munitions, and technologies may be conducted to determine procurement alternatives. FCT projects are nominated by the Services and U.S. Special Operations Command (SOCOM) each year and submitted to Congress for approval prior to obligation of funds. This Research Category 6.5 is assigned and identified in this descriptive summary in accordance with existing DoD policy. B. Program Change Summary FY 2002 FY 2003 FY 2004 FY 2005 Previous President's Budget 34.839 31.670 32.392 33.412 Current FY2004 President's Budget 34.839 26.873 34.873 35.705 Total Adjustments -4.797 2.481 2.293 Congressional program reductions -4.797 Congressional rescissions Congressional increases Reprogrammings SBIR/STTR Transfer Other 2.481 2.293 C. Other Program Funding Summary: N/A D. Acquisition Strategy: N/A

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2a Exhibit) DATE: February 2003 APPROPRIATION/BUDGET ACTIVITY Defense Wide RDT&E,D BA6 R-1 ITEM NOMENCLATURE Foreign Comparative Testing (FCT) PE 0605130D8Z COST (In Millions) FY2002 FY2003 FY2004 FY2005 FY2006 FY2007 FY2008 FY2009 Total Program Element (PE) Cost 34.839 26.873 34.873 35.705 36.221 36.807 37.641 38.335 A. Mission Description and Budget Item Justification The mission of the FCT program is to test and evaluate foreign non-developmental items (NDI) identified by the Services and Combatant Commanders in order to avoid costly and time-consuming U.S. new start acquisition programs. The FCT program is Congressionally mandated in Title 10, USC, Section 2350a. FCT tests and evaluates conventional defense equipment, munitions, and technologies manufactured and developed by major allies of the United States and other friendly foreign countries to determine the ability of such equipment, munitions, and technologies to satisfy United States military requirements or to correct operational deficiencies. While the testing of NDI and items in the late state of the development process are preferred, the testing of equipment, munitions, and technologies may be conducted to determine procurement alternatives. FCT projects are nominated by the Services and U.S. Special Operations Command (SOCOM) each year and submitted to Congress for approval prior to obligation of funds. This Research Category 6.5 is assigned and identified in this descriptive summary in accordance with existing DoD policy. B. Program Accomplishments and Plans FY 2002 Accomplishments: (FY2002 new starts & continuing projects) Funded the following new or continuing foreign system tests and evaluations and/or technology assessments: - Completed Advanced Lightweight Grenade Launcher Ammunition - Completed Airborne Video Recorder/Replay System - Completed Bradley Fighting Vehicle Long-Life Roadwheels - Completed Chemical Protective Gloves - Completed Driver's Vision Enhancer - Completed Gunfire Detection System - Completed High Mobility Excavator - Completed High Performance Hydraulic Pump - Completed Infrared Flare for C-17 - Completed Joint Protective Aircrew Ensemble - Completed Large Aircraft Interior Decontamination - Completed Less Sensitive RDX - Completed Lightweight Aluminum Track for AAAV - Completed Lightweight Chemical Agent Detector

- Completed Lightweight Diesel Driven Auxiliary Power Unit for AAAV - Completed Man Portable Multi-Sensor System - Completed MC-130H Aerial Refueling System Pod - Completed Multi-Bandwidth Submarine Antenna - Completed Optically Improved SADA II - Completed Parachute Leaflet Delivery System - Completed Personal Temperature Regulation System - Completed Plastic Practice Bombs - Completed Prophet Ground - Completed Retractable Arresting Cable System - Completed Skin/Open Wound Decontamination - Completed Star Tracker - Completed Tactical Geographical Information System - Completed VLF/LF Composite Bushing Replacement - Continued Advanced Demolition Weapons - Continued Floating Smoke Pot Components - Continued MAAWS IR Illumination Round - Initiated and completed 7.62mm Lightweight Machine Gun - Initiated and completed Fiber Optic Security Fence - Initiated and completed Laser Obstacle Detection System - Initiated and completed Stand Alone Cooling Suit - Initiated 40mm Dud Reducing Ammo - Initiate Assault Breacher Vehicle Mine Plow and Lane Marking System - Initiated Communications Distribution System - Initiated Digital Flight Control System for EA-6B - Initiated Eagle Vision Sensor Upgrade - Initiated Infrared Decoy - Initiated High Frequency Adaptive Antenna Receive System - Initiated NBC Multi-purpose Sock - Initiated Self-Destruct Fuze for Multiple Launch Rocket System - Initiated Self-Regulating Anti-G Ensemble - Initiated Silverized Kevlar FY 2003 Plans: (FY2002 Continuing Projects and FY2003 New Start Projects) Fund the following new or continuing foreign system tests and evaluations and/or technology assessments: 2

- Complete Advanced Demolition Weapons - Complete Assault Breacher Vehicle Mine Plow and Lane Marking System - Complete Communications Distribution System - Complete Eagle Vision Sensor Upgrade - Complete Floating Smoke Pot Components - Complete High Frequency Adaptive Antenna Receive System - Complete Self Regulating Anti-G Ensemble - Continue 40mm Dud Reducing Ammo - Continue Digital Flight Control System for EA-6B - Continue Infrared Decoy - Continue MAAWS IR Illumination Round - Continue NBC Multipurpose Sock - Continue Self Destruct Fuze for Multiple Launch Rocket System - Continue Silverized Kevlar - Initiate and complete High Rate-of-Fire.50 Caliber Machine Gun - Initiate and complete Body Armor Flotation Vest - Initiate and complete Body Worn Radar Receivers - Initiate and complete Corona Monitoring System - Initiate and complete Man Portable Intrusion Detection System - Initiate and complete Shipboard Anti-Jam GPS Antenna - Initiate 40mm Enhanced Grenade Launcher for M4 Carbine - Initiate 105mm Preformed Fragments - Initiate 155mm Ammunition - Initiate Ballistic Armor for Helicopters - Initiate Deployable Instrumentation for MAGTF Training System - Initiate Eye-Safe Laser Rangefinder for M1A1 Main Battle Tank - Initiate Fuel Cells for Dismounted Soldier Systems - Initiate Global Cellular Phone Optimization - Initiate Improved Specific Emitter Identification System - Initiate Man Portable SATCOM System - Initiate Missile Reserve Battery Replacement - Initiate Rayon for Heatshield and Motor Nozzles - Initiate Replacement Structures for Aircraft - Initiate Small Bundle Resupply System - Initiate Special Effects Small Arms Marking System - Initiate Underwater Communication and Tracking System for Submarines FY 2004 Plans: (FY2003 Continuing Projects) 3

Fund approximately 44 new or continuing foreign system tests and evaluations and/or technology assessments to include: - Complete 40mm Enhanced Grenade Launcher for M4 Carbine - Complete 105mm Preformed Fragments - Complete 155mm Ammunition - Complete Ballistic Armor for Helicopters - Complete Deployable Instrumentation for MAGTF Training System - Complete Digital Flight Control System for EA-6B - Complete Fuel Cells for Dismounted Soldier Systems - Complete Global Cellular Phone Optimization - Complete Improved Specific Emitter Identification System - Complete Infrared Decoy - Complete MAAWS IR Illumination Round - Complete Man Portable SATCOM System - Complete Missile Reserve Battery Replacement - Complete NBC Multipurpose Sock - Complete Rayon for Heatshield and Motor Nozzles - Complete Replacement Structures for Aircraft - Complete Silverized Kevlar - Complete Self Destruct Fuze for Multiple Launch Rocket System - Complete Small Bundle Resupply System - Complete Special Effects Small Arms Marking System - Complete Underwater Communication and Tracking System for Submarines - Continue 40mm Dud Reducing Ammunition - Continue Eye Safe Laser Rangefinder for M1A1 Battle Tank - Initiate and complete Cleaner Burning Stores Release Cartridges - Initiate and complete Wireless LAN Monitoring System - Initiate High Temperature Protective Coating for Gas Turbine Engines - Initiate Resilient Abrasive Resistant Skirt for LCAC - Initiate Ultra Light Aero Diesel Engine FY 2005 Plans: (FY2004 Continuing Projects) Fund approximately 44 new or continuing foreign system tests and evaluations and/or technology assessments: 4

- Complete 40mm Dud Reducing Ammo - Complete Eye Safe Laser Rangefinder for M1A1 Main Battle Tank - Complete High Temperature Protective Coating for Gas Turbine Engines - Complete Resilient Abrasive Skirt for LCAC - Complete Ultra Light Aero Diesel Engine C. Other Program Funding Summary: N/A D. Acquisition Strategy: N/A 5