August 30, Executive Director for Operations

Similar documents
Emergency Preparedness Final Rule Implementation

Technical Basis for the Emergency Preparedness Rulemaking

GUIDANCE AND EXAMPLES FOR IDENTIFYING 10 CFR 50.2 DESIGN BASES

NUCLEAR REGULATORY COMMISSION [NRC ] Nuclear Regulatory Commission Insider Threat Program Policy Statement

NRC UPDATE EP REGULATORY ACTIVITIES. Glenn M. Tracy / Kathy Halvey Gibson Office of Nuclear Reactor Regulation

Regulatory Activities Related to Power Reactors Transitioning to Decommissioning

REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH REGULATORY GUIDE 1.8 (Drafts were issued as DG-1084 and DG-1012)

Research and Test Reactor Licensing Actions and Lessons Learned

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is discontinuing a rulemaking

Emergency Preparedness Near Nuclear Power Plants

Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants

NUCLEAR EMERGENCY MANAGEMENT IN CANADA AND THE UNITED STATES

NUCLEAR REGULATORY COMMISSION [NRC ] Preparation of Environmental Reports for Nuclear Power Stations

i6 Ct AR (p. 16): HEMORANDUMI FOR: Chairman Zech Commissioner Roberts Commissioner Carr Commissioner Rogers Commissioner Curtiss FROM:

Preparation of Environmental Reports for Nuclear Power Stations

Regulatory Approach for License Renewal for Commercial Nuclear Power Reactors in the USA

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN

-td.51. PROPOSED RULE Washington, D.C e DOCKET NUMBER. , r00 MRI 24 A 7 :l 5. March 9, 2000

GAO NUCLEAR REGULATION. Progress Made in Emergency Preparedness at Indian Point 2, but Additional Improvements Needed

NRC REGULATORY ISSUE SUMMARY RADIATION SAFETY OFFICERS FOR MEDICAL-USE LICENSES UNDER 10 CFR PART 35

U.S. NUCLEAR REGULATORY COMMISSION MANAGEMENT DIRECTIVE (MD) Governmental Relations and Public Affairs

Fingerprinting and Criminal History Records Check Requirements for Unescorted Access to Certain Radioactive Material

DRAFT REGULATORY GUIDE

(Billing Code ) Defense Federal Acquisition Regulation Supplement: Costs. Related to Counterfeit Electronic Parts (DFARS Case 2016-D010)

NRC REGULATORY ISSUE SUMMARY TRANSPORTATION OF RADIOACTIVE MATERIAL QUANTITIES OF CONCERN NRC THREAT ADVISORY AND PROTECTIVE MEASURES SYSTEM

ATTACHMENT C TO THE SOUTH CAROLINA EMERGENCY OPERATIONS PLAN AUTHORITIES AND REFERENCES

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN

ATTACHMENT C TO THE SOUTH CAROLINA EMERGENCY OPERATIONS PLAN AUTHORITIES AND REFERENCES

NUCLEAR REGULATORY COMMISSION. [Docket Nos ; NRC ] Northern States Power Company - Minnesota; Prairie Island Nuclear Generating Plant

ATOMIC SAFETY AND LICENSING BOARD

November 18, Dear Ms. Vietti Cook:

Minutes Board of Trustees

Planning and Preparedness for Radiological Emergencies at Nuclear Power Stations

Nuclear Plant Emergency Response

Nuclear Plant Emergency Response

Medicaid Program; Deadline for Access Monitoring Review Plan Submissions. AGENCY: Centers for Medicare & Medicaid Services (CMS), HHS.

Details of Study Report 1 1 Introduction 2 International Emergency Response Systems 3 Present Situation and Approach in East Asia 4 Conclusion

NEI [Revision 0] Guidelines for a Certified Fuel Handler Training and Retraining Program

NRC REGULATORY ISSUE SUMMARY REQUIREMENTS FOR EXEMPT DISTRIBUTION LICENSEE ANNUAL TRANSFER REPORTS

Fukushima Dai-ichi March 11, 2011 and Beyond

Demand for Immediate Resignation from the NRC and Other Measures

NATIONAL RESPONSE PLAN

Preparation for the implementation of the Convention on Physical Protection of Nuclear Material and its Amendment in Senegal

RADIOLOGICAL EMERGENCY PREPAREDNESS PROGRAM (REPP)

APPENDIX A ENFORCEMENT GUIDANCE MEMORANDA

Protecting Our Nation. A Report of the U.S. Nuclear Regulatory Commission. Office of Nuclear Security and Incident Response

Florida FY Emergency Management Performance Grant Program CERT/Citizen Corps Program Grant Funding Opportunity

CIP Cyber Security Incident Reporting and Response Planning

Request for Proposals Emergency Response Plan, Training and Vulnerability Assessment

Department of Defense DIRECTIVE

BUSINESS SERVICES VP EMERGENCY MANAGEMENT CHAPTER #2 Board of Trustees Approval: 8/13/2014 POLICY Page 1 of 1

TO ALL LICENSEES OF OPERATING PLANTS, APPLICANTS FOR AN OPERATING LICENSE, AND HOLDERS OF CONSTRUCTION PERMITS

Interactive Review for Medical Device Submissions: 510(k)s, Original PMAs, PMA Supplements, Original BLAs, and BLA Supplements

FENOC AOLVS. February 3, 2000 PY-CEI/NRR-2463L. United States Nuclear Regulatory Commission Document Control Desk Washington, D. C.

DRAFT REGULATORY GUIDE

Managed Care, CHIP Delivered in Managed Care, and Revisions Related to Third. AGENCY: Centers for Medicare & Medicaid Services (CMS), HHS.

DIRECTIVE TRANSMITTAL

Department of Defense INSTRUCTION. Occupational Ionizing Radiation Protection Program

FEMA s Role in Terrorism Preparedness and Response Plan

MEMORANDUM OF AGREEMENT BETWEEN THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION AND THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY

Department of Defense DIRECTIVE

NUCLEAR REGULATORY UPDATE

CEMP Criteria for Adult Day Care Centers Emergency Management

May 12, 2016 MEMORANDUM. Certain provisions of FSMA are already in effect, namely: Mandatory recall authority (FSMA 206).

CEMP Criteria for Ambulatory Surgery Centers Emergency Management

February 13, 2013 EA

[Second Reprint] SENATE, No. 278 STATE OF NEW JERSEY. 217th LEGISLATURE PRE-FILED FOR INTRODUCTION IN THE 2016 SESSION

DIRECTIVES. COUNCIL DIRECTIVE 2009/71/EURATOM of 25 June 2009 establishing a Community framework for the nuclear safety of nuclear installations

EMERGENCY MANAGEMENT PLANNING CRITERIA FOR ADULT DAY CARE FACILITIES

SENATE, No STATE OF NEW JERSEY. 216th LEGISLATURE INTRODUCED APRIL 28, 2014

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C April 10, 2018

IAEA MISSION TO REVIEW NISA S APPROACH TO THE COMPREHENSIVE ASSESSMENTS FOR THE SAFETY OF EXISTING POWER REACTOR FACILITIES

STRENGTHENING REGULATORY REQUERMENTS FOR PHYSICAL PROTECTION IN INDONESIA BASED ON INFCIRC 225 REV.5. Presented by : Suharyanta BAPETEN

MEMORANDUM OF AGREEMENT Between The Commonwealth of Massachusetts And The United States Army and National Guard Bureau

May St. Louis Area Regional Hospital. Re-Entry Plan

Lands and Investments, Office of

NRC Update on Regulatory Activities Affecting Industrial Radiography

Home Health Agency Requirements CMS Emergency Preparedness Final Rule

LEGISLATIVE ACTS AND OTHER INSTRUMENTS COUNCIL DIRECTIVE establishing a Community framework for the nuclear safety of nuclear installations

Reform of Japan s Nuclear Safety Regulation

Department of Defense DIRECTIVE

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C

HUMBOLDT BAY INDEPENDENT SPENT FUEL STORAGE INSTALLATION LICENSE APPLICATION ENVIRONMENTAL REPORT SAFETY ANALYSIS REPORT

4.2.2 Transmission Owners Transmission Planners Transmission Service Providers Balancing Authorities.

Post- Fukushima accident. Action plan. Follow-up of the peer review of the stress tests performed on European nuclear power plants

AMENDMENT #3 August 19, 2011 REQUEST FOR PROPOSALS (RFP) VIDEO LOTTERY OPERATION LICENSE IN BALTIMORE CITY (# )

NUCLEAR REGULATORY COMMISSION [NRC ] Dry Storage and Transportation of High Burnup Spent Nuclear Fuel

VOCATIONAL SAFETY PROGRAM SELF INSPECTION CHECKLIST

Unit 7. Federal Assistance for Mass Fatalities Incidents. Visual 7.1 Mass Fatality Incident Response

DOD INSTRUCTION NATIONAL DISASTER MEDICAL SYSTEM (NDMS)

Civil Protection Operational Management Plan of Japan Atomic Energy Agency (Provisional translation)

HEALTH P H Y S I C S SOCIETY

DOD INSTRUCTION DOD ISSUANCES PROGRAM

Nuclear Law and Malaysian Legal Framework on Nuclear Security AISHAH BIDIN FACULTY OF LAW UKM

REQUEST FOR PROPOSAL INDEPENDENT CONSULTANT EXPERT OYSTER CREEK SAFETY ADVISORY PANEL

GAO MEDICAL DEVICES. Status of FDA s Program for Inspections by Accredited Organizations. Report to Congressional Committees

DEPARTMENT OF HOMELAND SECURITY REORGANIZATION PLAN November 25, 2002

Approaches and Methods to Conduct Regulatory Safety Review and Assessment

Department of Defense INSTRUCTION

Transcription:

IN RESPONSE, PLEASE REFER TO: M110830A August 30, 2011 MEMORANDUM FOR: R. W. Borchardt Executive Director for Operations FROM: Annette L. Vietti-Cook, Secretary /RA/ SUBJECT: STAFF REQUIREMENTS - AFFIRMATION SESSION, 8:55 A.M., TUESDAY, AUGUST 30, 2011, COMMISSIONERS' CONFERENCE ROOM, ONE WHITE FLINT NORTH, ROCKVILLE, MARYLAND (OPEN TO PUBLIC ATTENDANCE) I. SECY-11-0053 Final Rule: Enhancements to Emergency Preparedness Regulations (10 CFR Part 50 and 10 CFR Part 52) (RIN-3150-AI10) The Commission approved a final rule, subject to the comments noted below and the attached changes, amending certain emergency preparedness (EP) requirements in the regulations that govern the domestic licensing of production and utilization facilities. Among other things, the final rule adds a conforming provision that governs licenses, certifications, and approvals for new nuclear power plants; codifies certain voluntary protective measures and generically applicable requirements similar to those previously imposed by Commission orders; enhances the ability of licensees to implement certain EP and protective measures in the event of a radiological emergency; and addresses security issues identified after the terrorist events of September 11, 2001. Following incorporation of the attached changes, the Federal Register notice should be reviewed by the Rulemaking, Directives, and Editing Branch in the Office of Administration and forwarded to the Office of the Secretary for signature and publication. It was very beneficial for all stakeholders to have the opportunity to review draft guidance along with the proposed rule language. This is a good practice that, whenever possible, should be utilized as part of our rulemaking process. Any future EP rulemaking should include stronger technical bases for areas such as backup alert and notification system (ANS) and evacuation timing. The staff should re-evaluate the guidance that provides a methodology for evaluating changes to the evacuation time estimates (ETEs) as experience is developed in use of this method. Whenever possible, licensees should be encouraged to establish their Emergency Operating Facilities (EOFs) as close to sites as practical. The Commission looks forward to ultimately receiving the staff s analysis of how we can develop a more performance-based approach to EP.

The staff should continue its stakeholder engagement throughout the implementation period for this rule. On the basis of this engagement, necessary adjustments to the rule and associated guidance may be identified. The staff should strive to finalize the NRC guidance in a timely manner in order to support orderly implementation by licensees and coordination with other affected entities. The staff should report back to the Commission in an information paper upon the completion of the final FEMA REP Manual with an analysis of the impacts the FEMA REP Manual, in its final form, poses for the implementation of the final rule by NRC s licensees. The Commission supports the staff s research in several areas to determine the feasibility of risk-informing EP as noted in SECY 11-0053, and expects that the state-of-the art reactor consequence analysis (SOARCA) project and forthcoming probabilistic risk assessment (PRA) level III initiative in the NRC s Office of Nuclear Regulatory Research should serve to provide the risk-informed technical rationale to support further enhancements of EP requirements and guidance. The staff should document the language from the Statements of Consideration cited in the ACRS s May 18, 2011, letter in an appropriate guidance document before publishing the final rule. The staff should carefully monitor how inspection results from hostile action-based (HAB) exercises impact radiological emergency preparedness (REP) programs. With respect to alert and notification system (ANS) for residents in surrounding communities near nuclear power plants, technology advancements, consideration of backup power systems and lessons learned from natural disasters should continue to be leveraged to ensure all segments of the population are effectively informed in a radiological emergency especially in the instance of widespread power losses. Emergency officials should be encouraged to seek public insights as they plan and resource their REP efforts. After issuance of FEMA guidance the staff should assess stakeholder feedback and inform the Commission if the FEMA guidance adversely affects the timelines for rule implementation schedules outlined in SECY-11-0053. However, the issuance of NRC s final rule should not be delayed as adjustments to implementation schedules have been made in anticipation of these pending changes. Attachment: Changes to the Final Rule in SECY-11-0053

cc: Chairman Jaczko Commissioner Svinicki Commissioner Apostolakis Commissioner Magwood Commissioner Ostendorff OGC CFO OCAA OCA OIG OPA Office Directors, Regions, ACRS, ASLBP (via E-Mail) PDR

Comments and Changes to be Incorporated in the Final Rule Prior to Publication 1. The implementation period for the amended emergency plan change process in the final rule should be 90 days after the final rule s publication in the Federal Register, which would provide time to institute any necessary changes to plant procedures. 2. The current requirement for licensees to obtain NRC approval to locate their EOFs beyond 25 miles should be maintained. 3. The following editorial/typographical edits should be made to the Federal Register Notice. a. Page 7, line 22, revise to read: exercises were will be challenging and did will not b. Page 21, line 9, revise to read: considers it prudent, for hostile action events outside of normal working hours, to fully activate ERO members for off-normal working hour hostile action to c. Page 21, line 24, revise to read:..ris 2006-12, do would not provide d. Page 26, last line, revise to read: Rescue of, and medical attention to, significant e. Page 45, first full paragraph should not be in boldface type. f. Page 56, last sentence (continuing on page 57) should not be in boldface type. g. Page 59, line 10, change license to licensee h. Page 60, line 16, revise to read: based and, as such, compliance i. Page 61, lines 24-25, revise to read: emergency plan, as modified, can continue to be effective. as modified. j. Page 62, line 2, revise to read: maintains the plan s effectiveness. k. Page 62, line 5, revise to read:..standards of 50.47(b), alone l. Page 62, line 15, delete the comma after effectiveness m. Page 76, line 3, revise to read: document and, therefore, would n. Page 76, lines 18-19, revise to read: If this threshold is reached during the decennial period between censuses this threshold is reached, the licensee o. Page 82, lines 1-2, remove underline p. Page 82, line 23, remove the comma after implementation q. Page 89, line12, remove the comma after actions and remove the parenthesis before Although

r. Page 94, line 9, remove the comma after radiological s. Page 99, lines 8-12, revise to read: However, the NRC has determined that, since the alternative facility (or facilities) must have the capability for communication to communicate with the EOF, control room, and site security;, to perform offsite notifications;, and for to conduct engineering assessment activities, including damage control team planning and preparation, then licensees should have flexibility in meeting these requirements based on site-specific characteristics. t. Page 99, line 20, remove the comma after licensee u. Page 106, line 22, remove the extra period after exercise v. Page 107, line 8, add space after among w. Page 107, line 10, revise to read: The NRC believes that, in the current threat environment, nuclear power x. Page 128, paragraph (gg)(1), first line, add a comma after if y. Page 132, heading II. The Preliminary Safety Analysis Report should be in boldface type.