North Eastern Regional Power Committee

Similar documents
TRIP OF YALLOURN POWER STATION NO KV BUSBAR ON 6 DECEMBER 2015

Generator Interconnection System Impact Study Report Carteret County, NC MW Queue #297 Original Submittal Revision 1

Generator Interconnection Facilities Study Report Franklin County, NC 50.0 MW Solar Farm Queue #384

SOUTHERN REGIONAL POWER COMMITTEE BANGALORE. MINUTES OF THE SPECIAL MEETING ON RGMO/MVAR HELD AT SRPC BANGALORE ON 29 th JANUARY 2014

It is noted that the Unit is taken out from 00:04 hours of

Gujarat Energy Transmission Corporation Limited (GETCO)

Generator Interconnection Impact Study Report Bladen County, NC 75.0 MW Solar Farm Queue #377

Generator Interconnection Impact Study Report Wayne County, NC 20.0 MW Solar Farm Queue #364

Organization Address Tele/Fax No./

OC Approved 2/17/05 SB/DS Stability Limits for the addition of 3.26% Series Reactor

Summary of ARR & Fees and Charges for SLDC Filings. Submitted by SLDC. For FY

107 FERC 61,053 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Recruitment Rules for the post of Staff Car Driver (Special Grade)

Solar Energy Corporation of India Limited New Delhi

KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION LIMITED PÀ

RG 102 Accreditation for the Inspection of Non-public High Voltage Electrical Systems

Outage dates (duration): September 5, 1996 to May 27, 1999 (2.7 years) Reactor age when outage began: 8.8 years

ELECTION COMMISSION OF INDIA

The North Eastern Management Association (NEMA)

j. Billing procedure k. Periodical Inspections Page 1

PAKISTAN CIVIL AVIATION AUTHORITY REQUEST FOR PROPOSAL ENERGY PERFORMANCE CONTRACT AT JINNAH INTERNATIONAL AIRPORT

Invitation to Submit Expression of Interest and Proposal

(TO BE PUBLISHED IN THE GAZETTE OF INDIA, PART II, SECTION 3, SUB-SECTION (i) )

Uttar Gujarat Vij Company Limited

Experience Two year experience in the field of Networking/Programming/ Software Development etc.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) )

Speed Post. New Delhi dated the 8 th September, The Chief Secretaries of All the State Govts. (As per list attached)

TRANSMISSION TRANSMISSION SYSTEM OPERATIONS DIVISION

Siemens Power Academy Lagos Course Schedule

A. General provisions and other electrical systems are specified in other Sections of Division 26.

Bio Energy #1 Distribution Generator Interconnections Less than 35 kv

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Heritage Grants - Receiving a grant. Mentoring and monitoring; Permission to Start; and Grant payment

Electric Reliability Organization Event Analysis Process Phase 2 Field Test Draft May 2,

Minutes of the Canadian Nuclear Safety. Commission (CNSC) Meeting held on. January 26, 2017

Report Documentation Page

PROCUREMENT PLAN. Procurement of Goods and Works Method Threshold Comments. Consulting Services

CIRCULAR. Subject: - Draft Recruitment Rules for various Group 'C' posts in National Zoological Park.

Copy for Kind information : ED (Commercial & RC) / ED (NRTS-I) / COO (BDD) / ED (Engg-TL & SS)

The Provision and Use of Work Equipment (PUWER) Policy

Transmission Planning Attachment K Public Input Meeting

FERCI MODEL SOPs. [The IEC members (author/s, reviewer/s) and Chairperson will sign and date the SOP on this first page]

DEPARTMENT OF FACILITIES MANAGEMENT MAINTENANCE AND SERVICES INVITATION TO TENDER

Powered by Safety. Powell Training Catalog

Vacancy Notice No. RCIL/2014/P&A/44/37 (ii) NER

P A N E L B O A R D S C H E D U L E

ELECTRICIDADE DE MOÇAMBIQUE, E.P. com energia construimos futuro

Standard Development Timeline

[Case No. 10 of 2016]

1 Confirmation of the Minutes of the 140 th Meeting of OCC of SRPC held on 08 th February 2018 at SRPC, Bangalore

Summary Report for Individual Task E-1069 Maintain the KVG-72(*) Status: Approved

Summary Report for Individual Task E-1102 Repair Communications System Control C-6533(*)/ARC Status: Approved

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) )

NATIONAL NUCLEAR REGULATOR

GoI-UNDP Disaster Risk Management Programme. Project Management Board (PMB) GoI-UNDP Disaster Risk Management Programme [ ] Agenda Notes

Roadmap for Implementation of Renewable Energy Certificate Mechanism for India. Guidelines and Operating Rules for Monitoring Institution(s)

WECC Standard VAR-002-WECC-2 Automatic Voltage Regulators

If any queries arise ESB Networks DAC can be contacted at or

No: GTU/ITAP/2018/ 4046 Date: 31/05/2018 CIRCULAR

ARMED FORCES TRIBUNAL, REGIONAL BENCH, KOCHI

Standard NUC Nuclear Plant Interface Coordination

4.2.2 Transmission Owners Transmission Planners Transmission Service Providers Balancing Authorities.

ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN, UNIT VIII, BHUBANESWAR *** *** ***

Revised National Tuberculosis Control Programme TRIBAL ACTION PLAN

ASBESTOS MANAGEMENT POLICY

CITY OF COFFEYVILLE, KANSAS REQUEST FOR PROPOSALS FOR ELECTRICAL ENGINEERING, SUBSTATION MAINTENANCE, TESTING & SUPPORT SERVICES

NOTICE FOR THE EXPRESSION OF INTEREST (EOI) : (REVISED)

XXXXX Kwalsa Phase II Project. Interconnection Facilities Study and Project Plan

Consumer User Manual for Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

DSO Non GPA Process. November 2010 Version 8

Clean Technology Fund Grant Agreement

NATIONAL ZOOLOGICAL PARK MATHURA ROAD, NEW DELHI

SURAT SMART CITY DEVELOPMENT LTD.

GE Energy Connections

Open Category Applicants

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT COMPLIANCE DEPARTMENT COM 2035

NPCC Tasks Related to NERC Blackout Recommendations Timeline

VIA ELECTRONIC FILING

VREDENDAL SOLAR POWER PARK (PTY) LTD.

STATE NURSING COUNCIL CONTACT ADDRESS (O) (O) (F) (O) (F)

No. APNMC/1010/2014 Dt This is to inform you that A.P. Nurses and Midwives Council had resolved in its

Health and Safety Roles, Responsibilities and Organisation

Scheme of Merit cum means based scholarship to students belonging to minority communities.

GOVERNMENT OF INDIA MINISTRY OF DEFENCE (DGQA) SENIOR QUALITY ASSURANCE ESTABLISHMENT(ARMTS) & LPR KHAMARIA, JABALPUR

PROMOTING REGIONAL ELECTRICITY TRADE IN CENTRAL ASIA. Paul Vallely Program Leader Central Asia Regional Office 6 September 2017

Incident Management Plan

OUR: (a) Total 10 seats (b) AIM: (c) OBJECTIVES: Admission procedure for the academic session : (a) Distribution of seats:

Welcome to this meeting on July 21, 2017

City and County of San Francisco LIFELINES COUNCIL. MEETING NOTES Meeting #9 Developing the Lifelines Council Work Program

Emergency Operations Plan

Aboriginal Group Communication Plan Annual Report. Site C Clean Energy Project

STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-2, SUB 1089 BEFORE THE NORTH CAROLINA UTILITIES COMMISSION

Request for Empanelment (RFE) of. Facilitators

TECHNICAL DAYS, APRIL 2017 ABB Plant Fingerprint Assessment Optimizing Operations. Fernando Tobar, Country Service Manager

Minutes of Part 1 of the Merton Clinical Commissioning Group Governing Body Tuesday, 26 th January 2016

Department of Economic Analysis & Research, NABARD

National Conference on Power System Protection February 2015, Bangalore, India

CWE Flow-based Market Coupling Project

1st Workshop Federal Grid Code

Transcription:

North Eastern Regional Power Committee Minutes of 28 th Operation Coordination Committee meeting Date: 09/07/2008 Venue: Conference Hall, NERPC Shillong Shri B. Lyngkhoi, Assistant Secretary, NERPC welcomed all the participants to the 28 th OCC meeting. He informed the members that Shri A. Magudapathi, Member Secretary; NERPC was admitted in NEIGHRIMS hospital on 23 rd June, 2008 due to heart ailment and he could not attend the meeting. He requested the members to remember him in prayers for his speedy recovery. He expressed his appreciation to Member Secretary that in spite of the doctor s advise to take one month rest he always remained active by monitoring the day to day activities of NERPC from his residence. He then requested Shri L.K.Kanungo, GM, NERLDC to chair the meeting. GM, NERLDC welcomed all the participants in the 28 th OCC meeting and invited the participants to deliberate on the agenda items so that the meeting could be fruitful. Then the agenda items were taken up. List of participants is at Annexure-I. Confirmation of the minutes of 27 th Operation Coordination Committee meeting of NERPC held at Shillong. GM, NERLDC wanted certain amendments in the minutes vide letter No. NERLDC/GM dated 07.07.2008. The same was read out by Assistant Secretary and agreed by constituents except the Item No. 7 which could not be finalized due to non-participation by Tripura. With these modifications as enclosed at Annexure V, the minutes were taken as confirmed as there were no comments or observations from any other constituent members. Shutdown of GTG #3 of AGBPP from 14.07.2008 to 108.2008 for Hot Parts Inspection & Generation Overhauling NEEPCO NEEPCO representatives informed that the Unit #3 of AGBPP is required to be inspected thoroughly so that the machine may generate efficiently during the lean hydro period. After deliberation, it was agreed that shutdown of GTG # 3 of AGBPP was required and it may be availed accordingly from 13.07.2008 to 108.2008. 3. Generation planning NERLDC. After deliberation, it was felt that generation of Loktak need be reduced to conserve water for lean hydro season since the reservoir level is low. In absence of NHPC representative, it was agreed that NHPC would be intimated about the decision by NERPC regarding the matter. Other generators may be scheduled as per their daily declared availability. 1

GM, NERLDC expressed concern about the present low water level of Barapani Lake as compared to last year and enquired from MeSEB representative about their generation planning in case the monsoon fails. He requested MeSEB to plan judiciously to avoid commercial implications. MeSEB representative informed that they are looking into this matter and accordingly necessary steps will be taken. 4. Outage planning for Generator & Transmission elements NERLDC Refer to Annexure-II. NEEPCO representative stated that shutdown of transmission lines of 132 KV Doyang Dimapur Lines will affect their generation as Doyang HEP is running under full capacity. GM, NERLDC enquired the loading capacity of 132 KV Doyang Dimapur line. AGM, NERTS informed that each circuit line can carry not more than 55 MW. NEEPCO informed that Doyang Mokokchung line & Doyang Kohima line are out of service and this will hamper the generation of Doyang HEP in case shutdown of any 132 KV Doyang Dimapur line. They requested NERPC to write to Department of Power, Nagaland to restore the above lines. Assistant Secretary informed that they will write again to DOP, Nagaland and enquired about the status of these lines. 5. 6. 7. Review of grid performance in the previous month: NERLDC presented the details regarding the performance of the grid for the month of June 2008 before taking up the agenda items. Refer Annexure III. Major grid disturbances in the previous month (June 2008): There was one minor grid disturbance which was discussed. Refer Annexure IV. Additional items: 1) Referring to the inquiries raised by NEEPCO, Shri Lalrinsanga, E.E NERPC requested GM, NERLDC to explain the scheduling procedure followed for hydro stations as per the latest CERC order. GM, NERLDC briefly explained that as per the latest CERC regulation, over/under generation in the 1 st day is reflected in the schedule of the 4 th day through a simple formula. Since the declared capacity of a station is, in general, not allowed for revision except under few defined contingencies, the schedule of the 4 th day may therefore be more/less than the Declared Capacity of 4 th day depending on actual generation of the station over its schedule generation in the 1 st day. 2

The underlying concept is; if a station/generator earns UI by over generating in the 1 st day, it has to return back UI on the 4 th day as its schedule will be jacked up by quantum of excess generation on the 1 st day over its DC on 4 th day. He advised NEEPCO to monitor the actual generation accordingly. 2) There was a proposal from ASEB that elements like CTs, PTs, Circuit Breakers, Relays, etc of a specific brand and make may be procured on a common pool basis so that system availability could be improved through quick restoration by replacing the defective elements with healthy spares available in the common pool. After deliberation it was felt that the OCC of NERPC is not the right forum to resolve such issues and this may be discussed in PCC meeting and its recommendations put up to RPC of NER for a decision. Assistant Secretary, informed that as per the CBR of NERPC, PCC is scheduled to be held in every 3 (three) months. However if the members felt necessary to discuss the important issues, PCC meeting could be conducted along with OCC meeting. 3) Change of courses by rivers POWERGRID. As agreed in the 9 th CCM, POWERGRID gave a presentation regarding change of courses by rivers. Photographs of such change of courses in few locations were depicted. It was agreed that re-structuring of towers at such critical locations were essential and approval may be taken from the forthcoming RPC meeting to be held in the month of August 2008. GM, NERLDC enquired from PGCIL the number of towers which are critical so that the replacement and approval can be taken up. AGM, NERTS informed that at present only one tower (Loc No. 529)is critical and needs to be replaced immediately with Pile foundation structure. Other towers are under observation and if necessary they will intimate accordingly. POWERGRID also depicted pictures of damaged transformer at Nirjuli Sub station of PGCIL caused due to frequent trippings of 33 KV feeders of Arunachal Pradesh on fault. PGCIL informed that there may not be much difference in the cost of repairing and the cost of new transformer and hence proposed to buy a new transformer instead of repairing. Members felt that this issue is pertaining to Arunachal Pradesh. PGCIL can take up the matter with them and in case of any replacement/repair; Arunachal Pradesh has to bear the expenditures, since the said transformer is utilized only by this State. 8. Date and venue of next OCC. The Date for the next OCC has been fixed on 05 th August, 2008. The meeting will be held in the Conference Hall of NERPC, Shillong. 3

Annexure I LIST OF PARTICIPANTS IN THE 28 th O.C.C MEETING OF NERPC S. N. NAME OF PARTICIPANT DESIGNATION ARUNACHAL PRADESH ASEB A.K. Saikia H. Hazarika MANIPUR K.Jila Singh Sr. Manager, SLDC DGM, LDC E.E (E) MEGHALAYA T. Gidon A.E.E, SLDC MIZORAM H. Zonunsanga H. Lalnunsanga NAGALAND TRIPURA E.E, SLDC A.E, SLDC NEEPCO 3. 4. H. K. Changmai Akhtar Hussain Bhaskar Goswami B. R. Bhattacharya DGM DGM (E) Sr. Manager (E) Manager NERLDC L.K.Kanungo Sh. T. S. Singh 3. N.R. Paul 4. A. Mallick 5. S.K.Saha NERTS (PGCIL) A. Patir Somiran Das G. M DGM Chief Manager Chief Manager Deputy Manager AGM (O&M) Deputy Manager (OS) NHPC Trading Companies NERPC B. Lyngkhoi Lalrinsanga 3. S. M. Aimol 4. G. Medhi Assistant Secretary E.E. (Coml.) A.E.E A. E 4

Annexure II Proposed Shut down Program of POWERGRID Elements for the month of July, 08 S/N NAME OF T/L S/D DATE S/D TIME PURPOSE FEEDERS AFFECTED 1 132 KV Jiribam Loktak II 17.07.08 & 18.07.08 Jiribam Loktak II 2 132 KV Jiribam Aizawl 24.07.08 & 25.07.08 Jiribam Aizawl 3 132 KV Khandong Khliehriet - I 207.08 Khandong Khliehriet -I 08:00hrs 4 132 KV Badarpur Kolasib 107.08 to AMP Badarpur - Kolasib 16:00hrs 5* 132 KV Doyang Dimapur - I 16.07.08 Doyang-Dimapur I 6* 132 KV Doyang Dimapur - II 18.07.08 Doyang-Dimapur II 7 220 KV Kathalguri - Misa * Sl. No 5 & 6 subject to availability 207.08 & 23.07.08 Kathalguri - Misa S/D Program for POWERGRID sub-stations/bays/icts/reactors:- S/N NAME OF SUB-STATION/BAYS/ICT/ REACTOR S/D DATE S/D TIME PURPOSE AREAS/FEEDERS AFFECTED 1 33kV, 25 MVAR Tertiary Reactor-IV bay at Misa 16.07.08 08:00hrs to 14:00hrs AMP Tertiary Reactor- IV 5

Annexure-III Frequency Duration in IEGC ranges during 01-06-2008 to 30-06-2008 6.03 F<49 49<F<=50.5 93.93 F>50.5 Frequency Duration in relevant ranges during 01-06-2008 to 30-06-2008 175 36 6.03 F<49 49<F<=50 50<F<50.3 50.3<F<50.5 F>50.5 80.82 6

Annexure - III Frequency Profile Frequency profile during the period 01-06-2008 to 30-06-2008 500 50.59 Frequency(Hz) 50.00 49.00 48.67 48.00 1/4/08 3/4/08 5/4/08 7/4/08 9/4/08 11/4/08 13/4/08 15/4/08 17/4/08 19/4/08 21/4/08 23/4/08 25/4/08 27/4/08 29/4/08 Date MAX MIN AVG 50.7 FREQUENCY DURATION CURVE FOR JUNE'2008 50.5 50.3 50.1 49.9 Hz 49.7 49.5 49.3 49.1 48.9 48.7 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% % OF TIME 7

Annexure - III Voltage Profile Voltage profile of Imp. S/stns during the period 01-06-2008 to 30-06-2008 MAX MIN 20 Voltage (p.u.) 10 00 0.90 04 01 06 01 04 03 04 00 05 0.94 03 0.96 03 0.97 04 0.95 03 0.96 02 0.98 03 0.94 0.80 0.70 SALAKATI MISA400 MISA220 DMPR220 MRIANI IMPHAL K'PARA HFLONG AIZAWL K'GHAT NIRJULI MAWLAI Substations Voltage Profile Average Voltage Profile at 8:00 & 20:00 hrs of Jun2008 10 P.U. value 05 00 0.95 0.90 01 00 01 00 01 00 05 03 04 03 03 03 0.98 0.96 01 00 0.98 0.96 0.98 0.96 0.97 00 0.98 00 0.98 0.95 04 02 00 0.97 0.85 0.80 0.75 DMPR132 DMPR220 MISA220 MISA400 BALIPARA B'GAON IMPHAL HAFLONG JIRIBAM Substations AIZAWL K'GHAT K'HLT K'PARA MAWLAI SALAKATI NIRJULI BDR'PUR 8:00 hrs 20:00 hrs IEGC NORMS SL NO. SYSTEM VOLTAGE KV PU 1 400 KV 360KV 420KV 0.9 05 2 220 KV 200KV 245KV 0.9 11 3 132 KV 120KV 145KV 0.9 09 8

Annexure - III Schedule versus actual energy generation( Ex-Bus MU ) during 01-06-2008 to 30-06-2008 8389 8401 750 Ex-Bus MU 550 350 150-50 217.99 218.97 148.79 146.49-30 577 53.63 0.86 29.15 29.08-0.06 93.01 93.50 0.49 263 23.65 02 266 23.04 0.38 143.19 146.20 3.02 444 45.74 3.30 60.26 54.47 0.00 6.24 6.24 8.13 RHEP Kathal AGTPP KHD+KOP2 KOP DHEP Loktak Assam+DLF MeSEB Tripura -5.79 Nagaland N.E. region Utility SCHED *ACTUAL ACT-SCH 20:00 Hrs MW ( Average ) 1350 1150 950 750 550 350 150-50 3874 366 RHEP -16.74 Schedule versus actual MW generation at 20:00 hrs during 01-06-2008 to 30-06-2008 (period's average) 210.10 216 Kathal 6.37 76.03 76 0.03 53.90 53-0.77 165.73 162-4.03 447 43 0.33 693 63 30 2300 240 8.31 910 99 7.34 800 79-46 16.00 0 AGTPP KHD+KOP2 KOP DHEP Utility Loktak Assam+DLF MeSEB Tripura Nagaland -16.00 1414.01 1398 N.E. region -16.31 SCHED ACTUAL ACT-SCH Net Export to Eastern Region Note: Schedule corresponds to 20-21 Hrs Schedule Actual Act-Sch MU 49.87 137.94 88.07 MW, 20:00 255 70.17 47.62 Average VIOLATION BY GENERATORS NOT REPORTED 9