Appendix F. BCDC Consistency Determination

Similar documents
PUBLIC NOTICE Application for Permit

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

NOW, THEREFORE, the Navy and the School District hereby agree as follows:

M E M O R A N D U M. The Project and the items that the Commission will be considering at the June 15 th, 2010 meeting are summarized below.

Security Zones; Naval Base Point Loma; Naval Mine Anti Submarine. SUMMARY: The Coast Guard is increasing a portion of an existing

Date SUBJECT: REQUEST FOR PROPOSAL FOR DEVELOPMENT OF THE WILMINGTON OIL FIELD. Dear Vendor:

PART II THE COASTAL ZONE MANAGEMENT ACT

COASTAL CONSERVANCY. Staff Recommendation June 16, 2005 MALIBU ACCESS: DAN BLOCKER BEACH. File No Project Manager: Marc Beyeler

Final Supplemental Environmental Impact Statement APPENDIX C: COORDINATION PLAN

PINELLAS COUNTY DEO#12-1ESR

MEMORANDUM. July 7, 2016

PUBLIC NOTICE REQUEST FOR PERMISSION TO ALTER A U.S. ARMY CORPS OF ENGINEERS PROJECT PURSUANT TO 33 U.S.C. SECTION 408

DEPARTMENT OF THE ARMY. U.S. Army Corps of Engineers, Los Angeles District. Regulatory Division

Commandant. Subj: EXTENSION OF IMPLEMENT A non SCHEDULE FOR VESSELS SUBJECT TO BALLAST WATER MANAGEMENT (BWM) DISCHARGE STANDARDS

National Environmental Policy Act/California Environmental Quality Act Scoping Meeting Summary

TITLE 14 COAST GUARD This title was enacted by act Aug. 4, 1949, ch. 393, 1, 63 Stat. 495

Final Environmental Restoration Program Recordkeeping Manual

Frequently Asked Questions (FAQs) and SEIS Fact Sheet

SUPPLEMENTAL INFORMATION PACKET FOR Anti-Discriminatory Housing Policy

Florida Job Growth Grant Fund Public Infrastructure Grant Proposal

MEMORANDUM OF UNDERSTANDING LANDSCAPE CONSERVATION OF NATURAL RESOURCES IN CALIFORNIA THROUGH THE CALIFORNIA CONSERVATION PARTNERSHIP

Mission Bay Master Plan File No M September 27, 1990

Subj: STABILITY RELATED REVIEW PERFORMED BY THE AMERICAN BUREAU Of SHIPPING FOR U.S. FLAG VESSELS

PUBLIC NOTICE Application for Permit

Memo to the Planning Commission INFORMATIONAL ONLY

Exemptions from Environmental Law for the Department of Defense: Background and Issues for Congress

Hunters Point Radiological Cleanup FAQs

Department of Defense INSTRUCTION

Board of Supervisors' Agenda Items

U.S. Army Corps of Engineers Navigation Program Update

REPORT TO MAYOR AND COUNCIL

Memo to the Planning Commission HEARING DATE: APRIL 12, 2012 Continued from the March 1, 2012 hearing

COORDINATION PLAN. September 30, 2011

National Environmental Policy Act; Center Master Plan Update; Kennedy Space Center. AGENCY: National Aeronautics and Space Administration (NASA)

DOD INSTRUCTION DOD LOW-LEVEL RADIOACTIVE WASTE (LLRW) PROGRAM

Foreword. Mario P. Fiori Assistant Secretary of the Army (Installations and Environment)

*NOTICE * THIS APPLICATION WAS REVISED IN JULY 2016 PLEASE READ CAREFULLY -

San Francisco County Transportation Authority Proposition K Sales Tax Program Allocation Request Form

AnJEDISON 10 CFR CFR March 31, ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C.

MEMORANDUM OF UNDERSTANDING ON IMPLEMENTATION OF THE SOUTH BAY SALT POND RESTORATION PROJECT

Safety Zone, Barrel Recovery, Lake Superior; Duluth, MN. SUMMARY: The Coast Guard is establishing a temporary safety zone

General Plan Referral

LOCAL GOVERNMENT COMPREHENSIVE PLAN AMENDMENTS HENDRY COUNTY

Port of San Diego Resiliency in Terminal Operations at Tenth Avenue Marine Terminal Renée Yarmy, Program Manager, Energy & Sustainability

2100 Second St., SW Washington, DC Staff Symbol: G-MEP Phone: (202) United States U.S. Coast Guard NOV /11

PUBLIC BEACH & COASTAL WATERFRONT ACCESS PROGRAM. NC Department of Environmental Quality Division of Coastal Management

ACCF Diabetes Collaborative Registry Program Requirements v1.2 Posted on 9/14/2015

NOTICE OF AVAILABILITY TIERED DRAFT ENVIRONMENTAL IMPACT REPORT FOR THE SAN FRANCISCO STATE UNIVERSITY CREATIVE ARTS & HOLLOWAY MIXED-USE PROJECT

Seawall Earthquake Safety + Disaster Prevention Program Community Meeting June 21, 2018

DEPARTMENT OF THE ARMY GENERAL PERMIT

Fiscal Year 2011 Defense Environmental Programs Annual Report to Congress

Agenda Date: 2/28/18 Agenda Item: BA CLEAN ENERGY ORDER

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL

Army. Environmental. Cleanup. Strategy

MEMORANDUM OF COOPERATION BETWEEN THE PEACE CORPS AND NORTH CAROLINA STATE UNIVERSITY

GULF COAST ECOSYSTEM RESTORATION COUNCIL COMPREHENSIVE PLAN COMPONENT PROGRAM

Religious Ministry Support REFERENCE / AUTHORITYSOURCE DOCUMENT Information Sheet

City of Malibu Request for Proposal

PUBLIC NOTICE. Town of Ocean Isle Beach Attn: Ms. Debbie Smith, Mayor 3 West Third Street Ocean Isle Beach, North Carolina 28469

PUBLIC NOTICE. Attn: Mr. Christopher Layton 1200 Duck Road Duck, North Carolina CB&I 4038 Masonboro Loop Road Wilmington, North Carolina 28409

DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

SOUTHWEST LRT (METRO GREEN LINE EXTENSION)

Department of Homeland Security Office of Inspector General. The United States Coast Guard's Program for Identifying High Interest Vessels

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

FMFADA Deputy Director, Operations

Appendix C Request for Consideration of Plan Change Form Appendix D Controlled Copy Registration Transfer Form

Department of Defense DIRECTIVE

CITY OF FRESNO AIRPORTS DEPARTMENT REQUEST FOR QUALIFICATIONS (RFQ) FOR CONSULTING SERVICES FRESNO YOSEMITE INTERNATIONAL AIRPORT

SUMMARY: By this direct final rule, the Coast Guard is removing. the regulation for the safety zone at Snake Island, also known as

PURPOSE Appendix A BACKGROUND

EDWARDS AIR FORCE BASE ENVIRONMENTAL RESTORATION PROGRAM RESTORATION ADVISORY BOARD CHARTER

Updating the BRAC Cleanup Plan:

APPLICANT S AGENT RESOLUTION TO BEGIN THE DISASTER RECOVERY PROCESS WITH FEMA AND CAL-OES FOR THE JANUARY 2017 STORMS

Director, Department of Conservation and Development Contra Costa County, CA

2018 SUMMER COLLEGE INTERNSHIPS

Subj: EXTENSION OF IMPLEMENTATION SCHEDULE FOR APPROVED BALLAST WATER MANAGEMENT METHODS, Revision 1

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 1104 NORTH WESTOVER BOULEVARD, UNIT 9 ALBANY, GEORGIA SEPT 1ER

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 WEST OGLETHORPE AVENUE SAVANNAH, GEORGIA

2017 Nationwide Permit Reissuance

*NOTICE * THIS APPLICATION WAS REVISED IN JUNE 2015 PLEASE READ CAREFULLY -

Funding Availability for Small Shipyard Grant Program; Application Deadline. AGENCY: Maritime Administration, Department of Transportation

REPORTING AND INVESTIGATION OF MARINE CASUALTIES WHERE THE UNITED STATES IS A SUBSTANTIALLY INTERESTED STATE (SIS)

The City of Franklin has already expressed its intention to opt-in and administer the program locally.

Charter Department of Defense Military Family Readiness Council

A-3 RECLAMATION NOTICE OF AVAILABILITY

Exemptions from Environmental Law for the Department of Defense: Background and Issues for Congress

CHAPTER 6 PUBLIC AND AGENCY OUTREACH

An Invitation: Establishing a community forest with the U.S. Forest Service

Pacific States/British Columbia Oil Spill Task Force. Mutual Aid Agreement

REPORT. To the Honorable Mayor and City Council From the City Manager. May 9, 2016

POLICY AND PROCEDURES MANUAL

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

PUBLIC NOTICE Application for Permit

INTERGOVERNMENTAL COORDINATION ELEMENT:

JOINT PUBLIC NOTICE. July 16, Leake Avenue Post Office Box 4313 New Orleans, Louisiana Baton Rouge, Louisiana

Department of Defense DIRECTIVE

2018 SUMMER COLLEGE INTERNSHIPS

Environmental Restoration Program

Transcription:

Appendix F BCDC Consistency Determination

This page intentionally left blank.

DEPARTMENT OF THE NAVY BASEREAUGNMENTANDCLOSURE PROGRAM MANAGEMENT OFFICE WEST 1455 FRAZEE RD, SUITE 900 SAN DIEGO, CA 92108-4310 Ser BPMOW.RB\O I 04 ~ 1)1"1,',': r _ f~ ~ 2[J1 Ms. Jaime Michaels Coastal Program Analyst San Francisco Bay Conservation and Development Commission 50 California Street, Suite 2600 San Francisco, CA 94111 Dear Ms. Michaels: This letter is to document the conclusions of our discussions concerning a phased approach to Coastal Zone Management Act (CZMA) compliance at Hunters Point Shipyard (HPS). As we discussed, the U.S. Department of the Navy (Navy) is preparing a Supplemental Environmental Impact Statement (SEIS) for the disposal of surplus property at HPS San Francisco, California and its subsequent reuse by the City and County of San Francisco, California in a manner consistent with the amended 2010 Hunters Point Naval Shipyard Redevelopment Plan (20 I 0 Reuse Plan). The Navy is required to dispose of HPS in accordance with Public Law 101-510, the Defense Base Closure and Realignment Act of 1990, as amended. With regard to federal lands, the CZMA provides that "lands the use of which is by law subject solely to the discretion of or which is held in trust by the Federal Government" are excluded from the coastal zone. However, federal activities must be consistent to the maximum extent practicable with the provisions of the federally approved state coastal management program, which includes the San Francisco Bay Plan (Bay Plan) and related San Francisco Bay Area Seaport Plan (Seaport Plan). The Navy submitted a consistency determination to BCDC on January 12, 1999 for the HPS Redevelopment Plan analyzed in the Navy's 2000 FEIS. The BCDC issued a Letter of Agreement for Consistency Determination Number CN 1-99 on 8 March 1999. For this SEIS, the Navy has received two letters from BCDC that provided comments on the scope of the study (letter of October 24,2008) and comments on the draft SEIS (letter of April 12,2011). The Navy considered these comments and made various changes to the SEIS document based on your concerns. The Navy's action is disposal of surplus property from federal ownership. Following disposal, the property will no longer be owned or managed by the federal government and the City and County of San Francisco would be responsible for implementing the 2010 Reuse Plan and the future owner or developer of the property would be responsible for redeveloping the property.

Ser BPMOW.RB\0104 DEC 9 2011 The Navy's action, the disposal of real property from federal ownership, would have no effect on land or water use or an approved coastal program. However, the subsequent redevelopment of the property by a future property owner or developer in a manner consistent with the 2010 Reuse Plan would potentially have an effect. Specifically, the 2010 Reuse Plan proposes land uses within a small portion of the HPS property (approximate 55-ac [22-ha] area located within HPS parcels D-I and E [see Attachment I]), that are inconsistent with the existing Bay Plan, Seaport Plan, and the previous 1999 Consistency Determination. The Bay Plan and Seaport Plan designate this portion of the project site as a "Port" Priority Use Area. Within the port priority use area, marine terminals are designated for receiving and shipping either containerized or bulk cargo. The 2010 Reuse Plan proposes public and recreation land uses for this land area. As such, implementation of the 20 I 0 Reuse Plan would be inconsistent with the "Port" Priority Use designations in the current Bay Plan and Seaport Plan. No other HPS parcel or proposed land use affect a priority use area or are inconsistent with the goals and policies of the Bay Plan or Seaport Plan. The existing "Port" Priority Use designation at the project site does not reflect current economic conditions affecting the maritime shipping industry in San Francisco and the fact that other existing and planned port facilities in the Bay Area (e.g., Port of Oakland) are being managed to meet current and anticipated port related transportation demand (CBRE Consulting and Martin Associates 2009). In view of the lack of anticipated demand for maritime cargo facilities and to make the proposed 2010 Reuse Plan consistent with the Bay Plan and Seaport Plan, San Francisco Redevelopment Authority is currently seeking an amendment to the Bay Plan and Seaport Plan to delete the "Port" Priority Use and marine terminal designations from the HPS property, and make conforming changes to the Bay Plan and Seaport Plan maps, map notes, policies and tables (BCDC Staff Memo of November 18,2011). It is the Navy's understanding that the amendment would be completed by mid-2012. Following such amendment, the 2010 Reuse Plan would be consistent with the Bay Plan and Seaport Plan. Therefore, as we discussed on October 14,2011, and on November 28,2011, the Navy will take the steps described below to ensure compliance with the CZMA. The HPS property will be disposed in phases by the Navy and it is anticipated that parcels 0-1 and E, which includes the inconsistent "Port" Priority Use area, would be disposed of in a later phase. In the event that the Bay Plan and Seaport Plan are not amended before the portions of the project site designated as "Port" Priority Use (i.e., parcels D-l and E) are conveyed, then a new consistency determination, and if necessary an amendment to the 1999 Letter of Agreement, may be required from BCDC before disposing of the property. Prior to the transfer of parcels D-l and E, the Navy will review and, if necessary, provide BCDC with a consistency determination in accordance with applicable provisions of the CZMA. 2

I Ser BPMOW.RB\O I04 DEC 9 2011 Following disposal from federal ownership, the HPS property would be within the BCDC's jurisdiction and the future property owner and/or developer of the property would be required to obtain any applicable BCDC permits and other local, state, and federal approvals prior to implementing the 20 I 0 Reuse Plan. We look forward to continued collaboration with BCDC in completion of the Navy's environmental planning process. If you have any questions, please contact Mr. Ron Bochenek at (619) 532-0906 or rjbochenek@tecinc.com or ronald.bochcnek.ctr@navy.mil. Thank you for your attention and prompt response. Base Closure Manager By direction of the Director Attachments: As stated 3

ATTACHMENT 1 Proposed "Port" Priority Use Changes Hunters Point Shipyard, San Francisco, CA * SAN * I" h'\nclsco Brt'liba I It"...--' Hunters Point Shipyard South San Frano... n LEClEND F\'icrtyUses IlIIlJllllI WlLctiFE REFLGE _ WATERFROf{]" PARK, BEACH ~ WATER-RELATED INDUSTRY ~ PO[jT I,Xil AIRPORT ~ Ti[\A.lMARSH c=j SAlTPmjD,MM14GEDWETLAND :I< VISTA P01-4T ""111 BnH!',' --- SCH~ICDRIVE -- FREEWAl, RAILROI>D Millbrap I

STATE OF CAUJRNIA SAN F RANCISCO BAY CONSERVATION AND DEVELOPMENT COMMISSION THIRTY VAN NESS AVENUE, SUITE 201 1 SAN FRANCISCO. CALIFORNIA 94102-6080 PHONE (415) 5d-3686 GRAY DAVIS. Govenwr d LETlER OF AGREEMENT FOR CONSISTENCY DETERMINATION NO. CN 1-99 March 8,1999 United States Department of the Navy Engineering Field Activity, West Naval Facilities Engineering Command 900 Commodore Drive San Bruno, California 94066-5006 ATTENTION: John H. Kennedy, Head, Environmental and Installations Planning Ladies and Gentlemen: 1. Agreement A. The San Francisco Bay Conservation an^. Development CommiSsLan agrees with the detennination of the United States Department of the Navy that the following project is consistent with the Commission's Amended Management Program for San Francisco Bay: location: Description: In the Bay and within the 100-foot shoreline band, in the southeast portion of the San Francisco waterfront at the Hunters Point Shipyard, in the City and County of San Francisco. Transference of the Hunters Point Shipyard to the City and County of San Francisco and the San Francisco Redevelopment Agency for local reuse of the property. Only maritime activities consistent with the port priority use designation would occur at the port priority use area at the Hunters Point Shipyard. A variety of uses would occur on the property located outside of the port priority use am. Environmental response actions necessary for reuse of the Hunters Point Shipyard, such as the clean-up of contaminated sediments, would occur independently from the property transfer pursuant to the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). Although under CERCLA the Navy does not formally prepare and submit a consistency determination for the selected response action, the Navy is required by law to meet the substantive requirements of the Coastal Zone Management Act and would do so by considering the McAteer-Petris II. V

c b LmER OF AGREEMENT FOR CONSISTENCY DETERMINATION NO. CN 1-99 United States Department of the Navy Engineering Field Activity, West Naval Facilities Engineering Command March 8,1999 Page 2 Act and the Bay Plan policies for any work in BCDC's jurisdiction. All reuse activities occurring after the property transfer would be subject to BCDC permitting requirements. B. This agreement is given based on the information submitted by or on behalf of the United States Department of the Navy, in its letters dated January 12,1999, and February 16,1999. t U c II. Findings and Declarations A. On January 12,1999, and February 16,1999, the United States Department of the Navy submitted a description of the project and requested that the Commission concur that the proposed project is consistent with its Amended Coastal Zone Management Program for San Francisco Bay. Based on qe information contained in those materials, the proposed project is hereby found to be consistent with the provisions of the McAteer-PetriS Act and the policies of the San Francisco Bay Plan in that: (1) the designated port priority use area would only be used for maritime activities consistent with the Seaport Plan after the transfer of the Hunters Point Shipyard to the City and County of San Francisco and the San Francisco Redevelopment Agency for local reuse of the property; (2) the environmental response actions required for reuse of the site would meet the substantive requirements of the Coastal Zone Management Act by considering the McAteer-Petris Act and the Bay Plan policies for any work in BCDC's jurisdiction; and (3) all reuse activities occurring after the property transfer would be subject to BCDC permitting requiremcnts. B. A programmatic Revised Draft Environmental Impact Statement/Environmental Impact Report, issued by the United States Department of the Navy and the City and County of San Francisco, was prepared to assess the environmental impacts of the disposal and reuse of the Hunters Point Shipyard. The document states that no adverse environmental impacts would result from the transfer of Hunters Point Shipyard from the United States Department of the Navy to the City and County of San Francisco and the San Francisco Redevelopment Agency for local muse of the ProFrty- C. The Commission, pursuant to the Coastal Zone Management Act of 1972, as amended (16 USC Section 1451), and the implementing Federal Regulations in 15 CFR Part 930, is required to review Federal projects within San Francisco Bay and agree or disagree with the Federal agency's determination that the project is consistent with the Commission's Amended Coastal Zone Management Program for San Francisco Bay. This letter constitutes such review and comment. D. This project was listed with the Commission on February 19,1999, at which time no Commissioner or other party objected to the project.

LEnER OF AGREEMENT FOR CONSISTENCY DmRMlNATlON NO. CN 1-99 United States Department of the Navy Engineering Field Activity, West Naval Facilities Engineering Command March 8,1999 Page 3 Executed in San Francisco, California, on behalf of the San Francisco Bay Conservation and Development Commission on the date first above written. 'I' WILLTRkhM Executive Director WTIAGlra cc: U.S. Army Corps of Engineers, Attn: Regulatory Functions Branch San Francisco Bay Regional Water Quality Control Board, Attn: Certification Section Environmental Protection Agency, Attn: Mike Monroe, W-3-3

This page intentionally left blank.