REQUEST FOR QUALIFICATIONS. Ventura Avenue Mixed Use

Similar documents
REQUEST FOR QUALIFICATIONS

Request for Proposal No. RFP Consultant Services. for. Building Condition Assessment. Submittal Deadline: Date: March 1, Time: 10:00 a.m.

REQUEST FOR PROPOSALS. For. Rental Assistance Demonstration (RAD) Consulting. For HOUSING AUTHORITY OF THE CITY OF SAN BUENAVENTURA, CALIFORNIA

Request for Proposal (RFP) For. Architectural Services. Lauderdale County, MS. Board of Supervisors

Request for Qualifications Construction Manager at Risk Contract

Galesburg Public Library, Galesburg, IL

REQUEST FOR PROPOSALS

Colquitt Regional Medical Center

REQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services

REQUEST FOR PROPOSAL FOR ARCHITECTURAL SERVICES PACIFICA LIBRARY PROJECT

REQUEST FOR QUALIFICATIONS (RFQ)

District Office Building Seismic Retrofit At Contra Costa Community College District 500 Court St. Martinez, CA March 21, 2016

The University of Tennessee REQUEST FOR QUALIFICATIONS (RFQ)

Request for Proposals for Baggage Handling System / Checked Baggage Inspection System (CBIS)

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK

Request for Qualifications

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents

Request for Proposals. On-Call General Engineering Services. Public Works Department City of San Mateo 330 West 20th Avenue San Mateo, CA 94403

ARCHITECTURAL, LANDSCAPE, AND ENGINEERING CONSULTING SERVICES

Request for Qualifications No LEWIS AND CLARK HIGH SCHOOL Classroom Addition Project

Chabot-Las Positas Community College District

REQUEST FOR QUALIFICATION FOR PREPARATION OF FACILITIES MASTER PLAN AND FUTURE ARCHITECTURAL SERVICES

REQUEST FOR QUALIFICATIONS. Design Professional Services

AD HOC COMMITTEE ON CONCESSIONS AT ONE MILE RECRATION AREA MEETING

SALT LAKE CITY FIRE STATION 3

The School Board of Polk County, Florida. Selection Process for Architectural & Engineering Services

Knights Ferry Elementary School District

Program Community Development Block Grant (CDBG) Downtown Revitalization Program- Tier II

REQUEST FOR QUALIFICATIONS AND PROPOSALS (RFQ/P) RFQ # ARCHITECTURAL SERVICES Bond Measure G

681 Florida Housing Associates, L.P.: 681 Florida St SAN FRANCISCO, CA REQUEST FOR QUALIFICATIONS/PROPOSALS ( RFQ/P ) FOR GENERAL CONTRACTOR SERVICES

ARCHITECTURAL/ENGINEERING SERVICES

REQUEST FOR PROPOSAL GRANT WRITING, ADMINISTRATION, AND IMPLEMENTATION OF HOUSING PROGRAMS

REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR ARCHITECT/ENGINEER (A/E)

Facilities Condition Assessment

Request for Qualifications. Professional Design and Construction Services as a Design-Builder. For. Delhi Township Fire Station

CITY OF GOLDEN, COLORADO Parks and Recreation Department

Department of Toxic Substances Control

The School Board of Polk County, Florida. Selection Process for Continuing Contract for Architectural & Engineering Services

REQUEST FOR QUALIFICATIONS. General Contractor Construction Manager (GC/CM) Services. Modernization Project

4:00 p.m. on May 6, 2016

SECTION I - BACKGROUND

Request for Qualifications. Architectural Firms

This request for qualifications seeks the following type of service providers:

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES DELTONA MIDDLE 250 ENTERPRISE ROAD DELTONA, FLORIDA MASTER PLAN PROJECT NO.

Request for Proposals Construction Services Workplace Excellence Project

Okeechobee Utility Authority Engineering Services for Water Treatment Plant Improvements

REQUEST FOR PROPOSAL FOR POLICE OPERATIONS STUDY. Police Department CITY OF LA PALMA

REQUEST FOR QUALIFICATIONS (RFQ) FOR ARCHITECTURAL SERVICES FOR THE CONSTRUCTION OF A NEW PUBLIC SAFETY BUILDING/SUBSTATION

REQUEST FOR QUALIFICATIONS

RESTAURANT GRANT PROGRAM

Lexington Center Corporation Request for Qualifications for PROJECT COORDINATOR SERVICES

REQUEST FOR PROPOSAL DOWNTOWN RETAIL AND ENTERTAINMENT STRATEGY. For. The Redevelopment Agency of the City of Riverside. Issued: August 13, 2010

SANTA ROSA CITY SCHOOLS DISTRICT. 211 Ridgway Avenue Santa Rosa, CA Request for Proposals For Architectural Services

REQUEST FOR ARCHITECTURAL SERVICES ACTIVITY CENTER

May 18, 2016 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES

REQUEST FOR QUALIFICATIONS RFQ NO Orange Coast College Classroom Modernization Project

Request for Proposal (RFP) The Klamath Tribes Youth Fitness Center Klamath Tribes Housing Department (KTHD) RFP # 09-KTHD17

Request for Proposals: Non-Profit Housing Corporation Property Acquisition and Renovation

January 2, 2018 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES

CITY OF PORT HUENEME COMMUNITY DEVELOPMENT DEPARTMENT REQUEST FOR PROPOSAL FOR BUILDING & SAFETY SERVICES

CAMPBELL UNION HIGH SCHOOL DISTRICT

Request for Proposals Architectural Services Re: Fremont High School (RFP No date advertised July 17, 2014) ADDENDUM No. 2 (AUGUST 7, 2014)

The District is looking for the architectural firm to provide the following (not listed in order of preference):

REQUEST FOR QUALIFICATIONS

REQUEST FOR PROPOSALS For Design Services for New Fire Station

RESOLUTION NUMBER 2877

Housing Rehabilitation Program Administration

REQUEST FOR PROPOSAL NEW MARKET TAX CREDIT CONSULTANT SERVICES

REQUEST FOR QUALIFICATIONS

RFQ A-07 / FOR FF&E CONSULTING AND COORDINATION SERVICES FOR VARIOUS MEASURE B BOND PROJECTS

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES WESTSIDE ELEMENTARY 1210 JIMMY ANN DRIVE DAYTONA BEACH, FLORIDA 32117

REQUEST FOR PROPOSAL (RFP) # CONSULTANT SERVICES FOR DEVELOPMENT OF A DISTRICT SUSTAINABILITY PLAN

Request for Qualifications Construction Manager

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE BRIDGE REHABILITATION PROJECT. Issued by:

REQUEST FOR PROPOSALS

A. PROJECT INFORMATION

REQUEST FOR PROPOSALS STREAMLINED RFP

REQUEST FOR QUALIFICATIONS PRE-BOND ELECTION PLANNING SERVICES, MASTER PLANNING, AND ARCHITECT/ENGINEER SERVICES

REQUEST FOR QUALIFICATIONS FOR Energy Services Master Agreement

Architectural/Design Services

City of Imperial On-Call Plan Check and Inspection Services. Released: September 13, Important Dates

Single Site Permanent Supportive Housing Project

REQUEST FOR PROPOSALS. Design-Build of General Aviation Terminal Building. RFP# AIR/17-012, page 1

REQUEST FOR QUALIFICATIONS

REQUEST FOR PROPOSALS STREAMLINED RFP

LOCKHART INDEPENDENT SCHOOL DISTRICT

Boulder Housing Partners Request for Qualifications: RFQ # Architectural Services for Canyon Pointe and Glen Willow Renovation Projects

CITY OF INGLEWOOD Residential Sound Insulation Program

Request for Proposals and Specifications for a Community Solar Project

REQUEST FOR PROPOSALS: AUDIT SERVICES. Issue Date: February 13 th, Due Date: March 22 nd, 2017

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSALS. For: As needed Plan Check and Building Inspection Services

PLANT GROWTH ENVIRONMENTS FACILITY PROJECT NO

REQUEST FOR PROPOSALS For. Mobile Kitchen Consulting Services. for the. HOUSING AUTHORITY OF THE CITY of SAN BUENAVENTURA

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR INSTALLATION & UPGRADE OF BICYCLE FACILITIES (CLASS II & CLASS III) Issued by:

REQUEST FOR PROPOSALS (RFP) FOR TROUBLED BUILDINGS INITIATIVE CONDOMINIUM PROGRAM ACQUISITION AND DISPOSITION SERVICES

REQUEST FOR PROPOSALS

GRANT WRITING ASSISTANCE FOR THE HIGHWAY SAFETY IMPROVEMENT PROGRAM CYCLE 9

Gainesville City School System

COMMUNITY NON-PROFIT GRANT PROGRAM CALL FOR APPLICATIONS

Transcription:

REQUEST FOR QUALIFICATIONS General Contractor Services for the Rehabilitation of: By Homecomings, Inc. (Nonprofit Corporation Affiliated with the Housing Authority of the City of San Buenaventura) Date Issued: March 21, 2019 Submittal Deadline: 4:00 P.M. PST on April 17, 2019 All questions regarding this RFQ must be submitted via email to: Karen Flock kflock@hacityventura.org Page 1 of 10

Key Dates: Submit all questions regarding this RFQ on or before: 4:00 P.M. PST April 10, 2019 RFQ Responses Due: 4:00 P.M. PST April 17, 2019 General Contractor Interviews (as applicable) April 23, 2019 (Tentative Date) General Contractor Selection: By Week of May 6 Page 2 of 10

I. Purpose Table of Contents II. III. IV. Introduction and Background Project Details A. Site and Project Description B. Design Team C. Schedule and Financing D. Special Conditions/ Programmatic Requirements RFQ Schedule V. RFQ Instructions A. Required Information and Format B. Evaluation Criteria C. Contact Information D. Submission Requirements VI. VII. VIII. Selection Process Exhibits* A. Notice and Order B. Property Condition Assessment Report C. Cost of Repairs & Improvements Estimate D. Structural Review + Seismic Risk E. Asbestos & Lead Survey Report F. Phase 1 Environmental Site Assessment G. Site Map H. Schedule of Values Worksheet I. General Condition and Fee Worksheet J. Homecomings, Inc. Professional Services Agreement Terms and Conditions *Items VII A H are provided for the General Contractor s information only. Item VII I is a mandatory component of the Response to this RFQ. Please note, you will be asked to execute the Professional Services Agreement, Exhibit J, upon selection. Page 3 of 10

I. PURPOSE Homecomings, Inc. ( Homecomings ), a nonprofit corporation affiliated with the Housing Authority of the City of San Buenaventura (HACSB), is issuing this Request for Qualifications (RFQ) to select a General Contractor for pre construction and construction services related to the rehabilitation of a mixed use building in the city of Ventura. II. INTRODUCTION AND BACKGROUND Triad Properties, a nonprofit corporation associated with the Housing Authority of the City of San Buenaventura (HACSB), has acquired a mixed use building located at 1238 1288 North Ventura Avenue. It currently includes six commercial spaces and 33 dwelling spaces. It will be substantially rehabilitated and reconfigured to include approximately three commercial spaces and up to 32 apartments. The renovation will change a problem into a visible asset to the community. The construction contract will be between the General Contractor and a yet to be formed Limited Partnership (Owner). Homecomings, an affiliate of the HACSB, will be the Managing Member of the yet to be formed LLC that will be the General Partner of the Owner entity/limited Partnership. Homecomings would prefer to execute a Professional Services Agreement for pre construction and value engineering services immediately. The preference for the construction contract will likely be based on a Guaranteed Maximum Price (GMAX) format and will include a 100% open book policy, with all project related documents and records being readily available for review by the development team. Alternatively, the development team may consider a pre approved AIA Stipulated Sum Contract Form. III. PROJECT DETAILS A. SITE AND PROJECT DESCRIPTION Triad Properties is scheduled to acquire the development on April 1, 2019. The City of Ventura has issued a Notice and Order to correct 316 code violations. Triad Properties will begin immediately to address these code violations, but additional approvals and funding are being pursued to fully rehabilitate the property. The construction contract is anticipated to be in the range of $3.5 $4 million. The complete rehabilitation may include the following: 1. New electrical systems 2. New plumbing systems 3. ADA apartments 4. Wall, ceiling, and flooring repair and replacement Page 4 of 10

5. Adequate staircases 6. Appropriate seismic work 7. New windows 8. New heaters 9. New appliances 10. Replacement doors 11. Balcony repair 12. Reconfiguration of apartments 13. Sign program 14. Other items to be identified We recommend that the General Contractor visit the site. The site is accessible with no prior arrangements necessary. Please do not disturb the businesses or residents. B. DESIGN TEAM The design team includes the following partners: Developer HACSB General Partner Homecomings, Inc. Architect RRM Design Group Civil Engineer RRM Design Group MEP Engineer RRM Design Group Structural Engineer RRM Design Group Landscape Architect RRM Design Group Acoustic Consultant tbd Dry Utility Consultant tbd Geotechnical Consultant tbd Sustainability Consultant tbd C. SCHEDULE AND FINANCING The HACSB is working with the City of Ventura to determine and obtain required approvals. If approvals can be obtained in time, an application for 9% Low Income Housing Tax Credits will be submitted on July 1, 2019. If the application is successful, construction would start no later than March 2020. Additional and alternate financing sources will also be pursued, including: 1. City of Ventura CDBG and HOME funds; 2. Affordable Housing Program; 3. California HCD Multi Family Housing Program; 4. California No Place Like Home; and Page 5 of 10

5. 4% Low Income Housing Tax Credit Equity and Tax Exempt Bonds. As a condition of funding sources, federal prevailing wages will apply. Below is a list of key project milestones: 1. May 2019 Finalize construction scope 2. June 5, 2019 Initial Construction Budget 3. July 1, 2019 Apply for 9% Low Income Housing Tax Credits 4. September 25, 2019 Tax Credit Award 5. January 2020 Confirm Construction Cost Based on Available Construction Documents 6. February 2020 Execute AIA Agreement between Owner and Contractor 7. March 2020 Close Construction Loan, Issue Notice to Proceed and Start Construction D. SPECIAL CONDITIONS/PROGRAMMATIC REQUIREMENTS Prevailing Wage/Local Hire Obligations General Contractor must ensure adherence to: MBE/WBE, Section 3, and other requirements stipulated by the various funding sources including federal prevailing wage (as applicable). Sustainability Commitments The Developer has committed to achieving a GreenPoint Rated certification. With the assistance and input of the Sustainability Consultant and Design Team, the General Contractor will be responsible for implementing the sustainable building standards, particularly as they apply to construction methods, construction waste management and reuse, and materials. IV. RFQ SCHEDULE The Developer would prefer to execute a contract for pre construction services immediately, in order to allow for the General Contractor to provide support to address initial code compliance and design and value engineering input. The following is the anticipated Pre Construction schedule: 1. 3/21/2019 RFQ Issued 2. 4/17/2019 RFQ Responses Due 3. 4/23/2019 General Contractor Interviews (tentative date) 4. By Week of May 6 General Contractor Selection V. RFQ INSTRUCTIONS Page 6 of 10

A. REQUIRED INFORMATION AND FORMAT The RFQ Response provided by the General Contractor shall be complete, organized, and formatted as follows: 1. General Information a. Submit a cover letter introducing your firm and highlighting qualifications for the project a. Provide a completed AIA Document A305 2. Firm Capacity and Experience (30 Points) a. Provide a company profile, including number of years in business and information/resume(s) for company principal(s) b. Indicate number of employees at firm, separated by office location, if applicable c. Discuss your local experience and use of local subcontractors d. Discuss your experience with occupied rehabilitation and substantial rehabilitation e. Financial Profile i. Provide a breakdown of firm s annual volume for the past three (3) years ii. Provide a financial statement indicating current assets and liabilities iii. Indicate bonding rate and bonding company iv. Indicate insurance limits and insurance company v. List any pending, outstanding, or known financial claims or legal suits against firm 3. Management Plan Resources and Capacity (30 Points) a. Proposed Project Team i. Provide an organizational chart for the proposed project team ii. Provide resumes for all members of proposed project team b. Capability to Complete the Project i. Indicate staffing capabilities and expected administration structure for this project ii. Provide a list of relevant experience and a brief profile on similar recent projects, including: 1. Project size 2. Total construction cost (per net rentable and gross square feet) 3. Number of change orders for each project and cost as a percent of the original construction budget 4. Similarities to this project 5. Green Building Rating Systems, as applicable 6. Prevailing wage / Davis Bacon wage compliance, as applicable 7. MBE/WBE, Section 3 compliance (24 CFR Part 135), as applicable 8. Each project referenced should also include owner contact name(s), current telephone number(s) and/or e mail address(s) and photos 9. Please do not use any HACSB staff as reference Page 7 of 10

iii. Provide a list of currently booked/contracted work and backlog, including details on the size and cost of each project iv. Other: Identify whether your firm self performs any trade work v. Contract Structure 1. Describe experience with AIA GMAX c. Project Records and Cost Accounting i. Describe tools, software and or other systems used for construction management and maintaining project records. General Contractor must demonstrate that its internal accounting and cost tracking systems can manage a project of this size and type and maintain accurate project cost accounting. 4. Cost Effectiveness Fee & General Conditions (10 Points) a. Provide a completed General Conditions & Fee Worksheet (attached as Exhibit A ) for the project, making sure to tie the proposed schedule duration, for the purposes of calculating overall project General Conditions. General Contractor may modify the form to add or delete line items, but please highlight or note any modifications and provide reasoning for each. 5. Preconstruction Effort (20 Points) a. General Contractor will be involved in a pre construction role throughout the design and approval process of the Project. b. General Contractor will provide updated budgeting, constructability reviews, and potential value engineering opinions periodically as the Construction Documents are prepared and reviewed by the City of Ventura. Please indicate General Contractor s willingness to participate in this process and if compensation is required. However, price will be negotiated after selection. c. Discuss your approach to value engineering and your approach to cost effectiveness 6. Safety and Legal Factors (10 Points) a. Describe strategy for providing 24 hour site security to ensure the construction site is not an attractive nuisance b. Please provide the following: i. Safety records for the past three (3) years ii. Current Worker s Compensation experience factor iii. List of outstanding lawsuits including claims, both settled and unsettled for the past five (5) years iv. Self certification that there is no active Federal, State or Public Agency disqualification Page 8 of 10

B. EVALUATION CRITERIA Qualifications will be evaluated based on the following: 1. Firm Capacity and Experience 30 Points 2. Management Plan Resources and Capacity 30 Points 3. Cost Effectiveness Fees & General Conditions 10 Points 4. Preconstruction Effort 20 Points 5. Safety and Legal Factors 10 Points 100 Total Points C. CONTACT INFORMATION The above is intended to outline a general guide for responding to this RFQ. During the period leading up to the response deadline, please direct all correspondence and/or questions via email to: kflock@hacityventura.org. Do not contact any other Housing Authority staff regarding this RFQ. All responses to questions will be answered in writing by email and copied to all who have indicated by email to Karen Flock that they may respond. All responses to questions will also be available on the HACSB website. D. SUBMISSION OF QUALIFICATIONS STATEMENT The deadline for submitting a response to this RFQ is Friday, April 1, 2019 no later than 4:00 P.M. PST. Responses shall be submitted in electronic PDF form via email to: Karen Flock Senior Developer Housing Authority of the City of San Buenaventura 995 Riverside Street Ventura, CA 93001 kflock@hacityventura.org VI. SELECTION PROCESS Based on the responses to this RFQ, the Developer may select qualified firms to conduct an inperson interview, to discuss qualifications for the Project and review the RFQ response. We anticipate interviews to occur on April 23, 2019. Please advise us as soon as possible if this date does not work for you. We anticipate a final selection to be made by the week of May 6, 2019. VII. EXHIBITS Page 9 of 10

Exhibits can be found at the following link: https://www.dropbox.com/sh/xbtbny3sbuhts5p/aaa4ezbduwlbdvgi860l3n5za?dl=0 VIII. RFQ TERMS AND CONDITIONS Please note that the information provided in this RFQ is subject to change, is not all inclusive, and should be considered informational in nature. If any of the items included in this RFQ directly conflict with information found in the design specifications or drawings, please assume that the latter documents govern. Homecomings may, at its sole and absolute discretion, reject any and all, or parts of any and all, proposals; re advertise this RFQ; postpone or cancel, at any time, this RFQ process; or waive any irregularities in this RFQ or in the proposals received as a result of this RFQ. Also, the determination or the criteria and process whereby proposals are evaluated, the decision as to who shall receive a contract award, or whether an award shall ever be made as a result of this RFQ, shall be at the sole and absolute discretion of Homecomings. Developer s Reservation Rights: In submitting its qualifications, General Contractor understands that Developer will determine in its sole discretion which General Contractor, if any, will be selected for this project. General Contractor waives the right to claim damages or costs of any nature based on the selection process, any communications associated with the selection process, and the final selection of the successful Respondent. Without regard to the process set forth above, Developer reserves an unconditional right to terminate the selected General Contractor at any time, for any reason, during the pre construction period. All General Contractor s responses shall be good for a minimum of 60 days from the submittal date. Page 10 of 10