ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

Similar documents
ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / ADVANCED TANK ARMAMENT SYSTEM (ATAS)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Counter Narcotics Technology Program Office

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Multi-Platform Electronics

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 25 R-1 Line #165

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #90

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2000

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

PRODUCT MANAGEMENT/ PRODUCT DIRECTOR OFFICE TEAM OF THE YEAR (05 LEVEL)

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: NUCLEAR WEAPON MODERNIZATION FY 2012 OCO

UNCLASSIFIED. Cost To Complete Total Program Element ED8: Paladin Integrated Management (PIM)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

Public-Private Private Partnering

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #91

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing EF4: Integrated Broadcast System

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Air Traffic Control/Approach/Landing System (ATCALS) FY 2013 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

COST (Dollars in Millions) FY07 FY08 FY09 FY10 FY11 FY12 FY12

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Depot Maintenance (NON-IF) FY 2011 Total Estimate. FY 2011 OCO Estimate

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: FIREFINDER FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: National Security Space Office

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001

UNCLASSIFIED R-1 ITEM NOMENCLATURE

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Air Traffic Control/Approach/Landing System (ATCALS) FY 2012 OCO

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE

BMDO RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 11 R-1 Line #92

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

B. Program Change Summary: RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) FEBRUARY 2008 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Tactical Data Links. FY 2011 OCO Estimate. FY 2011 Total Estimate

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 15 R-1 Line #140

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #222

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Specialized Undergraduate Pilot Training. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: 468

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Integrated Personnel and Pay System-Army (IPPS-A) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #176

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Air Force Integrated Personnel and Pay System (AF-IPPS) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Region/Sector Operation Control Center Modernization Program

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Transcription:

BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE 5 - ENG MANUFACTURING DEV 0604649A - Engineer Mobility Equipment Development COST (In Thousands) FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate Estimate Estimate Estimate Estimate Estimate Complete Total Program Element (PE) Cost 45657 14862 9279 0 0 0 0 0 0 0 G25 M1 BREACHER DEV 45200 14862 0 0 0 0 0 0 0 0 G26 HEAVY ASSAULT BRIDGE 457 0 0 0 0 0 0 0 0 0 G29 ENGINEER VEHICLE UPGRADES 0 0 9279 0 0 0 0 0 0 0 A. Mission Description and Budget Item Justification: PLEASE NOTE: This administration has not addressed FY2003-2007 requirements. All FY 2003-2007 budget estimates included in this book are notional only and subject to change. This pogram element supports the development of new, advanced combat engineer systems that will have mobility characteristics comparable to the maneuver forces supported. The programs included in this program element are the Grizzly (M1 Breacher), the Wolverine (Heavy Assault Bridge) and the legacy Armored Vehicle Launched Bridge (AVLB). The Grizzly base vehicle is an M1 Abrams Tank chassis whereas the Wolverine base vehicle is the M1A2 System Enhancement Package (SEP) Abrams Tank chassis. The Grizzly integrates a versatile/survivable full-width mine clearing blade with automatic depth control, a power driven arm, and an armored commander's control station on the chassis. The Wolverine integrates a Military Load Class (MLC) 70 bridge spanning a 24 meter gap (26 meter bridge) with computer controlled launching mechanism and is fully FBCB2 compliant. The Engineer Vehicle Upgrades (G29) project recapitalizes the M48/M60 based AVLB. The Engineer Vehicle Upgrades (DG29) support the Legacy transition path of the Transformation Campaign Plan (TCP). 0604649A Item No. 93 Page 1 of 8 Exhibit R-2 Engineer Mobility Equipment Development 384 Budget Item Justification

BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE 5 - ENG MANUFACTURING DEV 0604649A - Engineer Mobility Equipment Development B. Program Change Summary FY 2000 FY 2001 FY 2002 FY 2003 Previous President's Budget (FY2001 PB) 57881 0 0 0 Appropriated Value 58321 15000 Adjustments to Appropriated Value 0 a. Congressional General Reductions 0 b. SBIR / STTR -1558 0 c. Omnibus or Other Above Threshold Reductions -239 0 d. Reprogramming -10665 0 e. Rescissions -202-138 Adjustments to Budget Years Since FY2001 PB 0 9279 Current Budget Submit (FY 2002/2003 PB ) 45657 14862 9279 0 Change Summary Explanation: - FY 2000 Funds reprogrammed (-$10665K) to higher priority requirements. - FY 2002/2003 Funds reprogrammed to support the AVLB recapitalization effort. 0604649A Item No. 93 Page 2 of 8 Exhibit R-2 Engineer Mobility Equipment Development 385 Budget Item Justification

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2A Exhibit) 5 - ENG MANUFACTURING DEV 0604649A - Engineer Mobility Equipment Development G25 COST (In Thousands) FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate Estimate Estimate Estimate Estimate Estimate Complete G25 M1 BREACHER DEV 45200 14862 0 0 0 0 0 0 0 0 A. Mission Description and Budget Item Justification: Not applicable for this item. B. Other Program Funding Summary: Not applicable for this item. C. Acquisition Strategy: Not applicable for this item. D. Schedule Profile: Not applicable for this item. 0604649A (G25) Item No. 93 Page 3 of 8 Exhibit R-2A M1 BREACHER DEV 386 Budget Item Justification

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2A Exhibit) 5 - ENG MANUFACTURING DEV 0604649A - Engineer Mobility Equipment Development G26 COST (In Thousands) FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate Estimate Estimate Estimate Estimate Estimate Complete G26 HEAVY ASSAULT BRIDGE 457 0 0 0 0 0 0 0 0 0 A. Mission Description and Budget Item Justification: Not applicable for this item. B. Other Program Funding Summary: Not applicable for this item. C. Acquisition Strategy: Not applicable for this item. D. Schedule Profile: Not applicable for this item. 0604649A (G26) Item No. 93 Page 4 of 8 Exhibit R-2A HEAVY ASSAULT BRIDGE 387 Budget Item Justification

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2A Exhibit) 5 - ENG MANUFACTURING DEV 0604649A - Engineer Mobility Equipment Development G29 COST (In Thousands) FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate Estimate Estimate Estimate Estimate Estimate Complete G29 ENGINEER VEHICLE UPGRADES 0 0 9279 0 0 0 0 0 0 0 A. Mission Description and Budget Item Justification:Recapitalization is the selected upgrade that renews the Armored Vehicle Launched Bridge (AVLB) Chassis and Bridge to near zero time/zero miles. Bridge is upgraded from Military Load Class (MLC) 60 to MLC 70 with complete repair of common parts. Chassis is upgraded by installing improved hydraulic, electrical, suspension and powertrain system. The MLC 70 bridge is required to safely cross the current combat fleet weighing between 60 and 70 tons. The Chassis upgrade provides maneuver force mobility, sustained operational readiness rates and logistics commonality with current/future maneuver force. AVLB recapitalizaton updates obsolete 1950's technology and eliminates associated supply and obsolesence issues. Recapitalization is fundamental to the Army Transformation Plan, improving mobility, operational readiness rates and controling fleet Operation and Support (O&S) costs. The 36 year old AVLB, which has never had a major upgrade, must complement the Wolverine to meet the assault bridging requirement of the Army Transformation Plan. Recapitalization of the AVLB ensures it is viable and supportable for another 20 years of service. It provides the capability for MLC 70 combat vehicles (Abrams Tank and HERCULES) to safely cross the full span. The current 81% AVLB readiness rate will improve to sustain the required 90% operational readiness. FY 2002 Planned Program 8703 Developmental Contract 576 Program Management Total 9279 0604649A (G29) Item No. 93 Page 5 of 8 Exhibit R-2A ENGINEER VEHICLE UPGRADES 388 Budget Item Justification

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2A Exhibit) 5 - ENG MANUFACTURING DEV 0604649A - Engineer Mobility Equipment Development G29 B. Other Program Funding Summary FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Compl Total Cost PA, WTCV, GZ3050, AVLB SLEP 0 0 0 0 0 0 0 0 0 0 C. Acquisition Strategy:The recapitalized vehicle incorporates proven current technology components to support a low risk effort. Depending on the results of a market survey this will be either a competitive contract or sole source to General Dynamics Land Systems (GDLS) who has produced the only demonstrator vehicle to date. A single development contract will be awarded to complete design integration, testing and logistics package. Testing will verify performance, durability and safety in a combined Developmental Test/Operational Test (DT/OT). In production, a contractor will be selected based on the results of a market survey. The selected contractor will integrate the procurement of hardware/kits for application at Anniston Army Depot. D. Schedule Profile FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Award Development Contract Start Combined DT/OT Complete Combined DT/OT Production Readiness Review Milestone III 2Q 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0604649A (G29) Item No. 93 Page 6 of 8 Exhibit R-2A ENGINEER VEHICLE UPGRADES 389 Budget Item Justification

ARMY RDT&E COST ANALYSIS(R-3) 5 - ENG MANUFACTURING DEV 0604649A - Engineer Mobility Equipment Development G29 I. Product Development Contract Performing Activity & Total FY 2001 FY 2001 FY 2002 FY 2002 FY 2003 FY 2003 Cost To Total Target Method & Location PYs Cost Cost Award Cost Award Cost Award Complete Cost Value of Type Date Date Date Contract a. Develop TDP, Proveout CPFF TBD 0 0 8703 2Q 0 0 0 0 0 Subtotal: 0 0 8703 0 0 0 0 II. Support Cost Contract Performing Activity & Total FY 2001 FY 2001 FY 2002 FY 2002 FY 2003 FY 2003 Cost To Total Target Method & Location PYs Cost Cost Award Cost Award Cost Award Complete Cost Value of Type Date Date Date Contract a. Other Gov't Agencies MIPR TACOM Warren, MI, Various Sup't Offices 0 0 180 1Q 0 0 0 0 0 Subtotal: 0 0 180 0 0 0 0 0604649A (G29) Item No. 93 Page 7 of 8 Exhibit R-3 ENGINEER VEHICLE UPGRADES 390 Cost Analysis

ARMY RDT&E COST ANALYSIS(R-3) 5 - ENG MANUFACTURING DEV 0604649A - Engineer Mobility Equipment Development G29 III. Test and Evaluation Contract Performing Activity & Total FY 2001 FY 2001 FY 2002 FY 2002 FY 2003 FY 2003 Cost To Total Target Method & Location PYs Cost Cost Award Cost Award Cost Award Complete Cost Value of Type Date Date Date Contract a. DT/OT TBD TBD 0 0 0 0 0 0 0 0 Subtotal: 0 0 0 0 0 0 0 IV. Management Services Contract Performing Activity & Total FY 2001 FY 2001 FY 2002 FY 2002 FY 2003 FY 2003 Cost To Total Target Method & Location PYs Cost Cost Award Cost Award Cost Award Complete Cost Value of Type Date Date Date Contract a. PMO Support NA TACOM, Warren, MI 0 0 396 1Q 0 0 0 0 0 Subtotal: 0 0 396 0 0 0 0 Project Total Cost: 0 0 9279 0 0 0 0 0604649A (G29) Item No. 93 Page 8 of 8 Exhibit R-3 ENGINEER VEHICLE UPGRADES 391 Cost Analysis