Category 2: Meeting the Challenge of a Difficult Job Specialty Contractor

Similar documents
Recommended Physical Plant Improvements to Existing Nursing Homes for Disaster Preparedness. Report to the Governor and to the Legislature

Agency for Health Care Administration

The Pre-Construction Risk Assessment

Hospital Construction, Renovation, and Demolition

EQUIPMENT MANAGEMENT MEDICAL EQUIPMENT: EC , EC UTILITY SYSTEMS: EC , EC

upgrade to consider may be the Heating Ventilation and Air Conditioning (HVAC) system. Facilities may have to maintain higher humidity & filtration le

Standard EC Elements of Performance for EC The hospital manages fire risks.

Bluewater Health. Sarnia/Lambton, Ontario, Canada. Case Study

Risk Assessment Policy

Worker s Arm Pulled Into Belt and Pulley

Salt Lake Community College

Chapter Two. Innovation. We were a green crew and we knew it.

Delivery Models The Pros & Cons

ACCIDENT PREVENTION PROGRAM &

OPERATIONS DIVISION STANDARD OPERATING POLICY AND PROCEDURE. Duties of Shift Operators (Central Plants)

Date: September 2, Assisted Living Facilities (ALFs) To:

A Health and Safety Tip Sheet for School Custodians. Did you know? Step 1. Identify job hazards. Step 2. Work towards solutions

Facilities. Guide M ANAGEMENT. Facilities Management Directory of Services

The University of Texas at San Antonio

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

Copyright, Joint Commission International. Tracer Methodology

Student Affairs: Student Housing & Residence Life. Student Housing Residence Facilities Obz Square

(1) Electrical Arc Flash Safety Standing Operating Procedures (SOP)

A model of new thinking in mental health treatment HOFFMAN BUILDS:

The University of Texas at San Antonio

How Beacon Health System Gained Competitive Advantage and Acquired New Patients through Telehealth

2016 Final CMS Rules vs. Joint Commission Requirements

April 10, 2018 York Chan, CHFM, CHC, SASHE

UNITED STATES ARMY INTELLIGENCE AND SECURITY COMMAND

Surgical Instrumentation: Eliminating Chaos. The Complex Process of Surgical Instrument Maintenance and Improving the Healthcare Environment

3.5 Emergency Procedures Policy (Evacuation & Invacuation)

INFECTION CONTROL GUIDELINES Effective date: 01/77 SAFETY Revision date : 12/12 Review date :

COMPANY BACKGROUND TYLER MEDICAL'S ROLE IN THE WOUND CARE COVERAGE ENVIRONMENT

REQUEST FOR PROPOSALS (RFP) For Electrical Engineering Design Services City Hall Switchgear Replacement October 28, 2016

A. General provisions and other electrical systems are specified in other Sections of Division 26.

Guidelines & Standards. The American Association for Respiratory Care Ables Lane Dallas, Texas 75229

NATIONAL DEFENSE INDUSTRIAL ASSOCIATION NET3 CONFERENCE REMARKS BY MG (RET) WILLIE B. NANCE, JR. EXECUTIVE VICE PRESIDENT, CYPRESS INTERNATIONAL INC.

Risk Assessment Policy

The Joint Commission and Facility Design: A Partnership for Patient Safety and Quality Care

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Organization for Economic Co-operation and Development

National Standards for the Prevention and Control of Healthcare Associated Infections. Quality Improvement Plan (QIP)

Code of Practice Controlling access to hazardous or sensitive areas

Southeastern Arizona Contractors Association Scholarship Program Application

The Design Professional and Infection Prevention for Healthcare Facilities

Minnesota Health Care Engineers Association. Bob Dehler, P.E. Engineering Program Manager September 14, 2017

Summary of Responses to Open Ended Questions

Table 1: Types of Emergencies Potentially Affecting Urgent Care Centers o Chemical Emergency

Requirements for Construction Site Welfare Facilities

Rule R Nursing Facility Construction. Table of Contents. State Links: Utah.gov State Online Services Agency List Business.utah.gov Search.

Remarks by Paul Carttar at the Social Impact Exchange s Conference on Scaling Impact June 14, 2012

Capital Fund Financing Program OMB No Expires 4/30/2011 Part I: Summary PHA Name: Housing Authority of the City of Warner Robins

THE HEALTHCARE ENVIRONMENT

I. THE PROPOSED RULE: The proposed rule, including the analysis and text, are attached. REFERENCE TO APPLICABLE FORMS:

Monnal T75. Tailor-made breathing.

ARTICLE 6. PHYSICAL PLANT. s Alterations to Existing Buildings or New Construction.

Assessing Non-Technical Skills. A Guide to the NOTSS Tool Adapted for the Labour Ward

UNIFORM AND DRESS CODE POLICY - BANK MEMBERS

2015 Ohio Valley ABC Excellence in Construction Awards Project Entry Requirements and Forms

3.03 Functions of support services personnel Name

RFQ RW Asbestos Abatement Services Addendum 2

PUTNAM COUNTY PLANNING & DEVELOPMENT SERVICES

Buck & Boost Transformer Installation Instructions

Clinical Quality Review Team (CQRT) Training

SENIOR FOOD PRODUCTION UTILITY WORKER

MANAGING WORKFORCE MEDICAL CARE FOR REMOTE AND CROSS-COUNTRY PROJECTS. By David Landrum and Rene Scott

RISK ASSESSMENT POLICY

Providing Quality Equipment and Services for Specialized Mechanical Air Systems. Serving Kentucky and Southern Indiana for over 70 years

WARNING: Up to 50% of the new patients calling your office may be lost due to the way your team handles that all-important initial phone call!

S2 Accident, Incident & Near Hit Reporting - 1 / 7

Room 29/30, Basepoint Winchester

Nottinghamshire County Council Disabled Children s Services Children s Occupational Therapy Service

Emergency Preparedness Planning and Implementation (EPPI) Study Guide

WEATHERIZATION ASSISTANCE PROGRAM Permanent Designations for Davidson, Forsyth, Guilford, Randolph, and Rockingham Counties

Extract from Managing Infection Control

CENTRAL IOWA HEALTHCARE Marshalltown, Iowa HEALTH & SAFETY POLICY EMERGENCY MANAGEMENT POLICY

City of Imperial On-Call Plan Check and Inspection Services. Released: September 13, Important Dates

Request for Proposals School Year Project Lafayette County School District 100 Commodore Drive Oxford, MS 38655

Fluorine Gas Mist Pot Fails

TARGETTED APPROCACH FINANCED BY THE GOVERNMENT OF ZIMBABWE (MINISTRY OF FINANCE) PROGRESS REPORT

Assembly Area Operations

Children s Disability Service Occupational Therapy Disabled Facilities Grants - Information Sheet

44th Annual Art in the Park Lake Odessa, Michigan August 4, AM - 4PM RULES & APPLICATION

STATE OF ALASKA COMPETENCY SPECIFICATION

Shift Supervisor Mining ROLE PROFILE

PRESENTORS Cyndi McCullough Andrew Yosten

Univer it of Michigan continue upgrade with ur le Hall renovation

Preparing for Life Safety Code Surveys with the Joint Commission - Part 2. Florida Hospital Association. Wednesday, May 2, 2018 WELCOME!

Certified Healthcare Safety Long Term Care (CHS-LTC) Examination Blueprint/Outline

Healthcare Competency Skills/Evaluation (Page 1 of 5)

Entry Guide Lloyd s List. Lloyd s List. Global Awards Global Awards 2017

A Day In the Life of A GP..

P. William Curreri, MD President

FIRST HILL SURGERY CENTER SEATTLE, WA 1101 MADISON TOWER

Associate(s): Includes practicing health care professionals and employees working at Ascension Health facilities.

Department of Health Update

Get it Done: Rebuild Michigan GRETCHEN WHITMER S PLAN FOR SAFE ROADS, CLEAN WATER, AND A BETTER ECONOMY

EXISTING CONDITIONS

Health and Safety Policy

SPONSORSHIP. OPPORTUNITIES 2018 Programs. Building Connections. Strengthening Business. YOUR County Chamber

Transcription:

Project Name: Medical Center of Aurora Surgery Renovations Category 2: Meeting the Challenge of a Difficult Job Specialty Contractor Company Name: Ludvik Electric Co. Project Cost: $2,584,955.00 The Medical Center of Aurora (MCOA) project was a renovation of the operating rooms and ancillary spaces in a functioning hospital that provided for some extraordinary challenges in keeping the hospital open. Critical surgeries are occurring every day and sometimes into the early morning hours and patients are often brought into the emergency room requiring immediate surgery. Due to the life-and-death nature of maintaining operations in a fully functional hospital while ensuring patient and staff safety, thorough planning was vital to ensure that absolutely nothing is interrupted during a medical procedure. Ludvik Electric achieved construction excellence on this project using highly ambitious, skilled, and dedicated people. Following are the details affirming the challenges, solutions, and cooperation of a truly integrated team. MCOA was first constructed in 1974. Although it has been remodeled and added to several times, technologies and other influences continually change the medical facility needs. Because the operating rooms (ORs) were out-of-date and no longer met the required certifications, MCOA had to upgrade and reconfigure 11 ORs, pre-op and post-op areas, and other supporting spaces. The team chosen to manage the electrical work for this important project would be required to work closely with nurses and doctors to accomplish the mission. That s when Ludvik Electric was engaged to provide the knowledge and skills necessary to upgrade all 11 ORs with their associated areas in the fully operational hospital. In addition to the work in the ORs, key electrical rooms would have to be relocated. Because the feeders to those electrical rooms which would also have to be relocated were underground, relocating the electrical rooms while maintaining operations would be even more difficult. Prior to any work being performed, a phasing plan was formulated that would allow the hospital to continue to perform surgeries and other procedures during the construction. Every

phase would have to be synchronized like a clock that keeps perfect time. Each area would have to be carefully analyzed because working on one area could affect an adjacent operating room that was still in action. Once an area was completed, there was no access into the space again making the phasing even more complicated. There were several other obstacles that would affect the planning. The moving of the electrical rooms created quite a challenge. Each electrical panel feeder had to be identified to see what it fed before being moved. Each circuit had to be traced so it could be isolated before being de-energized. Each fire alarm detector, fire alarm speaker, nurse call station, communication device, and indicator light above every headwall or door had to be researched so that nothing was left to chance. Ludvik crews were required to carry hospital radios during any construction that involved power interruptions, so MCOA could immediately notify our team of any emergency. We were never allowed more than a 10-minute outage of any electrical circuits and even those had to be coordinated with everyone and with permission from the hospital staff. To mitigate the possibility of a major catastrophe, the team decided that no more than three electrical circuits could be worked on at the same time. In a hospital, there are hundreds of circuits so when you are limited to three at a time, you know that it is not going to be an easy process. The new electrical rooms would have to be constructed first and new electrical equipment installed. After the room was constructed and equipped, the new electrical room would have to be energized before the next step could occur. Finally, one circuit at a time could be deactivated in the old electrical room and then re-energized from the new one. The process was tedious but necessary to accomplish the task. There were many moving parts to this project and crucial planning was a must. In addition to the relocation of critical electrical rooms, the heart of all phasing was dictated by an area referred to as Central Sterile. Central Sterile was the area where the instruments for the ORs were held and sterilized for surgeries. If Central Sterile wasn t operating properly, procedures in the ORs were not allowed. Central Sterile became a nemesis during the process. Even though a plan was agreed to prior to starting each area, there was always something that would occur in Central Sterile that would interfere. In some instances, new sterilization equipment was delivered late or manufactured wrong, making the plan obsolete. Each time,

Ludvik s team would have to re-evaluate their options and create a new plan to keep the ORs open. When it came time to begin a phase or to perform a workaround, a Method of Procedure (MOP) that would define each step would be written and reviewed by the entire team. If the MOP was questioned or rejected by even one reviewer, the process would start over until it was approved by everyone. The MOP identified what work needed to be performed and in what amount of time. The MOP also identified each piece of material that would have to be used so the material needed would be on-site just at the right time. Material was staged in containers outside of the hospital but on-site for ready access. A mitigation plan was also part of the MOP in case something went wrong with the procedure, allowing crews to reverse their task without impacting hospital operations. In addition, other trades were working on systems that the electrical work would affect, such as mechanical systems. The impacted mechanical systems were critical to move clean air throughout the ORs, heat and cool each space, and provide medical gas where required. MOPs became the bible for the electrical construction process. And oh, by the way, have you ever seen what s above a ceiling in a hospital? The ceilings were already packed with existing mechanical piping, plumbing, and other electrical systems. Finding space and sharing it with other trades was a challenge. But working closely with our trade partners and knowing that the end goal was for everyone s benefit, we were able to make alliances and found great cooperation. Due to the space restrictions in the ceilings and the schedules in which the work had to be performed, more workers had to be placed in a small area. Some of this could be mitigated by working multiple shifts, but much of the work had to be performed with multiple trades in a tight quarters. Again with mutual respect and coordination, Ludvik worked with the other trades as if in a well-choreographed dance performance worthy of a golden buzzer on America s Got Talent. While working in a hospital, another issue is the possibility of contamination and infection not just of a patient, but of construction personnel working above the ceiling. Therefore, stringent sanitary and Infection Control Risk Assessment (ICRA) policies made for difficult installation of materials in ceilings were utilized. Much of the installation had to be performed wearing protective clothing and using an ICRA cart to isolate contaminants. This

made for a slow installation process, especially in combination with the time, material, and operational constraints. As always, safety was a top priority to Ludvik Electric. By using pre-task plans (PTPs) each morning, we were able to communicate our goals for the day s tasks and identify safety issues that could arise, specific to the tasks being performed. Lock out/tag out procedures were vital to the safety of our craft. Many circuits remained live during construction and NFPA 70E had to be strictly adhered to while keeping three electrical systems in the hospital working (Normal, Emergency, and Critical). The systems had to be monitored extremely closely for patient and staff safety as well. Ludvik Electric is proud to have performed all throughout without a single safety incident and no lost time. Ludvik Electric did an outstanding job on The Medical Center of Aurora project. The electrical scope on this project was extremely difficult. The phasing proved to be a challenge as we had to keep several ORs operational during construction. This involved several critical electrical shutdowns that had to be scheduled during off-hours, with no room for error. Ludvik planned, and executed these shutdowns to perfection. One of the most difficult things was the relocation of an entire electrical room to make way for a new OR. The electrical feeds to and from this room all ran underground, which made it even more challenging. Just like the shutdowns, Ludvik came up with an excellent plan for this relocation, and even finished it one week ahead of schedule. It was a pleasure having Ludvik as our electrician. I would work with them again on any project! -Curtis Holbrook CHC, ASHE HCC, Superintendent, Layton Construction