SECTION DEMONSTRATION AND TRAINING

Similar documents
NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

UNIFIED FACILITIES GUIDE SPECIFICATION

FACILITIES MANAGEMENT

A. General provisions and other electrical systems are specified in other Sections of Division 26.

Design/Builder Qualifications Supplement (DBQS) Instructions. GENERAL INSTRUCTIONS UF-583, Ground Floor Renovation (Basic Science Bldg)

EQUIPMENT PURCHASE ORDER ADDENDUM BETWEEN UNIVERSITY OF NORTH CAROLINA HOSPITALS AND. Purchase Order Number

Design/Builder Qualifications Supplement (DBQS) Instructions

NOTE ON PERFORMANCE TESTING

ADVERTISEMENT OF PUBLIC NOTICE

January 2, 2018 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES

CITY OF GASTONIA REQUEST FOR LETTER OF INTEREST (LOI)

The University of North Carolina at Charlotte Facilities Management 9201 University City Blvd. Charlotte, N.C TEL: 704/

Student Technology Fee AY 2016 Tech Initiatives Proposal Form. DUE April 11, 2016

2015 Ohio Valley ABC Excellence in Construction Awards Project Entry Requirements and Forms

May 18, 2016 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES

Request for Qualifications No LEWIS AND CLARK HIGH SCHOOL Classroom Addition Project

SALADO INDEPENDENT SCHOOL DISTRICT

econsult econsult Introduction & Training Manual

REQUEST FOR QUALIFICATIONS PROJECT AND CONSTRUCTION MANAGEMENT CONSULTANT

APPENDIX 2. TRAINING SUPPORT PACKAGE STATEMENT OF WORK (SOW) FOR IMPROVED ENVIRONMENTAL CONTROL UNITS (9/18/36K IECUs)

FLIGHT ATTENDANT TRAINING MANUAL

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents

Associated with the District s Measure A Bond Program and Facilities Improvement Projects

Congress required the Secretary of DOT to prescribe regulations to establish a program requiring the certification of railroad train conductors.

NEW HAVEN UNIFIED SCHOOL DISTRICT REQUEST FOR BID

APPENDIX D CHECKLIST FOR PROPOSALS

TEXAS DEPARTMENT OF TRANSPORTATION INSPECT, SAMPLE, AND TEST FOR ASBESTOS CONTAINING MATERIAL AND MONITOR ABATEMENT PROJECTS PUBLICATION

REQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services

Construction Manager Qualifications Supplement (CMQS)

SANTA ROSA CITY SCHOOLS DISTRICT. 211 Ridgway Avenue Santa Rosa, CA Request for Proposals For Architectural Services

RFP for 2015 E-Rate Funded Wireless Upgrade Project at Four Locations In Thomasville City Schools RFP Reference# 2015Wireless Cabling Contact Mike

MISSISSIPPI STATE UNIVERSITY. Request for Proposals (RFP) Network Video Solution Package

Florida International University Project Fact Sheet Construction Manager Continuing Services Contact

a remote pharmacy is not necessarily intended to provide permanent??? how do we make it so that it may be only for limited duration.

FARMERSVILLE INDEPENDENT SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS FOR ARCHITECT SERVICES

Dakota County Technical College. Pod 6 AHU Replacement

REQUEST FOR PROPOSALS

CITY OF HONDO ENGINEERING REQUEST FOR QUALIFICATIONS

REQUEST FOR ARCHITECTURAL SERVICES ACTIVITY CENTER

FACILITIES MANAGEMENT

BISHOP CONSOLIDATED INDEPENDENT SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS FOR ARCHITECT

Instructional Improvement Grants 1

GOOSE CREEK CONSOLIDATED INDEPENDENT SCHOOL DISTRICT PURCHASING DEPARTMENT

SERVICE BULLETIN TRANSMITTAL SHEET HC-SB Blade - Secondary Windings on ( )7690 and ( )7890 Composite Blades

REQUEST FOR PROPOSALS For. Mobile Kitchen Consulting Services. for the. HOUSING AUTHORITY OF THE CITY of SAN BUENAVENTURA

REQUEST FOR QUALIFICATIONS AS-NEEDED CONSULTING PROJECT MANAGER

Salida School District, R-32-J Central Administration Office 310 East 9 th Street Salida, Colorado 81201

REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC)

WarmWise Business Custom Rebates Program Manual

Southern California Chapter 2017 Project Achievement Awards

REQUEST FOR QUALIFICATIONS

ICU Design Citation Release Statement

Facilities Condition Assessment

SOLICITATION NO: 15-1 REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES FOR NEW ELEMENTARY SCHOOL #3

Brachytherapy-Radiopharmaceutical Therapy Quality Management Program. Rev Date: Feb

Request for Proposals (RFP) for Police Body Worn Camera Systems and Video Storage Solutions For City of Boulder City, Nevada

Aboriginal Community Capital Grants Program Guide

EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR CALL CENTER SERVICES RFP EM Date Issued: March 15, 2018

FLORIDA DEPARTMENT OF TRANSPORTATION

REQUEST FOR PROPOSALS

City of Waterloo, Wisconsin. Request for Proposals. Municipal Engineering Services

Table of Contents OVERVIEW... 2 COAST GUARD GRANT PRODUCT GUIDELINES... 2 COAST GUARD MEDIA GUIDELINES FOR BOATING INFORMATION...

Westside Community Schools Request for Qualifications Architectural Design and Engineering Services Prairie Lane Elementary School March 1, 2018

EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR TECHNICAL SERVICES TO DEVELOP A SPREADSHEET TOOL

This request for qualifications seeks the following type of service providers:

Vancouver Film School BC High School Scholarship Competition Application Kit

Broadcast Diversity Scholarship Rules and Instructions. To be eligible for a Sinclair Broadcast Diversity Scholarship, an applicant must be:

1. Perform maintenance tasks associated with L120 and SMB actuators: 3. Evaluate L120 and SMB actuators for correct operation.

CITY OF GOLDEN, COLORADO Parks and Recreation Department

Outside of Deadwood Grant Fund

JOB DESCRIPTION: VILLAGE CLERK/PLANNER

EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR Forward Capacity Market Support Services RFP NUMBER EM

A. Must be a student member of AAa/e. (apply online at and click on Membership )

Wrong PSV Found Installed in Field

Request for Qualifications

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY

Washington County Public Works, Building Services

MINNEAPOLIS PARK POLICE DEPARTMENT

MINNESOTA STATE COLLEGES AND UNIVERSITIES

Big Brothers Big Sisters

2014 Construction Management Project Achievement Awards

Atkins Library Study Request for Proposal

Request for Proposal. WEBSITE DESIGN and CONTENT MANAGEMENT SERVICES

DESIGN DRAFTING COMPETITION

Marion County Public Library System Policy # 4 Meeting Room Policy

Attention Design Firms

Defective Backhoe Breaks Line

ABSTRACT SUBMISSION GUIDELINES

Call for abstracts. Submission deadline: 31 st October Submission guidelines

ADDENDUM NUMBER 02 TO THE BID DOCUMENTS. BID NUMBER: SJCC Parking Garage LED Lighting Retrofit EVERGREEN VALLEY COLLEGE

Project Excellence In Construction Awards

Approved for public release. Distribution is unlimited.

Documentation Training for Blood Product Administration At Hospital Corporation of America (HCA)

POSITION DESCRIPTION AND QUALIFICATIONS Water Treatment Plant Operator I

Request for Proposals for Construction Manager at Risk Watertown Community Center

Historic Preservation Special Category Application Webinar

EXHIBIT A. SCOPE OF SERVICES For EMERGENCY MANAGEMENT SERVICES. Revised 3/10/15

Passaic County Open Space, Farmland, & Historic Preservation Trust Fund

Request for Qualifications Construction Manager

Transcription:

SECTION 01 79 00 DEMONSTRATION AND TRAINING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section includes administrative and procedural requirements for instructing Owner's personnel, including the following: 1. Demonstration of operation of systems, subsystems, and equipment by Contractor and/or Subcontractor responsible for installation. Training shall not be a part of start-up or commissioning processes. 2. Training in operation and maintenance of systems, subsystems, and equipment. 3. Demonstration and training video recordings. 1.3 INFORMATIONAL SUBMITTALS A. Instruction Program: Submit outline of instructional program for demonstration and training, including a list of training modules and a schedule of proposed dates, times, length of instruction time, and instructors' names for each training module. Include learning objective and outline for each training module. 1. Indicate proposed training modules using manufacturer-produced demonstration and training video recordings for systems, equipment, and products in lieu of video recording of live instructional module. B. Qualification Data: For facilitator, instructor, and videographer. C. Attendance Record: For each training module, submit list of participants and length of instruction time. D. Evaluations: For each participant and for each training module, submit results and documentation of performance-based test. DEMONSTRATION AND TRAINING 01 79 00-1

1.4 CLOSEOUT SUBMITTALS A. Demonstration and Training Video Recordings: Submit 1 electronic copy within 21 days of end of each training module. 1. Identification: On each copy, provide an applied label with the following information: a. Name of Project. b. Name and address of videographer. c. Name of Architect. d. Name of Construction Manager. e. Name of Contractor. f. Date of video recording. 2. Transcript: Prepared and bound in format matching operation and maintenance manuals. Mark appropriate identification on front and spine of each binder. Include a cover sheet with same label information as the corresponding video recording. Include name of Project and date of video recording on each page. 3. Transcript: Prepared in PDF electronic format. Include a cover sheet with same label information as the corresponding video recording and a table of contents with links to corresponding training components. Include name of Project and date of video recording on each page. 4. At completion of training, submit complete training manual(s) for Owner's use prepared in same PDF file format required for operation and maintenance manuals specified in Section 01 7823. 1.5 QUALITY ASSURANCE A. Facilitator Qualifications: A firm or individual experienced in training or educating maintenance personnel in a training program similar in content and extent to that indicated for this Project, and whose work has resulted in training or education with a record of successful learning performance. B. Instructor Qualifications: A factory-authorized service representative, complying with requirements in Section 01 4000 "Quality Requirements," experienced in operation and maintenance procedures and training. C. Videographer Qualifications: A professional videographer who is experienced photographing demonstration and training events similar to those required. D. Preinstruction Conference: Conduct conference at Project site to comply with requirements in Section 01 3100 "Project Management and Coordination." Review methods and procedures related to demonstration and training including, but not limited to, the following: 1. Inspect and discuss locations and other facilities required for instruction. DEMONSTRATION AND TRAINING 01 79 00-2

2. Review and finalize instruction schedule and verify availability of educational materials, instructors' personnel, audiovisual equipment, and facilities needed to avoid delays. 3. Review required content of instruction. 4. For instruction that must occur outside, review weather and forecasted weather conditions and procedures to follow if conditions are unfavorable. 1.6 COORDINATION A. Coordinate instruction schedule with Owner's operations. Adjust schedule as required to minimize disrupting Owner's operations and to ensure availability of Owner's personnel. B. Coordinate instructors, including providing notification of dates, times, length of instruction time, and course content. C. Coordinate content of training modules with content of approved emergency, operation, and maintenance manuals. Do not submit instruction program until operation, maintenance, and warranty data has been reviewed and approved by Architect and Owner. 1.7 INSTRUCTION PROGRAM A. Program Structure: Develop an instruction program that includes individual classroom and field training modules for each system and for equipment not part of a system, as required by individual Specification Sections. B. Training Modules: Develop a learning objective and teaching outline for each module. Include a description of specific skills and knowledge that participant is expected to master. For each module, include instruction for the following as applicable to the system, equipment, or component: 1. Basis of System Design, Operational Requirements, and Criteria: Include the following: a. System, subsystem, and equipment descriptions. b. Performance and design criteria if Contractor is delegated design responsibility. c. Operating standards. d. Regulatory requirements. e. Equipment function. f. Operating characteristics. g. Limiting conditions. h. Performance curves. 2. Documentation: Review the following items in detail: DEMONSTRATION AND TRAINING 01 79 00-3

a. Emergency manuals. b. Systems and equipment operation manuals. c. Systems and equipment maintenance manuals. d. Product maintenance manuals. e. Materials required for required scheduled maintenance f. Project Record Documents. g. Identification systems. h. Warranties and bonds. i. Maintenance service agreements and similar continuing commitments 3. Emergencies: Include the following, as applicable: a. Instructions on meaning of warnings, trouble indications, and error messages. b. Instructions on stopping. c. Shutdown instructions for each type of emergency. d. Operating instructions for conditions outside of normal operating limits. e. Sequences for electric or electronic systems. f. Special operating instructions and procedures. 4. Operations: Include the following, as applicable: a. Startup procedures. b. Equipment or system break-in procedures. c. Routine and normal operating instructions. d. Regulation and control procedures. e. Control sequences. f. Safety procedures. g. Instructions on stopping. h. Normal shutdown instructions. i. Operating procedures for emergencies. j. Operating procedures for system, subsystem, or equipment failure. k. Seasonal and weekend operating instructions. l. Required sequences for electric or electronic systems. m. Special operating instructions and procedures. 5. Adjustments: Include the following: a. Alignments. b. Checking adjustments. c. Noise and vibration adjustments. d. Economy and efficiency adjustments. 6. Troubleshooting: Include the following: a. Diagnostic instructions. b. Test and inspection procedures. 7. Maintenance: Include the following: DEMONSTRATION AND TRAINING 01 79 00-4

a. Inspection procedures. b. Types of cleaning agents to be used and methods of cleaning. c. List of cleaning agents and methods of cleaning detrimental to product. d. Procedures for routine cleaning e. Procedures for preventive maintenance. f. Procedures for routine maintenance. g. Instruction on use of special tools. 8. Repairs: Include the following: a. Diagnosis instructions. b. Repair instructions. c. Disassembly; component removal, repair, and replacement; and reassembly instructions. d. Instructions for identifying parts and components. e. Review of spare parts needed for operation and maintenance. 1.8 PREPARATION A. Assemble educational materials necessary for instruction, including documentation and training module. Assemble training modules into a training manual organized in coordination with requirements in Section 01 7823 "Operation and Maintenance Data." B. Set up instructional equipment at instruction location. 1.9 INSTRUCTION A. Facilitator: Engage a qualified facilitator to prepare instruction program and training modules, to coordinate instructors, and to coordinate between Contractor and Owner for number of participants, instruction times, and location. B. Engage qualified instructors to instruct Owner's personnel to adjust, operate, and maintain systems, subsystems, and equipment not part of a system. 1. Owner will furnish Contractor with names and positions of participants. C. Scheduling: Provide instruction at mutually agreed on times. For equipment that requires seasonal operation, provide similar instruction at start of each season. 1. Schedule training with Owner and Commissioning Agent with at least 14 days' advance notice. D. Training Location and Reference Material: Conduct training on-site in classroom setting and in the completed and fully operational facility using the actual equipment in-place. Conduct training using final operation and maintenance data submittals. DEMONSTRATION AND TRAINING 01 79 00-5

E. Evaluation: At conclusion of each training module, assess and document each participant's mastery of module by use of an oral, a written, or a demonstration performance-based test. F. Cleanup: Collect used and leftover educational materials and remove from Project site. Remove instructional equipment. Restore systems and equipment to condition existing before initial training use. 1.10 DEMONSTRATION AND TRAINING VIDEO RECORDINGS A. General: Engage a qualified commercial videographer to record demonstration and training video recordings. Record each training module separately. Include classroom instructions and demonstrations, board diagrams, and other visual aids, but not student practice. 1. At beginning of each training module, record each chart containing learning objective and lesson outline. B. Digital Video Recordings: Provide high-resolution, digital video in approved Owner format, produced by a digital camera with minimum sensor resolution of 12 megapixels and capable of recording in full HD mode with vibration reduction technology. 1. Submit video recordings on approved media. 2. File Hierarchy: Organize folder structure and file locations according to Project Manual table of contents. Provide complete screen-based menu. 3. File Names: Utilize file names based on name of equipment generally described in video segment, as identified in Project specifications. 4. Contractor and Installer Contact File: Using appropriate software, create a file for inclusion on the equipment demonstration and training recording that describes the following for each Contractor involved on the Project, arranged according to Project Manual table of contents: a. Name of Contractor/Installer. b. Business address. c. Business phone number. d. Point of contact. e. Email address. C. Recording: Mount camera on tripod before starting recording, unless otherwise necessary to adequately cover area of demonstration and training. Display continuous running time. 1. Film training session(s) in segments not to exceed 15 minutes. a. Produce segments to present a single significant piece of equipment per segment. b. Organize segments with multiple pieces of equipment to follow order of Project Manual table of contents. DEMONSTRATION AND TRAINING 01 79 00-6

c. Where a training session on a particular piece of equipment exceeds 15 minutes, stop filming and pause training session. Begin training session again upon commencement of new filming segment. D. Light Levels: Verify light levels are adequate to properly light equipment. Verify equipment markings are clearly visible prior to recording. 1. Furnish additional portable lighting as required. E. Narration: Describe scenes on video recording by audio narration by microphone while video recording is recorded or by dubbing audio narration off-site afterwards. Include description of items being viewed. F. Transcript: Provide a transcript of the agenda and narration. Display images and running time captured from videotape opposite the corresponding narration segment. G. Preproduced Video Recordings: Provide video recordings used as a component of training modules in same format as recordings of live training. PART 2 - PRODUCTS PART 3 - EXECUTION END OF SECTION DEMONSTRATION AND TRAINING 01 79 00-7