PUBLIC NOTICE. Attn: Mr. Robert Outten 954 Marshall C. Collins Drive Manteo, North Carolina 27954

Similar documents
PUBLIC NOTICE. Attn: Mr. Christopher Layton 1200 Duck Road Duck, North Carolina CB&I 4038 Masonboro Loop Road Wilmington, North Carolina 28409

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

PUBLIC NOTICE. Town of Ocean Isle Beach Attn: Ms. Debbie Smith, Mayor 3 West Third Street Ocean Isle Beach, North Carolina 28469

PUBLIC NOTICE.

PUBLIC NOTICE. Michael Baker International Mr. Edward Smail 4425 Belle Oaks Drive North Charleston, South Carolina 29405

PUBLIC NOTICE Application for Permit

PUBLIC NOTICE Application for Permit

PUBLIC NOTICE Application for Permit

PUBLIC NOTICE. APPLICANT: Town of Holden Beach Attn: Mr. David Hewett, Town Manger 110 Rothschild Street Holden Beach, North Carolina 28462

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NEW ORLEANS DISTRICT 7400 LEAKE AVE NEW ORLEANS LA September 17, 2018 PUBLIC NOTICE

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

JOINT PUBLIC NOTICE. July 16, Leake Avenue Post Office Box 4313 New Orleans, Louisiana Baton Rouge, Louisiana

DEPARTMENT OF THE ARMY NEW ORLEANS DISTRICT, CORPS OF ENGINEERS P. O. BOX NEW ORLEANS, LOUISIANA August 25, 2014 PUBLIC NOTICE

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 1104 NORTH WESTOVER BOULEVARD, UNIT 9 ALBANY, GEORGIA SEPT 1ER

JOINT PUBLIC NOTICE. October 1, 2018

November 20, 2017 PUBLIC NOTICE

July 5, JOINT PUBLIC NOTICE Savannah District/State of Georgia

PUBLIC NOTICE. US Army Corps Of Engineers Wilmington District

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 WEST OGLETHORPE AVENUE SAVANNAH, GEORGIA

Public Notice. In Reply Refer To: Corps File No. LRE S18 Date: September 4, 2018 Expires: September 24, 2018

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 1590 ADAMSON PARKWAY, SUITE 200 MORROW, GEORGIA FEB O

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 1590 ADAMSON PARKWAY, SUITE 200 MORROW, GEORGIA JUN 2 S 2017

PUBLIC NOTICE REQUEST FOR PERMISSION TO ALTER A U.S. ARMY CORPS OF ENGINEERS PROJECT PURSUANT TO 33 U.S.C. SECTION 408

AUG JOINT PUBLIC NOTICE Savannah District/State of Georgia

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 1590 ADAMSON PARKWAY, SUITE 200 MORROW, GEORGIA FEB-f

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2013 SESSION LAW HOUSE BILL 484

July 20, JOINT PUBLIC NOTICE Savannah District/State of Georgia

PONCE DE LEON INLET MANAGEMENT STUDY IMPLEMENTATION PLAN CERTIFICATE OF ADOPTION

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT 1325 J STREET SACRAMENTO CA PUBLIC NOTICE

DEPARTMENT OF THE ARMY GENERAL PERMIT

2017 Nationwide Permit Reissuance

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

REQUEST FOR PERMISSION TO MODIFY A U.S. ARMY CORPS OF ENGINEERS PROJECT UNDER SECTION 408

Scope of Services for Environmental Assessment for Projects

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA JANUARY 25, 2017

Corps Regulatory Program Update

Public Notice of Re-Authorization for General Permit

CESAM-RD-M May 2, 2013 PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS MOBILE DISTRICT

SPD Emergency Procedures and SPK Regional General Permit 8 for Emergency Actions

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 1590 ADAMSON PARKWAY, SUITE 200 MORROW, GEORGIA April 2, 2018

Shellfish Aquaculture Permitting Program Update

MEMORANDUM OF AGREEMENT BETWEEN THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION AND THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY

Lisa Mangione is a Senior Regulatory Project Manager with the Army Corps of Engineers Los Angeles District. She has over 25 years of professional

COORDINATION PLAN. As of November 14, 2011

Public Notice NOTICE ANNOUNCING MINOR MODIFICATIONS TO THE LETTER OF PERMISSION AUTHORIZING TRANSPORATION PROJECTS

Regulatory Guidance Letter 92-01

HARBOR INFRASTRUCTURE INVENTORIES Calumet Harbor, Illinois and Indiana

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA September 21, 2018

HARBOR INFRASTRUCTURE INVENTORIES Michigan City Harbor, Indiana

U.S. Army Corps of Engineers PHILADELPHIA DISTRICT

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA September 21, 2018

DEPARTMENT OF THE ARMY. U.S. Army Corps of Engineers, Los Angeles District. Regulatory Division

Commonwealth Transportation Board Briefing

Gulf Intracoastal Waterway

US ARMY CORPS OF ENGINEERS PERMITTING ARTIFICIAL REEFS

ARMY CORPS OF ENGINEERS. Action Needed to Ensure the Quality of Maintenance Dredging Contract Cost Data

-2- 4) The Corps will ensure the biological assessment is prepared in accordance with the Corps' "Biological Assessment Template."

Marine Minerals Program

THE SECTION 106 REVIEW PROCESS

Page 1 of NATIONWIDE PERMIT (NWP) PROGRAM - SUMMARY - ALABAMA CERTIFICATION & PRE-CONSTRUCTION INFOMATION

Regulatory Division General Information: January 2016

PASPGP-5 REPORTING CRITERIA CHECKLIST

Programmatic General Permit (18-PGP-01) Effective Date: XXXXXX Expiration Date: XXXXXXX

REGIONAL PERMIT. Effective date: August 15, 2013 Expiration Date: August 15, 2018

MEMORANDUM OF UNDERSTANDING COOPERATIVE ECOSYSTEM STUDIES UNITS NETWORK

Update on USACE Civil Works Program Authorities, Policies, and Guidance

Estero Island Restoration. The shoreline from R-176 through R-200, inclusive, has been designated as critically eroded by FDEP.

DEPARTMENT OF THE ARMY PERMIT

Distribution Restriction Statement Approved for public release; distribution is unlimited.

South Sacramento HCP Regional General Permit

STATE ENVIRONMENTAL REVIEW PROCESS FOR PENNSYLVANIA WASTEWATER PROJECTS. Clean Water State Revolving Fund Program

NCDOT Planning Summary for NCTA Projects

Comprehensive Plan for Conservation, Management and Long-term Sustainability of North Carolina s Beaches and Inlets

Safety and Security Zones; New York Marine Inspection and Captain of the Port

Final Supplemental Environmental Impact Statement APPENDIX C: COORDINATION PLAN

INTERGOVERNMENTAL COORDINATION ELEMENT:

TOWNSEND BOMBING RANGE MODERNIZATION

SAFETEA-LU. Overview. Background

PUBLIC NOTICE. Date: January 11,2000. File Number: In Reply Refer To: Ms. Christine Godfrey

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

South Carolina Sea Grant Consortium Leadership by Staff on Boards and Committees

FOREST SERVICE MANUAL NATIONAL HEADQUARTERS (WO) WASHINGTON, DC

Scoping Report April 2018

S One Hundred Seventh Congress of the United States of America AT THE FIRST SESSION

Hurricane Sandy Coastal Resiliency Competitive Grants Program

Environmental Impact Statement/Overseas Environmental Impact Statement (EIS/OEIS) for the Northwest Training Range Complex (NWTRC). An EIS/OEIS is con

Office of Surface Mining Reclamation and Enforcement

NEPA AND PRIVATE AIDS TO NAVIGATION

USACE: An Overview of Alternate Permitting Procedures

REGIONAL PERMIT. Effective Date: August 14, 2013 Expiration Date: August 14, 2018

PENNSYLVANIA STATE PROGRAMMATIC GENERAL PERMIT-4 STANDARD OPERATING PROCEDURES. June 5, 2014

Kauai Regional Sediment Management Plan

Coastal Zone Management Act Section 306A Guidance

Alabama Coastal Area Management Program Strategic Plan

SOUTH FLORIDA/CARIBBEAN COOPERATIVE ECOSYSTEM STUDIES UNIT AMENDMENT TWO TO COOPERATIVE AGREEMENT. between

vessel prepares for and actively off-loads two new Post-Panamax gantry cranes to the

DIVISION 15. ENVIRONMENTAL STANDARDS FOR BEACH AND DUNE PROTECTION*

Georgia Environmental Conference

Department of Army Permit Evaluation Process

Transcription:

US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: February 4, 2019 Comment Deadline: March 6 2019 Corps Action ID Number: SAW-2019-00175 The Wilmington District, Corps of Engineers (Corps) received an application from Dare County seeking Department of the Army authorization to perform year-round maintenance dredging of the federal project within Oregon Inlet and associated connecting channels, located in the Town Nags Head, Dare County, North Carolina. Specific plans and location information are described below and shown on the attached plans. This Public Notice and all attached plans are also available on the Wilmington District Web Site at http://www.saw.usace.army.mil/missions/regulatorypermitprogram.aspx Applicant: AGENT (if applicable): Dare County Attn: Mr. Robert Outten 954 Marshall C. Collins Drive Manteo, North Carolina 27954 Mr. Kenneth Willson, APTIM 4038 Masonboro Loop Rd Wilmington, North Carolina 28409 Authority The Corps evaluates this application and decides whether to issue, conditionally issue, or deny the proposed work pursuant to applicable procedures of the following Statutory Authorities: Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403) Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413)

Location Figure 1. Directions to Site: Oregon Inlet is located between the northern tip of Pea Island and the southern tip of Bodie Island, adjacent to the Atlantic Ocean, in the Town of Nags Head, Dare County, North Carolina. Project Area (acres): 2,500 acres Nearest Town: Town of Nags Head Nearest Waterway: Atlantic Ocean River Basin: Pasquotank

Latitude and Longitude: 35.774365 N, -75.531517 W Existing Site Conditions The project area encompasses the waters between the southern tip of Bodie Island and the northern portion of Pea Island including the ocean bar channel extending offshore and the connecting channels and waters on the Pamlico Sound side of the existing Bonner Bridge. The inlet connects the northern end of Pamlico Sound to the Mid Atlantic Bight region of the Atlantic Ocean. Oregon Inlet is approximately 1.5 miles along its axis and 0.6 miles wide. Bodie Island, which forms the inlet s northern shoulder, is a part of the Cape Hatteras National Seashore (Seashore), which is administered by the National Park Service (NPS). The southern end of Bodie Island, including the Oregon Inlet campground and the Oregon Inlet Marina and Fishing Center, is primarily used for recreation. The southern shoulder of the inlet is home to the Pea Island National Wildlife Refuge (Refuge). The Refuge lies within the boundaries of the Seashore and is administered by the U.S. Fish and Wildlife Service (USFWS). The Refuge consists primarily of barrier island beach, dunes, and coastal wetlands. A former U.S. Coast Guard Station building is at the northern end of Hatteras Island. The Station is listed on the National Register of Historic Places (NRHP). In 1963, the 2.44-mile long Bonner Bridge was constructed and served to connect vehicular traffic along Highway 12 between Bodie Island and Pea Island. The bridge includes a primary navigation span providing 65 feet of vertical clearance above mean high tide and 130 feet horizontal clearance between fenders. An adjacent span with 90 feet of horizontal clearance is often used for navigation as the result of natural channel movement. The primary navigation channel, Oregon Inlet Channel, extends approximately 3 miles and is aligned northeastward in the inlet proper and then turns northwestward to Old House Channel, into Pamlico Sound. Davis Channel, a secondary route just west of Pea Island, runs to the southwest for 2.5 miles and is especially susceptible to shoaling. Because the existing Bonner Bridge is nearing the end of its intended lifespan, the North Carolina Department of Transportation is in the process of constructing a replacement bridge. The new 2.8-mile Bonner Bridge, anticipated to open in the spring of 2019, will be located just west of the existing bridge. The new bridge will include seven navigation spans providing an average of 300 feet of horizontally clearance between spans and a vertical clearance of 70 feet. The navigation zone (navigation span height and width) would be 1,600 to 2,000 feet long. Following the construction of the new bridge, the majority of the original bridge will be demolished with the exception of a 1,000-ft section at the south end that will be repurposed into a fishing pier. Like most inlets, the geomorphology of Oregon Inlet is dynamic. During relatively storm-free periods, an elongated spit forms along the southern shoulder of Bodie Island and the cross-section of the inlet assumes a narrow, but deep configuration with steep banks. However, during times of stormy weather, when Oregon Inlet s shoulders are well-rounded, the configuration is a shallow channel with wide overbanks on one or both sides.

Applicant s Stated Purpose The stated purpose of Dare County s proposed action is to have the ability to operate a yet-to-be-constructed dredge within the confines of Oregon Inlet in a manner that aligns with current USACE maintenance practices within Oregon Inlet. This includes the ability to conduct maintenance dredging on a year-round basis. The need of this action is to maintain the county s, regions, and states economic viability while preserving environmental quality and human safety. Project Description NC Senate Bill 99 (2017) allocated $15 Million to Dare County from the State s Shallow Draft Navigation Channel Dredging and Aquatic Weed Fund to provide a forgivable loan to a private partner for the purchase of a shallow draft hopper dredge to be used under the direction of the Oregon Inlet Task Force (OITF), an advisory body appointed by the Dare County Commission. Although the OITF is to coordinate the use of the new dredge for all shallow draft navigation channels located in waters of the State, this particular action is specific to the confines of Oregon Inlet and certain connecting channels. Maintenance dredging is currently performed by the Wilmington District dredge fleet (sidecast and hopper dredges) pursuant to its 2004 Finding of No Significant Impact (FONSI) entitled, Use of Government Plant to Dredge in Federally Authorized Navigation Projects in North Carolina. Dare County proposes to work under the subject FONSI to utilize the new dredge on a year-round basis at Oregon Inlet. The proposed action will utilize a yet-to-be-constructed, privately owned special purpose dredge in the same manner and under the same conditions as what is currently authorized for the Wilmington District Corps of Engineers (Corps) perform maintenance dredging within the waters in proximity to Oregon Inlet, as defined in the Corps 2004 Finding of No Significant Impact (FONSI) entitled Use of Government Plant to Dredge in Federally Authorized Navigation Projects in North Carolina. The dredging conducted by the privately owned dredge would not replace dredging performed by the Corps dredge fleet; rather it would complement the Corps existing efforts. The dredging dimensions of the current Corps authorization include a 14-feet deep by 400-feet wide channel through Oregon Inlet and the ocean bar. An approximate 16,050- footlong portion of the channel from Oregon Inlet to Hell s Gate (12-feet deep by 100- feet wide) and an approximate 2,850-footlong portion of Old House Channel (12-feet deep by 100-feet wide) in Dare County. Because the Corps authorization allows for the maintenance dredging to follow best water, the footprints of the areas to be dredged are not fixed. A bathymetric survey will be performed prior to each dredge event in an effort to determine the location of the best water for the channel. For the proposed project, a dredge corridor has been developed and will serve as the domain in which dredging could be performed in the future. (Figure 2)

The nearshore disposal sites for material dredged under this authorization would be identical to what is currently authorized by the Corps. These areas include nearshore disposal off the north end of Pea Island and in deep scour holes beneath the Herbert C. Bonner Bridge. Because it is anticipated that the majority of the existing Bonner Bridge will be demolished in the near future, the disposal of material for this proposed action will be limited to the areas surrounding the remaining bridge pilings. The applicant is seeking authorization to be able to perform maintenance dredging on a year-round basis utilizing the yet-to-be-constructed dredge. Utilizing the Corps 2004 EA/FONSI, the dredge will be constructed to the specifications that were developed to reduce the potential impacts to threatened and endangered species. These specifications will be implemented for the operation of the privately owned dredge as well. It is anticipated that the volume of material that will be dredged from the Oregon Inlet bar, as well as the connecting channels, will average between 900,000 and 1,000,000 cubic yards annually. Figure 2. Avoidance and Minimization The applicant has performed an alternatives analysis for this permit action. This included the evaluation of a status-quo alternative and the preferred alternative. The alternatives were identified and evaluated through the scoping and pre-application process, and further

detailed descriptions of these alternatives may be reviewed in the application and associated applicant-prepared Environmental Assessment. Essential Fish Habitat Pursuant to the Magnuson-Stevens Fishery Conservation and Management Act, this Public Notice initiates the Essential Fish Habitat (EFH) consultation requirements. The Corps initial determination is that the proposed project may affect, but not likely to adversely affect EFH or associated fisheries managed by the South Atlantic or Mid Atlantic Fishery Management Councils or the National Marine Fisheries Service. As part of the pre-application and scoping process, a copy of the EA, including an EFH assessment, has been sent to The Nation Marine Fisheries Service for review. Cultural Resources Pursuant to Section 106 of the National Historic Preservation Act of 1966, Appendix C of 33 CFR Part 325, and the 2005 Revised Interim Guidance for Implementing Appendix C, the District Engineer consulted district files and records and the latest published version of the National Register of Historic Places and initially determines that: Should historic properties, or properties eligible for inclusion in the National Register, be present within the Corps permit area; the proposed activity requiring the DA permit (the undertaking) is a type of activity that will have no potential to cause an effect to an historic properties. No historic properties, nor properties eligible for inclusion in the National Register, are present within the Corps permit area; therefore, there will be no historic properties affected. The Corps subsequently requests concurrence from the SHPO (or THPO). Properties ineligible for inclusion in the National Register are present within the Corps permit area; there will be no historic properties affected by the proposed work. The Corps subsequently requests concurrence from the SHPO (or THPO). Historic properties, or properties eligible for inclusion in the National Register, are present within the Corps permit area; however, the undertaking will have no adverse effect on these historic properties. The Corps subsequently requests concurrence from the SHPO (or THPO). Historic properties, or properties eligible for inclusion in the National Register, are present within the Corps permit area; moreover, the undertaking may have an adverse effect on these historic properties. The Corps subsequently initiates consultation with the SHPO (or THPO).

The proposed work takes place in an area known to have the potential for the presence of prehistoric and historic cultural resources; however, the area has not been formally surveyed for the presence of cultural resources. No sites eligible for inclusion in the National Register of Historic Places are known to be present in the vicinity of the proposed work. Additional work may be necessary to identify and assess any historic or prehistoric resources that may be present. The District Engineer s final eligibility and effect determination will be based upon coordination with the SHPO and/or THPO, as appropriate and required, and with full consideration given to the proposed undertaking s potential direct and indirect effects on historic properties within the Corps-indentified permit area. Endangered Species Pursuant to the Endangered Species Act of 1973, the Corps reviewed the project area, examined all information provided by the applicant and consulted the latest North Carolina Natural Heritage Database. Based on available information: The Corps determines that the proposed project would not affect federally listed endangered or threatened species or their formally designated critical habitat. The Corps determines that the proposed project may affect, not likely to adversely affect federally listed endangered or threatened species or their formally designated critical habitat. The Corps initiates consultation under Section 7 of the ESA and will not make a permit decision until the consultation process is complete. The Corps is not aware of the presence of species listed as threatened or endangered or their critical habitat formally designated pursuant to the Endangered Species Act of 1973 (ESA) within the project area. The Corps will make a final determination on the effects of the proposed project upon additional review of the project and completion of any necessary biological assessment and/or consultation with the U.S. Fish and Wildlife Service and/or National Marine Fisheries Service. Other Required Authorizations The Corps forwards this notice and all applicable application materials to the appropriate State agencies for review. North Carolina Division of Water Resources (NCDWR): The Corps will generally not make a final permit decision until the NCDWR issues, denies, or waives the state Certification as required by Section 401 of the Clean Water Act (PL 92-500). The receipt of the application and this public notice, combined with the appropriate application fee, at the NCDWR Central Office in Raleigh constitutes initial receipt of an application for a 401 Certification. A waiver will be deemed to occur if the NCDWR fails to act on this

request for certification within sixty days of receipt of a complete application. Additional information regarding the 401 Certification may be reviewed at the NCDWR Central Office, 401 and Buffer Permitting Unit, 512 North Salisbury Street, Raleigh, North Carolina 27604-2260. All persons desiring to make comments regarding the application for a 401 Certification should do so, in writing, by March 6, 2019 to: NCDWR Central Office Attention: Ms. Karen Higgins, 401 and Buffer Permitting Unit (USPS mailing address): 1617 Mail Service Center, Raleigh, NC 27699-1617 Or, (physical address): 512 North Salisbury Street, Raleigh, North Carolina 27604 North Carolina Division of Coastal Management (NCDCM): Evaluation The application did not include a certification that the proposed work complies with and would be conducted in a manner that is consistent with the approved North Carolina Coastal Zone Management Program. Pursuant to 33 CFR 325.2 (b)(2) the Corps cannot issue a Department of Army (DA) permit for the proposed work until the applicant submits such a certification to the Corps and the NCDCM, and the NCDCM notifies the Corps that it concurs with the applicant s consistency certification. As the application did not include the consistency certification, the Corps will request, upon receipt,, concurrence or objection from the NCDCM. Based upon all available information, the Corps determines that this application for a Department of Army (DA) permit does not involve an activity which would affect the coastal zone, which is defined by the Coastal Zone Management (CZM) Act (16 U.S.C. 1453). The decision whether to issue a permit will be based on an evaluation of the probable impacts including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors that may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, flood plain values (in accordance with Executive Order 11988), land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. For activities involving the discharge of dredged or fill materials in waters of the United States, the evaluation of

the impact of the activity on the public interest will include application of the Environmental Protection Agency s 404(b)(1) guidelines. Commenting Information The Corps of Engineers is soliciting comments from the public; Federal, State, and local agencies and officials, including any consolidated State Viewpoint or written position of the Governor; Indian Tribes and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment (EA) and/or an Environmental Impact Statement (EIS) pursuant to the National Environmental Policy Act (NEPA). Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider the application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. Requests for a public hearing shall be granted, unless the District Engineer determines that the issues raised are insubstantial or there is otherwise no valid interest to be served by a hearing. The Corps of Engineers, Wilmington District will receive written comments pertinent to the proposed work, as outlined above, until 5pm March 6, 2019. Comments should be submitted to Mr. Josh Pelletier, Washington Regulatory Field Office, 2407 West Fifth Street, Washington, North Carolina 27889, at (910) 251-4605.