Lessons Learnt from Japanese Red Cross Response to Naoki Shiratsuchi Japanese Red Cross

Similar documents
Great East Japan Earthquake and Tsunami. Complete Record Document Covering from Relief Activities to Recovery Support

Japan: Earthquake and Tsunami

Nuclear Disaster Guidelines. for Preparedness, Response and Recovery. (Version: March 31, 2016) (English Translation)

Japan: Earthquake and tsunami

KNOWLEDGE NOTE 3-1. Mobilizing and Coordinating Expert Teams, Nongovernmental Organizations, Nonprofit Organizations, and Vounteers

Nuclear and Radiological Emergency Guidelines. Preparedness, Response and Recovery. Saving lives, changing minds.

Evaluation. Report Findings and Lessons Learned from the Japanese Red Cross Society s Response to the Great East Japan Earthquake and Tsunami

Reform of Japan s Nuclear Safety Regulation

The JNA Effort toward Restoration Assistance for the Great East Japan Earthquake

Enhancing resilience in the face of disaster

Damages and Response to Great East Japan Earthquake. Guidance of medical service division, Health policy bureau, MHLW, JAPAN

Disaster relief emergency fund (DREF) Palestine (Gaza): Complex emergency

Japan: Earthquake and Tsunami

<Introduction> <Reply to the recommendations>

Brazil: Floods. DREF operation n MDRBR005 GLIDE FL BRA DREF Update n 1 23 April 2010

For Accelerating the Reconstruction from the Great East Japan Earthquake. March, 2014

Presentation Outline. 1. Introduction: Disasters without. 2. Critical initial 72 hours after Disease

WHO's response to the Fukushima Daiichi NPP accident (2012) Seminar on the recovery and reconstruction of Fukushima, 3 September 2014, Geneva

Emergency Plan of Action (EPoA) Haiti: Earthquake

Lessons-learnt identified on Crisis Communication from Fukushima Nuclear Accident

Emergency Plan of Action (EPoA) Kyrgyzstan: Earthquake

Emergency Plan of Action (EPoA) Tajikistan: Floods in Khuroson District

Sanjo City Area Disaster Prevention Plan

The JNA Effort toward Restoration Assistance following the Great East Japan Earthquake

MAGEN DAVID ADOM IN ISRAEL

Chapter 2 Governance of the Education Sector and Disaster Risk Reduction

Japan: Earthquake and Tsunami

Information bulletin Samoa: Tropical Cyclone Evan

Emergency Plan of Action (EPoA) Israel: Complex Emergency

Final Report. (Main Text)

THE IAEA FUKUSHIMA REPORT AND THE IMPLICATIONS FOR NUCLEAR SAFETY AND EMERGENCY PREPAREDNESS

IRAN: EARTHQUAKE IN QAZVIN, HAMADAN AND ZANJAN REGIONS

Disaster Medicine and the Role of Medical Associations* 1

THE SEARCH SENIOR MAJOR GIFTS OFFICER INDIVIDUAL GIVING GREATER NEW YORK REGION.

Emergency Plan of Action (EPoA) Cote d Ivoire: Ebola virus disease preparedness. A. Situation analysis. Description of the disaster

ALGERIA: STORMS & FLOODS

For Accelerating the Reconstruction from the Great East Japan Earthquake. February 2014 NEMOTO Takumi, Minister for Reconstruction

Basic Guidelines for Reconstruction in Response to the Great East Japan Earthquake in the Reconstruction and Revitalization Period

Mobilizing Resources During Emergencies: How to ensure a functional surge capacity in your organisation?

CDW GOES ABOVE AND BEYOND.. TO ASSIST WHEN.. GLOBAL DISASTERS STRIKE..

Section 2 Frameworks for Responses to Armed Attack Situations

3 Member of JSCE, Professor, Crisis & Security Management Research Center, Kagawa University

For the relief of victims of the Great East Japan Earthquake and the recovery of the disaster-stricken areas

Hours of Service 28,000. Year in Review 2011

SIERRA LEONE: EMERGENCY ASSISTANCE TO THE SIERRA LEONE RED CROSS

CHILD CARE FACILITIES INTRODUCTION TO THE DISASTER PLAN

Disaster relief emergency fund (DREF) Benin: Cholera outbreak

Information bulletin China: Ludian Earthquake

Civil Protection Operational Management Plan of Japan Atomic Energy Agency (Provisional translation)

Nonprofit 911: In Case of Emergency Attend Webinar How to plan a disaster response and recovery campaign

DREF final report Brazil: Floods

The IAEA OSART Review. Attachment 1 Tokyo Electric Power Company

Emergency Plan of Action (EPoA) Cameroon: Ebola virus disease preparedness

Emergency appeal operation update Ukraine: Civil unrest

Emergency Plan of Action Final Report Albania: Floods

Activities of the Japan Medical Association Team in Response to the Great East Japan Earthquake

MOROCCO : FLASH FLOODS

The Role of Self-Defense Forces (SDF) in Responding to the Great East Japan Earthquake

Emergency Appeal Jamaica: Hurricane Sandy

Ukraine Consolidated Operational Plan 2014

The Great East Japan Earthquake

Emergency Plan of Action - Final Report

Technical Volume 3 Emergency preparedness and response

EL SALVADOR: SEISMIC SWARM

Annual Report

SUPPORTING NEPAL FOR EARTHQUAKE RECOVERY

to India and his colleagues.

Pan-American Disaster Response Unit

Disaster relief emergency fund (DREF) Philippines: Earthquake

Matthew Hewings, Operations Director. Mississippi Emergency Management Agency. Office of Response 03/02/17

Environmental Management. Respect for Human Rights. Nikon Community Contribution Activities Policy

Jamaica: Tropical Storm Nicole

3. Where have we come from and what have we done so far?

NIGER: Floods. DREF operation n MDRNE August, 2010

UGANDA: Political Disturbances- Civil Unrest

Sponsored by Russ Reid and the American Red Cross WCAI Research Opportunity 8 December 2011

Emergency Plan of Action West Coast: Ebola Preparedness

Osaka Municipal Government

International Federation of Red Cross and Red Crescent Societies

Cook Islands: Tropical Cyclones

Emergency Appeal Final Report China: Sichuan earthquake

Emergency Plan of Action (EPoA) Mauritius: Plague Preparedness

Japan s Assistance to Ukraine

Disaster Chaplaincy Services Inc

DISASTER PREPAREDNESS FOR MEDICAL PRACTICES

Reconstruction of the Radiation Emergency Medical System From the Acute to the Sub-acute Phases After the Fukushima Nuclear Power Plant Crisis

Sound Practice No. 1. Kobe City Restoration Plan Rebuilding after the 1995 Great Hanshin-Awaji Earthquake

Emergency appeal Liberia: Ebola virus disease

Supporting Nepal to Build Back Better

Disaster relief emergency fund (DREF) The Gambia: Cholera

Ops JET Relief Update #5: Team3 moves into Miyagi, SM Goh boosts MR Street Collection Party

Talia Frenkel/American Red Cross. Emergency. Towards safe and healthy living. Saving lives, changing minds.

Emergency Plan of Action (EPoA) The Gambia: Election Preparedness

Great East Japan Earthquake and Tsunami Aid Report

Asian Forum on Disaster Management and Climate Change Adaptation (draft only)

BUSINESS SUPPORT. DRC MENA livelihoods learning programme DECEMBER 2017

Emergency Plan of Action (EPoA) Sierra Leone: Ebola virus disease preparedness

DREF operation update India: Assam Floods

Frameworks for Responses to Armed Attack Situations

Telemedicine network as a disaster risk reduction

Transcription:

Lessons Learnt from Japanese Red Cross Response to 3.11 Naoki Shiratsuchi Japanese Red Cross

The International Red Cross and Red Crescent Movement 188 National Red Cross and Red Crescent Societies worldwide International Federation of Red Cross and Red Crescent Societies (IFRC), founded in 1919 International Committee of the Red Cross (ICRC), founded in 1863 2

Japanese Red Cross Society Established as Philanthropy Society in 1877 The Japanese Red Cross recognized by law Domestic Disaster Response Medical Services Nursing Education International Activities First Aid Blood programme Social Welfare Services 3

Role and responsibility of JRCS in disaster response National Disaster Countermeasure Basic Act defines the role of JRCS in the following area; Medical Relief Storage and Distribution of Relief Goods Supply of Blood Products Fundraising in Japan and Distribution (GIENKIN) Responding to various needs 4

JRCS Relief Activities to 3.11 896 medical teams mobilized Emergency relief materials and equipment distributed 1) 132,510 blankets 2) 30,972 emergency relief kits 3) 13,500 sleeping kits 4) 183,500 pieces of clothing 6 trucks(10t) and 1 trailer worth of commodities including brooms, shovels, dustpans, scrub brush, buckets, towels brushes and bin liner 9 bladder tanks Psycho-social programme (PSP); 718 staff members deployed JRCS volunteers, worth of over 70,000 man-days of work 5

Lessons Learnt from 3.11 6

Lessons Learnt from 3.11 Unexpected situation Local governments lost their capacity to respond to the situation Emergency medical relief Response to Nuclear Accident Assistance from the overseas Cash Grant Programme 7

Unexpected situation Local governments lost their capacity to respond to the situation Did not Work Most of the worst affected municipalities lost their capacity to respond to the disaster situation, such as needs assessment and provision of relief services to the affected population in the initial emergency phase JRCS was slow in extending an initial intervention, due to the failure of the system that JRCS responds to requests coming from the affected municipalities. Need for back-up system by prefecture and central government for providing surge capacity in case of affected municipalities lose their response capacity JRCS should develop its own needs assessment capacity 8

Unexpected situation Local governments lost their capacity to respond to the situation Worked : Ishinomaki Red Cross Hospital - only one hospital survived - played an important role in the Ishinomaki region, Miyagi Prefecture It provided not only emergency medical services but also, on behalf of the municipality, accommodated evacuees in initial days, conducted needs assessment in the region and supported to improve an environmental condition of evacuation centers, such as provision of water supply facilities It was enabled by the strong leadership of a doctor, supported by many medical and administrative personnel dispatched from all over Japan 9

Worked Emergency Medical Relief Medical teams dispatched faster and more Trainings and preparedness enabled initial deployment faster, based on the lessons learnt from Kobe earthquake in 1995 Rules and procedures have been changed so that medical teams can be dispatched without requests from the affected authorities 10

Did not work Emergency Medical Relief Treated a less number of patients as well as less severely wounded people in the initial phase (characteristic of tsunami disaster) Trainings focused on response to the earthquake situation based on the experience of Kobe earthquake, i.e. crush syndrome. Not prepared to deal with survivors with chronic diseases from tsunami disaster Emergency medical relief has limitation in saving lives of victims in the situation of tsunami in particular. Population has to be well prepared to evacuate onto safe places JRCS will further more engage in risk reduction programme at school and community level 11

Response to nuclear accident Did not work Activities of JRCS medical teams who were deployed to Fukushima prefecture was temporarily suspended due to the evolving effects of nuclear accident. This was criticized by the population of Fukushima. There was no preparedness against nuclear accident, including SoP and protective equipment (there was a myth of nuclear safety) 12

Response to nuclear accident Worked Operational guidelines were established without delay based on the knowledge of JRCS Atomic Bomb Hospital on radiation Radiation counters (Geiger counters) were provided with the help of International Red Cross Relief activities resumed in Fukushima 13

Assistance from overseas Did not work Unsolicited relief goods (or donor oriented) Non standardized goods Relief personnel without prior arrangements 14

Worked Assistance from overseas Joint assessment with a team composed of experienced personnel from the International Red Cross and their advice on formulating relief plan Communications delegate from the International Federation supported JRCS in dealing with foreign medias. Cash donations from sister RCRC Societies were useful for supporting afflicted population in their recovery process 15

Assistance from overseas More than 100 Red Cross Red Crescent Societies, countries and regions donated 59.7 billion JPY (USD 601 million) Livelihood support 29.4 billion Social Welfare support 2.0 billion Children s education support 3.1 billion Medical Services support 15.1 billion Total budget 59.7 billion yen Capacity building of JRCS 3.5 billion Assistance for nuclear power plant disaster victims 2.3 billion 16

Cash Grant (Gienkin) Japanese unique cash grant system all cash donations collected by designated institutions will be distributed to afflicted population. It has a characteristic as get well gift. JRCS raised the biggest amount of funds among those institutions designated to receive cash donations (Gienkin) All the funds received by designated institutions will be channeled through Cash Disbursement Committee who decides criteria for the distribution. Actual cash disbursement will be carried out by afflicted municipalities to each beneficiary. 17

Worked Cash grant (Gienkin) A substantial amount of cash grant is being utilized by beneficiaries to meet their immediate needs as well as long term recovery needs. Administrative costs in receiving and managing huge amount of donations (some USD 10 million) were fully covered by JRCS own fund no a single dollar was taken from the donations. 18

Did not work: Cash grant (Gienkin) Delay in identification of beneficiaries and disbursement due to over-burden on municipality workload limitation of soly relying on local governments Lack of communications and misunderstanding by the media/public about administrative costs 19

Conclusion The following Myths have been removed by the 3.11 and an environment is being developed for nation wide discussion for future disasters Myth 1: Preparedness should be based on the disaster scenario made by the central and local governments Myth 2: Disaster preparedness measures in the developed countries like Japan should have been well developed, so that no assistance overseas would be required. Myth 3: Nuclear power plants are absolutely safe Myth 4: Experience and minimum standards developed through responses to mega disasters in the developing countries would not apply to high income countries Over the estimation would no more be used as excuse 20