CWRBs and SMART Planning Lessons Learned and Looking Ahead

Similar documents
Planning Bulletin : SMART Planning in the Reconnaissance Phase

Regulation 20 November 2007 ER APPENDIX H POLICY COMPLIANCE REVIEW AND APPROVAL OF DECISION DOCUMENTS TABLE OF CONTENTS

REVIEW OF DECISION DOCUMENTS

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET, NW WASHINGTON, DC

REVIEW PLAN. San Clemente Storm Damage and Shoreline Protection Feasibility Study

CHACON CREEK LAREDO, TEXAS Project Review Plan Independent Technical Review

DEPARTMENT OF THE ARMY EC U.S. Army Corps of Engineers CECW Washington, D.C Circular No December 2012

Civil Works Process Overview

DEPARTMENT OF THE ARMY ER U.S. Army Corps of Engineers CECW-P Washington, DC Regulation No February 2016

Water Resources Reform and Development Act (WRRDA) of Section Vertical Integration and Acceleration of Studies. Interim Report to Congress

REVIEW PLAN SAIPAN LAGOON AQUATIC ECOSYSTEM RESTORATION STUDY SAIPAN, COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS (CNMI)

f. Methodology for Updating Benefit-to-Cost Ratios (BCR) for Budget Development (CWPM ) (draft);

Planning Modernization & WRRDA Implementation

DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, DC

PEER REVIEW PLAN SANTA CRUZ RIVER FEASIBILITY STUDY (TRES RIOS DEL NORTE) LOS ANGELES DISTRICT

DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DIVISION, GREAT LAKES AND OHIO RIVER CORPS OF ENGINEERS 550 MAIN STREET CINCINNATI, OH

REVIEW PLAN. Dade County Florida Beach Erosion Control and Hurricane Protection (BEC&HP) Project Limited Reevaluation Report. Jacksonville District

SUBJECT: South Atlantic Division Regional Programmatic Review Plan for the Continuing Authorities Program

Sabine Pass to Galveston Bay, Texas

AGENCY TECHNICAL REVIEW DOCUMENT TEMPLATES PCOP WEBINAR SERIES. Miki Fujitsubo, NTS FRM-PCX 15 February

DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, DC Engineering and Design CORPS-WIDE CENTERS OF EXPERTISE PROGRAM

REVIEW PLAN. Savannah Harbor DMCA 12A Dike Raising

Project Management Plan (PMP) Park Ranger Community of Practice

REVIEW PLAN MALIBU CREEK ECOSYSTEM RESTORATION FEASIBILITY STUDY MALIBU, CALIFORNIA LOS ANGELES DISTRICT

THE UNDER SECRETARY OF DEFENSE 3010 DEFENSE PENTAGON WASHINGTON, DC

Request for Proposals. For. Clinical Skills Assessment Pilot Project

Small Research Grants Program

National Deep Draft Navigation Planning Center of Expertise (DDNPCX) Update

PART ENVIRONMENTAL IMPACT STATEMENT

Report to Congress. June Deputy Under Secretary of Defense (Installations and Environment)

DEPARTMENT OF THE ARMY ER U. S. Army Corps of Engineers CERM-B Washington, DC Regulation No November 2001

Wall St. Training Valuation Case Competition Competition Guide

Deep Draft Navigation Planning Center of Expertise

DEPARTMENT OF THE ARMY EC US Army Corps of Engineers CECW-ZB Washington, DC Circular No September 2018

PRE-DISASTER MITIGATION (PDM)

USACE 2012: The Objective Organization Draft Report

Tri-City Mental Health Authority Spending Plan. April 2018 DRAFT. Tri-City Mental Health Authority Rimmi Hundal, MHSA Director

Capacity Building Programs Reporting Guidance

CITY OF LAREDO Environmental Services Department

Centerwide System Level Work Instruction

1. Introduction..3 a. Purpose of This Procedural Review Plan...3 b. Description and Information...3 c. References...3

Distribution Restriction Statement Approved for public release; distribution is unlimited.

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR ENERGY

THE REHABILITATION ACT OF 1973, AS AMENDED (by WIOA in 2014) Title VII - Independent Living Services and Centers for Independent Living

Engineer Circular Requests to Alter USACE Projects

NWP CRWP-SEED PROFESSIONAL DEVELOPMENT IN A HIGH-NEED MIDDLE OR HIGH SCHOOL REQUEST FOR PROPOSALS

SAMPLE. Small Grant Reporting Form PROGRESS REPORT

DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA

Informational Webinar

Renewed Measure M2 Eligibility Requirements Workshop. Orange County Transportation Authority April 12, 2011

Minister s Monitoring Committee On Workers Compensation

KANSAS CITY AREA LIFE SCIENCES INSTITUTE Collaborate2Cure Award (Issue Date 21 August 2017) Request for Proposals

ARKANSAS COLLEGE AND CAREER COACH PROGRAM

ELI LILLY-STARK NEUROSCIENCES PRE-DOCTORAL RESEARCH FELLOWSHIP IN NEURODEGENERATION

DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA

Virginia Sea Grant Graduate Research Fellowship Deadline: November 13, 2015

Department of Defense INSTRUCTION

Quality Assurance/Quality Control Procedures for Environmental Documents

Guidelines for Grant Applications

ONCAT-Funded Research Projects: A Handbook for Project Leads and Participants

PGY1 - Project Learning Experience Description

PARTNERS IN CARE Oahu Continuum of Care

PROGRAM AND APPLICATION MANUAL

CONTEXT FOR ANSWERING THE QUESTIONS: WHY DO WE HAVE TO DO VE? WHO HAS AUTHORITY OVER VE? THE CUSTOMER WON T PAY FOR VE!

Policy for Grant Financing: Implementing Procedures

New Draft Section 408 Policy Document EC

Sponsorship Agreement/Sub-Grant Posted Date June 6, 2016 Due Date for Applications Cycle 1: Cycle 2: July 15, 2016 January 13, 2017

DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, D.C

LIONS CLUBS INTERNATIONAL District Restructure and Redevelopment Grant Criteria and Application Format

Pharmacy Practice Advancement Demonstration Grants Applicant Webinar. Barbara Nussbaum Vice President ASHP Foundation

Guidelines for Grant Applications

REVIEW PLAN ORESTIMBA CREEK, CALIFORNIA FLOOD RISK MANAGEMENT FEASIBILITY STUDY SACRAMENTO DISTRICT

1. Eligibility: Competition is open to any registered undergraduate student in good standing.

Proposal Submission Instructions. Proposal Formatting Instructions. Required Proposal Components. Research Proposal, Fiscal Year 2014

DEPARTMENT OF THE ARMY. MEMORANDUM FOR Commander, US Army Corps of Engineers, Los Angeles District, (ATTN: CESPL-ED-DB, Mr.

Request for Proposal (RFP) Trail Corridor Design CEEn-2016CPST-010

ELI LILLY-STARK NEUROSCIENCES POST-DOCTORAL RESEARCH FELLOWSHIP IN NEURODEGENERATION

Department of the Army U.S. Army Corps of Engineers Washington, DC

Business Accelerator Operator Request for Proposals. Release Date: March 14, 2017

IPM. Western Region GUIDELINES FOR PROPOSAL PREPARATION AND SUBMISSION FOR FISCAL YEAR 2000

Notice of Support Availability: Pay for Success Administrative Data (PFS-AD) Training and Technical Assistance Services Issued: January 17, 2017

COUNCIL ON DOMESTIC VIOLENCE AND SEXUAL ASSAULT COMMUNITY BASED PRIMARY PREVENTION PROGRAMS GRANT FY REQUEST FOR PROPOSALS

Letter of Intent and Application Instructions 2018 Award for Excellence Program

Capacity Building Grant Programs (Section 4 and RCB) Work Plan Guidance

New York State Society of CPAs. Annual Report on Oversight

AmeriCorps State Formula Grant Competition. Operating and Planning Grants REQUEST FOR APPLICATIONS

PVA EDUCATION FOUNDATION

Chapter XVII: SCHOLARSHIP OF ASSESSMENT GRANTS

Methods: Commissioning through Evaluation

THE SOCIAL CARE WALES (SPECIFICATION OF SOCIAL CARE WORKERS) (REGISTRATION) (AMENDMENT) REGULATIONS 2018

Appendix G Peer Review Plan

Changes in the School Based Access Program (SBAP)

Project Management Plan (PMP) ARCHIVED. FY xx Project Title Base xxxx PDC AAAA Date

ONCAT-Funded Pathway Development Projects: A Handbook for Project Leads and Participants

COMMUNITY CLINIC GRANT PROGRAM

2016 Standard Application Packet for Concord Community Preservation Act Funding

UNC Lineberger Developmental Funding Program. Proposal Due Dates: 5:00pm March 15 and September 15

NG-J8 CNGBM DISTRIBUTION: A 01 October 2014 ACTION OFFICER S GUIDE TO PLANNING CONFERENCES AND EXEMPT EVENTS

2012 GRANT WRITING INSTITUTE Developing NIH Grant Proposals

University at Albany Benevolent Association Research Grants Fall 2017 and Spring 2018

Transcription:

CWRBs and SMART Planning Lessons Learned and Looking Ahead Wes Coleman Chief, Office of Water Project Review HQUSACE 21 May 2015 US Army Corps of Engineers PLANNING SMART

Purpose of the Webinar Discuss lessons learned regarding the execution of CWRBs and the application of those lessons to future CWRBs. This will not be a discussion of policy issues related to the final decision document. 3

Purpose of the CWRB Determine if the proposed Report of the Chief of Engineers and the accompanying final decision and NEPA documents are ready to release for State and Agency (S&A) Review as required by the Flood Control Act of 1944, as amended, as well as final NEPA review. 4

Timing of the CWRB The goal is that all CWRBs will be scheduled and executed no more than 60 days following log-in of the complete MSC Final Report Submittal Package. DCG- CEO Memorandum, U.S. Army Corps of Engineers Civil Works Review Board (CWRB) Expectations and Guidelines, 2 May 2014. Q - What needs to be completed prior to the CWRB? A - The question needs to be What needs to be completed prior the District Commander s signature on the final report? 5

Size of Reports The target for length of the main report for feasibility studies will be 100 pages or less. The environmental document should conform to guidance in ER 200-2-2. The entire feasibility report and appendices shall not exceed 1- three inch binder. DCG-CEO Memorandum, U.S. Army Corps of Engineers Civil Works Feasibility Study Program Execution and Delivery, 8 February 2012 Additional review time is being added for reports that exceed this requirement. 6

Post-Final Report Costs To ensure that the sponsor is afforded the opportunity to participate in any significant effort as a result of Washington level policy review, review support will be included as a work item in the PMP for District and non- Federal sponsor costs only. These costs, including any necessary travel, will be limited to those reasonable costs associated with the review and processing of the feasibility report. This item will be 5 percent of the total study cost or $50,000, whichever is less, and will be cost shared equally. ER 1105-2-100, paragraph G-8c(7) 7

Post-Final Report Costs $50,000 or less for 3x3x3 compliant studies. The District Commander must be significantly engaged and prepared prior to signing the final report. Preparation for the CWRB should be a refresher. Limit in-person PDT attendance at the CWRB. Significant comments are not expected during the S&A and final NEPA reviews. Active participation by the RIT, the HQUSACE policy review team, and the MSC helps limit study costs during the Administration s review. 8

Helpful Hints Graphic/visual portrayal is needed to buttress arguments and add a degree of clarity. The placemat is an effective tool that is also used as the primary briefing tool for the Chief of Engineers. The Fly-Over is an effective way for orienting the panel to the study area and the water resources problems and opportunities. This is a tool that should be generated at the beginning of the study. 9

Helpful Hints Include a slide on the cost and schedule for the study & the drivers. Summarize the screened array of alternatives and the rationale behind the screening criteria. Discuss analyses and application of risk that affected the screening of alternatives. EO 11988. Sea Level Rise/Climate Change. 10

Helpful Hints Provide a specific analysis on how NED/NER was determined. Reasonably maximize net benefits. CE/ICA In the economic summary, show the BCR at 7% in addition to the current FY discount rate. To the extent allowable, discuss the timeline for PED funding. 11

Helpful Hints Highlight the results of the District-level peer, legal and policy compliance reviews. The vertical team needs to be more diligent in documenting how the PDT addressed IEPR comments. The IEPR comments and their resolution will likely become a more prominent point of discussion at the Agency Decision Milestone (ADM). 12

Helpful Hints Lessons Learned. Considering the addition of a vertical team AAR with the District Commander prior to signing the final report. Lessons gathered from other studies prior to study initiation and throughout project development. Post-CWRB webinar. 13

Recommendations to the CWRB Guidance does not require the District or Division Commanders to recommend a CWRB action. If the Commanders want to recommend a CWRB action, it is to release the draft Chief s Report for S&A review and that it be accompanied by and consistent with the District Commander s final report and NEPA document. The purpose of the CWRB is not to decide on the release of the District Commander s report and the CWRB does not approve or disapprove the report. 14

Looking Ahead Inclusion of a rigorous ADM could affect, but not eliminate, the CWRB. A rigorous ADM is expected to drive a scaled CWRB that would focus more on the actions in the post-adm Decision Management Plan than on the pre-adm project development. The ADM is focused on the District Commander s Report while the CWRB is focused on the draft Chief s Report. 15

Looking Ahead The ADM would resemble the current CWRB, without Division Commander participation (home MSC or on the panel) The ADM engages senior executives that are likely to be members of the CWRB panel. Effort and resources currently expended post-final report for CWRB preparation may be reallocated to preparation for the ADM. 16

Questions? Type questions in the chat box. We will answer as many as time allows. For more information: http://www.corpsplanning.us US Army Corps of Engineers PLANNING SMART